Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management Tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Project Management Using Modern Guidance, Navigation and Control Theory

Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

Hill, Terry R.↗

Assessing C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

air traffic control↗

Assessing C2 Communications

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

aircraft communications↗

Risk Management for the International Space Station

The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

Sebastian, J.↗

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗

Scalable collaborative risk management technology for complex critical systems

We describe here our project and plans to develop methods, software tools, and infrastructure tools to address challenges relating to geographically distributed software development. Specifically, this work is creating an infrastructure that supports applications working over distributed geographical and organizational domains and is using this infrastructure to develop a tool that supports project development using risk management and analysis techniques where the participants are not collocated.

requirements prioritization↗

PRMS Data Warehousing Prototype

Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

Guruvadoo, Eranna K.↗

PRMS Data Warehousing Prototype

Project and Resource Management System (PRMS) is a web-based, mid-level management tool developed at KSC to provide a unified enterprise framework for Project and Mission management. The addition of a data warehouse as a strategic component to the PRMS is investigated through the analysis, design and implementation processes of a data warehouse prototype. As a proof of concept, a demonstration of the prototype with its OLAP's technology for multidimensional data analysis is made. The results of the data analysis and the design constraints are discussed. The prototype can be used to motivate interest and support for an operational data warehouse.

Guruvadoo, Eranna K.↗

Software engineering and data management for automated payload experiment tool

The Microgravity Projects Office identified a need to develop a software package that will lead experiment developers through the development planning process, obtain necessary information, establish an electronic data exchange avenue, and allow easier manipulation/reformatting of the collected information. An MS-DOS compatible software package called the Automated Payload Experiment Tool (APET) has been developed and delivered. The objective of this task is to expand on the results of the APET work previously performed by UAH and provide versions of the software in a Macintosh and Windows compatible format.

Maddux, Gary A.↗

Software engineering and data management for automated payload experiment tool

The Microgravity Projects Office identified a need to develop a software package that will lead experiment developers through the development planning process, obtain necessary information, establish an electronic data exchange avenue, and allow easier manipulation/reformatting of the collected information. An MS-DOS compatible software package called the Automated Payload Experiment Tool (APET) has been developed and delivered. The objective of this task is to expand on the results of the APET work previously performed by University of Alabama in Huntsville (UAH) and provide versions of the software in a Macintosh and Windows compatible format. Appendix 1 science requirements document (SRD) Users Manual is attached.

Maddux, Gary A.↗

Future ATM Concepts Evaluation Tool (FACET) Interface Control Document

This Interface Control Document (ICD) documents the airspace adaptation and air traffic inputs of NASA's Future ATM Concepts and Evaluation Tool (FACET). Its intended audience is the project manager, project team, development team, and stakeholders interested in interfacing with the system. FACET equips Air Traffic Management (ATM) researchers and service providers with a way to explore, develop and evaluate advanced air transportation concepts before they are field-tested and eventually deployed. FACET is a flexible software tool that is capable of quickly generating and analyzing thousands of aircraft trajectories. It provides researchers with a simulation environment for preliminary testing of advanced ATM concepts. Using aircraft performance profiles, airspace models, weather data, and flight schedules, the tool models trajectories for the climb, cruise, and descent phases of flight for each type of aircraft. An advanced graphical interface displays traffic patterns in two and three dimensions, under various current and projected conditions for specific airspace regions or over the entire continental United States. The system is able to simulate a full day's dynamic national airspace system (NAS) operations, model system uncertainty, measure the impact of different decision-makers in the NAS, and provide analysis of the results in graphical form, including sector, airport, fix, and airway usage statistics. NASA researchers test and analyze the system-wide impact of new traffic flow management algorithms under anticipated air traffic growth projections on the nation's air traffic system. In addition to modeling the airspace system for NASA research, FACET has also successfully transitioned into a valuable tool for operational use. Federal Aviation Administration (FAA) traffic flow managers and commercial airline dispatchers have used FACET technology for real-time operations planning. FACET integrates live air traffic data from FAA radar systems and weather data from the National Weather Service to summarize NAS performance. This information allows system operators to reroute flights around congested airspace and severe weather to maintain safety and minimize delay. FACET also supports the planning and post-operational evaluation of reroute strategies at the national level to maximize system efficiency. For the commercial airline passenger, strategic planning with FACET can result in fewer flight delays and cancellations. The performance capabilities of FACET are largely due to its architecture, which strikes a balance between flexibility and fidelity. FACET is capable of modeling the airspace operations for the continental United States, processing thousands of aircraft on a single computer. FACET was written in Java and C, enabling the portability of its software to a variety of operating systems. In addition, FACET was designed with a modular software architecture to facilitate rapid prototyping of diverse ATM concepts. Several advanced ATM concepts have already been implemented in FACET, including aircraft self-separation, prediction of aircraft demand and sector congestion, system-wide impact assessment of traffic flow management constraints, and wind-optimal routing.

FACET↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗

Agent-Based Simulations for Project Management

Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

White, J. Chris↗

Management: A continuing literature survey with indexes, March 1976

Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.

Source record↗

Management: A continuing literature survey with indexes

This bibliography lists 782 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1977. The citations, and abstracts when available, are reproduced exactly as they appeared originally in IAA and STAR, including the original accession numbers from the respective announcement journals. Topics cover the management of research and development contracts, production, logistics, personnel, safety, reliability and quality control citations. Includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.

Source record↗

Management. A continuing bibliography with indexes

This bibliography cites 604 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1979 covering the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. Program, project, and systems management; management policy, philosophy, tools, and techniques; decision making processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting are also covered. Abstracts are provided as well as subject, personal author, and corporate source indexes.

Source record↗

Analysis of At-Altitude LTE Power Spectra for C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration’s (NASA) Unmanned Aircraft Systems Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude small Unmanned Aerial Systems (sUAS, also known as drones) operations. This paper presents results of work completed in the paper [1] presented at the 2018 ICNS conference where proposed approaches were explored for evaluating and analyzing sUAS Command and Control (C2) links based on commercial cellular networks. This paper focuses on the UTM Project’s Technology Capability Level 3 (TCL-3) test results which address the communications portion identified within the same paper. A software defined radio (SDR) was flown as a sUAS payload to capture received signal spectrum in Long Term Evolution (LTE) frequency bands of interest. The purpose was to measure the RF environment at UTM altitudes to characterize the interference potential. The SDR payload was flown at various stationary altitudes where the LTE over-the-air complex (I/Q) samples were captured by the SDR and later post-processed. The SDR received inputs through an omnidirectional antenna. The complex samples captured were an aggregate of transmissions received from all line-of-sight (LOS) towers within the geographic area for the specific radio frequency bandwidth the SDR is programmed to capture. Using this approach, the complex samples captured do not distinguish between the various eNodeB's (Long Term Evolution (LTE) transmitting towers). The complex samples were post processed via a Discrete Fourier Transform (DFT) algorithm to view the captured spectrum along with the power levels across the captured LTE bandwidth. This SDR payload process of capturing complex samples was done at two different regions within the US: 1) NASA's Ames Research Center (ARC) in Moffett Field, CA, and 2) Griffiss Airfield in Rome, NY. The data capture at the ARC site was done at two physical locations within the Ames campus where many stationary altitude captures where done as high as 800 ft. above ground level (AGL). The data captured at the Griffiss Airport (also known as the NY Corridor Site) were acquired at one location with three specific stationary altitude levels – {Ground Level (GL), 300 ft., and 400 ft.}. The LTE spectrum power levels were captured for two LTE carriers, AT&T and Verizon, at both sites where their respective spectra and power levels were measured and compared at various altitudes. The overall results show that there is an increase in LTE spectrum power levels at higher altitudes for drones. A detailed analysis of this data and conclusions drawn from the results are presented in this paper.

Kerczewski, Robert J.↗