After the hurricane: Validating a resilience assessment methodology

With increasing utility grid outages in the United States, there is growing interest in assessing risk and developing mitigation strategies to reduce the impact of grid outages. Working with the U.S. Air Force, the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a replicable energy resilience assessment methodology and investment decision tool to: (1) identify and score hazards and vulnerabilities at the site level; (2) analyze risks to energy infrastructure; and (3) identify and prioritize energy resilience investments. This work improves on existing resilience assessment methodologies and tools by combining a bottom-up, all-hazards assessment methodology with top-down geographic information system mapping capabilities to provide an innovative, dynamic tool for identifying and prioritizing actionable solutions. This process combines probabilistic forecasting with an iterative approach for continuously updating and reassessing risks to address temporal dynamism. Relationships among systems are modeled and visualized to estimate the effectiveness of resilience actions across multiple interdependent systems and inform financial priorities through cost-difficulty-impact trade-offs. The approach is validated in a case study at Tyndall Air Force Base (AFB) in Florida, which experienced a Category 5 hurricane in 2018. The risks and mitigation strategies identified pre-hurricane are compared with post-hurricane, realized impacts. The assessment effectively identifies risks and actions to increase site energy resilience, but the methodology can be enhanced though greater consideration of the interdependencies between the energy system and related systems like transportation, communication, and food/water systems, which impact the recovery of the energy system and the base.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling the Functional Forms of Grid Disturbances

This report introduces a functional form that may be used to quantitatively predict the impacts of new grid tools and changing system qualities on the likelihoods, durations, and depths of various grid disturbances. Each disturbance scenario is modeled to have three component stages—avoidance, reactance and recovery, which together parametrically estimate one disturbance’s impacts. The modeled scenario is then placed and replicated within an analysis period to represent the likelihood or frequency of the scenario and its consequent impacts. Whereas analysts have struggled to define and apply metrics for grid resilience, the functional form introduced by this report shares units of measurement with accepted grid-status measures (e.g., numbers of customers currently experiencing a service outage). Furthermore, the integrated and averaged functional form over an analysis period provides a meaningful normalized performance metric (e.g., customer outage minutes per year) that is ultimately independent of the duration of the period of. The approach may be applied similarly regardless of the severity or frequency of the disturbances that are being analyzed. Because metrics can be chosen to be identical in both the hypothetical future and the actual historical past, the historical past eventually becomes the test of the future predictions, at least in a statistical sense. The authors originally developed this approach to facilitate analysis of the effects of transactive energy (TE) systems effects on electric power grid resilience. TE systems invite energy suppliers and consumers to actively collaborate toward the discovery of, and their responses to, the locational value of energy. The findings from this process are often embodied as energy prices, the dynamics of which indicate the locational value of energy and can further represent important grid service needs. While some academic papers claim to quantify the value of a specific TE system design toward grid resilience, the answer, in general, has been elusive. Not only do multiple and conflicting definitions of resilience and reliability exist, but countless TE systems are being invented. We conclude the following: (1) The ideal analysis should harmonize rather than differentiate resilience and reliability. Therefore, this report uses the more general term disturbance whenever the overloaded terms resilience and reliability can be avoided. (2) The effectiveness of TE systems must be mapped to underlying qualities of a TE system, thereby avoiding presumptions that every TE design offers similar advantages. The authors seek to evaluate the parametric effects of TE system qualities (e.g., spatial granularity, granularity of time steps, length of future prediction horizon) on avoiding, reacting to, and recovering from grid disturbances. Furthermore, any advantages (or disadvantages) must be fairly compared with the many alternative tools, systems, and strategies that might offer comparable benefits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New York Solar Smart DG Hub-Resilient Solar Project: Economic and Resiliency Impact of PV and Storage on New York Critical Infrastructure

Resilient PV, which is solar paired with storage ('solar-plus-storage'), provides value both during normal grid operation and power outages as opposed to traditional solar PV, which functions only when the electric grid is operating. During normal grid operations, resilient PV systems help host sites generate revenue and/or reduce electricity bill charges. During grid outages, resilient PV provides critical emergency power that can help people in need and ease demand on emergency fuel supplies. The combination of grid interruptions during recent storms, the proliferation of solar PV, and the growing deployment of battery storage technologies has generated significant interest in using these assets for both economic and resiliency benefits. This report analyzes the technical and economic viability for resilient PV on three critical infrastructure sites in New York City (NYC): a school that is part of a coastal storm shelter system, a fire station, and a NYCHA senior center that serves as a cooling center during heat emergencies. This analysis differs from previous solar-plus-storage studies by placing a monetary value on resiliency and thus, in essence, modeling a new revenue stream for the avoided cost of a power outage. Analysis results show that resilient PV is economically viable for NYC's critical infrastructure and that it may be similarly beneficial to other commercial buildings across the city. This report will help city building owners, managers, and policymakers better understand the economic and resiliency benefits of resilient PV. As NYC fortifies its building stock against future storms of increasing severity, resilient PV can play an important role in disaster response and recovery while also supporting city greenhouse gas emission reduction targets and relieving stress to the electric grid from growing power demands.

14 SOLAR ENERGY↗

Ion-neutral Coupling During Deep Solar Minimum

The equatorial ionosphere under conditions of deep solar minimum exhibits structuring due to tidal forces. Data from instruments carried by the Communication Navigation Outage Forecasting System (CNOFS) which was launched in April 2008 have been analyzed for the first 2 years following launch. The Planar Langmuir Probe (PLP), Ion Velocity Meter (IVM) and Vector Electric Field Investigation (VEFI) all detect periodic structures during the 20082010 period which appear to be tides. However when the tidal features detected by these instruments are compared, there are distinctive and significant differences between the observations. Tides in neutral densities measured by the Gravity Recovery and Climate Experiment (GRACE) satellite were also observed during June 2008. In addition, Broad Plasma Decreases (BPDs) appear as a deep absolute minimum in the plasma and neutral density tidal pattern. These are co-located with regions of large downward-directed ion meridional velocities and minima in the zonal drifts, all on the nightside. The region in which BPDs occur coincides with a peak in occurrence rate of dawn depletions in plasma density observed on the Defense Meterological Satellite Program (DMSP) spacecraft, as well as a minimum in radiance detected by UV imagers on the Thermosphere Ionosphere Mesosphere Energetics and Dynamics (TIMED) and IMAGE satellites

IVM↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Closed-Loop Distribution System Restoration Tool for Natural Disaster Recovery. Final CRADA report

We propose to continue the development of the restoration algorithms and the tool’s user interface, both of which have been developed under the GMLC-0131 project. This project aims to develop a distribution restoration decision support tool that will assist utilities in performing distribution restoration after extreme weather events in an optimal and efficient manner. The tool will integrate the weather information/forecasts and system fragility assessment together with the field measurement data to improve the situational awareness and estimate the system damage status. Advanced optimization models will be leveraged to dispatch repair crews and associated resources. New resources (e.g., automatic switches and distributed generators (DGs)) enabled by distribution automation and smart grid development will be utilized to reconfigure distribution grids and pick up loads promptly to reduce the outage sizes and durations. The closed-loop feature of the tool will make the tool adaptive to the evolving weather events and varying restoration capabilities. In this CRADA, we will collaborate with S&C Electric Company (S&C) to refine ANL-1060 (07/17/2019) the restoration algorithms that can be potentially applicable for any utility systems and vendor products, including: 1) Customizable information from both utility users and vendor users; 2) User interface design.

54 ENVIRONMENTAL SCIENCES↗

Near Real-Time Applications of Earth Remote Sensing for Response to Meteorological Disasters

Numerous on‐orbit satellites provide a wide range of spatial, spectral, and temporal resolutions supporting the use of their resulting imagery in assessments of disasters that are meteorological in nature. This presentation will provide an overview of recent use of Earth remote sensing by NASA's Short‐term Prediction Research and Transition (SPoRT) Center in response to disaster activities in 2012 and 2013, along with case studies supporting ongoing research and development. The SPoRT Center, with support from NASA's Applied Sciences Program, has explored a variety of new applications of Earth‐observing sensors to support disaster response. In May 2013, the SPoRT Center developed unique power outage composites representing the first clear sky view of damage inflicted upon Moore and Oklahoma City, Oklahoma following the devastating EF‐5 tornado that occurred on May 20. Subsequent ASTER, MODIS, Landsat‐7 and Landsat‐8 imagery help to identify the damaged area. Higher resolution imagery of Moore, Oklahoma were provided by commercial satellites and the recently available International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) instrument. New techniques are being explored by the SPoRT team in order to better identify damage visible in high resolution imagery, and to monitor ongoing recovery for Moore, Oklahoma. Other applications are being developed to refine light source detections with the VIIRS day‐night band and to map hail during the growing season through combination of available satellite and radar imagery. The aforementioned products and support are not useful unless they are distributed in a timely manner and within an appropriate decision support system. This presentation will provide an update on ongoing activities to support inclusion of these data sets within the NOAA National Weather Service Damage Assessment Toolkit, which allows meteorologists in the field to consult available satellite imagery while performing their damage assessment.

Molthan, Andrew L.↗

Near Real-­Time Applications of Earth Remote Sensing for Response to Meteorological Disasters

Numerous on‐orbit satellites provide a wide range of spatial, spectral, and temporal resolutions supporting the use of their resulting imagery in assessments of disasters that are meteorological in nature. This presentation will provide an overview of recent use of Earth remote sensing by NASA's Short‐term Prediction Research and Transition (SPoRT) Center in response to disaster activities in 2012 and 2013, along with case studies supporting ongoing research and development. The SPoRT Center, with support from NASA's Applied Sciences Program, has explored a variety of new applications of Earth‐observing sensors to support disaster response. In May 2013, the SPoRT Center developed unique power outage composites representing the first clear sky view of damage inflicted upon Moore and Oklahoma City, Oklahoma following the devastating EF‐5 tornado that occurred on May 20. Subsequent ASTER, MODIS, Landsat‐7 and Landsat‐8 imagery help to identify the damaged area. Higher resolution imagery of Moore, Oklahoma were provided by commercial satellites and the recently available International Space Station (ISS) SERVIR Environmental Research and Visualization System (ISERV) instrument. New techniques are being explored by the SPoRT team in order to better identify damage visible in high resolution imagery, and to monitor ongoing recovery for Moore, Oklahoma. Other applications are being developed to refine light source detections with the VIIRS day‐night band and to map hail during the growing season through combination of available satellite and radar imagery. The aforementioned products and support are not useful unless they are distributed in a timely manner and within an appropriate decision support system. This presentation will provide an update on ongoing activities to support inclusion of these data sets within the NOAA National Weather Service Damage Assessment Toolkit, which allows meteorologists in the field to consult available satellite imagery while performing their damage assessment.

Molthan, Andrew L.↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power System Resilience Considering Hurricane Storms and Generator Step-up Transformers

Power system resilience describes the system’s ability to withstand and recover quickly from unexpected power outages due to extreme events. As society’s electrification continues at a rapid rate, it is imperative electric infrastructure is designed and operated with extra security. This work studies the impact of severe hurricane storms on the power system located along the United States’ Eastern Seaboard. Specific focus is designated to steady state system operation and loss of large generation step up power transformers. A series of phasor domain power system simulations are conducted to determine the critical point at which the system loses steady state operability. Additionally, active power load shedding and generator dispatching are studied as mitigation and recovery strategies. Results indicate generator dispatching as an effective proactive mitigation strategy and load shedding as an effective recovery strategy.

Liu, Yilu↗

Cost Recovery for Standby and Ancillary Services for Distributed Generation: Considerations for New Mexico

A New Mexico statute allows investor-owned utilities to recover costs of “standby and ancillary services” resulting from distributed generation (DG). In attempting to do so, it is important to recognize both the physical and economic impacts, positive and negative, that distributed generation creates. Distributed generation has different impacts on ancillary and standby services depending on the location, capacity, and production patterns of the systems. Low penetrations of small distributed generation systems will not create significant contingencies for utilities. System impact of fluctuations in DG production may be no larger than normal fluctuations caused by customer demand, such as an air conditioner cycling. Higher penetrations and large DG system may produce noticeable impacts; so magnitude is critical when determining potential additional recoverable utility costs. Understanding DG impact on ancillary services is a relatively new and emerging area of study and as such there are not well-established formulas or protocols. Discretion is required. A hosting capacity analysis can help determine how much DG can be implemented before the impacts become substantive. Standby rates are traditionally used for large industrial generators or combined heat and power systems and threshold system size levels are often used in determining applicability of standby rates. System size thresholds may also be appropriate for standby rates and DG. Relatively small, geographically diverse DG systems are unlikely to create a noticeable coincident outage, so developing a standby charge based on assumed coincidence may not be appropriate. Individual lines and feeders may have considerable excess capacity during coincident outages, or they may be fully utilized and facing upgrades in the near future, which could vary over time. Understanding specific events that create concern for utilities is critical to developing an appropriate rate mechanism (e.g., single residential or community system outage, cascading event, clouds, eclipse). Any modeling or studies of the grid should also recognize the unique situation created when DG is coupled with a smart inverter or storage. These devices change the value proposition and can help mitigate some of the voltage and ramping issues DG can pose for a utility. Utilities can recover their fixed costs in a variety of ways, and some are better suited for DG than others. Beyond charging for standby and ancillary services, other options include fixed customer charges, demand charges, minimum bills, time-of-use rates and updated net energy-metering policies. Studies and analyses of the specific impacts that DG has on the grid should inform utilities’ decision-making process because distributed generation creates both costs and benefits for the grid. Any charge specific to DG customers should be backed up with analysis. At the heart of this conversation is utilities attempting to recover fixed costs. Allowing utilities to indiscriminately recover all stranded fixed costs can negatively affect long-term market efficiency by blunting utility incentives to lower costs and acting as a barrier to entry and exit. The current status of New Mexico’s grid, impending infrastructure updates, and likely customer adoption patterns for DG (backed up by transparent analysis) should remain at the forefront when considering charges for standby and ancillary services. Recognizing that utility regulation is largely a reactive process, it is recommended that applications for DG related standby or ancillary services cost recovery mechanisms be thoroughly reviewed by an experienced economist. If the commission has no such skill set on staff, one might be hired.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Effective restoration strategies of interdependent power system and communication network

The power system is continuously evolving towards a smarter grid by adding intelligent electrical devices that leverage communication technologies to provide visualisation, control and automation. The integration of power system and communication network has brought challenges into the resilience of interdependent networks. Following an outage or blackout, system operators cannot only restore one network while simply ignoring the interconnection with the other network. Effective restoration strategies that involve co‐ordination between power system and communication network have become critical in enhancing the resilience. An optimisation‐based restoration strategy is developed to coordinate the restoration actions between two networks. The problem is modelled as a mixed integer linear programming problem, with the objective of activating every node in both networks with the minimum number of activation/energisation of branches. The developed strategies are tested on the modified IEEE 14‐bus system incorporating communication network. Simulation results demonstrate that the coordinated restoration strategies are effective and critical in the successful recovery of interdependent networks. The developed model could also provide insights in network design and planning to enhance the resilience of interdependent power system and communication network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Storm-DEPART (Damage Estimate Prediction and Recovery Tool)

Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chattanooga Electric Power Board Case Study Distribution Automation

In 2009, the U.S. Department of Energy under the American Recovery and Reinvestment Act (ARRA) awarded a grant to the Chattanooga, Tennessee, Electric Power Board (EPB) as part of the Smart Grid Investment Grant Program. The grant had the objective “to accelerate the transformation of the nation’s electric grid by deploying smart grid technologies.” This funding award enabled EPB to expedite the original smart grid implementation schedule from an estimated 10-12 years to 2.5 years. With this funding, EPB invested heavily in distribution automation technologies including installing over 1,200 automated circuit switches and sensors on 171 circuits. For utilities considering a commitment to distribution automation, there are underlying questions such as the following: “What is the value?” and “What are the costs?” This case study attempts to answer these questions. The primary benefit of distribution automation is increased reliability or reduced power outage duration and frequency. Power outages directly impact customer economics by interfering with business functions. In the past, this economic driver has been difficult to effectively evaluate. However, as this case study demonstrates, tools and analysis techniques are now available. In this case study, the impact on customer costs associated with power outages before and after the implementation of distribution automation are compared. Two example evaluations are performed to demonstrate the benefits: 1) a savings baseline for customers under normal operations1 and 2) customer savings for a single severe weather event. Cost calculations for customer power outages are performed using the US Department of Energy (DOE) Interruption Cost Estimate (ICE) calculator2. This tool uses standard metrics associated with outages and the customers to calculate cost impact. The analysis shows that EPB customers have seen significant reliability improvements from the implementation of distribution automation. Under normal operations, the investment in distribution automation has enabled a 43.5% reduction in annual outage minutes since 2012. This has led to an estimated total savings of $26.8 million per year. Examining a single severe weather event3, the distribution automation was able to restore power to 40,579 (nearly 56%) customers within 1–2 seconds and reduce outage minutes by 29.0%. This saved customers an estimated $23.2 million over the course of the storm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Decommissioning of Air Sparge System at Vertical Processing Facility, Solid Waste Management Unit 077 Implementation Report

This document discusses the decommissioning of the air sparge (AS) system at the Vertical Processing Facility (VPF), Solid Waste Management Unit 077 at Kennedy Space Center, Florida completed between January 30, 2023, and February 8, 2023. A 2005 Resource Conservation and Recovery Act Facility Investigation identified chlorinated volatile organic compound impacts at the site. Following assessment activities, an AS system was in operation intermittently from April 2012 through October 2017, when the system was permanently shutdown due to equipment failure. Trichloroethene and vinyl chloride remained above their groundwater cleanup target levels in several monitoring wells and the site was moved into the Industrial Area Long Term Monitoring Program. VPF continues to be sampled biennially; the most recent event was May 2022. Successful implementation of this decommissioning project will reduce the risk of accidental AS and soil vapor extraction well damage and will lower operating costs associated with maintaining obsolete AS systems. Decommissioning the AS system at VPF included vegetation clearing to access AS wells and associated piping, abandonment of all on site AS wells, temporary electrical outage, and site restoration. At the completion of demobilization and site restoration activities, the site was returned to its original or better than original condition.

Jason J Bublitz↗

Reinforcement Learning for Intentional Islanding in Resilient Power Transmission Systems

Intentional islanding is the process of identifying and deliberately decomposing the transmission network to form self-sustained islands from an endangered network during disruptions to improve resilience and security. Most existing intentional islanding models are offline resilience decision tools and hence do not provide outage responses in a timely manner. In this paper, a reinforcement learning (RL) based model for intentional islanding is developed, which offers real-time switching control, online deployability, and adaptability to varying system conditions. The intentional islanding process is formulated as a Markov decision process, where the optimal transmission switching policy is learned using the RL approach. The control policy is learned over an environment that encompasses a Power System Simulator for Engineering (PSS/E) model of the transmission network, facilitated by an interface to the standard openAI Gym framework. The proposed RL-based methodology aims to form stable and self-sustainable islands by ensuring voltage stability while reducing the power mismatch in the formed islands. A proximal policy optimization algorithm is designed, which is suitable for controlling the on/off status of the switches with multi-layer perceptron as value and actor networks. The effectiveness of the proposed framework in the self-recovery of the grid by island formation is applied on the modified IEEE 39-bus test network and validated by dynamic simulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗