Search NASASearch

SEARCH · Search NASA

Results for “Nuclear Power Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

480 records · Page 4

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DEFE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS

Working Fluid Characterization and Performance Assessment of Subcritical Organic Rankine Cycles Based on the Lee–Kesler Approach for Energy Recovery

Here, a generalized model using the Lee–Kesler approach based on the corresponding states principle is developed to assess the performance of subcritical Organic Rankine Cycles operating with different working fluids. Each fluid is characterized by five parameters: the acentric factor, critical temperature, critical pressure, molar mass, and the ideal-gas ratio of specific heats at the critical temperature. The model was developed using the compressibility factor modified version of the Benedict–Webb–Rubin equation proposed by Lee and Kesler and the enthalpy and entropy functions to calculate thermodynamic state properties. The model was validated by comparing the results calculated with the model and working fluid thermodynamic properties obtained with the CoolProp database. This comparison was conducted for 91 working fluids, obtaining a relative error below 5% for 88 out of the 91 fluids (∼97%). A generalized parametric study was conducted to determine the influence of the pinch point and each fluid parameter on the performance of Organic Rankine Cycle (ORC) systems. It was found that efficiency increases with critical temperature, ideal-gas ratio of specific heats at the critical temperature, and acentric factor, reaching up to 13%. The developed model enables the evaluation of ORC system performance for existing working fluids. It also allows the formulation and evaluation of new fluids to enhance the performance of the ORC while retrieving energy from any kind of source; and likewise, the methodology can be applied to other power generation cycles.

24 POWER TRANSMISSION AND DISTRIBUTION

Value of Geothermal Energy Storage for Supply-Side and Demand-Side Applications

This report presents the results of a study examining the value potential for geothermal energy storage (GES), a long-duration energy storage resource that stores thermal and/or geomechanical energy in the subsurface. GES could benefit the overall U.S. power system by temporally shifting electricity generation (supply-side) or meeting building heating and cooling load (demand-side). This report analyzes supply-side and demand-side opportunities independently because of differences in applications and models. Currently there is significant uncertainty about the development costs for GES, with only a limited number of demonstration plants for electric energy storage and building heating and cooling storage developments. In this report, we estimate the value of supply-side and demand-side GES to the bulk power system in the contiguous United States. Because of the significant uncertainty about GES development costs, this analysis does not consider GES deployment costs but instead focuses on the value of GES to the U.S. electricity system. The estimated values of GES provide reference points for economically competitive commercial cost targets. Supply-side GES is modeled as part of an enhanced geothermal system (EGS) generation plant in NREL's Regional Energy Deployment System (ReEDS) capacity expansion model (Ho et al. 2021). In contrast to conventional geothermal plants, which generate constant power, EGS plants have unique features that may allow for in-reservoir energy storage for flexible generation. Demand-side GES for heating and cooling, including seasonal hot and cold storage and short-duration heat pump storage, is incorporated into a price-taker model using Cambium electricity marginal cost projections. To establish an upper bound for the value of GES, analysis focused on favorable scenarios for storage with high generation from zero marginal cost, variable renewable energy resources. High penetrations of variable renewable energy generation can increase hourly electricity price variability, which increases the value of temporal energy arbitrage for storage technologies like GES.

15 GEOTHERMAL ENERGY

India Power Sector Reliability Analysis [Slides]

The objective of the study is to assess pathways for India to achieve its 2070 power sector goals reliably and cost-effectively by considering various supply- and demand-side factors to support planning by national stakeholders including the Central Electricity Authority (CEA).

08 HYDROGEN

EXERGETIC: De-Risking Next-Generation Resilient Geothermal Hybrids via At-Scale Evaluation Using Virtual Emulation Digital Twin Environment for Efficient Operation

The DOE-GTO-funded project, award number 5.1.2.12, entitled "EXERGETIC - De-risking Next Generation Resilient Geothermal Hybrids via at-Scale Evaluation Using a Virtual Emulation Digital Twin Environment for Efficient Operation," advances the solution to these challenges by developing and validating a geothermal co-emulation environment implemented at the National Laboratory of the Rockies (NLR)'s Advanced Research on Integrated Energy Systems (ARIES) platform. This framework enables the de-risking of next-generation geothermal and geothermal hybrid systems through high-fidelity modeling, real-time digital emulation, advanced control strategies, and techno-economic assessment. The project focused on geothermal hybrid configurations that integrate geothermal power plants with concentrated solar power and underground thermal energy storage, enabling enhanced efficiency, flexibility, and grid support capabilities. The main goal of this project was the development of a geothermal digital co-emulation environment to demonstrate the technical and economic value of geothermal hybrid systems and their contribution to grid stability and flexibility. The EXERGETIC framework combined physics-based models, controls, and real assets at ARIES, including digital real-time simulators (DRTS), a 20-MW-scale controllable grid interface (CGI), and a 2-MW conventional generator. Detailed transient models were developed for the key subsystems of a hybrid geothermal plant, including parabolic trough solar collectors, reservoir thermal energy storage (RTES), and a binary Organic Rankine Cycle (ORC) power plant. The ORC model explicitly captured thermal inertia and off-design operation and integrated control strategies to dynamically respond to electric load profiles. The models were validated against published experimental and numerical studies, demonstrating strong agreement and confirming the accuracy and robustness of the modeling approach. The resulting digital twin represents geothermal-solar-storage systems at multiple scales (1 MW to 100 MW) and enables realistic emulation of grid-connected operation. The control architecture allows the geothermal resource to provide stable baseload generation, while solar and stored thermal energy supply flexible, dispatchable support during periods of high demand or variable grid conditions. A key contribution of the EXERGETIC project is the demonstration that geothermal hybrid systems can be designed to be active grid assets rather than passive baseload generators. Using the ARIES platform, the digital twin was evaluated under multiple grid scenarios, including load following, voltage support at the distribution level, and frequency response at the transmission level. Results show that hybrid geothermal systems can respond effectively to dynamic grid conditions, providing inertia-like behavior, primary frequency support, and voltage regulation through coordinated control. In addition to the performance and grid services capability analysis of geothermal and hybrid geothermal systems, the EXERGETIC project also focused on scalability and techno-economic analysis of geothermal hybrid plants. In particular, for the scalability analysis, machine-learning (ML)-based surrogate models were trained using data generated from the geothermal digital twin under different grid-connected scenarios and plant capacities. These ML models demonstrated strong interpolation and extrapolation capabilities across plant sizes, accurately reproducing both steady-state and transient responses with very low errors. Regarding the techno-economic analysis, plant performance results were integrated with cost models for hybrid geothermal systems, and the levelized cost of electricity (LCOE) was used as the main economic metric to evaluate system performance across a range of system capacities, solar shares, solar multiples, and storage durations. Results indicate that economies of scale significantly reduce geothermal LCOE as plant capacity increases, with large-scale systems (25-100 MW) achieving substantially lower costs than small plants. Hybridization with solar thermal energy and storage further improves economic performance by increasing capacity utilization and enabling flexible dispatch. In addition, thermal storage plays a critical role in reducing LCOE by maximizing geothermal, solar, and stored energy resources. In summary, the results from this project demonstrate that geothermal hybrid systems represent a promising alternative for increasing the energy conversion efficiency of geothermal technologies, contributing to the preservation of geothermal resources, and supporting the transition of geothermal plants from traditional baseload resources into flexible, resilient, and cost-competitive energy conversion technologies.

15 GEOTHERMAL ENERGY

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (

Development of Hydrogen Burner for FT4000® Aeroderivative Engine - Final Report

This report details an effort to develop a retrofittable fuel/air injector for the FT4000® aeroderivative gas turbine that enables use of hydrogen as a carbon-free fuel for efficient power generation. The FT4000 engine’s low-NOx combustor was developed by Pratt & Whitney and RTX Technology Research Center with core technology from the Pratt & Whitney PW4000 turbofan aircraft engine. The current FT4000 production engine operates on either natural gas or No. 2 fuel oil with water injection to achieve high thermal efficiency and low emissions. This engine is fielded by Mitsubishi Power Aero and delivers 70 MW of power with a simple-cycle efficiency of over 41% when operating with wet compression. The work reported here advances the technology readiness level of the FT4000 combustor for operation with hydrogen, starting with an experimental assessment of the current production hardware with increasing hydrogen content mixed with natural gas and ending with improved nozzle concepts for fully robust operation with 100% hydrogen. High-pressure single-sector combustor rig tests have been completed, demonstrating the ability for the dual fuel nozzle to operate an FT4000 combustor on 100% hydrogen with low nitrogen oxide (NOx) emissions. Metal temperature measurements and video images of the flame structure from zero to 100% hydrogen highlight opportunities to improve the fuel nozzle robustness for high hydrogen conditions. The design of new fuel/air mixer concepts to improve durability and operability with high hydrogen levels was also completed. A total of eleven new concepts were developed and analyzed, ranging from modifications to the bill-of-materials nozzle to fully clean sheet designs. The concepts were evaluated with non-reacting and reacting flow evaluations to assess the performance of the new hardware designs. Non-reacting tests included Phase Doppler Particle Analysis (PDPA) for droplet size and velocity, mechanical patternation for liquid water flux, and planar laser induced fluorescence (PLIF) with acetone-seeding for gaseous fuel/air mixing characterization. Five scaled candidate fuel nozzle designs, in addition to a scaled bill-of-materials nozzle, were then successfully evaluated in an atmospheric pressure burner rig. The nozzles were evaluated for performance with natural gas, hydrogen/natural gas blends, and pure hydrogen. For 100% hydrogen, the nozzles were evaluated with and without water injection. Optical and infrared imaging of the flame and fuel nozzle was captured. NOx emissions were sampled from fixed emissions probes. The results show measurable differences between the various designs, and the data was used to down-select the two most promising designs to advance to future full pressure rig testing. Results from this study have cleared the current production FT4000 engines with dual fuel nozzles to operate at baseload power on blends of hydrogen mixed with natural gas and water. Two promising nozzle designs have been developed to enable fully robust operation with up to 100% hydrogen. These nozzles require validation at full baseload operating conditions before they can be introduced to the field.

03 NATURAL GAS

Wide-Bandgap Semiconductor Amplifiers for Fusion Plasma Heating and Control

This paper discusses power electronics developed under the ARPA-E GAMOW program to support nuclear fusion power production. The goal of this project was to develop and assess the potential for wide-bandgap (WBG) semiconductor devices in power electronics to enable high-efficiency and high-voltage solid-state systems for fusion plasma generation, heating, and control. The power electronics use an architecture in which multiple high-power boards can be combined to produce megawatt-level power, where using multiple boards provides high reliability. Two main areas of power electronics boards are developed in this project for fusion plasma heating and control applications: (1) pulse generation and control and (2) radiofrequency generation. The first area is for boards capable of driving high-voltage millisecond pulses at high duty cycles. The envisioned application of these pulses is in plasma control of magnetohydrodynamic instabilities, plasma position, and edge-localized modes. Pulse-width modulation allows for the implementation of a wide variety of linear and nonlinear control systems. The boards developed for this project could actuate control coils based on digital input signals and can be parallelized to provide megawatts of output power. The design of the pulse generator is a low-side load switch. A load switch was designed and constructed that utilized 2-kV-rated field-effect transistor (FET)-based cascodes developed by Qorvo under this project to perform initial testing of these cascodes. The second area is being implemented using class E amplifiers with WBG devices and a reactance steering network to handle inductive or capacitive plasma loads. Applications include ion cyclotron resonance heating (ICRH) and high-harmonic fast-wave (HHFW) heating. A class E reactance steering network is demonstrated in modeling and experiment with a resistive-inductive load that models an inductively-coupled plasma. Power combining of boards with class E reactance steering networks is also simulated and demonstrated experimentally, to enable scaling up to high power. Modeling of high-power-density cooling and remaining useful life is conducted to enable reliable, effectively cooled high-power electronics for fusion applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Integrated Simulation of Weld Residual Stress Evolution and Crack Propagation Using XFEM

Nuclear power plant components operate in environments that promote multiple degradation mecha- nisms, several of which involve crack initiation and growth. An ongoing effort in the U.S. Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is developing a general capability within the Multiphysics Object Oriented Simulation Environment (MOOSE) framework for simulating three-dimensional crack growth under a range of driving conditions, including fatigue, stress corrosion cracking (SCC), brittle fracture, and stress-relaxation cracking. This report demonstrates an end-to-end workflow that uses this capability to model weld-residual-stress-driven SCC in the J-groove weld of a pressurized-water reactor control rod drive mechanism penetration in the vessel head. The workflow consists of a thermomechanical welding simulation with temperature-dependent plasticity, followed by cooldown to ambient conditions, and a restart of the simulation using the MOOSE extended finite element method (XFEM) module to propagate a three-dimensional crack through the residual stress field. New welding capabilities were developed to properly initialize newly activated elements in the weld region, and robustness improvements were made to the mesh-based algorithm for defining cutting planes in the 3D XFEM algorithm, allowing it to handle complex crack fronts and stress fields. Together these advances allowed the simulated SCC crack to grow from an initial elliptical flaw in the weld, across the weld, through the tube wall, and almost to the triple point (where the weld, tube, and reactor pressure vessel head intersect) over roughly 36 years of simulated service. These results demonstrate a workflow that can be extended to fully three-dimensional welding simulations and more complex crack interaction problems.

42 - ENGINEERING

Techno-Economic Evaluation of a 600MW Pumped Storage Hydropower Plant using the Pumped Storage Hydropower Valuation Tool

This paper presents a techno-economic evaluation of the proposed 600 MW, 8-hour Craig – Hayden pumped storage hydropower project using the U.S. Department of Energy’s Pumped Storage Hydropower Valuation Tool. The analysis integrates plant technical characteristics, regional grid conditions, and market-based operating assumptions to quantify stacked value streams from energy arbitrage, capacity, ancillary services, transmission congestion relief, and reliability. Both price taker and price influencer frameworks are applied to examine the impact of market participation and system interactions on lifecycle economic performance using Benefit - Cost Analysis and Multi - Criteria Decision Analysis. The results show that the price taker approach provides higher revenue estimates based on exogenous price signals, while the price influencer approach captures production cost savings, renewable curtailment reduction, and market price formation, yielding more conservative but system-representative outcomes. The study demonstrates the strategic value of long-duration PSH for enhancing operational flexibility, resource adequacy, and grid reliability in a high-renewable Western Interconnection.

Bhattacharyya, Arjun [ORNL] (ORCID:000900060976046

Plant Engineers Solar Energy Handbook: Southern California Region

Discussed in order after the introduction are solar components and systems (collectors, storage, service hot water systems, space heating with liquid and air systems, space cooling, heat pumps and controls); computer programs for system optimization; local solar and weather data; a description of buildings and plants in Southern California applying solar technology; current Federal and California solar legislation; standards, codes and performance testing information; a listing of manufacturers, distributors, and professional services available in Southern California region; and information access. Finally, solar design check lists for those engineers who wish to design their own systems. The program for the Solar Workshop for the Plant Engineer, March 30, 1978, Los Angeles, California is included.

14 SOLAR ENERGY

Electron/hadron separation with the TRD based on GaAs pixel detectors

Transition Radiation Detectors (TRDs) are widely used for particle identification in both high-energy physics and astroparticle physics. They are typically equipped with gaseous detectors. The main limitation of these types of detectors is that TR photons and ionization losses cannot be decoupled, which significantly reduces the particle separation power. Recent advancements in the development of pixel detectors based on GaAs sensors offer a unique opportunity to effectively detect TR photons and separate them from ionization losses. Such detectors represent novel devices that combine precise tracking capabilities with particle identification (PID) properties. The present work is dedicated to an experimental study of particle identification properties of the TRD prototype based on 500 μ m-thick GaAs sensor bonded to a Timepix3 chip. Studies were performed at the CERN SPS and it was shown that at a particle momentum of 20 GeV/c, the probability of misidentifying a hadron as an electron is below 10 −2 for an electron detection efficiency of 98%–99%, and it is 1 . 6⋅10 −4 for electron detection efficiency of 90%. This performance surpasses the electron/hadron rejection power of all known TRDs by an order of magnitude for the same detector length.

GaAs detectors

POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT

Across the country, electric utilities are grappling with the persistent hurdles of integrating Distributed Energy Resources (DERs). Managing these assets safely and effectively is a complex endeavor, complicated by varying ownership structures, management philosophies, and the diversity of the technologies themselves. Consequently, the industry has seen a proliferation of bespoke system designs, control strategies, and communication frameworks—forcing utilities to spend significant time and resources developing one-off integration solutions. This project addressed these integration hurdles through a scalable demonstration of intelligent devices designed to coordinate and control diverse resources in low-voltage applications. This concept minimized the need for complex integration by transforming the separate DERs into a dispatchable virtual power plant (VPP) with integrated resiliency functions (called a Node). By collaborating with a utility partner, the project focused on developing rapidly implementable use cases that bridged the gap between theoretical control and real-world deployment

99 GENERAL AND MISCELLANEOUS

Probing the fatigue enhancement in a thermally aged cast duplex stainless steel by in situ neutron diffraction

After long-term thermal aging at 400 °C for 3000 h and 10,000 h, a cast duplex stainless steel exhibits promoted fatigue performance, including enhanced three-stage cyclic hardening and prolonged fatigue life. Utilizing in situ neutron diffraction, the phase-specific stresses are resolved, and their evolutions over entire fatigue cycling reveal the underlying mechanisms of the fatigue enhancement. It is found that the ferrite phase bears a much higher stress than the austenite matrix under both as-received and aged conditions. The enhanced cyclic hardening in Stage I is attributed to the strengthening of both phases due to thermal aging, while the enhancement in Stage III results from the martensitic transformation induced strengthening. The fatigue life is prolonged thanks to the cyclic hardening and the delay of martensitic transformation in the austenite phase after thermal aging.

Yu, Dunji [ORNL] (ORCID:0000000189467851)

Integral Nuclear Data and Benchmarking Needs for Fusion Energy Systems

Fusion energy systems are currently being designed and optimized using radiation transport codes. To deal with the unique environment inside a fusion-based system, many of these designs incorporate novel materials able to withstand the high radiation fields, ensure adequate cooling and thermal protection, and produce tritium. Validation plays a vital role in building trust in the predictive power of these models and computational methods. Validation of a code consists of modeling documented real-world experiments and comparing the code-predicted response to the measured response. Adequate validation requires measured responses from real-world experiments, also known as integral data, that mimic the system being designed, including materials, impinging radiation, and temperature, among other variables. The most trusted integral data are experimental responses that have been through a rigorous benchmarking process that develops a recommended computational model and evaluates all experimental uncertainties. Finally, there are a few research groups around the world that have been producing integral data for fusion applications, but a substantial investment is needed to address the unique validation needs of the fusion community.

Fusion