INFLUENCE OF NON-EQUILIBRIUM CONDITIONS ON LIQUID HYDROGEN STORAGE TANK BEHAVIOR.
Abstract not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Hanford Site in Washington State has legacy radiological waste that is being retrieved from single shell tanks (SSTs) and transferred to newer, double shell tanks (DSTs) for eventual closure of the SSTs. The waste is maintained in the DSTs until eventual immobilization can be performed at the Waste Treatment and Immobilization Plant (WTP), currently under construction. Until full immobilization is complete, extended service of the DSTs must be ensured by mitigating corrosion of the steel tank walls and buried steel pipelines. A Pit Air Supply System has been developed to mitigate corrosion of the leak detection pits connected to the concrete foundations of the DSTs. The objectives for the present study are: (i) to corrode steel specimens in an electrolytic simulant to form artificial pits with specific pit depths, and (ii) to determine the temperature and humidity levels that will mitigate further pit growth. Experimental work and results will be presented to evaluate conditions associated with the PASS system and predict corrosion rates when the PASS is operating.
The Savannah River Site (SRS) and Hanford produced large quantities of plutonium and other radioisotopes. The separations processes recovered plutonium and produced large quantities of High- Level Waste (HLW) that accumulated at each site in large, underground storage tanks. SRS has been retrieving the stored HLW, pretreating the waste for immobilization, and immobilizing the waste in glass or grout waste forms since the mid-1990s. Treatment of the waste at Hanford is expected to start in the early 2020s. Mercury is present in both the SRS and Hanford tank waste. SRS has recently completed an evaluation of mercury speciation throughout the tank waste treatment and immobilization flowsheet. This study was reviewed to determine what information from the study can be applied to the Hanford tank waste treatment program.
In Nuclear Power Plants VVER 440, Russian type of reactor there was designed auxiliary building where according to basic design all operational liquid radioactive waste (RAW) should be stored in large capacity tanks during the whole operational period. That's why there are in the auxiliary building several types of large storage tanks with different internal volume from 110 m{sup 3}, 460 m{sup 3} to 550 m{sup 3}. Storage tanks are usually situated in rooms with limited access and minimal handling space. Operational waste was here transported by the system of pipes from the reactor building. There is possibility to handle with the waste and set the pipeline in to the chosen storage tanks. Nobody takes care about the quality of waste in the storage tanks and waste waits for the period of decommissioning when it should be treated. The storage capacity was designed for the whole lifetime of nuclear power plant. Currently the life time of Nuclear Power Plant's (NPP) is extended and there is necessity to retrieve and treat the RAW in advance. Another reason why the stakeholder, who operates the NPPs, decides to treat the operational RAW during the operational period of NPP, is that there are still new requirements from safety point of view which need to have free available space for example because of potential accident. So treating the operational RAW during the life time of NPP is present issue. Because in basic design nobody cares how the RAW will be retrieved and treated in the future, there is usually no technology for that in existing NPP. Some of the NPPs build an additional building with suitable technologies for treatment or hire the company which offer mobile technology for retrieving the waste from the storage tanks. Wood Nuclear Slovakia PLC provides all activities within liquid RAW management projects by its own staff including management, design, construction and deployment of equipment, engineering support, as well as all RAW retrieval and solidification activities. We offer RAW management as a service without any significant changes in existing NPP's buildings and technology. It is always a technical challenge to conduct successful retrieval, pumping and treatment of RAW. The complex RAW retrieval system can be designed as tailored solution for any RAW storage according to known boundary conditions and specific needs. These systems are based on years of experience with RAW manipulation, processing and treatment and the whole RAW management knowledge by Wood Nuclear Slovakia LTD. (authors)
As a part of the Accelerated Basin De-Inventory (ABD) program Tanks 31 or 32 will be re-purposed to support increasing the number of annual Material Test Reactor (MTR) and High Flux Isotope Reactor (HFIR) dissolutions. The proposed plan will allow Tanks 31 or 32 to be used as the dissolver cold chemical solution makeup tank and storage tank. The dissolver cold chemicals are 50% nitric acid, process water, mercuric nitrate, and gadolinium nitrate. Tanks 31 and 32 are 9 ft. (outer diameter) x 36 ft, horizontal, and can hold approximately 56,000 liters (15,000 gallons) each. One full volume of Tanks 31 or 32 can support 4 HFIR 6.4D equivalent batches. Both tanks are equipped with liquid level instrumentation. Tank 31 is equipped with 1 pump used for transfer and recirculation while Tank 32 is equipped with two pumps, one for transfer and the other for recirculation. Each of the pumps is equipped with sample taps. The tanks do not have specific gravity instrumentation, an agitator, or a sampler. Piping modifications will also be performed to supply the tank with cold chemicals. The current dissolver chemical composition is 5.0 -8.5M HNO3 and ~0.2 g Gd/L. The recirculating pump connected to Tank 31 is rated for a flowrate 175 gpm while the pump connected to Tank 32 is rated for a flowrate 50 gpm.
Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.
Renewable energy technologies are becoming more attractive and gaining more attention as the world becomes increasingly aware of the negative impacts of global warming and greenhouse gas (GHG) emissions. Two such emerging technologies are geothermal heat pumps (GHP) and solar thermal heating which can be used for heating and cooling of buildings. GHP systems are a well-studied technology that have been proven to be more efficient than traditional air-source heat pumps for space conditioning of buildings. Solar thermal heating has become more common as a way to heat domestic hot water (DHW) in homes, but the two technologies are not often combined. This study presents the findings of combining an open-loop GHP with 100 ft2 of flat plate solar thermal panels and a 5,655-gallon sensible water storage tank for space heating and DHW heating needs of a residential home in Bozeman, MT, USA. The goal of this system was to use energy from the solar panels and storage tank first to decrease pumping energy from the GHP well. The open loop system was designed to be a backup system to the solar thermal panels and sensible storage tank. An actual home was modeled to determine potential energy and cost savings of such a system compared to a traditional propane boiler. Then, a case study was performed on the installed system from January to June 2021. Results obtained from April 2nd to June 5th, 2021 indicated that the combination system supplied all necessary heat, and that heat was supplied from the thermal storage tank 55% of the time. This represents a savings of 330 kWh of energy and $36 compared to operating just the open loop geothermal system. From April 2nd to June 5th the combination system consumed a total of 2,510 kWh of energy and cost $274 to operate. Based on data obtained, there is significant potential for energy savings compared to a propane boiler, however only small potential for cost savings.
In recent years, more scrutiny has been placed on the release of greenhouse gasses (GHGs) by the oil and gas industry in North America as climate concerns increase. In the coming years, stricter regulations proposed by the Environmental Protection Agency (EPA) concerning the release of GHGs will further direct attention to GHG emissions quantification, modeling, and overall reduction. Active natural gas wellsites employ production equipment that routinely emits methane during normal operation. Production equipment often includes, but is not limited to, gas production units (GPUs), pneumatic controllers (PCs) and actuators powered by produced natural gas, and produced water storage tanks. This work details direct methane emission measurements taken at active natural gas wellsites originating from intermittent pneumatic controllers and produced water storage tanks. Efforts to model methane flows originating from these sources are also detailed, and those results are compared to direct measurement. The direct methane emissions measurement campaign collected flow data from two active dry wellsites in the Marcellus shale region. These measurement campaigns captured, in total, several weeks of continuous data from these sites. Data included multiple pneumatic device vent flowrate channels, a single channel monitoring total emissions vented from the produced water storage tanks, and corresponding site weather data. Periodic composition measurements were taken from flows vented from produced water tanks. Computational modeling efforts attempted to mimic a given site’s methane emissions behavior given limited input parameters. Direct measurement data and simulation data yielded, through reduction and analysis, apparent methane emissions factors, statistics on pneumatic device actuation events, important relationships between GPU parameters and pneumatic device actuation events, produced water storage tank vent flows and flow compositions, and parameters most contributing to the magnitude and frequency of these fugitive methane emissions. Measurements, considering data from a 72hr period, produced PC emissions factors from 0.008 to 0.03 SCFH per device with an average device emitting 0.026 SCFH at the first site. The second site produced PC emissions factors spanning from 0.05 to 25.47 SCFH with an average device emitting 1.93 SCFH not including the 25.47 SCFH device, which was assumed to be malfunctioning. Two unique water tank emission measurements were made, 618 g CH4 per hour and 32.6 g CH4 per hour. On a water basis, the water tank emissions factors were 0.66 and 0.042 kg CH4 per bbl of water, respectively.
Tank 15 is a 4,234,000-liter (1,118,500-gallon) Type 2 high-level waste storage tank located in H Tank Farm at the Savannah River Site. It was put into service in 1960 to receive high-activity, H-Modified (HM) waste from H Canyon. Between June 1964 and November 1972, the waste tank was filled six times, and supernate was decanted five times, leaving behind the sludge solids. Tank 15 also received a mixture of high-activity and low-activity HM waste from Tank 16. Tank 15 has more recently undergone several mixing campaigns to remove much of the sludge waste; however, the effectiveness of suspending the sludge heel via mechanical mixing has significantly diminished. Low Temperature Aluminum Dissolution (LTAD) is a process developed for the dissolution of suspended aluminum solids in a large waste storage tank. Originally intended for deployment during the preparation of sludge batches in H Tank Farm for the Defense Waste Processing Facility (DWPF), the process involves maintaining the waste storage tank at a slightly elevated temperature and highly alkaline chemistry to facilitate dissolution of aluminum solids. As mechanical heel removal efforts diminished in effectiveness in Tank 15, LTAD was selected to both reduce the volume of sludge solids remaining in the heel and to modify the sludge rheology to facilitate the suspension of additional solids using the installed mixing devices.
A thermodynamic model was developed for the oxy-combustion Allam-Fetvedt cycle. This information was then used to develop an optimized dispatch strategy using price strips supplied by the modeling teams. The price strips represent future possible grid configurations that include a high penetration of variable renewables and a carbon tax. Multiple optimization strategies and tools were used to maximize the net present value (NPV) of the plant on these potential future grids. The optimization varied the size of the air separation unit, the size of oxygen storage tanks, the size of carbon dioxide storage tanks and the flow rate of the carbon dioxide pipeline. The team was able to determine a dispatch strategy that resulted in a positive NPV for all price strips. This indicates that an oxy-combustion plant with oxygen storage would be economically viable on a future grid with a high degree of variable renewables.
The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)
Hanford stores millions of gallons of radioactive and chemically hazardous waste from the production of weapon materials in tank farms consisting of underground carbon-steel storage tanks surrounded by reinforced concrete. Six of these Hanford tank farms use double-shell storage tanks (DSTs). The DST farms were constructed from 1968 to 1986 with a planned 40–50 year design life, so some are already operating beyond their initial life expectancy. Ultrasonic testing (UT) has indicated significant thinning on the bottom of the secondary (outer) liner of these tanks, believed to arise from groundwater intrusion driving concrete side corrosion. There is no direct access to the steel/concrete interface between the tank and the concrete pad, making it difficult to apply a chemical-based mitigation strategy or to conduct repairs, but cathodic protection (CP) is a possible method to inhibit further concrete-side corrosion. Hanford already uses CP to protect below grade steel piping within the tank farms and connected to the tanks, but this system was not designed to protect the tank bottoms. CP design must account for the structures surrounding the DSTs, including the steel reinforcing bars (rebar) within the concrete pad and vault, various process lines, and the existing CP system. In this study, finite element analysis (FEA) modeling was carried out to simulate CP protection of 1) a single tank and CP anode to develop options for modeling the rebar and to compare to a simpler circuit model and 2) the entire Hanford AN tank farm as a representative example consisting of seven tanks, associated piping, and both existing and new CP anodes. Both circuit and FEA models predict that significant protective current could be delivered to the bottoms of the tanks with the addition of tank-protection anodes below the depth of the tanks. Simulations with only the existing pipe-protection anodes active confirmed that only a very small current to the tank bottoms is predicted under present conditions. Multiple simplified representations of the dome and wall rebar were tested to reduce the computational complexity of the tank-farm simulations, resulting in modeling the rebar as edge elements with a prescribed effective circumference that matches the real rebar surface area. The geometry of the rebar is also simplified into horizontal hoops around the tank walls and radial rebar over the dome with increased effective circumference to retain the target surface area. This simplification was found to greatly reduce the complexity and solution time of the models without large changes in current distributions, especially to the tank bottom. A range of values were tested for model parameters such as soil and concrete resistivities and polarization resistance to investigate their impact on the current and electric potential distributions. Depending on the parameters used, FEA simulations predict some risk of overprotection, particularly on the piping system; since overprotection can also lead to surface damage associated with hydrogen gas generation at the interface (e.g. hydrogen embrittlement or damage to coatings), this needs to be considered when refining the design of the new CP system. Comparison between the FEA models and the circuit model representation demonstrated that the circuit model could not match the predicted FEA current distribution, even when using the exact same surface areas. This discrepancy appeared to be at least partly attributable to the impact of the relative positions of the tank components and anodes to each other and to the ground surface. The FEA model accounts for the relative positions since it solves the governing equations in three dimensions, but the circuit model cannot account for the positioning. In particular, the circuit model underpredicts the current to the tank bottom and overpredicts the current to the dome compared to FEA for the baseline geometry. The FEA models omitted the electrically isolated rebar in the bottom concrete slab. However, a circuit based stray current model estimated that only 2.1% of the total current through the slab would stray into the rebar, corresponding to ~0.21 A for a target current density of 2 mA/ft2 to the tank bottom. The estimated corrosion driven by this amount of stray current is predicted to yield a lifetime of >400 years for the minimum rebar diameter, assuming an acceptable cross-section area loss of 10%.
Industrial facilities are seeking new strategies that help in providing savings mechanisms for demand charges. Demand charges are the charges incurred by industrial facilities as a result of power usage. Thermal energy storage has advanced significantly with lots of new applications, garnering the interest of many industrial facilities. These applications could be used to shave the industrial facilities’ peak electric demand and reduce their demand charges. This paper aims to demonstrate the efficacy of thermal energy storage in reducing demand charges and highlight new developments in the integration of smart control systems with thermal energy storage. The study compares energy consumption and peak demand for a facility equipped with and without thermal energy storage tanks using a fixed schedule for charging and discharging. Additionally, the paper examines the impact of incorporating a smart controller to determine when to charge and discharge the tank based on the facility’s real-time power usage and a given setpoint. The results indicate cost savings from the use of thermal energy storage tanks under two proposed scenarios, reflected in the reduced cost of power consumption for the studied facility. The incorporation of a smart controller with the thermal energy storage tank in the facility studied could provide estimated savings of 3.3% per year of power consumption charges, without considering the contribution of any incentives. The estimated savings provided by the fixed schedule scenario are 2.7% per year.
A chloride-based molten-salt system that uses a ternary blend of MgCl2/KCl/NaCl is investigated to provide higher temperature thermal energy storage capability. Despite higher thermal stability, molten chlorides present several unique challenges, including the design of internal refractory-ceramic liners to prevent the corrosion and thermal stress of alloy tank shells. This work discusses issues and potential solutions related to containment of molten chloride salt, specifically the optimization of the refractory material at the molten salt interface (hot face). The down-selected hot face candidate limits permeation of salt through the material and forms a highly stable secondary surface phase in equilibrium with the molten salt. A mortar is created using the corrosion resistant hot face brick. Brick and mortar composite are subjected to mechanical stress/strain analysis, in order to calculate composite material properties and better inform thermomechanical models. The U.S. Department of Energy Generation 3 (DOE Gen3) program seeks to develop higher efficiency CSP plants that can provide cost-competitive, flexible power in the U.S. electric grid. The proposed Gen3 Liquid Pathway CSP plant closely resembles the configuration of current nitrate salt power towers with two-tank storage (Gen2). The differences between Gen2 and Gen3 include the types of compatible materials used in salt storage tank construction. Stainless steel loses strength at Gen3 temperatures, and although nickel superalloys would be capable of withstanding sustained high temperatures, these materials are prohibitively expensive at scale. Uninsulated tank shells also pose a significant risk as common steels are highly susceptible to chemical attack from molten chloride salt. To address these concerns, refractory-ceramic based containment materials are proposed to line the inside of the hot and cold storage tanks. In doing so, stainless or carbon steel shells may be used in construction depending on the level of insulation provided. The composition of the internal liner requires careful consideration to maximize the efficacy of multiple parameters including corrosion resistance, strength at operating temperature, durability, and cost. This is particularly true for the material at the interface with the salt, known as the "hot face", which is responsible for protecting the insulating layers between the tank shell and the hot face brick layer. The molten salt in this system is superheated over 300 °C above its freeze temperature. Therefore, unlike other industrial processes which use refractory-lined vessels, it is not expected that a freeze plane will develop in the hot face. Therefore, the hot face must be designed to withstand chemical corrosion and inhibit permeation of molten salt into the insulating layers. A down selection was performed to identify a hot face candidate best equipped to maintain thermal, mechanical, and chemical integrity when exposed to molten salt over extended periods of time. Long-duration chemical capability experiments were conducted with the down selected hot face refractory fully immersed in molten chloride salt for up to 3000 hours. The average salt penetration does not exceed 100 microns. When extrapolated to 20 and 30 years of continuous exposure, the expected salt penetration depth is approximately 2.0 mm and 2.9 mm, respectively. A magnesium-rich secondary phases develops at the salt/refractory interface. X-ray diffraction identifies the material as forsterite (Mg2SiO4), which is reported to form synthetically in molten chloride salt solutions. These results suggest the selected hot face will adequately inhibit salt permeation. While there is optimism that the hot face brick will inhibit salt permeation, mortar joints are typically the weakest point of a refractory brick liner. From a thermochemical perspective, differing thermal expansion coefficients may result in the mortar and brick to grow independent of each other, creating gaps through which molten salt can penetrate. To address this issue, NREL has developed an in-house mortar composed of the down selected hot face brick that has been shown to be compatible with the salt. Compressive stress/strain analyses have been performed on the brick/ mortar composites to generate stress/strain curves. Modulus of elasticity and Poisson's ratio of the composite may be calculated from the stress/strain curves, in order to provide more representative data to finite element mechanical models for accurate approximation of stress on the tank shell and the amount of thermal expansion expected within the tank liner.
The Hanford Nuclear Reservation site contains approximately 211 million liters of radioactive and chemically hazardous waste arising from nuclear weapons production, beginning with World War II, and continuing through the Cold War. The waste is stored in 177 carbon-steel underground storage tanks, of which 149 are single-shell tanks (SSTs) and the remaining are double-shell tanks (DSTs). The mission of an ongoing River Protection Project is to retrieve the waste from the underground storage tanks and then treat and immobilize (i.e., vitrify) it for disposal. Waste from the older SSTs is being progressively retrieved into the newer DSTs for storage pending treatment, immobilization, and disposal. Waste chemistry controls are in place to mitigate general corrosion, pitting corrosion, and stress corrosion cracking (SCC) and minimize corrosion risks to the carbon steel tank liners of DST at the Hanford Site. The chemistry control program focuses on preserving liner integrity while balancing the need for caustic/nitrite additions that have large downstream impacts on vitrification. Some of the DSTs store salt cake or sludge waste layers contain out-of-specification interstitial liquids that contact the primary tank bottom or sidewall. Remediation of such layers through chemical additions is not practical. At the present time, the most significant leak integrity concern at Hanford is for corrosion of the tank bottoms of DSTs where the solids layer is out of specification because of hydroxide ion depletion and consequently, pH values that are less than 12. Cathodic protection (CP) has been proposed as a possible way to protect the liners of such tanks against corrosion. The objective of this project was to investigate the feasibility of applying CP to Hanford DSTs to mitigate internal corrosion of the carbon steel tank primary liners. The scope of the project included (1) a literature review on the application of CP to storage tank systems, in general, and to waste tanks at the Savannah River Site (SRS) and Hanford, (2) a review of the finite element analysis (FEA) model recently developed to evaluate potentials for a DST, and (3) the development of a boundary element analysis (BEA) model for CP for a DST. Tank AN-107, one of the Hanford DSTs, was selected for this work because (1) the bottommost waste layer in the tank is out-of-specification, and (2) electrochemical and resistivity data, based on recent waste sampling and testing, are available for this tank. The overarching conclusion of this study is that, based on the available information, it is feasible to apply CP to mitigate internal corrosion of the primary liners of the Hanford DSTs. However, significant additional information and work are required before a CP system can be designed. Recommendations for next steps in the design of the CP system will be presented.