At least 73 records · Page 4

Aging of Concrete for the Evaluation of Repair Materials to Protect the Walls of the HCAEX Tunnel at Savannah River - 20301

H-Canyon, located in the Savannah River site, is a unique facility for chemical reprocessing of plutonium, highly-enriched uranium, and other radioactive materials. The exhaust gases of the H-Canyon are sent through the H-Canyon Exhaust (HCAEX) tunnel for contamination removal. Robotic inspections of the tunnel revealed significant degradation of the reinforced concrete structure that was associated with acid attack, and could compromise the structural stability of the tunnel. Thus, the identification and evaluation of potential repair materials that could be applied on the degraded walls to mitigate and prevent further degradation is of significant interest to the Department of Energy and the Savannah River representatives. This research effort has been divided into two phases: 1) Development and evaluation of aged concrete under accelerated aging conditions (which is the focus of this paper) and 2) Evaluation of potential repair materials applied on aged and non-aged concrete under simulated aggressive conditions. In order to develop and evaluate concrete samples exposed to accelerated aging conditions in simulated aggressive environments, a literature review of the HCAEX tunnel was conducted that included 1) characterization and extent of the concrete damage, 2) environmental conditions inside the tunnel and 3) primary deterioration mechanisms. In addition, potential coatings and/or repair materials for degraded concrete surfaces exposed to aggressive environments (primarily acidic) were selected from the literature review and the most common testing and measurements for evaluating acid attack phenomena, erosion, etc. were reviewed. From the literature review findings, a preliminary bench-scale test plan for the concrete aging was developed, including accelerated aging tests with aggressive conditions (acid fumes, humidity, etc.). Concrete samples were exposed to the aging accelerated conditions (e.g. immersion in acid solutions) and visual inspection, mass loss and pH change (acid solution) were recorded over time. Correlations between the visual inspection, mass loss and pH changes results and the aging time or the aging conditions were developed. Specimens submitted to the highest acid concentration showed the fastest and most intense degradation. The type of coarse aggregate (limestone) used for the concrete seemed to be the cause of the fastest aging observed, compared to the cement paste. The research findings created the foundation for the ongoing investigation, in which new concrete samples with a mix design similar to the HCAEX tunnel will be tested and will serve as the substrate for testing the selected coatings and /or repair materials. In this paper, the literature review and preliminary results from the aging tests are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adhesion Capabilities of Permanent Foaming Fixatives for Deactivation and Decommissioning Activities - 20308

Florida International University's Applied Research Center and the Department of Energy's Savannah River National Laboratory are examining various mechanical properties of intumescent rigid polyurethane foams in order to be used as a permanent foaming fixative. Intumescent polyurethane foams are favored more than non-intumescent polyurethane foams due to their ability to mitigate flame and smoke propagation when exposed to a fire. As a consequence, this ability, known as intumescing, will allow fire personnel ample time to arrive at a scene. Due to sites being dormant for many decades before the final decontamination stages, the likelihood of a fire remains high. Adhesion properties will ensure quality immobilization performance. The analysis consisted of evaluating tensile adhesion strengths on a variety of commercial-off-the-shelf polyurethane (PU) foams. The foams consisted of intumescent and a combination of flexible and rigid foams. The goal was to down select the rigid foams out of the group in terms of tensile adhesion performance. The ensuing analysis was to conduct shear adhesion testing on the rigid foams in an operational volume with one of the rigid foams being intumescent. This approach helped down select the intumescent rigid foam in an adhesion and operational sense. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCR Operational Summary and Optimization for Tank 9 Processing - 20314

Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Transport Modeling for Technology Evaluation and Long-Term Monitoring in the Tims Branch Testbed, SC - 20343

Studies conducted at U.S. DOE sites have shown the presence of heavy metals, radionuclides, and volatile organic compounds in surface water, groundwater, and soil as a result of nuclear activity in the Cold War era. Since the 1990's, innovative cleanup methods have been implemented in the Tims Branch watershed at Savannah River Site (SRS) to limit the contaminant flux to the stream that have reduced the contaminant concentrations to acceptable regulatory levels in the dissolved phase. A tin-based treatment which effectively eliminated all local anthropogenic mercury inputs to this ecosystem resulted in a known step function addition of inert tin oxide particles which now serve as a potential tracer for sedimentation and particle transport processes in the stream. The long-term effectiveness of this and other remediation techniques and the potential for remobilization of adsorbed contaminant in sediment during extreme hydrologic conditions however remains unclear. It is therefore important to understand not only the fate and transport of dissolved contaminants, but also the movement of sediment and the relevant interactions with dissolved contaminant. To narrow this knowledge gap, a study is being conducted using the Tims Branch watershed as a stream-scale ecosystem test-bed to identify the primary transport processes of major contaminants of concern (such as mercury, nickel and uranium) with an emphasis on interactions with sediment transport. This involves the development of a fully distributed hydrologic watershed model of the Tims Branch watershed to predict streamflow under extreme weather conditions, as well as the development of a comprehensive contaminant transport model that can properly account for coupled contaminant and sediment transport. Review of relevant research reports and peer-reviewed journals revealed that aside from advection-dispersion transport of dissolved contaminants, adsorption and desorption with suspended solids and bed sediment also play an important role in the transport of those contaminants of concern. To develop the fully distributed hydrologic watershed model, the MIKE SHE 2-dimensional (2D) land surface/3D groundwater model that simulates surface/subsurface hydrologic processes (such as overland flow, evapotranspiration, and infiltration) was coupled with a 1D streamflow model that accounts for stream water hydraulics (such as hydraulic structures, cross-sections, and network). To model contaminant transport, the MIKE 11 streamflow component was coupled with the MIKE 11 AD module that simulates solute transport through advection and dispersion, and MIKE ECO Lab module that accounts for both sediment transport and interactions with dissolved contaminant. At this stage, the development and optimization of the fully distributed hydrologic model has been completed, achieving satisfactory statistical results between observed and predicted discharge as indicated by a root mean square error (RMSE) of 0.039 cms and a Nash-Sutcliffe efficiency coefficient (NSE) of 0.764. The ongoing development of the contaminant transport model has also yielded realistic results from preliminary tests. Results from this study are a key to evaluating the effectiveness of tin (II)-based mercury treatment of wetlands at the SRS site, and are also relevant to evaluating the potential of using this type of novel remediation technology in other mercury-contaminated stream systems. Knowledge acquired from this research will also support interpretation of historical data on the trends of contaminant concentration distribution in Tims Branch, particularly considering the effect of extreme hydrological events on the stream flow and pollutant transport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Advancing Technologies for Remote Inspections - 20345

In 2017, the DOE Environmental Management Office of Technology Development (DOE-EM TD) sponsored the H-Canyon Advanced Technology Demonstration (ATD) to demonstrate to DOE facilities the value of using new commercial-off-the-shelf (COTS) and near-ready technologies to solve difficult problems and enhance worker safety. The DOE Savannah River Site (SRS) H-Canyon Air Exhaust Tunnel (HCAEX) inspection task was identified as representative of the hazardous, human denied environments which could benefit from advanced technologies. The HCAEX underground concrete tunnel is visually inspected biannually using a camera mounted on a remotely operated vehicle (ROV) designed and built by SRNL. While tunnel images have provided valuable visual information, it is desirable to have a higher order of understanding of the environment to support a more thorough structural integrity (SI) analysis and for long term planning purposes. As part of the ATD, the Concrete Integrated Product Team (CIPT) was formed to identify and evaluate available sensors and methods mature enough to remotely obtain tunnel concrete characterization data of high value and with a high probability of success. The team included SMEs and H-Canyon stakeholders in the field of concrete, nondestructive examination (NDE), structural integrity, sensors and remote systems from SRNL, SRNS, LANL, DOE-SR and the Army Corps of Engineering. The CIPT completed an in-depth identification of customer concrete inspection needs and potential technology solutions. Sensors and methods were evaluated on performance, data usefulness, cost and the feasibility of a successful deployment given the unique tunnel access challenges and environment. Two technologies were identified as promising by the CIPT for near term demonstration and evaluation: Lidar (Light Detection and Ranging) 3-dimensional (3D) mapping and remote robotic deployment of NDE instrumentation. Laser spectroscopy to characterize tunnel surface chemical changes was also of interest, but presently cost prohibitive. This paper will include a discussion of the two efforts underway to evaluate and implement the CIPT recommendations. First, the status of the November 2019 deployment of Lidar at a single location into the tunnel is presented. This initial deployment provided the team a learning curve and lessons learned on the challenges of tunnel deployment to include remote operation and data collection, stabilization of the sensor in high air flow (∼30 mph), ability to achieve a tolerance accuracy of 0.25-inches, and the probability to identify change in tunnel dimensions over time. Secondly, a discussion on the development of the Robotic Arm Concrete Inspection Test Bed capable of deploying NDE instruments to examine custom concrete forms will be presented. Concrete forms simulating the rough concrete surfaces, strength, composition and potential structural defects that can be found at our DOE EM facilities have been designed and built for the test bed. Two state-of-the art concrete NDE instruments have been identified as having potential to work on rough concrete walls, they are being tested and characterized as to their ability to provide desired structural integrity data to include wall thickness and defect identification on the developed test beams. Lastly, lessons learned, and the path forward will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site High Level Radioactive Waste Tank Sample Thermolytic Hydrogen Generation - 20346

To support the revision of flammability calculations and controls for the Savannah River Site (SRS) High-Level Radioactive Waste (HLW) tanks, Savannah River National Laboratory (SRNL) conducted laboratory measurements with the goal of quantifying hydrogen produced in HLW by non-radiolytic chemical reactions (i.e., thermolysis). Testing was performed with HLW tank supernate samples that represented a cross section of types of waste at SRS, including tanks that store typical evaporator concentrate, dissolved salt-cake, dilute recycle stream from the Defense Waste Processing Facility (DWPF), evaporator concentrate of the recycle stream from DWPF, fresh waste from the canyon separations facility, and waste that has been through salt processing cesium removal. Non-radioactive simulant testing included the classes of organic compounds historically introduced into the HLW tanks that were recently shown to be the most active toward the thermolytic generation of hydrogen. The reaction rate equations developed for thermolytic hydrogen generation from each class of organic compound showed direct proportionality to organic compound concentration and hydroxide concentration. Simulant testing identified that highly concentrated waste with high hydroxide concentration had the highest rates of thermolytic hydrogen generation. Using the radioactive tank sample thermolysis measurements at high temperatures and the mechanistic salt dependence of the simulant models, a global model was developed for tank waste thermolytic hydrogen generation as a function of total organic carbon content of SRS HLW. Through the primary functionality of the global model (organic carbon and free hydroxide concentration), the relative reactivity of the organic carbon in the waste was quantified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting Saturated Hydraulic Conductivity over Time for Degrading Saltstone Vault Concrete - 20376

At the Savannah River Site (SRS), low-level liquid tank waste is mixed with cementitious materials to produce a solid, monolithic waste form referred to as saltstone. The liquid saltstone mixture is pumped into massive concrete structures referred to as saltstone disposal units (SDUs) for curing and long-term storage. SDUs are vaults made of high performance concrete forming a barrier between saltstone and the surrounding environment. Predicting the long-term performance of SDU vault concrete, as well as the saltstone material itself, is critical to understanding the potential releases of radionuclides to the surrounding environment as described in the Saltstone Disposal Facility (SDF) performance assessment (PA). The hydraulic conductivity profile for SDU vault concrete was conservatively assumed to degrade linearly from the initial saturated hydraulic conductivity of the intact concrete over a long period of time. The initial hydraulic properties of saturated SDU vault concrete have been measured, and the final hydraulic properties of degraded vault concrete are assumed to be the same as the porous backfill material that will surround the vault after closure. The assumed final condition of the vault concrete is also conservative in that it provides a greater estimate of water penetration through the vault than would generally be expected. Therefore, insights that provide more realistic but conservative estimates as to how degradation processes may change the hydraulic properties of the SDU vault concrete, the time dependent relationship of the vault concrete hydraulic properties to degradation (and thus time), and the final hydraulic properties of the vault concrete provides useful additions to the SDF PA. This paper focuses on the assumption that the saltstone vault concrete saturated hydraulic conductivity would decrease linearly as a function of degradation time; this assumption resulted from a worst-case, weighted (by relative layer thickness), arithmetic average of intact and backfill material hydraulic conductivities representing flow parallel to a layered system. This research indicates that the effective saturated hydraulic conductivity of the degraded SDU vault concrete should be based on the relative thickness-weighted geometric mean of the intact and degraded layers hydraulic conductivities. This alternative, which is supported extensively in the relevant literature and evaluated in this paper, leads to a more realistic and defensible estimate of the effective saturated hydraulic conductivity in degraded vault concrete while remaining conservative. The impact of using the more realistic estimate of the effective saturated hydraulic conductivity for the degraded concrete decreases the effective saturated hydraulic conductivity by up to several orders of magnitude for early times (i.e., when the SDU vault concrete is assumed degraded via sulfate attack and carbonation). This revised estimate of the effective saturated hydraulic conductivity has been implemented in the recently revised SDF PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Methods for In-line Monitoring of Yield Stress During the Transfer of Radioactive Waste - 20435

Radioactive waste slurries at the Savannah River Site (SRS) and Hanford often behave as non-Newtonian fluids with a yield stress. The yield stress increases the size of equipment needed to transport or mix these slurries and can increase the risk of process upsets. This property is often measured by collection of samples and transportation to a laboratory, which can increase the risk of personnel exposure and even change the rheology. In addition, slurry rheology has been observed to change with time. Real-time in-line monitoring (RTIM) of rheological properties of slurries can have substantial benefits to critical processes which are currently in operation or will be part of future plans in Department of Energy (DOE) complex processes. The need for an appropriate RTIM technology that can potentially minimize or eliminate numerous sampling operations was recently identified. This research at Florida International University focuses on addressing the need for a reliable RTIM technology at US Department of Energy sites. The objective of this work is to investigate and develop appropriate and reliable technologies that can perform accurate and easy measurements of yield stress with minimal changes to the flow conditions at US Department of Energy sites. Use of ultrasound in longitudinal and shear modes was considered as a method for monitoring of yield stress variations with no disturbance to the flow. Measurement of shear wave velocity (in shear mode) and monitoring of sound velocity variations with start of flow from rest (longitudinal mode) are the underlying principles. Measurement of pressure loss and liquid rise (due to static differential pressure) during flow of slurries were two other methods that were considered and investigated. In addition, analysis of stability depth of a penetrometer in slurry medium (penetrometer method) revealed a potential suitability. This paper presents efforts associated with investigation of different methods mentioned earlier for kaolin-water mixtures at different concentrations. Theoretical analysis showed that all methods under investigation were capable of monitoring yield stress in a desirable range of 0 to 70 pascal. A bench scale test setup was constructed for investigation of pressure loss and liquid rise methods. Simulants at different concentrations were created for initial testing campaigns. For ultrasonic testing, effects of yield stress on sound propagation speed in longitudinal and shear modes were investigated for simulants placed inside PVC pipes. Parameters such as simulant concentration and pipe diameter were varied to find optimal values. It was found that spacing (or medium thickness) of 1/8 inch or less was necessary to observe echoes with sufficient strength. In addition, a significant effect of yield stress on sound propagation velocity was observed. For the liquid rise method, kaolin-water simulant at 1.17 specific gravity was pumped through a 1/4 inch pipe and liquid height was measured in a vertical riser branching off a three-way connection. Static gauge pressure was varied within [0.3 to 1.1] psi range by increase of pumping pressure and flow. Results showed consistent yield stress data within 10% deviation from values reported by a rheometer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of Processing Batches for Tank Closure Cesium Removal Through In-Tank Batch Contact Testing - 20470

The Tank Closure Cesium Removal (TCCR) process at the Savannah River Site (SRS) is currently processing waste from Tank 10H, generating decontaminated salt solution that is sent to Tank 11H. Transfers out of Tank 11H are then disposed of on site as a grout wasteform in the SRS Saltstone Processing Facility. This is a full-scale demonstration of the use of Crystalline Silicotitanate (CST) for the decontamination of aqueous nuclear waste supernate. CST primarily removes cesium from the high sodium alkaline feed, but also adsorbs strontium, actinides, and some other trace metals. The TCCR unit is an at-tank set of four ion exchange columns, with two typically being operated in series during waste processing. Tank 10H is serving a dual function as both the salt dissolution tank as well as the feed tank for the TCCR system. Prior to operation of TCCR, Tank 10H must undergo dissolution campaigns, dissolving the salt cake to form an aqueous salt solution (supernate). After each dissolution campaign, the supernate created must be qualified prior to processing through the TCCR system. Qualification includes detailed characterization of the supernate as well as in-tank batch contact tests to determine the equilibrium loading of Cs-137 on the CST ion exchange media (IONSIV{sup TM} R9120-Ba). In support of the in-tank batch contact testing, Savannah River National Laboratory (SRNL) developed a CST sample holder, also referred to as a 'tea-bag', to hold a measured amount (∼0.1 grams) of pretreated CST between stainless steel screens. The tea-bag fits within a standard stainless steel sample vial that has been modified to allow the flow of supernate to the CST. This sample holder is then immersed in the waste tank allowing free contact between the CST beads and the surrounding liquid, at an effectively infinite liquid-to-solid phase ratio. A pair of tea-bags are deployed in the tank for a period of 10 days for each batch, after which the CST is recovered, digested, and analyzed to determine the loading of cesium isotopes on the CST. This result then supports the TCCR column thermal loading limits for processing as part of the TCCR safety basis. This paper will discuss the design and testing of the CST sample holder, as well as results from the first few batches of waste qualified and subsequently processed through the TCCR system. In addition, results from analyses of Tank 11H samples, showing decontamination of the product will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Upcoming Process Improvement Efforts at the Saltstone Facilities at the Savannah River Site - 20474

The Saltstone Facilities at the Savannah River Site (SRS) process and dispose of low activity salt solution waste generated by other liquid waste facilities. Today in the Liquid Waste System (LWS), approximately 125 million liters of salt waste remain to be processed. The Saltstone Production Facility (SPF) receives the decontaminated salt waste, which is mixed with dry feeds consisting of cement, fly ash and slag to produce the saltstone. The mixed slurry is pumped to the Saltstone Disposal Units (SDUs) for safe disposal in the Saltstone Disposal Facility (SDF). To support continuous Salt Waste Processing Facility (SWPF) operations at annual processing volumes many times higher than present, significant modifications are required to ensure that the SPF has the capacity to support the throughput of salt waste. These changes include several infrastructure upgrades that are being worked through the Enhanced Low Activity Waste Disposal (ELAWD) project. In addition to infrastructure upgrades, Savannah River Remediation (SRR), the Savannah River Site's Liquid Waste Contractor for the U.S. Department of Energy, has identified a flowsheet improvement opportunity of implementing a cement-free saltstone formulation to eliminate cement from the current three component formulation. This two-component formulation would simplify the procurement, transport, off-loading, and storage of the premix materials, and increase the storage capacity for the individual components. This flowsheet, when implemented, will reduce operational risk and improve throughput necessary to achieve disposal rates necessary for SWPF operations. Research has been completed to confirm the feasibility of this formulation, with the new cement-free flowsheet expected to be implemented in the next few years. Improvements have also been identified downstream of the SPF to increase SDU utilization. Specifically, a concentrated effort has taken place to raise the fill height in SDU 6 to the full disposal height, 13 meters, to maximize the usage of each SDU in support of the liquid waste disposal mission. This improvement has been made through additional thermal modeling and improved process understanding to create a SDU flammability model and control strategy more representative of facility operations. This work will allow for the completion of construction and operational readiness for SDU 7 while filling SDU 6 to ensure there is no lapse in available space once SWPF starts up. A summary of these improvements as they relate to increased throughput will be provided along with associated status. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Augmented Monitoring and Condition Assessment Program for SNF Wet Storage Life Extension - 20489

Approximately 27 MTHM of spent nuclear fuel (SNF) owned and managed by the U.S. Department of Energy, Office of Environmental Management is stored in the L Basin at the Savannah River Site (SRS). This 'DOE SNF' is comprised of approximately 12,000 aluminum-clad, aluminum-based fuel assemblies (∼7 MTHM), and approximately 2000 non-aluminum fuel assemblies (∼20 MTHM). A program is in progress to perform Non-Destructive Examination (NDE) of the fuel and their storage containers to characterize the materials' condition, and to evaluate the effects of service to enable continued safe wet storage of the SNF. The Augmented Monitoring and Condition Assessment Program (AMCAP), a two-part program to develop and implement remote underwater Non-Destructive Examination of the aluminum SNF, and of the containers of the non-aluminum SNF, respectively, is aimed at the characterization and evaluation of corrosion degradation of aluminum fuel and container materials. The predominant design of the aluminum SNF (ASNF) stored in L Basin is the Materials Test Reactor (MTR) equivalent design, a plate fuel design. These SNF are stored in 5'' diameter tubes or 5'' x 5'' squares (called bundles) that are nominally 12' or up to 14' long. The SNF is de-bundled and inspected using a custom-designed MTR Fuel Inspection Table. The inspection table provides for indexed fuel positioning for a video camera examination with controlled lighting. A total of 10 of the SNF originating from foreign research and test reactors were selected for examination based on burnup, enrichment, and prior damage caused by service/storage history. A special inspection campaign of these 10 assemblies is in progress. The observed corrosion damage included minor to moderate attack from general corrosion, pitting, crevice, end grain and galvanic corrosion. Example results from the completed inspections are shown and discussed. The focus is a comparison of the as-received condition versus the as-found current storage condition that will serve to validate Water Chemistry and Corrosion Monitoring Programs. The non-aluminum SNF (NASNF) stored in L Basin are of diverse design that includes various geometries with claddings of stainless steel, Zircaloy, and Hastelloy. The fuel core materials include uranium alloys, oxides/mixed oxides, and carbides. These SNF materials, originating from early experimental and test reactors, are in various physical forms including single fuel elements and cut pieces. The fuel is stored in L Basin in various configurations including in direct bundled storage in aluminum tubes and in isolation cans that are in the bundles or in a larger over-size storage container (OSC). Concern with inside-out corrosion and the potential loss of configuration control and ability to handle the storage containers prompted the development of remote NDE methods that include visual and UT technologies to assess the condition of the containers. Candidate stored materials were selected for a special inspection campaign; the development of the NDE methods for the inspection for galvanic, crevice and sediment-induced corrosion (inside-out) are discussed. A summary of the SNF storage in L Basin at the SRS, and an overview of the AMCAP to enable continued safe storage of DOE SNF are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Dry Storage of Aluminum-Clad Spent Nuclear Fuel - 20490

A candidate disposition pathway for the > 13 MTHM of aluminum-clad spent nuclear fuel (ASNF), owned and managed by the U.S. Department of Energy, is the drying and placement of the SNF into sealed-canister dry storage, with the ASNF-in- canisters 'road-ready' for transportation to and final direct disposal in a repository waste package. Technical information gaps in fuel drying, and fuel dry storage behavior, have previously challenged the declaration of technology readiness for drying and placement of this fuel into the DOE Standard Canister design for > 50 years of safe dry storage. The principal technical information gaps included: i) characterization and thermal dehydration behavior of aluminum (oxy)hydroxide films attendant on the cladding due to film formation during reactor operation and during post-discharge up to long-term wet storage histories; and ii) G-value data to enable estimation of the radiolytic gas generation from the cladding with its (oxy)hydroxide films. Thus, the oxide films on the ASNF challenged the safety of a sealed storage canister with thermal and radiolytic decomposition of the waters on the films that can lead to corrosion, pressurization, and flammability issues. These gaps in the technical information base have largely been closed. This paper discusses the investigations at the Idaho National Laboratory (INL) and the Savannah River National laboratory (SRNL), and outlines the pending technology development work for input to an engineering design to enable a road-ready dry storage system for ASNF. The ASNF inventory considered for road-ready dry storage is stored at the Savannah River Site (SRS) and at the Idaho Nuclear Technology and Engineering Center (INTEC) at the INL. The ASNF inventory in the SRS L Basin is from foreign and domestic research reactors (FRR and DRR), and is diverse in terms of design, irradiation, and post-reactor-discharge storage conditions; these factors yield a range of characteristics of cladding oxide films on ASNF. Mixed aluminum (oxy)hydroxide (boehmite and bayerite/gibbsite) films, non-uniform in thicknesses up to a maximum local thickness bounded by 25 μm, were observed on ASNF materials removed from wet storage in the L Basin and in non-sealed dry storage at the SRS following reactor service and a long-term (up to 40+ years) interim storage history. The ASNF inventory at INTEC, in both wet and vented dry storage, is predominantly from the Advanced Test Reactor (ATR), but it also includes DRR and FRR fuel. To address a profound behavior of these films, radiolysis testing of aluminum specimens with mixed type boehmite/bayerite oxide films was performed to develop basic data on G-values for production of radiolytic hydrogen under dry storage conditions with nominal relative humidity, temperature, and cover gas. Modeling and simulation of canister internal environments with postulated inventories of oxide films provides estimation of the evolution of the conditions of the canister loaded with ASNF. Simultaneous Thermal Analysis (TGA/DSC) of hydrated oxide powders, and laboratory-scale aluminum specimens with a bayerite film (∼10 μm) using TGA methods, inform drying time/temperature conditions to be used for the ASNF. A demonstration project is recommended for Verification and Validation of the drying and storage of the ASNF. Remaining major tasks leading up to the hot demonstration include scale-up radiolysis testing and scale-up drying testing. Engineering design with the information from the technology program will establish the safety basis and enable long-term (> 50 years) dry storage compatibility with ASNF in the DOE Standard Canister pending its transportation to and disposal in a repository. This full capability would show the ASNF-in-canister storage system to be road-ready. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Big Data and AI at DoE's Legacy Sites - 20546

More than 30 years have passed since DOE started the decommissioning of nuclear weapon complexes and the clean-up of soil and groundwater. All the sites have been collecting and archiving soil and groundwater monitoring datasets; particularly contaminant concentration time-series. These datasets provide unparalleled opportunities to understand the system behavior (including more fundamental hydrological and geochemical processes, the response to various perturbations, the long-term trend and environmental decay rate towards the regulatory limit). This understanding is critical for providing multiple lines of evidences that can support site closure. In this study, we explore the machine learning (ML) and artificial intelligence (AI) applications to the long-term soil and groundwater management at DoE's legacy sites. ML can improve our understanding of the subsurface systems, which is critical for long-term monitoring and management of the sites, while AI can automate or support some of decision-making processes (e.g., anomaly detection, monitoring well placements). The particular focuses are to develop general algorithms to: (1) to identify distinct spatiotemporal patterns and to identify several groups that have similar temporal behaviors, using unsupervised clustering methods, (2) identify the different temporal scales of hydrological responses to climate perturbations by time-series analysis, and (3) reduce the number of monitoring wells by identifying the minimum sufficient number of wells to capture the heterogeneity of the groundwater contaminant plume and concentration distribution, using the Gaussian Process model. We demonstrate our methodology at the Savannah River Site F-Area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IER-519 CED-2: Final Design for Thermal/Epithermal eXperiments (TEX) with Absorbers to Provide Validation Benchmarks for Hanford Tank Farms

The Hanford tank farms contain 56 million gallons of waste across 177 tanks. The primary criticality safety concern for the waste is the plutonium inventory in waste solids – approximately 670 kg in total. Criticality safety analysis credits the absorption and dilution properties of the large quantities of other elements (aluminum, chromium, iron, manganese, nickel, silicon, sodium, and zirconium) present in the waste. Of these, iron and manganese are by far the most significant neutron absorbers, particularly for the waste compositions of highest criticality safety concern. The criticality safety analyses at the Hanford Waste Treatment and Vitrification Plant (WTP) and the Savannah River tank farms also credit iron and manganese as the primary neutron absorbers to demonstrate subcriticality.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Ammonium and Iodine Decontamination Factors for Hanford's Waste Treatment and Immobilization Plant Feed in the Effluent Treatment Facility

Savannah River National Laboratory (SRNL) reviewed the unit operations in the Effluent Treatment Facility (FTP) at the Hanford site to estimate the partitioning of iodine and ammonia when processing Waste Treatments and Immobilization Plant (WTP) feed. The evaluation consisted of literature and vendor data reviews and no experiments were performed. A list of the unit operations reviewed, along with estimated decontamination factors (DFs) for both iodine and ammonium are shown in the table below. With the exception of the Peroxide Decomposer, reasonable estimations of the decontamination factors for all operations are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative uptake, translocation, and plant mediated transport of Tc-99, Cs-133, Np-237, and U-238 in Savannah River Site soil columns for the grass species Andropogon virginicus

Here, this study examines the ability of the grass species Andropogon virginicus to alter the subsurface transport and redistribution of a suite of radionuclides ( 99 Tc, 133 Cs (stable analog for 135 Cs and 137 Cs), 237 Np, 238 U) with varying chemical behaviors in a Savannah River Site soil via the use of vegetated and unvegetated soil columns. After an acclimation period, a small volume of solution containing all radionuclides was introduced into the columns via Rhizon© pore water sampling tubes. Plants were grown for an additional 4 weeks before shoots were harvested, and columns were prepared for sampling. Plant presence led to decreased radionuclide release from the columns, mainly due to radionuclide specific combinations of system hydrology differences resulting from plant transpiration as well as plant uptake. For the most mobile radionuclides, 99 Tc followed by 237 Np, plant presence resulted in significantly different soil concentration profiles between vegetated and unvegetated columns, including notable upward migration for 237 Np in columns with plants. Additionally, plant uptake of 99 Tc was the greatest of all the radionuclides, with plant tissues containing an average of 44 % of the 99 Tc, while plant uptake only accounted for <2 % of 237 Np and <0.5 % of 133 Cs and 238 U in the system. Although overall plant uptake of 133 Cs and 238 U were similar, the majority of 133 Cs taken up by plants was associated with 133 Cs already available in the aqueous phase while 238 U uptake was mainly associated with the solid phase, meaning that plant activity resulted in a fraction of the native 238 U being mobilized and thus, made available for plant uptake. Overall, this study quantified the influence of several plant-mediated physical and biogeochemical factors that have significant influence on radionuclide mobility and transport in this complex system which can be further utilized in future system or site-specific environmental transport and risk assessment models.

59 BASIC BIOLOGICAL SCIENCES↗

Coal Ash Beneficial Use at Savannah River Site

The Savannah River Site (SRS) has over 1.4 million cubic meters of coal ash and coal fines left over from coal-burning power plants that operated on site. Currently, the coal ash must be disposed of in an approved landfill or the coal ash-containing basins must be closed in place (i.e. consolidation, appropriate cover and liner system). Potential beneficial uses of the coal ash include geotechnical fill, such as backfill needed in the closure cap of the Z-area Saltstone Disposal Units (SDU), and use in cementitious material applications like thermal beneficiation or cement kiln feed, thereby reducing the environmental footprint of SRS. In this study, samples of coal ash from SRS were obtained and characterized for chemical and physical properties. Coal ash samples did not leach sulfates or heavy metals, so the coal ash is a candidate for geotechnical fill use. The samples also did not increase the acidity of the leachate during leaching tests, so it would not be detrimental to use as geotechnical fill near cementitious materials. The composition and energy potential of the coal ash makes it favorable for use as feed for external/off-site cement kilns or thermal beneficiation plants