Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Derivation of Failure Rates and Probability of Failures for the International Space Station Probabilistic Risk Assessment Study

National Aeronautics and Space Administration s (NASA) International Space Station (ISS) Program uses Probabilistic Risk Assessment (PRA) as part of its Continuous Risk Management Process. It is used as a decision and management support tool to not only quantify risk for specific conditions, but more importantly comparing different operational and management options to determine the lowest risk option and provide rationale for management decisions. This paper presents the derivation of the probability distributions used to quantify the failure rates and the probability of failures of the basic events employed in the PRA model of the ISS. The paper will show how a Bayesian approach was used with different sources of data including the actual ISS on orbit failures to enhance the confidence in results of the PRA. As time progresses and more meaningful data is gathered from on orbit failures, an increasingly accurate failure rate probability distribution for the basic events of the ISS PRA model can be obtained. The ISS PRA has been developed by mapping the ISS critical systems such as propulsion, thermal control, or power generation into event sequences diagrams and fault trees. The lowest level of indenture of the fault trees was the orbital replacement units (ORU). The ORU level was chosen consistently with the level of statistically meaningful data that could be obtained from the aerospace industry and from the experts in the field. For example, data was gathered for the solenoid valves present in the propulsion system of the ISS. However valves themselves are composed of parts and the individual failure of these parts was not accounted for in the PRA model. In other words the failure of a spring within a valve was considered a failure of the valve itself.

Vitali, Roberto↗

Method and system for dynamic probabilistic risk assessment

The DEFT methodology, system and computer readable medium extends the applicability of the PRA (Probabilistic Risk Assessment) methodology to computer-based systems, by allowing DFT (Dynamic Fault Tree) nodes as pivot nodes in the Event Tree (ET) model. DEFT includes a mathematical model and solution algorithm, supports all common PRA analysis functions and cutsets. Additional capabilities enabled by the DFT include modularization, phased mission analysis, sequence dependencies, and imperfect coverage.

Dugan, Joanne Bechta↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

Probabilistic Risk Assessment for Decision Making During Spacecraft Operations

Decisions made during the operational phase of a space mission often have significant and immediate consequences. Without the explicit consideration of the risks involved and their representation in a solid model, it is very likely that these risks are not considered systematically in trade studies. Wrong decisions during the operational phase of a space mission can lead to immediate system failure whereas correct decisions can help recover the system even from faulty conditions. A problem of special interest is the determination of the system fault protection strategies upon the occurrence of faults within the system. Decisions regarding the fault protection strategy also heavily rely on a correct understanding of the state of the system and an integrated risk model that represents the various possible scenarios and their respective likelihoods. Probabilistic Risk Assessment (PRA) modeling is applicable to the full lifecycle of a space mission project, from concept development to preliminary design, detailed design, development and operations. The benefits and utilities of the model, however, depend on the phase of the mission for which it is used. This is because of the difference in the key strategic decisions that support each mission phase. The focus of this paper is on describing the particular methods used for PRA modeling during the operational phase of a spacecraft by gleaning insight from recently conducted case studies on two operational Mars orbiters. During operations, the key decisions relate to the commands sent to the spacecraft for any kind of diagnostics, anomaly resolution, trajectory changes, or planning. Often, faults and failures occur in the parts of the spacecraft but are contained or mitigated before they can cause serious damage. The failure behavior of the system during operations provides valuable data for updating and adjusting the related PRA models that are built primarily based on historical failure data. The PRA models, in turn, provide insight into the effect of various faults or failures on the risk and failure drivers of the system and the likelihood of possible end case scenarios, thereby facilitating the decision making process during operations. This paper describes the process of adjusting PRA models based on observed spacecraft data, on one hand, and utilizing the models for insight into the future system behavior on the other hand. While PRA models are typically used as a decision aid during the design phase of a space mission, we advocate adjusting them based on the observed behavior of the spacecraft and utilizing them for decision support during the operations phase.

dynamic fault trees↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Constellation Probabilistic Risk Assessment (PRA): Design Consideration for the Crew Exploration Vehicle

Managed by NASA's Office of Safety and Mission Assurance, a pilot probabilistic risk analysis (PRA) of the NASA Crew Exploration Vehicle (CEV) was performed in early 2006. The PRA methods used follow the general guidance provided in the NASA PRA Procedures Guide for NASA Managers and Practitioners'. Phased-mission based event trees and fault trees are used to model a lunar sortie mission of the CEV - involving the following phases: launch of a cargo vessel and a crew vessel; rendezvous of these two vessels in low Earth orbit; transit to th$: moon; lunar surface activities; ascension &om the lunar surface; and return to Earth. The analysis is based upon assumptions, preliminary system diagrams, and failure data that may involve large uncertainties or may lack formal validation. Furthermore, some of the data used were based upon expert judgment or extrapolated from similar components~systemsT. his paper includes a discussion of the system-level models and provides an overview of the analysis results used to identify insights into CEV risk drivers, and trade and sensitivity studies. Lastly, the PRA model was used to determine changes in risk as the system configurations or key parameters are modified.

Prassinos, Peter G.↗

U.S. Nuclear Operating Experience Program for Probabilistic Risk Assessment Parameter Estimations

This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.

99 GENERAL AND MISCELLANEOUS↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗

Probabilistic risk assessment of the Space Shuttle. Phase 3: A study of the potential of losing the vehicle during nominal operation. Volume 2: Integrated loss of vehicle model

The application of the probabilistic risk assessment methodology to a Space Shuttle environment, particularly to the potential of losing the Shuttle during nominal operation is addressed. The different related concerns are identified and combined to determine overall program risks. A fault tree model is used to allocate system probabilities to the subsystem level. The loss of the vehicle due to failure to contain energetic gas and debris, to maintain proper propulsion and configuration is analyzed, along with the loss due to Orbiter, external tank failure, and landing failure or error.

Fragola, Joseph R.↗

Bayesian Framework For Bioburden Density Calculations To Perform Planetary Protection Probabilistic Risk Assessment

The planetary protection discipline aims to minimize the microbial contamination on spacecraft to prevent the inadvertent contamination of other planetary bodies, known as forward planetary protection (PP). Planetary protection probabilistic risk assessment (PRA) relies on two core methodologies-the contamination probability event tree analysis and statistical parameter estimation. Planetary protection engineers combine several techniques to estimate the bioburden present on spacecraft components. A direct assay to enumerate CFU (colony forming units) is the preferred methodology, but given a similar processing environment the bioburden present on certain components is inferred using: (1) a NASA defined bioburden estimate based upon the biological cleanliness of the manufacturing/assembly environment or (2) sampled data from a similar spacecraft component. The paper presents an empirical Bayesian framework to systematically treat bioburden estimation and its uncertainties on different levels starting with measurement procedures to combining different components to subsystems and whole spacecraft. It is shown that the Bayesian approach can effectively handle estimations and their uncertainties at different levels and produce a reliable estimate for bioburden to be used to evaluate the probability of contamination.

Seuylemezian, Arman↗

2009 Space Shuttle Probabilistic Risk Assessment Overview

Loss of a Space Shuttle during flight has severe consequences, including loss of a significant national asset; loss of national confidence and pride; and, most importantly, loss of human life. The Shuttle Probabilistic Risk Assessment (SPRA) is used to identify risk contributors and their significance; thus, assisting management in determining how to reduce risk. In 2006, an overview of the SPRA Iteration 2.1 was presented at PSAM 8 [1]. Like all successful PRAs, the SPRA is a living PRA and has undergone revisions since PSAM 8. The latest revision to the SPRA is Iteration 3. 1, and it will not be the last as the Shuttle program progresses and more is learned. This paper discusses the SPRA scope, overall methodology, and results, as well as provides risk insights. The scope, assumptions, uncertainties, and limitations of this assessment provide risk-informed perspective to aid management s decision-making process. In addition, this paper compares the Iteration 3.1 analysis and results to the Iteration 2.1 analysis and results presented at PSAM 8.

Hamlin, Teri L.↗

Trade Studies of Space Launch Architectures using Modular Probabilistic Risk Analysis

A top-down risk assessment in the early phases of space exploration architecture development can provide understanding and intuition of the potential risks associated with new designs and technologies. In this approach, risk analysts draw from their past experience and the heritage of similar existing systems as a source for reliability data. This top-down approach captures the complex interactions of the risk driving parts of the integrated system without requiring detailed knowledge of the parts themselves, which is often unavailable in the early design stages. Traditional probabilistic risk analysis (PRA) technologies, however, suffer several drawbacks that limit their timely application to complex technology development programs. The most restrictive of these is a dependence on static planning scenarios, expressed through fault and event trees. Fault trees incorporating comprehensive mission scenarios are routinely constructed for complex space systems, and several commercial software products are available for evaluating fault statistics. These static representations cannot capture the dynamic behavior of system failures without substantial modification of the initial tree. Consequently, the development of dynamic models using fault tree analysis has been an active area of research in recent years. This paper discusses the implementation and demonstration of dynamic, modular scenario modeling for integration of subsystem fault evaluation modules using the Space Architecture Failure Evaluation (SAFE) tool. SAFE is a C++ code that was originally developed to support NASA s Space Launch Initiative. It provides a flexible framework for system architecture definition and trade studies. SAFE supports extensible modeling of dynamic, time-dependent risk drivers of the system and functions at the level of fidelity for which design and failure data exists. The approach is scalable, allowing inclusion of additional information as detailed data becomes available. The tool performs a Monte Carlo analysis to provide statistical estimates. Example results of an architecture system reliability study are summarized for an exploration system concept using heritage data from liquid-fueled expendable Saturn V/Apollo launch vehicles.

Mathias, Donovan L.↗

Reliability and Probabilistic Risk Assessment - How They Play Together

Since the Space Shuttle Challenger accident in 1986, NASA has extensively used probabilistic analysis methods to assess, understand, and communicate the risk of space launch vehicles. Probabilistic Risk Assessment (PRA), used in the nuclear industry, is one of the probabilistic analysis methods NASA utilizes to assess Loss of Mission (LOM) and Loss of Crew (LOC) risk for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability distributions to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: 1) what can go wrong that would lead to loss or degraded performance (i.e., scenarios involving undesired consequences of interest), 2) how likely is it (probabilities), and 3) what is the severity of the degradation (consequences). Since the Challenger accident, PRA has been used in supporting decisions regarding safety upgrades for launch vehicles. Another area that was given a lot of emphasis at NASA after the Challenger accident is reliability engineering. Reliability engineering has been a critical design function at NASA since the early Apollo days. However, after the Challenger accident, quantitative reliability analysis and reliability predictions were given more scrutiny because of their importance in understanding failure mechanism and quantifying the probability of failure, which are key elements in resolving technical issues, performing design trades, and implementing design improvements. Although PRA and reliability are both probabilistic in nature and, in some cases, use the same tools, they are two different activities. Specifically, reliability engineering is a broad design discipline that deals with loss of function and helps understand failure mechanism and improve component and system design. PRA is a system scenario based risk assessment process intended to assess the risk scenarios that could lead to a major/top undesirable system event, and to identify those scenarios that are high-risk drivers. PRA output is critical to support risk informed decisions concerning system design. This paper describes the PRA process and the reliability engineering discipline in detail. It discusses their differences and similarities and how they work together as complementary analyses to support the design and risk assessment processes. Lessons learned, applications, and case studies in both areas are also discussed in the paper to demonstrate and explain these differences and similarities.

Safie, Fayssal↗