Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Scheduling Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

AXAF: Current Developments and Future Plans for the Scientific Data Analysis

AXAF, the Advanced X-ray Astrophysics Facility, is one of NASA's great observatories scheduled for launch in January of 1999 by a Space Shuttle. This facility will be available to scientists in the United States and to the international astronomical community over an anticipated mission lifetime of at least 5 years. The objective of AXAF is to make astrophysical observations in the 0.09 to 10.0 keV energy range with two imaging detectors, and two sets of transmission gratings giving high spatial (0.5 arcsec) and spectral (E/(Delta)E=100-2000) resolution. The AXAF Science Center (ASC) in Cambridge, MA, USA is responsible for obtaining and reviewing observation proposals submitted by users, providing long range science planning and performing all science data calibration, data analysis, science instrument trend analysis, and science data archiving. The ASC will distribute science data products to the users. We will review here the current developments and future plans for the AXAF scientific data analysis system, its infrastructure and new key features, including the global modelling and fitting environment, integrated data analysis GUIs and new analysis tools.

Fruscione, Antonella↗

Science Alert Demonstration with a Rover Traverse Science Data Analysis System

The Onboard Autonomous Science Investigation System (OASIS) evaluates geologic data gathered by a planetary rover. This analysis is used to prioritize the data for transmission, so that the data with the highest science value is transmitted to Earth. In addition, the onboard analysis results are used to identify science opportunities. A planning and scheduling component of the system enables the rover to take advantage of the identified science opportunity. OASIS is a NASA-funded research project that is currently being tested on the FIDO rover at JPL for the use on future missions.

Castano, R.↗

MAPS - a computerized management analysis and planning system

Program lists work structure of projects at all levels. System integrates work item, its schedule, its status against the schedule, responsible personnel, and explanatory comments. structure of MAPS promotes natural organization of project work elements, project features and uses are given.

Packe, D. R.↗

Extracting and Generating PV Soiling Profiles for Analysis, Forecasting, and Cleaning Optimization

The identification and prediction of the daily soiling profiles of a photovoltaic site is essential to plan the optimal cleaning schedule. In this article, we analyze and propose various methods to extract and generate photovoltaic soiling profiles, in order to improve the analysis and the forecast of the losses. New soiling rate extraction methods are proposed to reflect the seasonal variability of the soiling rates and, for this reason, are found to identify the most convenient cleaning day with the highest accuracy for the investigated sites. Also, we present an approach that could be used to predict future soiling losses through the implementation of stochastic weather generation algorithms whose ability to identify in advance the best cleaning schedule is also successfully tested. The methods presented in this article can optimize the operation and maintenance schedule and could make it possible, in the future, to predict soiling losses through analysis based only on environmental parameters, such as rainfall and particulate matter, without the need of long-term soiling data.

14 SOLAR ENERGY↗

Project Planning and Reporting

Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.

Source record↗

Exercise with prebreathe appears to increase protection from decompression sickness: Preliminary findings

Extravehicular activity (EVA) from the Space Shuttle involves one hour of prebreath with 100% oxygen, decompression of the entire Shuttle to 10.2 psia for at least 12 hours, and another prebreath for 40 minutes before decompression to the 4.3 psia suit pressure. We are investigating the use of a one-hour prebreathe with 100% oxygen beginning with a ten-minute strenuous exercise period as an alternative for the staged decompression schedule described above. The 10-minute exercise consists of dual-cycle ergometry performed at 75% of the subject's peak oxygen uptake to increase denitrogenation efficiency by increasing ventilation and perfusion. The control exposures were preceded by a one-hour prebreathe with 100% oxygen while resting in a supine position. The twenty-two male subjects were exposed to 4.3 psia for 4 hours while performing light to moderate exercise. Preliminary results from 22 of the planned 26 subjects indicate 76% DCS following supine, resting prebreathe and 38% following prebreathe with exercise. The staged decompression schedule has been shown to result in 23% DCS which is not significantly different from the exercise-enhanced prebreathe results. Prebreathe including exercise appears to be comparable to the protection afforded by the more lengthy staged decompression schedule. Completion of the study later this year will enable planned statistical analysis of the results.

Webb, James T.↗

Planning for the semiconductor manufacturer of the future

Texas Instruments (TI) is currently contracted by the Air Force Wright Laboratory and the Defense Advanced Research Projects Agency (DARPA) to develop the next generation flexible semiconductor wafer fabrication system called Microelectronics Manufacturing Science & Technology (MMST). Several revolutionary concepts are being pioneered on MMST, including the following: new single-wafer rapid thermal processes, in-situ sensors, cluster equipment, and advanced Computer Integrated Manufacturing (CIM) software. The objective of the project is to develop a manufacturing system capable of achieving an order of magnitude improvement in almost all aspects of wafer fabrication. TI was awarded the contract in Oct., 1988, and will complete development with a fabrication facility demonstration in April, 1993. An important part of MMST is development of the CIM environment responsible for coordinating all parts of the system. The CIM architecture being developed is based on a distributed object oriented framework made of several cooperating subsystems. The software subsystems include the following: process control for dynamic control of factory processes; modular processing system for controlling the processing equipment; generic equipment model which provides an interface between processing equipment and the rest of the factory; specification system which maintains factory documents and product specifications; simulator for modelling the factory for analysis purposes; scheduler for scheduling work on the factory floor; and the planner for planning and monitoring of orders within the factory. This paper first outlines the division of responsibility between the planner, scheduler, and simulator subsystems. It then describes the approach to incremental planning and the way in which uncertainty is modelled within the plan representation. Finally, current status and initial results are described.

Fargher, Hugh E.↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The CPAT Domain Model - How CPAT "Thinks" from an Analyst Perspective

To help effectively plan the management and modernization of its large and diverse fleet of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) commissioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Program on State Agency Remote Sensing Data Management (SARSDM)

A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.

Eastwood, L. F., Jr.↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Automated Approach for Acquiring Onboard Rover Science

Rover traverse distances are increasing at a faster rate than downlink capacity is increasing. As this trend continues, the quantity of data that can be returned to Earth per meter traversed is reduced. The capacity of the rover to collect data, however, remains high. This circumstance leads to an opportunity to increase mission science return by carefully selecting the data with the highest science interest for downlink. We have developed an onboard science analysis technology for increasing science return from missions. Our technology evaluates the geologic data gathered by the rover. This analysis is used to prioritize the data for transmission, so that the data with the highest science value is transmitted to Earth. In addition, the onboard analysis results are used to identify additional science gathering opportunities. A planning and scheduling component of the system enables the rover to take advantage of the identified science opportunity.

Anderson, R. C.↗

Modification and updating of the Manned Activity Scheduling System (MASS) for shuttle and shuttle payloads analysis. Volume 2: Space shuttle sortie payload analysis

Space shuttle operations include a significant number of launches with a sortie laboratory serving as a facility for manned experimentation in space. Planning a program of space experiments for a facility of this type requires that both the composition of the laboratory payload and the schedule of experiment operations for each payload be carefully selected. Experiment operations are investigated using the manned activity scheduling system (MASS). Schedules provided by these models assist in selecting experiment groups that efficiently use the laboratory resources and yield the desired experiment accomplishment at the program level. An alternate use of the MASS models provides for establishing the time-dependent supporting resources required for a specified candidate payload. A procedure for defining and analyzing shuttle sortie payloads was developed. This procedure was then applied to the definition of mixed-discipline experiment payloads for an advanced technology laboratory (ATL) supported by two-and three-man crews. The ATL payloads, including schedules of experiment operations, were defined to realize a high percentage of experiment accomplishment. The study considers the sensitivity of experiment accomplishment rate to variations of system parameters such as crew cross training, crew operations, shuttle and laboratory resources, ground target systems, and operational orbits.

Huyett, R. C.↗

The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.

To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank

97 MATHEMATICS AND COMPUTING↗

The Capability Portfolio Analysis Tool (CPAT): A Mixed Integer Linear Programming Formulation for Fleet Modernization Analysis (Version 2.0.2).

In order to effectively plan the management and modernization of their large and diverse fleets of vehicles, Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) commis- sioned the development of a large-scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This paper contains a thor- ough documentation of the terminology, parameters, variables, and constraints that comprise the fleet management mixed integer linear programming (MILP) mathematical formulation. This paper, which is an update to the original CPAT formulation document published in 2015 (SAND2015-3487), covers the formulation of important new CPAT features.

97 MATHEMATICS AND COMPUTING↗