Search NASA⌕ Search

SEARCH · Search NASA

Results for “TQM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

66 records · Page 4

The development and operation of the international solar-terrestrial physics central data handling facility

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) International Solar-Terrestrial Physics (ISTP) Program is committed to the development of a comprehensive, multi-mission ground data system which will support a variety of national and international scientific missions in an effort to study the flow of energy from the sun through the Earth-space environment, known as the geospace. A major component of the ISTP ground data system is an ISTP-dedicated Central Data Handling Facility (CDHF). Acquisition, development, and operation of the ISTP CDHF were delegated by the ISTP Project Office within the Flight Projects Directorate to the Information Processing Division (IPD) within the Mission Operations and Data Systems Directorate (MO&DSD). The ISTP CDHF supports the receipt, storage, and electronic access of the full complement of ISTP Level-zero science data; serves as the linchpin for the centralized processing and long-term storage of all key parameters generated either by the ISTP CDHF itself or received from external, ISTP Program approved sources; and provides the required networking and 'science-friendly' interfaces for the ISTP investigators. Once connected to the ISTP CDHF, the online catalog of key parameters can be browsed from their remote processing facilities for the immediate electronic receipt of selected key parameters using the NASA Science Internet (NSI), managed by NASA's Ames Research Center. The purpose of this paper is twofold: (1) to describe how the ISTP CDHF was successfully implemented and operated to support initially the Japanese Geomagnetic Tail (GEOTAIL) mission and correlative science investigations, and (2) to describe how the ISTP CDHF has been enhanced to support ongoing as well as future ISTP missions. Emphasis will be placed on how various project management approaches were undertaken that proved to be highly effective in delivering an operational ISTP CDHF to the Project on schedule and within budget. Examples to be discussed include: the development of superior teams; the use of Defect Causal Analysis (DCA) concepts to improve the software development process in a pilot Total Quality Management (TQM) initiative; and the implementation of a robust architecture that will be able to support the anticipated growth in the ISTP Program science requirements with only incremental upgrades to the baseline system. Further examples include the use of automated data management software and the implementation of Government and/or industry standards, whenever possible, into the hardware and software development life-cycle. Finally, the paper will also report on several new technologies (for example, the installation of a Fiber Data Distribution Interface network) that were successfully employed.

Lehtonen, Kenneth↗

Increases in efficiency and enhancements to the Mars Observer non-stored commanding process

The Mars Observer team was, until the untimely loss of the spacecraft on August 21, 1993, performing flight operations with greater efficiency and speed than any previous JPL mission of its size. This level of through-put was made possible by a mission operations system which was composed of skilled personnel using sophisticated sequencing and commanding tools. During cruise flight operations, however, it was realized by the project that this commanding level was not going to be sufficient to support the activities planned for mapping operations. The project had committed to providing the science instrument principle investigators with a much higher level of commanding during mapping. Thus, the project began taking steps to enhance the capabilities of the flight team. One mechanism used by project management was a tool available from total quality management (TQM). This tool is known as a process action team (PAT). The Mars Observer PAT was tasked to increase the capacity of the flight team's nonstored commanding process by fifty percent with no increase in staffing and a minimal increase in risk. The outcome of this effort was, in fact, to increase the capacity by a factor of 2.5 rather than the desired fifty percent and actually reduce risk. The majority of these improvements came from the automation of the existing command process. These results required very few changes to the existing mission operations system. Rather, the PAT was able to take advantage of automation capabilities inherent in the existing system and make changes to the existing flight team procedures.

Brooks, Robert N., Jr.↗

Upward appraisal as a means for improving supervisory performance and promoting process improvement, with long-term implications for organizational change

This study represents the implementation phase of an organizational development project which was initiated last year in the Management Support Division (MSD) at Langley Research Center to diagnose organizational functioning. As a result of MSD survey data from last year's effort, a Quality Action Team was created to address the responses compiled from the MSD Organizational Assessment Questionnaire and Follow-Up Questionnaire. The team was officially named the MSD Employee Relations Improvement Team (MERIT). MERIT's goal was to analyze major concerns generated by the questionnaires and to present feasible solutions to management which would improve supervisory performance, promote process improvement; and ultimately, lead to a better organization. The team met weekly and was very disciplined in following guidelines needed to ensure a fully functioning team. Several TQM tools were used during the team process, including brainstorming and the cause and effect diagram. One of the products produced by MERIT was a 'report card', more formally known as an upward appraisal system, to evaluate supervisory performance in the division office, its three branches, and in teams. Major areas of emphasis on the 47 item report card were those identified by employees through the previously administered questionnaires as needing to be improved; specifically, training, recognition, teamwork, supervision and leadership, and communication. MERIT created an enlarged and modified version of the report card which enabled scores for each individual supervisor to be recorded on a separate form, along with summary results and employee comments. Report card results have been compiled and fed back to the Division Chief and Assistant Division Chief. These individuals will in turn, feed the results back to the remaining supervisors and the team leaders. Although results differ among supervisors, some similarities exist. Communication generally appears to be adequate, which represents an improvement over last year. In contrast, recognition and teamwork are the two major areas where improvement in supervisory performance seems to be most needed. The initial report card results will serve as a baseline against which future performance ratings will be compared. Once supervisors have been presented with their data and given an opportunity to analyze and discus the results, they will be assisted in developing an action plan for improving their performance and work processes. They will be provided with ongoing support from management in following through with the action plan.

Siegfeldt, Denise V.↗

BSM Delta qualification 2, volume 1

This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into Booster Separation Motor (BSM) flight hardware: (1) vulcanized-in-place nozzle aft closure insulation; (2) new isostatic ATJ bulk graphite throat insert material; (3) adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; (4) deletion of the igniter adapter insulator ring; (5) deletion of igniter adapter/igniter case interface RTV; and (6) deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM Total Quality Management (TQM) Team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing - consisting of two motors, randomly selected by USBI's onsite quality personnel from production lot AAY, which were modified to accept the enhancements - were completed to provide the final qualification of the enhancements for incorporation into flight hardware. It is concluded that all of the enhancements herein tested are qualified to be incorporated into flight hardware for the BSM.

Source record↗

BSM Delta Qualification 2, volume 2

This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 2 details the environmental testing (vibration and shock) conducted at Marshall Space Flight Center (MSFC) to which the motors were subjected prior to static tests.

Source record↗

BSA Delta Qualification 2, volume 3, book 1

This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.

Source record↗

BSM Delta Qualification 2, volume 3, book 2

This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM0 flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material, adhesive EA9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor testing--consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- was completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3, Book 2 provides various supporting documentation to the previous volumes with regards to the testing of the two Delta qualification units: data acceptance records, thermal conditioning analysis, igniter adapter thermal flake analysis, laboratory adhesive (EA-9394) qualification report, throat insert thermal/structural analysis, Delta Qualification Nonconformance Reports (NCR's), O-ring seating tests, and interim test report for vulcanization process qualification.

Source record↗

Reinvention/reengineering of business and technical processes

The changing marketplace as evidenced by global competition is requiring American organizations to rethink, regroup, and redesign their processes. The umbrella of total quality management (TQM) includes many quality methods, techniques, tools, and approaches. There is no right way for every situation or circumstance. Adaptability and experimentation of several tools is necessary. Process management when properly applied can lead to continuous quality improvements. But some processes simply need to be discarded and new ones developed. This reengineering often results in vertical compression and job redesign and restructuring. Work activities must be designed around processes, not processes around work activities. Reengineering and process management do not stand alone--they support each other. Senior executive leadership and empowerment of workers at all organizational levels is vital for both short-term and long-term success.

Olsen, Eugene A.↗

Total Quality Management and the System Safety Secretary

The system safety secretary is a valuable member of the system safety team. As downsizing occurs to meet economic constraints, the Total Quality Management (TQM) approach is frequently adopted as a formula for success and, in some cases, for survival.

Quality Management System Safety Secretary↗

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.↗

Mission Operations and Command Assurance: Flight Operations Quality Improvements

Mission Operations and Command Assurance (MO&CA) is a Total Quality Management (TQM) task on JPL projects to instill quality in flight mission operations. From a system engineering view, MO&CA facilitates communication and problem-solving among flight teams and provides continuous process improvement to reduce risk in mission operations by addressing human factors. The MO&CA task has evolved from participating as a member of the spacecraft team to an independent team reporting directly to project management and providing system level assurance. JPL flight projects have benefited significantly from MO&CA's effort to contain risk and prevent rather than rework errors. MO&CA's ability to provide direct transfer of knowledge allows new projects to benefit from previous and ongoing flight experience.

mission↗

STARDUST: Discovery's InterStellar Dust and Cometary Sample Return Mission

The STARDUST Discovery mission will collect samples of cometary and interstellar dust and return them to Earth. The Jet Propulsion Laboratory provides project management with Lockheed Martin Astronautics as the spacecraft industrial partner. STARDUST management is aggressively pursuing cost control through the use of Total Quality Management principles, specifically operating in a Project Engineering and Integration Team that

STARDUST↗