BioMass PDU Electrical Design Study UPDATE

The BioMass Process Demonstration Unit (PDU) electrical system is used for the power distribution and control of the many motors and process required loads. Study requirements include a complete system analysis and equipment evaluation, which includes conductor sizing, transformer sizing, breaker and fuse sizing, short-circuit analysis, load-flow analysis, protective-device coordination, arc-flash-hazard analysis, and a multi-state code and grounding review.

09 BIOMASS FUELS↗

Rapid Automated Dissolution and Analysis Techniques for Radionuclides in Recycle Process Streams

The analysis of process samples for radionuclide content is an important part of current procedures for material balance and accountancy in the different process streams of a recycling plant. The destructive sample analysis techniques currently available necessitate a significant amount of time. It is therefore desirable to develop new sample analysis procedures that allow for a quick turnaround time and increased sample throughput with a minimum of deviation between samples. In particular, new capabilities for rapid sample dissolution and radiochemical separation are required. Most of the radioanalytical techniques currently employed for sample analysis are based on manual laboratory procedures. Such procedures are time- and labor-intensive, and not well suited for situations in which a rapid sample analysis is required and/or large number of samples need to be analyzed. To address this issue we are currently investigating radiochemical separation methods based on extraction chromatography that have been specifically optimized for the analysis of process stream samples. The influence of potential interferences present in the process samples as well as mass loading, flow rate and resin performance is being studied. In addition, the potential to automate these procedures utilizing a robotic platform is evaluated. Initial studies have been carried out using the commercially available DGA resin. This resin shows an affinity for Am, Pu, U, and Th and is also exhibiting signs of a possible synergistic effects in the presence of iron.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WECC Variable Generation Planning Reference Book: Appendices

The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

Makarov, Yuri V.↗

High Efficiency Structural Flowthrough Rotor with Active Flap Control: Volume Zero: Overview and Commercial Path

The Zimitar one-piece rotor primary structure is integrated, so balanced thrust and gravity loads flow through the hub region without transferring out of its composite material. Large inner rotor geometry is used since there is no need to neck down to a blade root region and pitch bearing. Rotor control is provided by a highly redundant, five flap system on each blade, sized so that easily handled standard electric linear actuators are sufficient.

17 WIND ENERGY↗

High Efficiency Structural Flowthrough Rotor with Active Flap Control: Volume One: Preliminary Design Report

The Zimitar one-piece rotor primary structure is integrated, so balanced thrust and gravity loads flow through the hub region without transferring out of its composite material. Large inner rotor geometry is used since there is no need to neck down to a blade root region and pitch bearing. Rotor control is provided by a highly redundant, five flap system on each blade, sized so that easily handled standard electric linear actuators are sufficient.

17 WIND ENERGY↗

High Efficiency Structural Flowthrough Rotor with Active Flap Control: Volume Two: Innovation & Cost Of Energy

The Zimitar one-piece rotor primary structure is integrated, so balanced thrust and gravity loads flow through the hub region without transferring out of its composite material. Large inner rotor geometry is used since there is no need to neck down to a blade root region and pitch bearing. Rotor control is provided by a highly redundant, five flap system on each blade, sized so that easily handled standard electric linear actuators are sufficient.

17 WIND ENERGY↗

High Efficiency Structural Flowthrough Rotor with Active Flap Control: Volume Three: Market & Team

The Zimitar one-piece rotor primary structure is integrated, so balanced thrust and gravity loads flow through the hub region without transferring out of its composite material. Large inner rotor geometry is used since there is no need to neck down to a blade root region and pitch bearing. Rotor control is provided by a highly redundant, five flap system on each blade, sized so that easily handled standard electric linear actuators are sufficient.

17 WIND ENERGY↗

System Impact Study of the Eastern Grid of Sumba Island, Indonesia: Steady-State and Dynamic System Modeling for the Integration of One and Two 850-kW Wind Turbine Generators

The goal of this project was to study the impact of integrating one and two 850-kW wind turbine generators into the eastern power system network of Sumba Island, Indonesia. A model was created for the 20-kV distribution network as it existed in the first quarter of 2015 with a peak load of 5.682 MW. Detailed data were collected for each element of the network. Load flow, short-circuit, and transient analyses were performed using DIgSILENT PowerFactory 15.2.1.

17 WIND ENERGY↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2016 Open and Closed Loop Test Plan

To demonstrate and validate the performance of the wide-are a damping control system, the project plans to conduct closed-loop tests on the PDCI in summer/fall 2016. A test plan details the open and closed loop tests to be conducted on the P DCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the result s from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Models and methods for assessing the value of HVDC and MVDC technologies in modern power grids

This report reflects the results of U.S. Department of Energy’s (DOE) Grid Modernization project 0074 “Models and methods for assessing the value of HVDC [high-voltage direct current] and MTDC [multi-terminal direct current] technologies in modern power grids.” The work was done by the Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) in cooperation with Mid-Continent Independent System Operator (MISO) and Siemens. The main motivation of this study was to show the benefit of using direct current (DC) systems larger than those in existence today as they overlap with the alternating current (AC) systems. Proper use of their flexibility in terms of active/reactive power control and fast response can provide much-needed services to the grid at the same time as moving large blocks of energy to take advantage of cost diversity. Ultimately, the project’s success will enable decision-makers and investors to make well-informed decisions regarding this use of DC systems. This project showed the technical feasibility of HVDC macrogrid for frequency control and congestion relief in addition to bulk power transfers. Industry-established models for commonly used technologies were employed, along with high-fidelity models for recently developed HVDC converter technologies; like the modular multilevel converters (MMCs), a voltage source converters (VSC). Models for General Electric Positive Sequence Load Flow (GE PSLF) and Siemens Power System Simulator (PSS/E), widely used analysis programs, were for the first time adapted to include at the same time both Western Electricity Coordinating Council (WECC) and Eastern Interconnection (EI), the two largest North American interconnections. The high-fidelity models and their control were developed in detail for MMC system and extended to HVDC systems in point-to-point and in three-node multi-terminal configurations. Using a continental-level mixed AC-DC grid model, and using a HVDC macrogrid power flow and transient stability model, the results showed that the HVDC macrogrid relieved congestion and mitigated loop flows in AC networks, and provided up to 24% improvement in frequency responses. These are realistic studies, based on the 2025 heavy summer and EI multi-regional modeling working group (MMWG) 2026 summer peak cases. This work developed high-fidelity models and simulation algorithms to understand the dynamics of MMC. The developed models and simulation algorithms are up to 25 times faster than the existing algorithms. Models and control algorithms for high-fidelity models were designed and tested for point-to-point and multi-terminal configurations. The multi-terminal configuration was tested connecting simplified models of EI, WI, and Electric Reliability Council of Texas (ERCOT). The developed models showed up to 45% improvement in frequency response with the connection of all the three asynchronous interconnections in the United States using fast and advanced DC technologies like the multi-terminal MMC-DC system. Future work will look into developing high-fidelity models of other advanced DC technologies, combining high-fidelity models with the continental-level model, incorporating additional services. More scenarios involving large-scale HVDC and MTDC will be evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Novel Concept for Flexible and Resilient Large Power Transformers

This feasibility study investigates a flexible and adaptable LPT design solution which can facilitate long-term replacement in the event of both catastrophic failures as well as scheduled replacements, thereby increasing grid resilience. The scope of this project has been defined based on an initial system study and identification of the transformer requirements from an overall system load flow perspective.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Microgrid Energy Management System Integration with Advanced Distribution Management System

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Light Summer Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 light summer base case.

25 ENERGY STORAGE↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Heavy Summer Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 heavy summer base case.

25 ENERGY STORAGE↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Dual Export Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2014 dual export base case.

25 ENERGY STORAGE↗

Development of an Integrated Distribution Management System

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Network Reduction Algorithm for Developing Distribution Feeders for Real-Time Simulators: Preprint

As advanced grid-support functions (AGF) become more widely used in grid-connected photovoltaic (PV) inverters, utilities are increasingly interested in their impacts when implemented in the field. These effects can be understood by modeling feeders in real-time systems and testing PV inverters using power hardware-in-the-loop (PHIL) techniques. This paper presents a novel feeder model reduction algorithm using a Monte Carlo method that enables large feeders to be solved and operated on real-time computing platforms. Two Hawaiian Electric feeder models in Synergi Electric's load flow software were converted to reduced order models in OpenDSS, and subsequently implemented in the OPAL-RT real-time digital testing platform. Smart PV inverters were added to the real-time model with AGF responses modeled after characterizing commercially available hardware inverters. Finally, hardware inverters were tested in conjunction with the real-time model using PHIL techniques so that the effects of AGFs on the choice feeders could be analyzed.