Search NASASearch

SEARCH · Search NASA

Results for “Orbital Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

406 records · Page 4

Ni-cd Battery Life Expectancy in Geosynchronous Orbit

The feasibility of using nickel cadmium batteries as an alternate if flight qualified NiH2 batteries are not available is explored. Battery life expectancy data being a key element of power system design, an attempt is made to review the literature, life test data and in orbit performance data to develop an up to date estimate of life expectancy for NiCd batteries in a geosynchronous orbit.

Broderick, R. J.

Horseshoe Asteroids and Quasi-satellites in Earth-like Orbits

Newly found asteroid 2003 YN107 is the first and only known current quasi-satellite (QS) of the Earth. Asteroid 2002 AA29 is in a horseshoe orbit (HS) but has periods of QS behavior. Both asteroids closely follow Earth s orbit. 2002 AA29 has inclination i is approximately 11 degrees while for 2003 YN107 i<5 degrees, making the most Earth-like orbit known. 2003 YN107, 2002 AA29, and other Earth-resonant objects in less Earthlike orbits, form an important new class of co-orbital bodies with interesting dynamics and are the best targets for sample return missions to asteroids.

M Connors

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation

Orbiting Solar Observatory Battery and Power Design

The OSO-1 represents a recent vintage satellite, or more recent design satellite. A summary of the battery design used on OSO-1 is presented. The temperature effects on voltage and charging-discharging of the battery system are discussed.

F E Ford

In Flight Performance of a Six Ampere-hour Nickel-cadmium Battery in Low Earth Orbit

Flight data for 17,000 orbital cycles are reviewed and summarized. The nickel cadmium battery system operated without failure or abnormality. Battery trend analysis used in determining the feasibility of extending mission life is discussed. The life test data for 20% depth of discharge indicates design life requirements would be reached even at a deeper depth of discharge.

Mcdermott, J. K.

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

A viewgraph presentation outlines the Earth Radiation Budget Satellite (ERBS) power system and battery history. ERBS spacecraft and battery cell failures are listed with the reasons for failure. The battery management decision and stabilization of the batteries is discussed. Present battery operations are shown to be successful.

Ahmad, Anisa

Temperature as a control knob on spin-orbit coupling

Spin-orbit coupling (SOC) governs many physical phenomena. Through ab initio molecular dynamics simulations, Lu and Sun demonstrated that structural disorder at elevated temperatures substantially reduces the effective SOC contribution that stabilizes band inversion, driving a topological-to-normal-insulator transition in Bi2Se3. Their work identifies temperature as a meaningful control parameter for SOC-mediated topology and other properties.

Liang, Liangbo [ORNL] (ORCID:0000000311990049)

Assembly bias and local Primordial non-Gaussianity from DESI DR1 quasars

The analysis of the large-scale clustering of quasars (QSO) observed by the Dark Energy Spectroscopic Instrument (DESI) represents a promising avenue for constraining local Primordial non-Gaussianity (PNG), parameterized by f NL . The signal to be constrained is the scale-dependent bias induced in the 2-point clustering of the considered tracer sample. The resulting constraints on f NL , however, are fully degenerate with the local PNG bias parameter b ϕ , dependent on the assembly bias parameter p. Using IllustrisTNG hydrodynamical simulations, we select a QSO sample reflecting the selection criteria and properties of DESI QSOs, and provide a robust prior for p, and thus for b ϕ , building on the findings of Fondi et al. 2024. We find a distribution with mean p̅ ≃ 1.4 with weak redshift dependence, stable to selection noise and consistent with the expected recent merger history typical of quasar-hosting halos. By comparing with the CAMELS simulations we demonstrate that this prior is robust to astrophysical assumptions and cosmic variance. Finally, applying this prior to the DESI DR1 dataset, we derive updated constraints on local PNG, obtaining f NL = -3.3±9.2.

cosmological parameters from LSS

RCA SATCOM Battery in Orbit Performance Update and Accelerated Life Test Results

No significant degradation of nickel cadmium battery performance in SATCOM F1 and F2 after almost 8 and 7-3/4 years in orbit was shown. Battery minimum discharge voltage data are presented for these spacecraft. In addition, 2 groups of nickel cadmium cells which are representative of those in orbit are undergoing real time eclipse-reduced suntime cycling in the laboratory. These groups of cells, which are being cycled at a maximum of 53% and 62% depth of discharge (based on actual capacity), have completed 14 and 15 eclipse seasons, respectively. Data for these groups of cells are presented and are compared with the in-orbit battery data.

Gaston, S. J.

Battery Study for the Shuttle Orbiter EAPU Upgrade

The use of Electric Auxiliary Power Unit (EAPU) in commercial, and military aviation, and in commercial electric automobiles, is reviewed. The specifications of the battery to be used in the space shuttle are reviewed, and the possible vendors discussed. The testing activity and the reliability and the safety features are presented.

Otzinger, Burton

Electric Propulsion Orbital Platform

This paper describes the Electric Propulsion Orbital Platform (EPOP), of which the primary objective is to provide an instrumented platform for testing electric propulsion devices in space. It is anticipated that the first flight, EPOP-1, will take place on the Shuttle-deployed Wake Shield Facility in 1996, and will be designed around a commercial 1.8 kW arcjet system which will be operated on gaseous hydrogen propellant. Specific subsystems are described, including the arcjet system, the propellant and power systems, and the diagnostics systems.

V. J. Friedly

Improved Treatment of Global Positioning System Force Parameters in Precise Orbit Determination Applications

Data collected from a worldwide 1992 experiment have been processed at JPL to determine precise orbits for the satellites of the Global Positioning System (GPS). A filtering technique has been tested to improve modeling of solar-radiation pressure force parameters for GPS satellites. The new approach improves orbit quality for eclipsing satellites by a factor of two, with typical results in the 25- to 50-cm range. The resultant GPS-based estimates for geocentric coordinates of the tracking sites, which include the three DSN sites, are accurate to 2 to 8 cm, roughly equivalent to 3 to 10 nrad of angular measure.

Y Vigue

Failure Modes of Reduced-Order Orbit Determination Filters and Their Remedies

Ways in which failure can occur in reduced-order, orbit determination filter, error covariance calculations are discussed. In the context of this article, reduced-order filters denote nonoptimal filters which include fixed levels of uncertainty in some parameters of the measurement models or in the spacecraft dynamical model which are not explicitly estimated in the filter equations. Failure is defined as an increase in the orbit determination covariance with the addition of data or as an unreasonable growth in the covariance with time, i.e., nonasymptotic behavior of the covariance. Some simple, known cases of failure are discussed along with their traditional remedies. In addition, more modern remedies are discussed which are currently under development at the Jet Propulsion Laboratory. The article first describes the known problems of reduced-order filters when they are employed for orbit determination, and their traditional remedies. Then, having defined these, the relevancy and desirability of the more modern remedies are made apparent.

D J Scheeres

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.

In-Orbit Earth Radiation Budget Satellite (ERBS) Battery Switch

This presentation reviews the history of the Earth Radiation Budget Satellite (ERBS) and the problems which were experienced with the batteries. After two cells shorted on the first Battery, the decision was made to take battery 1 of line in late 1992. This left the second battery supporting all loads. The second battery began to experience problems in 1998 into 1999. The decision was made to bring the first battery on line and take the second battery off line. The steps to switching the batteries are reviewed, and the results are discussed.

Ahmad, Anisa

Orbiting Astronomical Observatory Battery and Power System Design

The battery design of OAO-C (OAO-3) is given and consists of three-20 ampere hour 22 series connected cells in the battery. There are three batteries per spacecraft. The packaging configuration is described. The charging-discharging operations and the voltage potential of the battery system are discussed. Graphs are presented for the voltage limits (battery voltage versus temperature) and end of dark voltages (battery voltage versus ampere-hours discharged) of the battery system used on OAO-3. Data tables are also presented which give a summary of the battery performance and a comparison of OAO-3 with OAO A-2.

F E Ford

Diagnostics development for the Electric Propulsion Orbital Platform

We describe the development of the diagnostics systems for the first flight of the Electric Propulsion Orbital Platform (EPOP), which will center around the in-flight characterization of a 1.8 kW hydrogen arcjet system. In particular, we discuss a spacecraft communications experiment involving ground-to-spacecraft communications of the EPOP carrier; electrical probe measurements in the arcjet plume; and spectrally resolved plume imaging measurements of the same plume. The communications experiment is designed to measure small noise on the communications link which results from arcjet operation. The other two measurements primarily serve the purpose of characterization of the plume plasma. These measurements will be compared to similar measurements performed in a ground chamber to establish whether systematic differences exist between ground-based and in-flight performance of the arcjet system.

Wilhelmus M. Ruyten

Development of an Additively Manufactured Subscale Secondary Sealed Container for the NASA FROSTE Project

This presentation details the development of an additively manufactured (AM) subscale test article for the secondary sealed container (SSC) as part of the NASA FROSTE project. FROSTE is focused on the collection of regolith samples from shadowed regions of the Moon and the preservation of those samples at cryogenic temperatures for return to Earth. Our team was integrated into the FROSTE program to leverage innovative design approaches and additive manufacturing capabilities in support of a scalable development strategy, where the subscale configuration serves as the development path toward a full-scale SSC. Scalmalloy was selected as the primary material for all AM components due to its favorable strength-to-weight ratio, thermal conductivity, and demonstrated performance in aerospace applications. Its aluminum-based composition supports robust mechanical behavior at cryogenic temperatures while enabling efficient heat transfer and control of thermal gradients within the containment system. The SSC architecture consists of an outer container assembly that houses a phase change material (PCM) tank, which in turn contains primary containers holding the regolith. Thermal management relies on controlled conductive and radiative heat transfer, including a thermal connection assembly that interfaces the PCM tank to an external cryocooler via a thermal strap, and IMLI surrounding the PCM tank to inhibit radiative heat transfer. The outer container assembly incorporates sealing interfaces, thermal connection ports, and I/O feedthroughs, with PTFE spring seals used at critical interfaces to maintain containment integrity. The PCM tank is manufactured as a single monolithic Scalmalloy component and incorporates an integral lattice structure to minimize thermal gradients, internal channels for thermocouple routing, and interface features for thermal connection assembly integration. The tank is centrally suspended within the outer container using support rings, with G10 insulating components employed to inhibit thermal leaks. This work describes the design methodology, AM approach, and key considerations used to inform the design.

regolith