Search NASASearch

SEARCH · Search NASA

Results for “Utility and Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Multi-dimensional analysis of combustion instabilities in liquid rocket motors

A three-dimensional analysis of combustion instabilities in liquid rocket engines is presented based on a mixed finite difference/spectral solution methodology for the gas phase and a discrete droplet tracking formulation for the liquid phase. Vaporization is treated by a simplified model based on an infinite thermal conductivitiy assumption for spherical liquid droplets of fuel in a convective environment undergoing transient heating. A simple two parameter phenomenological combustion response model is employed for validation of the results in the small amplitude regime. The computational procedure is demonstrated to capture the phenomena of wave propagation within the combustion chamber accurately. Results demonstrate excellent amplitude and phase agreement with analytical solutions for properly selected grid resolutions under both stable and unstable operating conditions. Computations utilizing the simplified droplet model demonstrate stable response to arbitrary pulsing. This is possibly due to the assumption of uniform droplet temperature which removes the thermal inertia time-lag response of the vaporization process. The mixed-character scheme is sufficiently efficient to allow solutions on workstations at a modest increase in computational time over that required for two-dimensional solutions.

Grenda, Jeffrey M.

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION

Lunar Microgrid Trade Studies to Define Interface Converter Requirements

The National Aeronautics and Space Administration (NASA) is interested in developing an incremental lunar power grid to support continuous human/robotic operations under the Artemis missions and can scale to global power utilization and industrial power levels. The initial lunar surface power system will be composed primarily of assets that contain their own power generation and energy storage. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kVAC as an ideal transmission voltage. This paper documents the analysis and findings from these trade studies. These studies were used to define the operating voltage and develop a common interface for connecting lunar surface assets to the power grid. The Universal Modular Interface Converter (UMIC) connects lunar surface assets to the high voltage grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long-term vision of space exploration.

Planetary surface power

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT

Existing Methods for Grid Strength Assessment and Role of Hydropower in Future Grids

The power system is undergoing rapid evolution with increasing penetration of inverter-based resources (IBRs), large loads, microgrids, and power electronic devices. Ensuring reliable and stable operation of the modern power grid is a multi-faceted challenge that requires detailed understanding of this complex system. Dynamic stability is a major concern in maintaining the security of power grids as the generation mixes and large loads transitions to include high shares of power electronic devices. The operation of IBRs in regions with low system strength and higher grid impedances has been found to be the main reason behind many of the power system instabilities that manifest themselves in various types of oscillations and interactions that, if not properly addressed and damped, can jeopardize the reliable operation of the power system. Weak grid conditions compound such stability problems, particularly when many IBRs operate in proximity to and connect to weak power grids. Therefore, it is important to assess grid strength for planning, integration and operation of IBRs for a given power system. In this report, we aim to understand and classify existing methodologies for grid strength assessment, along with their limitations and future needs. Further, we aim to utilize the huge untapped potential in utilizing hydro energy resources in addressing some of the pertinent challenges of grid strength and reliable operation of modern power systems. Hydropower, historically valued for its flexibility and dispatchability, now faces new constraints due to reduced share of synchronous machines in the generation mix and seasonal variability of available water resources. Yet, these same plants present untapped potential beyond energy generation - notably, as providers of critical grid services. This report explores how hydropower plants, particularly through operation as synchronous condensers, can play a pivotal role in strengthening the grid amid evolving system dynamics.

13 HYDRO ENERGY

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model

Urban-Scale Control of School Bus Fleet Charging and Discharging Strategies Using Single and Multi-Stage Optimization

This paper presents a dual-strategy approach to optimizing charging and discharging schedules for school bus fleets, using the limited charging infrastructure effectively. We aim to ensure that each bus is fully charged for daily operations and aids in grid stability during peak demand. The first strategy utilizes linear programming to schedule overnight charging at available station sockets and strategic discharging during peak periods, efficiently coordinating limited resources. The second strategy employs metaheuristic techniques for continuous optimization, focusing on precise power requirements and offering greater flexibility than the linear model.

Selim, Alaa

Energy Storage and the Law of Averages: How Storage Can Make Electricity More Affordable

The electric grid is planned, built, and operated to satisfy peak demand. But because peak demand only occurs for a few hours per year, customers end up paying full price for grid infrastructure that is only used for a small fraction of the year—an increasingly expensive proposition as peak demand continues to grow and more infrastructure is required to meet it. The emergence of cost-competitive energy storage technologies in recent years, however, offers the potential for a grid that is planned, built, and operated based on average demand. By strategically siting and operating energy storage throughout the electric grid, excess generation in low-demand periods can be captured and stored near customers, which then reduces the amount of electricity that needs to be generated and moved through the transmission and distribution systems during high-demand periods. This paper describes these potential benefits, supported by real-world examples of energy storage projects that have created cost savings, which points to the potential for profound and far-reaching reductions in the cost of electricity if energy storage technologies are deployed at scale throughout the electric grid. These examples will be of use to system planners and operators, utility regulators, decision makers, and stakeholders in those processes as they look for opportunities to reduce the cost of electricity in their respective systems and jurisdictions.

25 ENERGY STORAGE

Temporal Large-Eddy Simulation

In 1999, Stolz and Adams unveiled a subgrid-scale model for LES based upon approximately inverting (defiltering) the spatial grid-filter operator and termed .the approximate deconvolution model (ADM). Subsequently, the utility and accuracy of the ADM were demonstrated in a posteriori analyses of flows as diverse as incompressible plane-channel flow and supersonic compression-ramp flow. In a prelude to the current paper, a parameterized temporal ADM (TADM) was developed and demonstrated in both a priori and a posteriori analyses for forced, viscous Burger's flow. The development of a time-filtered variant of the ADM was motivated-primarily by the desire for a unifying theoretical and computational context to encompass direct numerical simulation (DNS), large-eddy simulation (LES), and Reynolds averaged Navier-Stokes simulation (RANS). The resultant methodology was termed temporal LES (TLES). To permit exploration of the parameter space, however, previous analyses of the TADM were restricted to Burger's flow, and it has remained to demonstrate the TADM and TLES methodology for three-dimensional flow. For several reasons, plane-channel flow presents an ideal test case for the TADM. Among these reasons, channel flow is anisotropic, yet it lends itself to highly efficient and accurate spectral numerical methods. Moreover, channel-flow has been investigated extensively by DNS, and a highly accurate data base of Moser et.al. exists. In the present paper, we develop a fully anisotropic TADM model and demonstrate its utility in simulating incompressible plane-channel flow at nominal values of Re(sub tau) = 180 and Re(sub tau) = 590 by the TLES method. The TADM model is shown to perform nearly as well as the ADM at equivalent resolution, thereby establishing TLES as a viable alternative to LES. Moreover, as the current model is suboptimal is some respects, there is considerable room to improve TLES.

Pruett, C. D.

Numerical Analysis of a Rotating Detonation Engine in the Relative Reference Frame

A two-dimensional, computational fluid dynamic (CFD) simulation of a semi-idealized rotating detonation engine (RDE) is described. The simulation operates in the detonation frame of reference and utilizes a relatively coarse grid such that only the essential primary flow field structure is captured. This construction yields rapidly converging, steady solutions. Results from the simulation are compared to those from a more complex and refined code, and found to be in reasonable agreement. The performance impacts of several RDE design parameters are then examined. Finally, for a particular RDE configuration, it is found that direct performance comparison can be made with a straight-tube pulse detonation engine (PDE). Results show that they are essentially equivalent.

pulse detonation engines

Numerical Analysis of a Rotating Detonation Engine in the Relative Reference Frame

A two-dimensional, computational fluid dynamic (CFD) simulation of a semi-idealized rotating detonation engine (RDE) is described. The simulation operates in the detonation frame of reference and utilizes a relatively coarse grid such that only the essential primary flow field structure is captured. This construction yields rapidly converging, steady solutions. Results from the simulation are compared to those from a more complex and refined code, and found to be in reasonable agreement. The performance impacts of several RDE design parameters are then examined. Finally, for a particular RDE configuration, it is found that direct performance comparison can be made with a straight-tube pulse detonation engine (PDE). Results show that they are essentially equivalent.

propulsion

South Asia Group for Energy-India

The South Asia Group for Energy (SAGE) is working with Grid India and the Central Electricity Authority (CEA) to determine the best methods to deploy more inverter-based resources (IBR) such as solar photovoltaic generators and utility-scale battery. To address grid strength and stability concerns, planners and operators are working with the National Renewable Energy Laboratory's (NREL) team, through SAGE, to identify potential solutions for strengthening the grid and fostering grid reliability.

ENERGY PLANNING, POLICY, AND ECONOMY

Architectural Approaches for Integrating ADMS and DERMS: Challenges, Comparisons, and Real-World Use Cases

The electrical distribution landscape is rapidly transforming due to the proliferation of distributed energy resources (DERs) such as solar panels, wind turbines, battery storage systems, combined heat and power units, and electric vehicles, introducing variability and uncontrollability that traditional grid operators are ill-equipped to manage. This transformation is further accelerated by advancements in Information and Communication Technology infrastructure that connects control centers with end devices, demanding automation and a deeper understanding of new technologies by utility personnel. Advanced grid control techniques using system-level optimization, Artificial Intelligence, and Machine Learning at the enterprise level and distributed level are evolving to address these issues. There is also an opportunity to utilize the enormous data created by these new DER technologies in the grid. Advanced Distribution Management Systems (ADMS) and Distributed Energy Resource Management Systems (DERMS) are critical in addressing these challenges by automating grid operations and enhancing reliability. Given the relatively recent development of ADMS and DERMS, and the still relatively low level of ADMS and DERMS deployment in the industry, there is a notable deficiency in the comprehensive understanding of the challenges and benefits associated with these new technologies, especially with their complementary natures and integration architectures. This paper aims to bridge the knowledge gap in ADMS and DERMS integration, presenting three distinct integration architectures currently available, and discussing the challenges and benefits of each architecture to guide utilities, industry professionals, and researchers in optimizing grid management and decision-making processes for a resilient and efficient energy future.

24 POWER TRANSMISSION AND DISTRIBUTION

Towards Non-Intrusive Real-Time Monitoring of Behind the Meter Residential Distributed Energy Resources

The growing adoption of residential distributed energy resources (DERs) introduces more uncertain variability in power grid operation. More importantly, the residential DERs operate behind customers’ energy meters, and therefore, the utility cannot “directly” monitor them. Prior approaches to enable visibility into behind-the-meter (BTM) DERs either depend on estimations or require intrusive instrumentation on the customer side. To address the critical need for direct real-time monitoring of BTM DERs, in this paper, we propose a novel approach for utility-side direct real-time monitoring of residential BTM DERs. We utilize high-frequency (> 10kHz) conducted electromagnetic interference (EMI) from residential DERs’ grid-tied inverters to monitor their power generation. We discuss the working principle of our approach and present supporting results using three of-the-shelf grid-tied inverters.

14 SOLAR ENERGY

Spaceflight Operations Services Grid (SOSG)

In an effort to adapt existing space flight operations services to new emerging Grid technologies we are developing a Grid-based prototype space flight operations Grid. This prototype is based on the operational services being provided to the International Space Station's Payload operations located at the Marshall Space Flight Center, Alabama. The prototype services will be Grid or Web enabled and provided to four user communities through portal technology. Users will have the opportunity to assess the value and feasibility of Grid technologies to their specific areas or disciplines. In this presentation descriptions of the prototype development, User-based services, Grid-based services and status of the project will be presented. Expected benefits, findings and observations (if any) to date will also be discussed. The focus of the presentation will be on the project in general, status to date and future plans. The End-use services to be included in the prototype are voice, video, telemetry, commanding, collaboration tools and visualization among others. Security is addressed throughout the project and is being designed into the Grid technologies and standards development. The project is divided into three phases. Phase One establishes the baseline User-based services required for space flight operations listed above. Phase Two involves applying Gridlweb technologies to the User-based services and development of portals for access by users. Phase Three will allow NASA and end users to evaluate the services and determine the future of the technology as applied to space flight operational services. Although, Phase One, which includes the development of the quasi-operational User-based services of the prototype, development will be completed by March 2004, the application of Grid technologies to these services will have just begun. We will provide status of the Grid technologies to the individual User-based services. This effort will result in an extensible environment that incorporates existing and new spaceflight services into a standards-based framework providing current and future NASA programs with cost savings and new and evolvable methods to conduct science. This project will demonstrate how the use of new programming paradigms such as web and grid services can provide three significant benefits to the cost-effective delivery of spaceflight services. They will enable applications to operate more efficiently by being able to utilize pooled resources. They will also permit the reuse of common services to rapidly construct new and more powerful applications. Finally they will permit easy and secure access to services via a combination of grid and portal technology by a distributed user community consisting of NASA operations centers, scientists, the educational community and even the general population as outreach. The approach will be to deploy existing mission support applications such as the Telescience Resource Kit (TReK) and new applications under development, such as the Grid Video Distribution System (GViDS), together with existing grid applications and services such as high-performance computing and visualization services provided by NASA s Information Power Grid (IPG) in the MSFC s Payload Operations Integration Center (POIC) HOSC Annex. Once the initial applications have been moved to the grid, a process will begin to apply the new programming paradigms to integrate them where possible. For example, with GViDS, instead of viewing the Distribution service as an application that must run on a single node, the new approach is to build it such that it can be dispatched across a pool of resources in response to dynamic loads. To make this a reality, reusable services will be critical, such as a brokering service to locate appropriate resource within the pool. This brokering service can then be used by other applications such as the TReK. To expand further, if the GViDS application is constructed using a services-based mel, then other applications such as the Video Auditorium can then use GViDS as a service to easily incorporate these video streams into a collaborative conference. Finally, as these applications are re-factored into this new services-based paradigm, the construction of portals to integrate them will be a simple process. As a result, portals can be tailored to meet the requirements of specific user communities.

Bradford, Robert N.

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION