The Dangers of Parametrics

Building a parametric cost model is hard work. The data is noisy and often does not behave like we want it to. We need statistics to give us an indication of the goodness of our models, but; statistics can be manipulated and mislead. On top of all of that, our own very human biases can lead us astray; causing us to see patterns in the noise and draw false conclusions from the data. Yet, it is the data itself that is the foundation for making better cost estimates and cost models. I believe the mistake we often make is we believe that our models are representative of the data; that our models summarize the experiences, the knowledge, and the stories contained in the data. However, it is the opposite that is true. Our models are but imitations of reality. They give us trends, but not truth. The experiences, the knowledge, and the stories that we need in order to make good cost estimates is bound up in the data. You cannot separate good cost estimating from a knowledge of the historical data. One final thought. It is our attempts to make sense out of the randomness that leads us astray. In order to make progress as cost modelers and cost estimators, we must accept that there are real limitations on our ability to model the past and predict the future. I do not believe we should throw up our hands and say this is the best we can do. Rather, to see real improvement we must first recognize these limitations, avoid the easy but misleading solutions, and seek to find ways to better model the world we live in. I don't have any simple solutions. Perhaps the answers lie in better data or in a totally different approach to simulating how the world works. All I know is that we must do our best to speak truth to ourselves and our customers. Misleading ourselves and our customers will, in the end, result in an inability to have a positive impact on those we serve.

Prince, Frank A.↗

Estimating the Cost to do a Cost Estimate

This article provides a model for estimating the cost required to do a cost estimate. Overruns may lead to concellation of a project. In 1991, we completed a study on the cost of doing cost estimates for the class of projects normally encountered in the development and implementation of equipment at the network of tracking stations operated by the Jet Propulsion Laboratory (JPL) for NASA.

estimation cost estimate↗

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.↗

Proposed Reliability/Cost Model

New technique estimates cost of improvement in reliability for complex system. Model format/approach is dependent upon use of subsystem cost-estimating relationships (CER's) in devising cost-effective policy. Proposed methodology should have application in broad range of engineering management decisions.

Delionback, L. M.↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say 'No'?

We analyze the potential life cycle cost of assorted NASA human spaceflight architectures an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit.

cost modeling estimation↗

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

In 2011, NASA released a report assessing the market for commercial crew and cargo services to low Earth orbit (LEO). The report stated that NASA had spent a few hundred million dollars in the Commercial Orbital Transportation Services (COTS) program on the portion related to the development of the Falcon 9 launch vehicle. Yet a NASA cost model predicted the cost would have been significantly more with a non-commercial cost-plus contracting approach. By 2016 a NASA request for information stated it must "maximize the efficiency and sustainability of the Exploration Systems development programs", as "critical to free resources for reinvestment...such as other required deep space exploration capabilities." This work joins the previous two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for "...other required deep space exploration capabilities." These other capabilities include landers, stages and more. We mature the concept of "costed baseball cards", adding cost estimates to NASA's space systems "baseball cards." We show some potential costs, including analysis, the basis of estimates, data sources and caveats to address a critical question - based on initial assessment, are significant agency resources justified for more detailed analysis and due diligence to understand and invest in public private partnerships for human deep space exploration systems? The cost analysis spans commercial to cost-plus contracting approaches, for smaller elements vs. larger, with some variation for lunar or Mars. By extension, we delve briefly into the potentially much broader significance of the individual cost estimates if taken together as a NASA investment portfolio where public private partnership are stitched together for deep space exploration. How might multiple improvements in individual systems add up to NASA human deep space exploration achievements, realistically, affordably, sustainably, in a relevant timeframe?

cost modeling estimation↗

Long-range planning cost model for support of future space missions by the deep space network

A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.

Sherif, J. S.↗

The role of multispectral scanners as data sources for EPA hydrologic models

An estimated cost savings of 30% to 50% was realized from using LANDSAT-derived data as input into a program which simulates hydrologic and water quality processes in natural and man-made water systems. Data from the satellite were used in conjunction with EPA's 11-channel multispectral scanner to obtain maps for characterizing the distribution of turbidity plumes in Flathead Lake and to predict the effect of increasing urbanization in Montana's Flathead River Basin on the lake's trophic state. Multispectral data are also being studied as a possible source of the parameters needed to model the buffering capability of lakes in an effort to evaluate the effect of acid rain in the Adirondacks. Water quality in Lake Champlain, Vermont is being classified using data from the LANDSAT and the EPA MSS. Both contact-sensed and MSS data are being used with multivariate statistical analysis to classify the trophic status of 145 lakes in Illinois and to identify water sampling sites in Appalachicola Bay where contaminants threaten Florida's shellfish.

Slack, R.↗

Exploring NASA Human Spaceflight and Pioneering Scenarios

The life cycle cost analysis of space exploration scenarios is explored via a merger of (1) scenario planning, separating context and (2) modeling and analysis of specific content. Numerous scenarios are presented, leading to cross-cutting recommendations addressing life cycle costs, productivity, and approaches applicable to any scenarios. Approaches address technical and non-technical factors.

cost modeling estimation↗

Estimating airline operating costs

A review was made of the factors affecting commercial aircraft operating and delay costs. From this work, an airline operating cost model was developed which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model, similar in some respects to the standard Air Transport Association of America (ATA) Direct Operating Cost Model, permits estimates of aircraft-related costs not now included in the standard ATA model (e.g., aircraft service, landing fees, flight attendants, and control fees). A study of the cost of aircraft delay was also made and a method for estimating the cost of certain types of airline delay is described.

Maddalon, D. V.↗

Integrating Efficiency of Industry Processes and Practices Alongside Technology Effectiveness in Space Transportation Cost Modeling and Analysis

This paper presents past and current work in dealing with indirect industry and NASA costs when providing cost estimation or analysis for NASA projects and programs. Indirect costs, when defined as those costs in a project removed from the actual hardware or software hands-on labor; makes up most of the costs of today's complex large scale NASA space/industry projects. This appears to be the case across phases from research into development into production and into the operation of the system. Space transportation is the case of interest here. Modeling and cost estimation as a process rather than a product will be emphasized. Analysis as a series of belief systems in play among decision makers and decision factors will also be emphasized to provide context.

Zapata, Edgar↗

Cost model relationships between textile manufacturing processes and design details for transport fuselage elements

Textile manufacturing processes offer potential cost and weight advantages over traditional composite materials and processes for transport fuselage elements. In the current study, design cost modeling relationships between textile processes and element design details were developed. Such relationships are expected to help future aircraft designers to make timely decisions on the effect of design details and overall configurations on textile fabrication costs. The fundamental advantage of a design cost model is to insure that the element design is cost effective for the intended process. Trade studies on the effects of processing parameters also help to optimize the manufacturing steps for a particular structural element. Two methods of analyzing design detail/process cost relationships developed for the design cost model were pursued in the current study. The first makes use of existing databases and alternative cost modeling methods (e.g. detailed estimating). The second compares design cost model predictions with data collected during the fabrication of seven foot circumferential frames for ATCAS crown test panels. The process used in this case involves 2D dry braiding and resin transfer molding of curved 'J' cross section frame members having design details characteristic of the baseline ATCAS crown design.

Metschan, Stephen L.↗

Estimating the Deep Space Network modification costs to prepare for future space missions by using major cost drivers

This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).

Remer, Donald S.↗

The State of Play US Space Systems Competitiveness: Prices, Productivity, and Other Measures of Launchers & Spacecraft

Collects space systems cost and related data (flight rate, payload, etc.) over time. Gathers only public data. Non-recurring and recurring. Minimal data processing. Graph, visualize, add context. Focus on US space systems competitiveness. Keep fresh update as data arises, launches occur, etc. Keep fresh focus on recent data, indicative of the future.

cost modeling estimation↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Review of a Draft - Avoiding the Impossible: Re-focusing a Non-Feasible Mission 2-Hrs into a 3-Day Engineering Session

Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.

Hihn, Jairus M.↗

End-to-End Trade-Space Analysis for Designing Constellation

Multipoint measurement missions can provide a significant advancement in science return and this science interest coupled with as many recent technological advances are driving a growing trend in exploring distributed architectures for future NASA missions. Distributed Spacecraft Missions (DSMs) leverage multiple spacecraft to achieve one or more common goals. In particular, a constellation is the most general form of DSM with two or more spacecraft placed into specific orbit(s) for the purpose of serving a common objective (e.g., CYGNSS). Because a DSM architectural trade-space includes both monolithic and distributed design variables, DSM optimization is a large and complex problem with multiple conflicting objectives. Over the last two years, our team has been developing a Trade-space Analysis Tool for Constellations (TAT-C), implemented in common programming languages for pre-Phase A constellation mission analysis. By evaluating alternative mission architectures, TAT-C seeks to minimize cost and maximize performance for pre-defined science goals. This presentation will describe the overall architecture of TAT-C including: a User Interface (UI) at several levels of details and user expertise; Trade-space Search Requests that are created from the Science requirements gathered by the UI and validated by a Knowledge Base; a Knowledge Base to compare the current requests to prior mission concepts to potentially prune the trade-space; a Trade-space Search Iterator which, with inputs from the Knowledge Base, and, in collaboration with the Orbit & Coverage, Reduction & Metrics, and Cost& Risk modules, generates multiple potential architectures and their associated characteristics. TAT-C leverages the use of the Goddard Mission Analysis Tool (GMAT) to compute coverage and ancillary data, modeling orbits to balance accuracy and performance. The current version includes uniform and non-uniform Walker constellations as well as Ad-Hoc and precessing constellations, and its cost model represents an aggregate model consisting of Cost Estimating Relationships (CERs) from widely accepted models. The current GUI automatically generates graphics representing metrics such as average revisit time or coverage as a function of cost. The end-to-end system will be demonstrated as part of the presentation.

Mission Desig↗