Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission System Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Power beaming options for the Space Station

Viewgraphs on power beaming options for the space station are presented. Topics covered include: power plant locations; beamed power options (lasers or microwaves); space power system technology; planned TSS experiment; microwave transmission experiment for space shuttle cargo bay; and power transmission configuration from space shuttle to free-flying platform.

Glaser, Peter E.↗

Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty

The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.

Li, Yujia↗

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lewis Investigates Frequency Sharing Between Future NASA Space Systems and Local Multipoint Distribution Systems in the 27-GHz Band

At the request of the Federal Communications Commission (FCC), the NASA Lewis Research Center undertook an intensive study to examine the feasibility of frequency sharing between future NASA space services and proposed Local Multipoint Distribution Systems (LMDS) in the 25.25- to 27.5-GHz band. This follows NASA's earlier involvement in the FCC's 1994 Negotiated Rule Making Committee which studied frequency sharing between Ka-band Fixed Satellite Services and LMDS in the 27.5- to 29.5-GHz band. LMDS is a terrestrial, cellular, wireless communication service primarily intended to provide television distribution from hub stations located within relatively small cells to fixed subscriber receivers. Some proposed systems, however, also plan to offer interactive services via subscriber-to-hub transmissions. LMDS providers anticipate that their systems will be a cost-effective alternative to cable television systems, especially in urban areas. LMDS proponents have expressed an interest in using frequencies below 27.5 GHz. NASA, however, plans to operate three types of space systems below 27.5 GHz. The H, I, and J follow-on satellites for the Tracking and Data Relay Satellite System (TDRSS), which are planned for launch beginning in 1999, are designed to receive high-data-rate transmissions (up to 800 Mbps) from low-Earth orbiting "user" spacecraft in the 25.25- to 27.5-GHz band. In this case, the potential interference is the aggregate interference from LMDS transmitters (both hubs and subscribers) into the TDRSS tracking receive beams as they sweep over the Earth's surface while tracking lower altitude user spacecraft.

Source record↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL Planning Resources for States

This presentation summarizes some NREL resources and capabilities that states might want to access to help with decarbonization planning. It describes three types of resources: already-available, public datasets describing technology costs and future grid evolution; jurisdiction-specific integration studies that require directly partnering with NREL; and an envisioned new data product comprising state-specific standard scenarios that could be collaboratively funded by the states.

annual technology baseline↗

Methods to Incorporate Energy Efficiency in Electricity System Planning and Markets

Electric utilities, independent system operators and regional transmission operators have acquired significant levels of energy efficiency over several decades. The predominant approach utilities use to consider energy efficiency in electricity system planning and ISO/RTOs use in wholesale electricity markets is to reduce load forecasts to account for estimated impacts of relevant policies and programs. But an increasing number of states and utilities are interested in improved analysis of energy efficiency in electricity system planning and wholesale electricity markets. This report describes how to consider energy efficiency as a potential resource for the future by allowing it to compete with all other electricity system resources. Increasing levels of wind and solar, growth in peak demand, and electrification of transportation and other new loads have increased the need for a more flexible and responsive electricity system. Considering energy efficiency as a resource option can support these and other electricity system objectives, including grid reliability, reduced electricity costs, energy efficiency targets, and lower air pollutant emissions. The October 2019 slides were presented at the American Council for an Energy Efficient Economy Energy Efficiency as a Resource conference and provide an overview of the report. Portions of the report were included in the American Council for an Energy Efficient Economy Energy Efficiency 2020 Summer Study paper, Planning for the Grid of Tomorrow: Energy Efficiency as a Resource in Utility Resource Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Climate-Water Impacts on Interconnection-Scale Electricity System Planning

A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Telemetry communications guidelines

Data transmission capabilities of spacecraft telemetry communications systems, and guidelines for planning 1975-1980 missions

SPACECRAFT COMMUNICATIONS SYSTEM↗

National Transmission Planning Study - Long-Term Modeling Results

The National Transmission Planning Study (NTP Study) analyzed the transformation needed to ensure the U.S. transmission system continues to reliably meet electricity demand as the power sector evolves. The study linked several long- and short-term power systems models to test numerous interregional and regional transmission buildout scenarios. The results included in this dataset are from the long-term capacity expansion modeling, completed with NREL's ReEDS model. This includes nearly 100 future transmission scenarios with a wide range of economic, reliability, and resilience conditions. The dataset includes all the results visualized in the Tableau Public site, as linked below.

Array↗

Control and Simulation of a Grid-Forming Inverter for Hybrid PV-Battery Plants in Power System Black Start

Power system restoration is an important part of system planning. Power utilities are required to maintain black start capable generators that can energize the transmission system and provide cranking power to non-blackstart capable generators. Traditionally, hydro and diesel units are used as black start capable generators. With the increased penetration of bulk size solar farms, inverter based generation can play an important role in faster and parallel black start thus ensuring system can be brought back into service without the conventional delays that can be expected with limited black start generators. Inverter-based photovoltaic (PV) power plants have advantages that are suitable for black start. This paper proposes the modeling, control, and simulation of a grid-forming inverter-based PV-battery power plant that can be used as a black start unit. The inverter control includes both primary and secondary control loops to imitate the control of a conventional synchronous machine. The proposed approach is verified using a test system modified from the IEEE 9-bus system in the time-domain electromagnetic transient simulation tool PSCAD. The simulation results shows voltage and frequency stability during a multi-step black-start and network energization process.

Nguyen, Quan H.↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Satellite Telemetry and Return Link (STARLink)

The High Altitude Missions Branch of NASA's Ames Research Center has been pursuing methods and communication architectures to decrease processing time and shorten the dissemination paths of the data from scientific experiments on board the high altitude ER-2 aircraft. The Satellite Telemetry and Return Link (STARLink) is an innovative approach for providing real-time data from existing experiments and allows for highly interactive future experiment systems on the ER-2. The concept involves placing an advanced wideband data link system on the ER-2 (and future NASA aircraft) for communicating to the NASA Tracking Data and Relay Satellite System (TDRSS) and its designated ground station. The emphasis is on providing full duplex real-time data between the ground station hub (and its remote nodes) and the on board experiments, allowing real-time processing and alteration to the experiments. This paper defines the concept, goals, multiplexing and data transmission system architecture, current capabilities, and future plans of the STARLink and its ability to provide a distributed interactive gateway node between the aircraft and various scientific centers worldwide.

Andrew Roberts↗

Transmission Planning with Renewable Energy Zones (REZ): Overview, Select Case Studies, and Key Enablers

The renewable energy zone (REZ) transmission planning process is a proactive method to plan, approve, and build transmission infrastructure that connects high-quality and large-scale renewable resources to the power system. This presentation was developed for a technical side event focused on transmission systems to facilitate the rapid decarbonization of power systems at the Clean Energy Ministerial Senior Officials Meeting in March 2023. This document contains a synthesis of key REZ case studies throughout the world and is intended as a resource for policymakers and energy planners.

Australia↗