Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Diagnostics for PSR Upgrade

This report discusses the diagnostics upgrade plan for the PSR. The PSR diagnostics under discussion include beam position and phase monitor (BPPM), wirescanners, wall current monitors, bunch shape monitors, laser notchers, and diamond array detectors. Existing diagnostics at the PSR include beam position monitors (BPM), a wirescanner, and a wall current monitor. All existing diagnostics need modernization, as part of the PSR upgrade plan. Meanwhile, we will introduce minor changes to improve the existing setups, which will enhance the performance and the longevity of the diagnostics equipment and components in the upgraded PSR operation. On the other hand, new, advanced, and available diagnostic technologies at a high technology readiness level (TRL) can also be considered for implementation for the PSR upgrade. In this note, we go through all types of diagnostics, introducing their basic principle, operating status, and plans for the PSR upgrade.

43 PARTICLE ACCELERATORS↗

LA100 Equity Strategies. Chapter 12: Distribution Grid Upgrades for Equitable Resilience and Solar, Storage, and Electric Vehicle Access

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. As Los Angeles transitions toward clean energy, existing distribution grid infrastructure will need to be updated and expanded to support reliable service during routine operations, enable interconnection with distributed energy resources and electrified loads, and provide access to energy-related services during disasters. This chapter focuses on equity in distribution grid upgrades, reliability, and resilience in Los Angeles. Specifically, NREL performed grid upgrade and resilience analyses using a detailed model of the distribution grid and income-differentiated household load profiles, electric vehicle (EV) adoption patterns, distributed solar adoption, and grid reliability to explore two key questions to inform how the City of Los Angeles can ensure a resilient and reliable distribution grid for all communities during the clean energy transition: Where can distribution system upgrades can be prioritized to enable equitable access to, and adoption of, clean energy technologies and how can Los Angeles provide equitable, resilient access to electricity-related services (e.g., health care, food) during disaster events like earthquakes and flooding? The electric distribution system is the "last mile" of the grid, linking the multistate bulk power system with customers; new loads, including EVs; and distributed energy resources, such as customer and community solar and storage. This analysis focuses on the 4.8-kilovolt (kV) system, including service transformers that represent the utility-side of the grid connection for most residential customers. Chapter 17 looks at the customer-side of the grid connection with a focus on electric panel upgrade needs. The transition toward clean energy can put additional stress on the distribution system from distributed energy resources and electrification - especially EVs and increased use of electricity for heating, cooling, cooking, and hot water. This stress, measured here as the number of equipment overloads and voltage violations, correlates strongly to grid reliability and therefore is used as a proxy for understanding additional upgrades needed and to help ensure equitable access to electrification and distributed energy resources. NREL also conducted community resilience analysis to examine customer-level access to both electricity and a larger range of services, such as hospitals and grocery stores during a disaster. This analysis explicitly considers equity to understand differences in current resilience and resilience strategies to effectively improve critical services access for all Angelenos. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

14 SOLAR ENERGY↗

Energy impacts of nationwide window upgrades in commercial buildings

This report presents comprehensive estimates of the energy impacts of nationwide commercial building window upgrades in the United States, using a conservative approach. Windows play a substantial role in determining building energy use and occupant experience. Estimates point to commercial building windows impacting loads that represent more than 6 quads (approximately 6%) of annual primary energy use in the U.S. (Harris, 2022). Beyond heating and cooling loads, windows also have effects on lighting and occupant comfort. The fastest route to improving the energy efficiency of windows in U.S. buildings is upgrading or replacing windows in existing buildings. This is due to poor performance of windows in older existing buildings compared to most new construction, low levels of window replacement, and long window service life compared to energy-using building components. Nationwide window upgrades were considered using the following technologies: • Secondary glazing systems • Double pane (clear and tinted) • Triple pane (clear and tinted) • Electrochromic glazing Nationwide upgrades provide on the order of 4%–6% site energy savings in typical buildings, or up to 26% in buildings with the highest savings potential. Electrochromic windows, with their ability to adapt dynamically to environmental conditions, can provide additional benefits, ranging from median savings of 7.2% in buildings with window to wall ratio (WWR) greater than 10% and up to 28% for some buildings. Savings increase substantially for buildings with higher WWR. This study’s approach focused on isolating the direct energy benefits from improvement in window performance, and does not take into account the following additional benefits from window retrofits, which are likely to be substantial: • Managing peak demand and enabling HVAC equipment downsizing. • Energy savings from customizing upgrades to building type and climate. • Energy savings and comfort improvements resulting from post-retrofit reductions in air leakage. • Non-energy benefits, such as occupant comfort and resilience during extreme weather.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA's New Approach for Evaluating Risk Reduction Due to Space Shuttle Upgrades

As part of NASA's intensive effort to incorporate quantitative risk assessment (QRA) tools in the Agency's decision-making process concerning Space Shuttle risk, NASA has developed a powerful risk assessment tool called the Quantitative Risk Assessment System (QRAS). The QRAS is a tool designed to estimate Space Shuttle risk and evaluate Space Shuttle upgrades. This paper presents an overview of the QRAS with focus on its application for evaluating the risk reduction due to proposed Space Shuttle upgrades. The application includes a case study from the Space Shuttle main engine (SSME). The QRAS overview section of the paper includes the QRAS development process, the technical approach to model development, the QRA quantification methods and techniques, and observations concerning the complex modeling involved in QRAS. The application section of the paper describes a practical case study using QRAS models for evaluating critical Space Shuttle Program upgrades, specifically a proposed SSME nozzle upgrade. This paper presents the method for evaluating the proposed upgrade by comparing the current nozzle (old design with well-established probabilistic models) to the channel wall nozzle (new design at the preliminary design level).

Safie, Fayssal M.↗

Mass Storage System Upgrades at the NASA Center for Computational Sciences

The NASA Center for Computational Sciences (NCCS) provides supercomputing and mass storage services to over 1200 Earth and space scientists. During the past two years, the mass storage system at the NCCS went through a great deal of changes both major and minor. Tape drives, silo control software, and the mass storage software itself were upgraded, and the mass storage platform was upgraded twice. Some of these upgrades were aimed at achieving year-2000 compliance, while others were simply upgrades to newer and better technologies. In this paper we will describe these upgrades.

Tarshish, Adina↗

Design and Performance of the PALM-3000 3.5 kHz Upgrade

PALM-3000 (P3K), the second-generation adaptive optics (AO) instrument for the 5.1 meter Hale telescope atPalomar Observatory, was released as a facility class instrument in October 2011 and has since been used on-skyfor over 600 nights as a workhorse science instrument and testbed for coronagraph and detector development.In late 2019 P3K underwent a significant upgrade to its wavefront sensor (WFS) arm and real-time control(RTC) system to reinforce its position as a state-of-the-art AO facility and extend its faint-end capability forhigh-resolution imaging and precision radial velocity follow-up of Kepler and TESS targets. The main featuresof this upgrade include an EM-CCD WFS camera capable of 3.5 kHz framerates, and an advanced Digital SignalProcessor (DSP) based RTC system to replace the aging GPU based system. Similar to the pre-upgrade system,the Shack-Hartmann wavefront sensor supports multiple pupil sampling modes using a motorized lenslet stage.The default sampling mode with 64×64 subapertures has been re-commissioned on-sky in late 2019, witha successful return to science observations in November 2019. In 64×mode the upgraded system is alreadyachieving K-band Strehl ratios up to 85% on-sky and can lock on natural guide stars as faint as mV=16. A16×16 subaperture mode is scheduled for on-sky commissioning in Fall 2020 and will extend the system’s faintlimit even further. Here we present the design and on-sky re-commissioning results of the upgraded system,dubbed P3K-II.

Vasisht, Gautam↗

BETO 2021 Peer Review - Catalytic Upgrading of Biochemical Intermediates (CUBI) 2.3.1.101-104

The Catalytic Upgrading of Biochemical Intermediates (CUBI) project is a multi-lab effort within ChemCatBio (CCB) that is focused on improving the catalytic upgrading of intermediates from biochemical deconstruction and/or biological conversion (i.e. fermentation) to fuels and chemical co-products. This is accomplished by developing catalysts with improved performance and durability, mitigating the impact of biogenically-derived inhibitors (including water), and evaluating intensified processes to reduce separations requirements and improve carbon utilization. Specific catalytic upgrading routes being developed are: 1) fermentation-derived 2,3-butanediol (BDO); 2) fermentation-derived carboxylic acids; and 3) lignocellulosic sugar-derived furfurals. These routes represent key technology pathways being investigated within BETO's biochemical conversion portfolio. By utilizing experimental and characterization capabilities and modeling tools across the 4 CUBI labs and collaborations with CCB Enabling Projects, the CUBI project is advancing catalytic upgrading process performance and robustness. Its impact is already well-established by several high-impact journal articles and patent publications, along with industrial engagement in related, competitively-awarded collaborations. The CUBI project will result in >25% MFSP cost reduction in the catalytic upgrading section of integrated biochemical conversion routes, as quantified by ongoing TEA modeling.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

Data driven investigation to understand the influence of total solids on biological biogas upgrading

In situ biogas upgrading achieves CO 2 conversion to CH 4 via hydrogenotrophic methanogenesis; however, gas-liquid mass transfer constraints limit the upgrading performance. Recognizing that optimization studies often underrepresent the effects of total solids (TS) and organic loading rate (OLR), this study undertook a holistic, statistics driven assessment of operating conditions for in situ H 2 assisted biogas upgrading, centering the analysis on TS and OLR. A dataset of 31 studies was compiled and comprised 99 observations. A rigorous analytical framework was employed, combining data standardization, fixed- and random-effects (REML) weighted regressions with cluster-robust errors, stratified analyses, and machine learning. Mixed-effects meta regression indicated that TS was the main factor explaining differences of methane fraction (CH 4 %) when considering the between studies heterogeneity. Focusing on a near-stoichiometric subset (H 2 /CO 2 ≈ 4:1), TS remained significant. Stratified results showed a stronger negative relationship between TS and CH 4 % in UASB reactors than in CSTRs, with a negative effect under mesophilic conditions and no significant effect under thermophilic conditions. A Random Forest model corroborated the statistical findings, consistently ranking H 2 /CO 2 ratio, OLR, TS, and hydrogen injection rate (HIR) as the most influential predictors. These findings delineate trends across increasing TS levels, particularly between 1% and 10%, and provide preliminary insights for TS above 15% in in situ biogas upgrading. They further provide insights for the influence of TS by reactor type and temperature, thereby advancing the evidence base for implementing biological CO 2 conversion to CH 4 in practice.

In situ biogas upgrading↗

Cost and Life-Cycle Greenhouse Gas Implications of Integrating Biogas Upgrading and Carbon Capture Technologies in Cellulosic Biorefineries

We discuss gaseous streams in biorefineries that have been undervalued and underutilized. In cellulosic biorefineries, coproduced biogas is assumed to be combusted alongside lignin to generate process heat and electricity. Biogas can instead be upgraded to compressed biomethane and used as a transportation fuel. Capturing CO 2 -rich streams generated in biorefineries can also contribute to greenhouse gas (GHG) mitigation goals. We explore the economic and life-cycle GHG impacts of biogas upgrading and CO 2 capture and storage (CCS) at ionic liquid-based cellulosic ethanol biorefineries using biomass sorghum. Without policy incentives, biorefineries with biogas upgrading systems can achieve a comparable minimum ethanol selling price (MESP) and reduced GHG footprint ($1.38/liter gasoline equivalent (LGE) and 12.9 gCO 2e /MJ) relative to facilities that combust biogas onsite ($1.34/LGE and 24.3 gCO 2e /MJ). Incorporating renewable identification number (RIN) values advantages facilities that upgrade biogas relative to other options (MESP of $0.72/LGE). Incorporating CCS increases the MESP but dramatically decreases the GHG footprint (-21.3 gCO 2e /MJ for partial, -110.7 gCO 2e /MJ for full CCS). The addition of CCS also decreases the cost of carbon mitigation to as low as $52-$78/t CO 2 , depending on the assumed fuel selling price, and is the lowest-cost option if both RIN and California's Low Carbon Fuel Standard credits are incorporated.

09 BIOMASS FUELS↗

New developments in structure-property and amorphous materials research at the upgraded 16-BM-B Paris-Edinburgh press station at HPCAT

Beamline 16-BM-B of the High-Pressure Collaborative Access Team (HPCAT) at the Advanced Photon Source (APS) provides a Paris-Edinburgh press program to probe the structure and properties of crystalline and amorphous materials up to 12 GPa at room temperature or 7 GPa at 2000°C. During the recent APS upgrade, 16-BM-B undertook major improvements to its instrumentation and measurement techniques. The upgrade includes the addition of a 1.2 m horizontal “condenser” mirror and a new variable-sized collimation system, the combination of which decreases the acquisition time for energy dispersive X-ray diffraction measurements by a factor of 10 when compared to pre-upgrade measurements. The addition of a new Ge energy-sensitive detector and DANTE (XGLab) digital pulse processor allows for processing the increased diffraction counts with minimal deadtime. In addition to upgraded beamline components, new techniques are being developed for eventual release to the user community, including electrical resistivity and tomography measurements.

APS upgrade↗

Get a winning Oracle upgrade session using the quarterback approach

Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

Oracle upgrade schedule quarterback approach IBS N↗

Reducing the cost of home energy upgrades in the US: An industry survey

Decarbonizing the US residential building stock requires a substantial acceleration in home energy upgrades. Numerous barriers exist to accelerating adoption of efficient and electric building technologies, but foremost among these is high upfront costs. This study uses an industry survey delivered to a sample of home energy professionals to examine promising cost reduction strategies across a range of project types, including HVAC, water heating, and envelope/insulation projects. The survey included quantitative and qualitative questions to collect evidence on the estimated cost reduction potential of these strategies and their likelihood of use in the construction industry. The 167 survey respondents included contractors, energy consultants, architects, manufacturers, and others with experience in delivering energy upgrades in single-family and multifamily buildings in the US. Results show that significant cost reductions are achievable by minimizing additional infrastructure costs (such as replacing electric panels), streamlining project planning/management, and deploying innovations that simplify installation. We find that for a typical deep retrofit project, including heat pumps for space and water heating in addition to envelope upgrades, the strategies could result in a total installed cost reduction of nearly 50%, dramatically improving the customer economics of such a project. This research makes a novel contribution to the literature on strategies to reduce the costs of residential retrofits. We discuss how our study's insights on the highest-value cost reduction strategies for home energy upgrades can further accelerate their uptake in the US housing stock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The CMS Phase-1 Pixel Detector Upgrade

The CMS detector at the CERN LHC features a silicon pixel detector as its innermost subdetector. The original CMS pixel detector has been replaced with an upgraded pixel system (CMS Phase-1 pixel detector) in the extended year-end technical stop of the LHC in 2016/2017. The upgraded CMS pixel detector is designed to cope with the higher instantaneous luminosities that have been achieved by the LHC after the upgrades to the accelerator during the first long shutdown in 2013–2014. Compared to the original pixel detector, the upgraded detector has a better tracking performance and lower mass with four barrel layers and three endcap disks on each side to provide hit coverage up to an absolute value of pseudorapidity of 2.5. This paper describes the design and construction of the CMS Phase-1 pixel detector as well as its performance from commissioning to early operation in collision data-taking.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

The Cost of Decarbonization and Energy Upgrade Retrofits for US Homes

Cost is a major barrier when upgrading homes to reduce carbon emissions required to meet DOE’s climate-related goals. This report summarizes a nationwide effort to gather home energy upgrade project cost data along with household energy performance data. The goal was to develop cost benchmarks and to guide future R&D efforts aimed at cost compression and scaling of the residential upgrade market. The cost data were compiled for both total project costs and costs of individual measures. The majority of energy savings were modeled, with some models using measured site data for calibration. The database was analyzed using clustering techniques to find common energy and CO2 reduction approaches. The individual measures were combined into archetypal solutions to determine least-cost approaches to maximizing energy and carbon savings. Several financial analyses were preformed to examine other cost metrics beyond first cost. Project data was obtained for 1,739 projects, from 15 states and 12 energy programs, with a total of 10,512 individual measures. The database includes a wide-array of projects, ranging from single-measure HVAC upgrades to net-zero energy whole home remodels. Projects were predominantly single-family detached dwellings with wood frame construction. Most of the data was obtained from energy programs because they had recorded the necessary information and were willing to share with this study. This sample of convenience can provide broad guidance and national cost benchmarks, but lacks sufficient detail to draw more disaggregated conclusions, such as geographical trends. The majority of data contributions were obtained without compensation from sources where the required data was already in some sort of structured format. We compensated sources to enter data from individual projects into a structured data format for about 500 projects, with an average cost of about $40 per project. The database was highly skewed to lower cost, lower impact projects due to the nature of the sample of convenience. Less than 10% of projects had savings greater than 50%. The cost data for individual measures in the database are being used in other DOE efforts on residential energy use/decarbonization. This data collection effort should continue in order to provide the best-informed guidance for DOE and industry R&D, as well as deployment efforts (including policy and program planning).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗