Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Vind: A Blockchain-Enabled Supply Chain Provenance Framework for Energy Delivery Systems

Enterprise-level energy delivery systems (EDSs) depend on different software or hardware vendors to achieve operational efficiency. Critical components of these systems are typically manufactured and integrated by overseas suppliers, which expands the attack surface to adversaries with additional opportunities to infiltrate into EDSs. Due to this reason, the risk management of the EDS supply chain is crucial to ensure that we are knowledgeable about the vulnerabilities in software and hardware components that comprise any critical part, quantifiable risk metrics to assess the severity and exploitability of the attack, and provide remediation solutions that can influence a prioritized mitigation plan. There is a need to realize cyber supply chain risk management for industrial control systems’ hardware, software, and computing and networking services associated with bulk electric system (BES) operations. This article proposes a blockchain-based cyber supply chain provenance platform (“Vind”) for EDSs to realize data provenance in a cyber supply chain ecosystem.

Bandara, Eranga↗

Toxicity Values for Chemicals

The toxicity values for chemicals contained in this dataset comprise acute, subchronic, and chronic exposure durations. Cancer slope factors, inhalation unit risk, reference dose, and reference concentrations are available. These values should be used in cancer risk and noncancer hazard assessments for the calculation of preliminary remediation goals (PRGs) and hazard characterization. Users can select toxicity values from 10 combinations of exposure durations and cancer/noncancer toxicity values and select up to 1000 chemicals per query. The dataset supports environmental risk assessments, regulatory decision-making, and environmental planning with tools for benchmarking against risk-based standards. This structured approach ensures a robust evaluation of environmental risks tailored to regulatory needs.

Stewart, Debra [Oak Ridge National Laboratory (ORN↗

A Cost and Benefit Analysis of Orbital Debris Remediation, Mitigation,Tracking, and Characterization

Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work(Colvin, Karcz, and Wusk. 2023), referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current paper summarizes the work of Locke and Colvin (2024), which contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Orbital Debris↗

Cost and Benefit Analysis of Orbital Debris Remediation

This report describes a cost-benefit analysis of approaches for debris remediation, which is defined as any action taken to reduce the risks posed by orbital debris by moving, removing, or reusing it. A better understanding of the near-term costs and benefits of the different approaches to remediation can support decision-making about R&D investment and policy creation in this area.

Thomas J. Colvin↗

Cost Benefit Analysis of Space Debris Remediation

These slides provide a high-level summary of a cost-benefit analysis of approaches for debris remediation, which is defined as any action taken to reduce the risks posed by orbital debris by moving, removing, or reusing it. A better understanding of the near-term costs and benefits of the different approaches to remediation can support decision-making about R&D investment and policy creation in this area.

Tom Colvin↗

Multidecadal Biological Monitoring and Abatement Program assessing human impacts on aquatic ecosystems within the Oak Ridge Reservation in eastern Tennessee, USA

Human activities can be powerful drivers of ecosystem change within catchments. While most long-term catchment studies have been conducted at pristine sites, such studies are less common from sites more impacted by human activity. The Oak Ridge National Laboratory's Biological Monitoring and Abatement Program (BMAP) was developed in the mid-1980s to (1) assess compliance with environmental regulations, (2) identify causes of adverse ecological impacts, (3) provide data for human and ecological risk assessments, and (4) evaluate the effectiveness of remedial actions taken to mitigate the impacts of contaminants in soils, groundwater, and surface water by documenting ecological recovery on the Oak Ridge Reservation (ORR), a federally owned 33,476-acre site in eastern Tennessee, USA, managed by the U.S. Department of Energy. The ORR is composed of multiple watersheds containing many small to mid-size streams. BMAP uses an integrated approach for determining stream health; its databases include long-term seasonal records of contaminant concentrations in water and biota, data from aquatic toxicity testing, and surveys of macroinvertebrate and fish assemblages from impacted and reference streams. These long-term data provide valuable records of degradation and recovery in catchment ecosystems. Our objective in this work is to describe our study system and data series in order to increase awareness of the availability of these long-term data to the catchment science community.

54 ENVIRONMENTAL SCIENCES↗

Analysis of semivolatile organics in liquid radioactive residue using sorptive stir bar and solvent back-extraction

Current methods for semivolatiles analysis in radioactive samples can produce large volumes of radioactive solvent residue. A method utilizing stir-bar sorptive extraction has been explored in this work for its applicability to radioactive waste samples. This low solvent analytical method may accelerate remediation, minimize hazardous solvent waste, and reduce exposure risk to workers. Organic compounds (polyaromatic hydrocarbons, chlorinated aromatics, and phenolic compounds) were chosen as surrogates for common Liquid Waste System (LWS) contaminants at Savannah River Site (Aiken, SC). Stir-bar extraction parameters (extraction time, matrix modification, and effective pH range) and solvent back extraction parameters (solvent type, volume, and extraction time) were optimized experimentally for the chosen compounds. Affinity of the stir-bar extraction polymer to radionuclides Cs-137 and Am-241 was observed to determine radionuclide concentration effects. The stir-bar method achieved mean recovery of 100 ± 0.7% (1σ), relative to 114 ± 7% using solvent extraction, while reducing weekly method hands-on time by 93.4% and solvent volume consumption by 99.3%. Sensitivity was improved by 378% in simulated tank waste and 278% in real-world LWS matrix, relative to solvent extraction. This work has produced a safe and optimized method for the low solvent analysis of organics in legacy radioactive tank waste by stir-bar sorptive extraction.

GC-MS↗

Status of SRNL Radiological Field Lysimeter Experiment (RadFLEx) – Year 7

The Radiological Field Lysimeter Experiment (RadFLEx) began in 2012 and is a collaboration between the Savannah River National Laboratory (SRNL) and Clemson University. The purpose of this facility is to study the long-term (2 to 20 years) fate and transport of radionuclides in the Savannah River Site (SRS) vadose zone under natural field and meteorological conditions. The unique facility houses 48 5-L cores filled with sediments amended with various radionuclide sources. The results from these studies have been applied to the development of geochemical models used to assess the risk posed by subsurface nuclear waste disposal, environmental remediation, and waste form development. This report describes the refurbishment of the exterior of the RadFLEx facility and the synthesis and deployment of six plutonium(Pu) sources, four neptunium (Np) sources and one radium (Ra) source. It is anticipated that these newly installed lysimeter cores will be studied for up to 10 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reference Gastrointestinal Absorption Fractions for Radionuclides Ingested in Soil

Oak Ridge National Laboratory is conducting a project for the Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation involving derivation of cancer risk coefficients for ingestion of radionuclides in soil. EPA provides guidance on quantifying gastrointestinal (GI) absorption of a chemical in a given medium for use in risk evaluations including assessments for Superfund sites. Essentially, a medium-specific GI absorption fraction may be applied if and only if there is sound information to support that value. Otherwise, the applied GI absorption fraction should be the best estimate of fractional absorption of the chemical when ingested in highly soluble form. Based on our review of the literature on GI absorption of elements in soil, we have concluded that for many elements there is convincing evidence of substantially reduced absorption in ingested soil compared with ingestion in readily dissolved form. This report summarizes the reviewed information and proposes a comprehensive set of GI absorption fractions for ingestion of elements in soil. For most elements, the proposed GI absorption fractions are lower than the default absorption fractions recommended by the International Commission on Radiological Protection for radionuclides ingested in highly soluble form, even though considerable conservatism has been incorporated into the proposed soil-specific GI absorption fractions.

59 BASIC BIOLOGICAL SCIENCES↗

Soil Desiccation Treatability Testing at BC Waste Disposal Cribs

During Hanford’s production period, low-level waste products generated from chemical processing of uranium fuel rods were discharged directly to the ground through a system of cribs and trenches located in the 200-BC-1 Operable Unit (OU). The site consists of 6 cribs and 20 trenches that received more than 117,000 m3 of radioactive liquid waste discharged to the soil. These unlined infiltration galleries held volumes of liquid waste while it seeped into the ground, with the understanding that the 100 m (330 ft) thick vadose zone in the area would effectively capture the effluent and prevent groundwater impacts. A conceptual model showing the operation of cribs and trenches is shown in Figure 1. Data show effluent from the 26 cribs and trenches containing about 410 curies of Technetium-99 (Tc-99) is primarily located between 30 m and 70 m (98 ft and 230 ft) depth (Corbin et al., 2005; Ward et al., 2004). Despite no evidence indicating that the contamination has reached the groundwater at BC cribs and trenches, the mobility of Tc-99 had been demonstrated in laboratory tests and was recognized as a threat to groundwater at the site. Using data from numerical models, laboratory analyses, field investigations, and information on historical discharges, the EPA and Ecology identified Tc-99 and U contamination of the vadose zone as a remediation priority. The U.S. DOE was notified by EPA and Ecology regarding risks associated with Tc-99 contamination in a letter requesting development of a strategy for improved methods to understand the nature and extent of vadose zone contamination, specifically Tc-99, and to develop remedial options for addressing such contamination. To develop the appropriate technology for characterizing, remediating, and monitoring the deep vadose zone Tc-99 contamination, the U.S. DOE worked with the EPA and Ecology to create a Treatability Test Plan under a Remedial Investigation/Feasibility Study (RI/FS) for the Hanford 200 Areas. Under this RI/FS, it was determined that a treatability test for soil desiccation should be carried out as it was identified as a promising in-situ treatment technology for mitigating risks posed by Tc-99 contamination to the groundwater table. The BC Cribs and Trenches site was identified as a representative site for Tc-99 and U contamination and selected for the soil desiccation treatability test. In this chapter, we summarize the overlying regulatory framework of RI/FS and treatability tests and illustrate how development and experimentation supported the evaluation of selected remedies. We briefly discuss the RI/FS for the 200 Areas of the Hanford Site and focus on the soil desiccation treatability testing performed at the BC cribs and trenches site under the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DVZ-TT). The DVZ-TT is one component of the remedial investigation/feasibility study for the Hanford 200 Areas and represents the underlying regulatory framework that drives site operations towards records of decision and site closure.

Mangel, Adam R.↗

Environmental risks and opportunities of orphaned oil and gas wells in the United States

Abstract Hundreds of thousands of documented and undocumented orphaned oil and gas wells exist in the United States (U.S.). These wells have the potential to contaminate water supplies, degrade ecosystems, and emit methane and other air pollutants. Thus, orphaned wells present risks to climate stability and to environmental and human health, which can be reduced by plugging. To quantify environmental risks and opportunities of well plugging at the national level, we analyze data on 81 857 documented orphaned wells across the U.S. We find that > 4.6 million people live within 1 km of a documented orphaned well. 35% of the documented orphaned wells are located within 1 km of a domestic groundwater well, yet only 8% of the wells have groundwater quality data within a 1 km radius. Methane emissions from the documented orphaned wells represent approximately 3%–6% of total U.S. methane emissions from abandoned oil and gas wells, but this estimate is based on measurements at < 0.03% of U.S. abandoned wells. 91% of the documented orphaned wells overlie formations favorable for geologic storage of carbon dioxide and hydrogen, meaning that orphaned well plugging can reduce leakage risks from future storage projects. Finally, we estimate plugging costs for documented orphaned wells to exceed the $4.7 billion federal funding by 30%–80%, emphasizing the importance of prioritizing federal spending on wells with large remediation benefits. Overall, environmental monitoring data are not extensive enough to quantify risks, especially those related to air and water quality and human health. Plugging orphaned wells can provide opportunities for geologic storage of carbon dioxide and hydrogen and geothermal energy development, thereby facilitating efforts to transition to net-zero energy systems. Our analysis on environmental risks and opportunities of orphaned wells provides a framework that can be used to manage the millions of documented and undocumented orphaned wells in the U.S. and abroad.

54 ENVIRONMENTAL SCIENCES↗

An Overview of In-Stu Treatability Studies at Marshall Space Flight Center, Huntsville, Alabama

Marshall Space Flight Center (MSFC) is located in Huntsville, Alabama (north-central Alabama), on approximately 1,840 acres near the center of the U.S. Army's Redstone Arsenal (RSA). MSFC is the National Aeronautics and Space Administration's (NASA's) principal propulsion development center. Its scientists, engineers, and support personnel play a major role in the National Space Transportation System by managing space shuttle mission activities, including the microgravity laboratory. In addition, MSFC will be a significant contributor to several of NASA's future programs, including the Reusable Launch Vehicle (X-33), International Space Station, and Advanced X-ray Astrophysics Facility, as well as research on a variety of space science applications. MSFC has been used to develop, test and manufacture space vehicles and components since 1960, when civilian rocketry and missile activities were transferred from RSA to MSFC. In 1994, MSFC was placed on the National Priority List for the management of hazardous waste sites, under the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). One requirement of the CERCLA program is to evaluate the nature and extent of environmental contamination resulting from identified CERCLA sites, assess the public health and environmental risks associated with the identified contamination, and identify potential remedial actions. A CERCLA remedial investigation (RI) for the groundwater system has identified at least five major plumes of chlorinated volatile organic compounds (CVOCs) in the groundwater beneath the facility. These plumes are believed to be the result of former management practices at 14 main facility locations (termed "source areas") where CVOCs were released to the subsurface. Trichloroethene (TCE) is the predominant CVOC and is common to all the plumes. Perchloroethene (PCE) also exists in two of the plumes. In addition to TCE and PCE, carbon tetrachloride and 1,1,2,2-tetrachloroethane are contained in one of the plumes. The CVOCs are believed to exist as dense non-aqueous phase liquids (DNAPLs) beneath many of the source areas.

McElroy, Bill↗

Decision Aid for Conjunction Risk Mitigation by Differential Drag

In the previous five years, the rate of conjunctions that the NASA Conjunction Assessment Risk Analysis (CARA) team processed and analyzed has more than tripled. (NASA CARA, 2024) New missions in the early development phases are now required to plan for dealing with conjunctions under the present space environment, and also projecting forward into a future likely with even further increased utilization of the space environment. Some missions are investigating the possibility of using differential drag to remediate conjunctions without expending limited fuel or for missions without propulsive capabilities. The NASA CARA team studied the historical record of conjunctions to evaluate the circumstances under which differential drag may be successfully applied and have developed a series of tables to use as a decision aid for missions considering differential drag. CARA records all conjunctions of their protected payloads, with historical records starting in 2005 (with significant conjunction events starting to occur on or after 2013). From this record, approximately 7,300 had a probability of collision (Pc) greater than 1 in 10,000, the nominal requirement for a risk mitigation maneuver (RMM) to be made per NASA Procedural Requirements (NPR) 8079.1 (NASA, 2023), at 3 days prior to the time of closest approach, the time analyzed for differential drag efficacy. CARA’s maneuver trade space tool (MTS) was used to prop-agate the primary satellite forward from that decision point with varying degrees of increase to ballistic coefficient (BC), and then recalculate the Pc to evaluate whether or not the conjunction was mitigated (Pc < 3E-6). These results were then binned and sorted along several axes, including altitude, amount of delta-BC, and (pre-maneuver) rate of energy dissipation, to identify underlying patterns. The altitude plot is shown in Figure 1. We found that differential drag was most successful for satellites with perigees below 560 km, and which could adopt an average delta-BC of 2 or greater (that is, increasing their ballistic coefficient by a factor of 3). However, this is a difficult threshold for a mission to clear; very few spacecraft are capable of adopting a high-drag configuration for 72 hours continuously. Planet’s Dove spacecraft use differential drag to remediate conjunctions (Griffith, et al., 2021), and they have a maximum delta-BC factor of 9, but in practice (with mission and charging constraints) they achieve a time-averaged delta-BC that is closer to 2 (Foster, et al., 2017). In contrast, a NASA mission in development reached out to CARA to evaluate the utility of differential drag to remediate potential conjunctions for a spacecraft which is capable of a similar high delta-BC, but with operational constraints that limit their time-averaged delta-BC to less than 1. CARA has developed tables that can be used as decision aids to advise missions-in-development about the best way to utilize their differential drag capabilities. For missions below 560 km with the operational flexibility to devote multiple days to holding a high-drag configuration (or a sufficiently high drag ratio to compensate for limitations on that time), they are able to successfully remediate high-risk conjunctions. Conversely, missions that do not meet these ex-acting criteria – most missions – can instead be advised to use on-board propulsion systems to perform RMMs or to turn their minimum-area face towards the approach vector, thereby reducing Pc at the moment of conjunction. (NASA, 2023)

risk mitigation↗

An Overview of the Risk Assessment Information System

This technical memorandum (TM) presents an overview of the Risk Assessment Information System (RAIS), a collection of web-based tools designed to assist with the environmental risk assessment process. The objective of the RAIS is to be a single resource for the risk assessment process, providing guidance when planning and performing the steps: data assessment, exposure assessment, toxicity assessment, and risk characterization. The RAIS evolved as a result of the initial remediation efforts at various United States (U.S.) Department of Energy (DOE) facilities. The goal was to increase the efficiency and transparency of the human health and ecological assessments being performed by DOE’s Office of Environmental Management, Oak Ridge Operations (ORO) office by providing a repository for toxicity information, physicochemical data, risk assessment procedures, standardized risk calculation methods, and web-based tools. Since the initial launch in 1996, the RAIS has expanded its user base outside of the federal government and now has users from over 100 countries, universities, states, and local governments. What sets the RAIS apart from other risk assessment sites are the publicly available, searchable toxicity and physicochemical databases and the wide range of chemical and radionuclide risk calculation tools. The purpose of this TM is to present the RAIS tools in order of the website menus and explain how they fit in the risk assessment process. In addition, this TM describes differences between the chemical and radionuclide tools of the RAIS. Screening level equations, chronic daily intake equations, and default exposure factors used in the chemical and radionuclide calculators are included in the appendices of this TM. This TM is not intended to be a detailed guide to risk assessment or the RAIS tools. The tools on the RAIS can be used to comply with procedures from multiple agencies, including but not limited to DOE, U.S. Environmental Protection Agency (EPA), U.S. Department of Defense (DoD), and many state governments. Further information on the RAIS tools can be found in the user guides and tutorials available on the webpage.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Remediating Non-Positive Definite State Covariances for Collision Probability Estimation

The NASA Conjunction Assessment Risk Analysis team estimates the probability of collision (Pc) for a set of Earth-orbiting satellites. The Pc estimation software processes satellite position+velocity states and their associated covariance matri-ces. On occasion, the software encounters non-positive definite (NPD) state co-variances, which can adversely affect or prevent the Pc estimation process. Inter-polation inaccuracies appear to account for the majority of such covariances, alt-hough other mechanisms contribute also. This paper investigates the origin of NPD state covariance matrices, three different methods for remediating these co-variances when and if necessary, and the associated effects on the Pc estimation process.

Hall, Doyle T.↗

Improving Long-term Monitoring of Contaminated Groundwater at Sites where Attenuation-based Remedies are Deployed

This study presents an effective approach to tackle the challenge of long-term monitoring of contaminated groundwater sites where remediation leaves residual contamination in the subsurface. Traditional long-term monitoring of contaminated groundwater sites focuses on measuring contaminant concentrations and is applicable to sites where contaminant mass is removed or degraded to a level below the regulatory standard. The traditional approach is less effective at sites where risk from metals or radionuclides continues to exist in the subsurface after remedial goals are achieved. We propose a long-term monitoring strategy for this type of waste site that focuses on measuring the hydrological and geochemical parameters that control attenuation or remobilization of contaminants while de-emphasizing contaminant-concentration measurements. Furthermore, we demonstrate how this approach would be more effective than traditional long-term monitoring, using a site in South Carolina, USA, where groundwater is contaminated by several radionuclides. A comprehensive enhanced attenuation remedy has been implemented at the site to minimize discharge of contamination to surface water. The immobilization of contaminants occurs in three locations by manipulation of hydrological and geochemical parameters, as well as by natural attenuation processes. Deployment of our proposed long-term monitoring strategy will combine subsurface and surface measurements using spectroscopic tools, geophysical tools, and sensors to monitor the parameters controlling contaminant attenuation. The advantage of this approach is that it will detect the potential for contaminant remobilization from engineered and natural attenuation zones, allowing potential adverse changes to be mitigated before contaminant attenuation is reversed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗