Capturing Historic Reliability Performance Through Graph Databases: A Model Based System Engineering Approach

With the goal of improving the performance and reliability of high dependable technological systems such as nuclear power plants, advanced monitoring and health management systems are employed to inform system engineers on observed degradation processes and anomalous behaviors of assets and components. This information is captured in the form of large amount of data which can be heterogenous in nature (e.g., numeric, textual). Such large data availability poses challenges when system engineers are required to parse and analyze them in order to track historic reliability performance of assets and components. This paper tackles directly this challenge by providing means to organize data in the form of a graph: a knowledge graph. The presented approach distinguish itself from current knowledge graph-based methods by the fact that model-based system engineering (MBSE) models are used to “put data into context”. In particular, MBSE models are used as skeleton of a knowledge graph; numeric and textual data elements, once processed, are associated to MBSE model elements. Thus, a knowledge graph captures both system architecture (though MBSE models) and health/performance data. Such feature opens the door to new data analytics methods designed to identify causal relations between observed phenomena.

97 - MATHEMATICS AND COMPUTING↗

Data Analytics Methods to Measure Plant Outage Resilience

Every 18 or 24 months nuclear power plants (depending on plant configuration, pressurized or boiling water reactor respectively) undergo a period of outage where the plant is taken offline and a large number of maintenance and surveillance activities (that cannot be performed while plant is running) are performed in typically 2–3 weeks. Planning of a plant outage is very challenging since all the activities are required to be performed in the shortest amount of time given available resources (typically contractor crews hired for the duration of the outage). Consequently, plant outages can be costly due the actual loss of power generation and crew costs and, because of it, there is a need to maximize resource usage in the outage planning phase and reduce the risk of outage delays. This paper is addressing these needs by providing a set of analytical methods designed to analyze plant outage schedule and identify critical elements based on available resources (time and crews). These methods are based on natural language processing and optimization algorithms. In this respect, two classes of methods have been developed: one that focuses on the time resource and how variability in the time to complete outage tasks may impact outage delays, and one that minimizes the risk of outage delays by integrating available resources to assess when daily activities should be performed.

97 - MATHEMATICS AND COMPUTING↗

Model-Based Approaches to Generate Knowledge from Data in a Plant Reliability Context

One challenge that nuclear power plant system engineers are facing is continuous generation of an extremely large amount of equipment reliability (ER) data. These data elements come in textual (e.g., condition reports) and numeric (e.g., generated by monitoring systems) forms. They provide system engineers with valuable insights and information by discovering anomalous behaviors or degradation trends, identifying possible causes behind such behaviors and trends, and predicting their direct consequences. This paper directly targets the knowledge generation from ER data by putting “data into context.” We employ model-based system engineering (MBSE) of systems and assets to represent and capture their architecture and functional (i.e., cause-effect) relations. ER data elements are processed by first identifying which of the developed MBSE elements they are referring to. This task is harder for textual data since the information contained in issue or maintenance reports needs to be “understood” by a computational tool. We called this process “knowledge extraction” since our methods extract knowledge from textual data. Last, once numeric and textual ER data elements have been processed and “understood,” we discover possible cause-effect relations among them. This is performed by observing whether a logical connection through the MBSE models exists, and if there is a temporal relationship among them. The logic and temporal are the two main ingredients to perform “machine reasoning” from ER data.