Deep Analysis Net with Causal Embedding for Coal-fired Power Plant Fault Detection and Diagnosis (DANCE4CFDD)

Fault detection and diagnosis is critical to power plant operation to ensure attaining high reliability while reducing operation cost. As more renewable power is introduced to the power grid, traditional fossil power plants take on the extra burden of excessive load cycling to compensate the generation variability from renewable power. Such load cycling will pose more reliability challenges to power plant operation. There are a number of challenges faced by today’s asset health management system in coal- fired (or gas) power plants: 1) high-dimensional nonlinear interaction among multiple time series measurements; 2) high measurement variance induced by operational conditions/modes; 3) variation among asset types and plant configurations; and 4) a small number of faulty events to learn from. To cope with these challenges, today’s fielded asset health management systems rely heavily on manual efforts from domain experts and hand-crafted features or rules based on domain knowledge. Despite its role in plant reliability, such a practice is costly and hinders its scalability and sustainability, particularly when a plant undergoes modifications. The objective of this project is to develop a novel end-to-end AI learning system that is trainable (i.e., the AI representation of a complex system behavior can be directly learned from properly labeled data) for accurate fault detection and root cause analysis. The ability to create a fault detection model directly from time series could alleviate the efforts associated with today’s asset management solution development. In the course of this project, we have achieved the following: Created an AI model development environment incorporating state-of-the-art neural network architectures for rapid model development and evaluation; Developed novel learning strategies for training of fault detection model; Developed special-purpose neural network architecture embedded with variable association graph aiming for better interpretability; Developed a learning strategy to leverage a small number of faulty events for enhanced fault detection capability; Conducted detailed experimental study based on public benchmark datasets and demonstrated the effectiveness of the proposed solution; and Validated the developed system with data from both a coal-fired plant boiler dynamic simulation model and real-world coal-fired power plant covering multiple asset and fault types. Overall, the project attained a technology readiness level of TRL 5 from TRL 2 at the beginning of the project.

20 FOSSIL-FUELED POWER PLANTS↗

A Case for Bundle Protocol in Space

NASA, through the Advanced Exploration Systems (AES) project, is investing in the development and infusion of delay tolerant networking (DTN) protocols for use on future space flight missions. The cornerstone of the DTN suite is the Bundle Protocol which provides network layer addressing and routing of data blocks. In 2017, the Plankton, Aerosol, Cloud, and Ocean Ecosystem (PACE) mission was selected as the first in-house robotic science mission to implement the Bundle Protocol for downlink of housekeeping telemetry. One year into the design and incorporation of the Bundle Protocol on PACE, this presentation makes a case for using the Bundle Protocol for communication with future space assets. Specifically, the use of the Bundle Protocol (1) simplifies relaying data through store and forward routing and custody transfer; (2) simplifies downlink management through delivery guarantees; and (3) simplifies storage services through block level interactions with memory devices.

Swinski, J. P.↗

Recovery of the Space Shuttle Columbia Avionics

Lessons Learned: a) Avionics data can playa critical role in the investigation of a "close call" or accident. b) Avionics designers should think about the role their systems might play in an investigation. c) Know your data, down to the bit level. d) Know your spacecraft - follow the data. e) Internal placement of circuit cards can affect their survivability. f) Think about how to reconstruct nonvolatile memory (e.g. serialize IC's, etc.) g) Use of external assets can aid in extracting data from avionics.

Hames, Kevin L.↗

Climate Change Adaptation Activities at the NASA John F. Kennedy Space Center, FL., USA

In 2010, the Office of Strategic Infrastructure and Earth Sciences established the Climate Adaptation Science Investigators (CASI) program to integrate climate change forecasts and knowledge into sustainable management of infrastructure and operations needed for the NASA mission. NASA operates 10 field centers valued at $32 billion dollars, occupies 191,000 acres and employs 58,000 people. CASI climate change and sea-level rise forecasts focus on the 2050 and 2080 time periods. At the 140,000 acre Kennedy Space Center (KSC) data are used to simulate impacts on infrastructure, operations, and unique natural resources. KSC launch and processing facilities represent a valued national asset located in an area with high biodiversity including 33 species of special management concern. Numerical and advanced Bayesian and Monte Carlo statistical modeling is being conducted using LiDAR digital elevation models coupled with relevant GIS layers to assess potential future conditions. Results are provided to the Environmental Management Branch, Master Planning, Construction of Facilities, Engineering Construction Innovation Committee and our regional partners to support Spaceport development, management, and adaptation planning and design. Potential impacts to natural resources include conversion of 50% of the Center to open water, elevation of the surficial aquifer, alterations of rainfall and evapotranspiration patterns, conversion of salt marsh to mangrove forest, reductions in distribution and extent of upland habitats, overwash of the barrier island dune system, increases in heat stress days, and releases of chemicals from legacy contamination sites. CASI has proven successful in bringing climate change planning to KSC including recognition of the need to increase resiliency and development of a green managed shoreline retreat approach to maintain coastal ecosystem services while maximizing life expectancy of Center launch and payload processing resources.

plant communities↗

Marine Corps Base Camp Lejeune - Forest Burn Data

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This data package contains burn and wildfire history and time enabled service data.

54 ENVIRONMENTAL SCIENCES↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Marine Corps Base Camp Lejeune New River Estuary (NRE) - Autonomous Vertical Profiler (AVP) Stone's Bay Data 2008-2013

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This data package includes a zipfile containing the results of continuous (30 minute interval) water quality samples and wind speed and direction anemometer (MET) data from Stone's Bay at Station 3 (AVP1). Description from Monitoring Report: Autonomous vertical profilers (AVPs) were deployed from June 2008 through October 2016 in central Stones Bay at Station 3, and in Morgan Bay upstream of Station 5 and were used to continuously monitor key water quality parameters. The AVPs consist of a moored floating platform housing a computer controlled winch mechanism that lowers and raises a YSI Model 6600 multi-parameter water quality datasonde at programmable time intervals (Reynolds-Fleming et al., 2002). Winch speed and sampling frequency of the AVP system and datasonde were configured to produce full water column profiles of temperature, salinity, DO concentration, chl concentration (by fluorescence), and turbidity every 30 minutes and achieve vertical depth resolution of approximately 10 cm. An anemometer (RM Young) affixed to the mast of the AVP measured six minute averages of wind speed and direction every 30 minutes. Data were stored locally on the AVP computers, and telemetered back to the laboratory each night. Datasondes were exchanged with freshly cleaned and calibrated datasondes as necessary but at least on a monthly basis.

54 ENVIRONMENTAL SCIENCES↗

Marine Corps Base Camp Lejeune New River Estuary (NRE) - Autonomous Vertical Profiler (AVP) Morgan Bay Data 2008-2016

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This data package includes a zipfile containing the results of continuous (30 minute interval) water quality samples and wind speed and direction anemometer (MET) data from Morgan Bay upstream of Station 5 (AVP2): Autonomous vertical profilers (AVPs) were deployed from June 2008 through October 2016 in central Stones Bay at Station 3, and in Morgan Bay upstream of Station 5 and were used to continuously monitor key water quality parameters. The AVPs consist of a moored floating platform housing a computer controlled winch mechanism that lowers and raises a YSI Model 6600 multi-parameter water quality datasonde at programmable time intervals (Reynolds-Fleming et al., 2002). Winch speed and sampling frequency of the AVP system and datasonde were configured to produce full water column profiles of temperature, salinity, DO concentration, chl concentration (by fluorescence), and turbidity every 30 minutes and achieve vertical depth resolution of approximately 10 cm. An anemometer (RM Young) affixed to the mast of the AVP measured six minute averages of wind speed and direction every 30 minutes. Data were stored locally on the AVP computers, and telemetered back to the laboratory each night. Datasondes were exchanged with freshly cleaned and calibrated datasondes as necessary but at least on a monthly basis.

54 ENVIRONMENTAL SCIENCES↗

Long-run Marginal Emission Rates for Electricity - Workbooks for 2021 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States. The LRMER is an estimate of the rate of emissions that would be either induced or avoided by a long-term (i.e., more than several years) change in electrical demand. It incorporates both the projected changes to the electric grid, as well as the potential for an incremental change in electrical demand to influence the structural evolution of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treats grid assets as fixed. The Levelized LRMER worksheet within each workbook is set up to produce a levelized long-run marginal emission rate based on user-provided inputs. These levelized LRMER values are intended for analysts to use when estimating the emissions induced (or avoided) by a long-term change in end-use electricity demand. There are two workbooks that supply the data at two different geographic resolutions: states and GEA regions (20 regions that are similar to, but not exactly the same as, the US EPA's eGRID regions). For more data underlying these emissions factors, see the Cambium 2021 project at https://cambium.nrel.gov/. For more details on the inputs into the scenarios available in the workbooks, see the Standard Scenarios 2021 Report (https://www.nrel.gov/docs/fy22osti/80641.pdf). This data was produced as part of the Cambium project. For more details about the methodology, see the Cambium Documentation: Version 2021 (https://www.nrel.gov/docs/fy22osti/81611.pdf). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initial Demonstration of the Real-Time Safety Monitoring Framework for the National Airspace System Using Flight Data

As new operational paradigms and additional aircraft are being introduced into the National Airspace System (NAS), maintaining safety in such a rapidly growing environment becomes more challenging. It is therefore desirable to have an automated framework to provide an overview of the current safety of the airspace at different levels of granularity, as well an understanding of how the state of the safety will evolve into the future given the anticipated flight plans, weather forecast, predicted health of assets in the airspace, and so on. Towards this end, as part of our earlier work, we formulated the Real-Time Safety Monitoring (RTSM) framework for monitoring and predicting the state of safety and to predict unsafe events. In our previous work, the RTSM framework was demonstrated in simulation on three different constructed scenarios. In this paper, we further develop the framework and demonstrate it on real flight data from multiple data sources. Specifically, the flight data is obtained through the Shadow Mode Assessment using Realistic Technologies for the National Airspace System (SMART-NAS) Testbed that serves as a central point of collection, integration, and access of information from these different data sources. By testing and evaluating using real-world scenarios, we may accelerate the acceptance of the RTSM framework towards deployment. In this paper we demonstrate the framework's capability to not only estimate the state of safety in the NAS, but predict the time and location of unsafe events such as a loss of separation between two aircraft, or an aircraft encountering convective weather. The experimental results highlight the capability of the approach, and the kind of information that can be provided to operators to improve their situational awareness in the context of safety.

Real-time Safety Monitoring↗

MIRACL Co-Simulation Platform Lab assets and tools integration

Pacific Northwest National Laboratory's (PNNL) co-simulation platform (CSP) for the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project, also known as MIRACL-CSP, is a functional layer designed and developed to oversee the operational exchanges of data at the application level to and from different resources residing on the MIRACL Data Hub shared platform. MIRACL-CSP allows virtual interactions between various data hub resources during co-simulation runtime.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Satellite Command and Control Through the World Wide Web

The Automated Space System Experimental Testbed (ASSET) system is a simple yet comprehensive real-world operations network being developed. Phase 3 of the ASSET Project was January-December 1997 and is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer. (2) Support prioritized handling of multiple (PIs) Principle Investigators as well as associated payload experimenters. (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft. (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware. (5) Implement a beacon monitoring test. (6) Implement an experimental blackboard controller for space system management. (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals are examined. Significant sections of this report were also published as a conference paper. Several publications produced in support of this grant are included as attachments. Titles include: 1) Experimental Initiatives in Space System Operations; 2) The ASSET Client Interface: Balancing High Level Specification with Low Level Control; 3) Specifying Spacecraft Operations At The Product/Service Level; 4) The Design of a Highly Configurable, Reusable Operating System for Testbed Satellites; 5) Automated Health Operations For The Sapphire Spacecraft; 6) Engineering Data Summaries for Space Missions; and 7) Experiments In Automated Health Assessment And Notification For The Sapphire Microsatellite.

Cantwell, Brian↗

Exploring the Feasibility of a Carbon Dioxide Storage Hub in Western North Dakota

The University of North Dakota Energy & Environmental Research Center (EERC) and project partner ONEOK, Inc. (ONEOK) are investigating the feasibility of establishing a CO2 (carbon dioxide) storage hub in western North Dakota—in the heart of the Williston Basin. The conceived Roughrider Carbon Storage Hub would store CO2 captured from six gas-processing plants owned and operated by project partner ONEOK and a planned gas-to-liquids plant. This 2-year U.S. Department of Energy-sponsored Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Phase II feasibility study is evaluating the aggregation of the CO2 captured from these seven sources for injection into stacked geologic storage complexes. The proposed hub includes several aspects that make it a highly qualified candidate for a feasibility study with a notably reduced project risk profile. These include 1) a project partner (ONEOK) with a committed goal to reduce greenhouse gas emissions; 2) prior subsurface data analysis supporting a potential stacked storage configuration with adequate CO2 storage resource; 3) commitment from local, regional, and state-level stakeholders; and 4) a state with U.S. Environmental Protection Agency underground injection control Class VI primacy. ONEOK’s assets in the Williston Basin provide significant environmental benefits by capturing and processing natural gas that may otherwise be flared or vented. Storing CO2 from these gas-processing facilities will reduce overall CO2 emissions in the basin while providing essential services to producers there and contributing to continued energy independence in the domestic markets.

03 NATURAL GAS↗

NASA Software Engineering Benchmarking Study

To identify best practices for the improvement of software engineering on projects, NASA's Offices of Chief Engineer (OCE) and Safety and Mission Assurance (OSMA) formed a team led by Heather Rarick and Sally Godfrey to conduct this benchmarking study. The primary goals of the study are to identify best practices that: Improve the management and technical development of software intensive systems; Have a track record of successful deployment by aerospace industries, universities [including research and development (R&D) laboratories], and defense services, as well as NASA's own component Centers; and Identify candidate solutions for NASA's software issues. Beginning in the late fall of 2010, focus topics were chosen and interview questions were developed, based on the NASA top software challenges. Between February 2011 and November 2011, the Benchmark Team interviewed a total of 18 organizations, consisting of five NASA Centers, five industry organizations, four defense services organizations, and four university or university R and D laboratory organizations. A software assurance representative also participated in each of the interviews to focus on assurance and software safety best practices. Interviewees provided a wealth of information on each topic area that included: software policy, software acquisition, software assurance, testing, training, maintaining rigor in small projects, metrics, and use of the Capability Maturity Model Integration (CMMI) framework, as well as a number of special topics that came up in the discussions. NASA's software engineering practices compared favorably with the external organizations in most benchmark areas, but in every topic, there were ways in which NASA could improve its practices. Compared to defense services organizations and some of the industry organizations, one of NASA's notable weaknesses involved communication with contractors regarding its policies and requirements for acquired software. One of NASA's strengths was its software assurance practices, which seemed to rate well in comparison to the other organizational groups and also seemed to include a larger scope of activities. An unexpected benefit of the software benchmarking study was the identification of many opportunities for collaboration in areas including metrics, training, sharing of CMMI experiences and resources such as instructors and CMMI Lead Appraisers, and even sharing of assets such as documented processes. A further unexpected benefit of the study was the feedback on NASA practices that was received from some of the organizations interviewed. From that feedback, other potential areas where NASA could improve were highlighted, such as accuracy of software cost estimation and budgetary practices. The detailed report contains discussion of the practices noted in each of the topic areas, as well as a summary of observations and recommendations from each of the topic areas. The resulting 24 recommendations from the topic areas were then consolidated to eliminate duplication and culled into a set of 14 suggested actionable recommendations. This final set of actionable recommendations, listed below, are items that can be implemented to improve NASA's software engineering practices and to help address many of the items that were listed in the NASA top software engineering issues. 1. Develop and implement standard contract language for software procurements. 2. Advance accurate and trusted software cost estimates for both procured and in-house software and improve the capture of actual cost data to facilitate further improvements. 3. Establish a consistent set of objectives and expectations, specifically types of metrics at the Agency level, so key trends and models can be identified and used to continuously improve software processes and each software development effort. 4. Maintain the CMMI Maturity Level requirement for critical NASA projects and use CMMI to measure organizations developing software for NASA. 5.onsolidate, collect and, if needed, develop common processes principles and other assets across the Agency in order to provide more consistency in software development and acquisition practices and to reduce the overall cost of maintaining or increasing current NASA CMMI maturity levels. 6. Provide additional support for small projects that includes: (a) guidance for appropriate tailoring of requirements for small projects, (b) availability of suitable tools, including support tool set-up and training, and (c) training for small project personnel, assurance personnel and technical authorities on the acceptable options for tailoring requirements and performing assurance on small projects. 7. Develop software training classes for the more experienced software engineers using on-line training, videos, or small separate modules of training that can be accommodated as needed throughout a project. 8. Create guidelines to structure non-classroom training opportunities such as mentoring, peer reviews, lessons learned sessions, and on-the-job training. 9. Develop a set of predictive software defect data and a process for assessing software testing metric data against it. 10. Assess Agency-wide licenses for commonly used software tools. 11. Fill the knowledge gap in common software engineering practices for new hires and co-ops.12. Work through the Science, Technology, Engineering and Mathematics (STEM) program with universities in strengthening education in the use of common software engineering practices and standards. 13. Follow up this benchmark study with a deeper look into what both internal and external organizations perceive as the scope of software assurance, the value they expect to obtain from it, and the shortcomings they experience in the current practice. 14. Continue interactions with external software engineering environment through collaborations, knowledge sharing, and benchmarking.

Rarick, Heather L.↗

Sensing Service Transformer Secondary Currents using Planar Magnetic Pick-up Coils

The rapid deployment of distributed energy resources (DERs) is creating stresses on utility assets in the distribution networks. The service transformer, which is the most commonly used utility asset is often not monitored, since the cost of available sensing solutions is as high as the transformer itself. This paper presents a method to use an array of printed circuit board coils to intelligently monitor North American pole top service transformers. The approach, uses a novel, self-calibrating algorithm to infer the fixed geometry of the installation, by recording data over an extended period of time. The proposed method can enable rapid installation of a non-intrusive sensor that can be used to monitor loading levels of the distribution transformer. Furthermore, these sensors can help in planning, prognostics and advanced situational awareness for utilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Locating the Source of Events in Power Distribution Systems Using Micro-PMU Data

A novel method is proposed to locate the source of events in power distribution systems by using distribution-level phasor measurement units, a.k.a., micro-PMUs. An event in this paper is defined rather broadly to include any major change in any component across the distribution feeder. The goal is to enhance situational awareness in distribution grid by keeping track of the operation (or misoperation) of various grid equipment, assets, distribution energy resources, loads, etc. The proposed method is built upon the compensation theorem in circuit theory to generate an equivalent circuit to represent the event by using voltage and current synchrophasors that are captured by micro-PMUs. Importantly, this method makes critical use of not only magnitude but also synchronized phase angle measurements, thus, it justifies the need to use micro-PMUs, as opposed to ordinary RMS-based voltage and current sensors. The proposed method can work with data from as a few as only two micro-PMUs. The effectiveness of the developed method is demonstrated through computer simulations on the IEEE 123-bus test system, and also on micro-PMUs measurements from a real-life 12.47 kV test feeder in Riverside, CA. In conclusion, the results verify that the proposed method is accurate and robust in locating the source of different types of events on power distribution systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Online Detection of Inter-Turn Winding Faults in Single-Phase Distribution Transformers Using Smart Meter Data

Turn-to-turn faults between primary windings due to insulation degradation are a major cause of distribution transformer failure, and occur due to high levels of stress such as overloading and overheating. An additional consequence of these faults is an increased voltage on the transformer secondary due to effective change in turns ratio. This paper develops a novel method for early detection of insulation degradation and subsequent inter-turn winding failure by monitoring the transformer secondary voltage. The algorithm is based on a cumulative sum (CUSUM) statistic and compares voltages on neighbouring transformers to flag degrading assets. Results obtained from simulation as well as experimental data show that smart meter measurements can be utilized to achieve very high detection accuracy while keeping costs low. Here, the paper also demonstrates the validity of the algorithm in the presence of measurement noise, residential solar power injection etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗