Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Common Data Acquisition Systems (DAS) Software Development for Rocket Propulsion Test (RPT) Test Facilities - A General Overview

The advent of the commercial space launch industry and NASA's more recent resumption of operation of Stennis Space Center's large test facilities after thirty years of contractor control resulted in a need for a non-proprietary data acquisition system (DAS) software to support government and commercial testing. The software is designed for modularity and adaptability to minimize the software development effort for current and future data systems. An additional benefit of the software's architecture is its ability to easily migrate to other testing facilities thus providing future commonality across Stennis. Adapting the software to other Rocket Propulsion Test (RPT) Centers such as MSFC, White Sands, and Plumbrook Station would provide additional commonality and help reduce testing costs for NASA. Ultimately, the software provides the government with unlimited rights and guarantees privacy of data to commercial entities. The project engaged all RPT Centers and NASA's Independent Verification & Validation facility to enhance product quality. The design consists of a translation layer which provides the transparency of the software application layers to underlying hardware regardless of test facility location and a flexible and easily accessible database. This presentation addresses system technical design, issues encountered, and the status of Stennis' development and deployment.

Hebert, Phillip W., Sr.↗

Hollow electron-lens assisted collimation and plans for the LHC

The hollow electron lens (e-lens) is a very powerful and advanced tool for active control of diffusion speed of halo particles in hadron colliders. Thus, it can be used for a controlled depletion of beam tails and enhanced beam halo collimation. This is of particular interest in view of the upgrade of the Large Hadron Collider (LHC) at CERN, in the framework of the High-Luminosity LHC project (HL-LHC). The estimated stored energy in the tails of the HL-LHC beams is about 30 MJ, posing serious constraints on its control and safe disposal. In particular, orbit jitter can cause significant loss spikes on primary collimators, which can lead to accidental beam bump and magnet quench. Successful tests of e-lens assisted collimation have been carried out at the Tevatron collider at Fermilab and a review of the main outcomes is shown. Preliminary results of recent experiments performed at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven, put in place to explore different operational scenarios studies for the HL-LHC, are also discussed. Status and plans for the deployment of hollow electron lenses at the HL-LHC are presented.

43 PARTICLE ACCELERATORS↗

Status and Prospects of the Global Automotive Fuel Cell Industry and Plans for Deployment of Fuel Cell Vehicles and Hydrogen Refueling Infrastructure

Automobile manufacturers leading the development of mass-market fuel cell vehicles (FCVs) were interviewed in Japan, Korea, Germany and the United States. There is general agreement that the performance of FCVs with respect to durability, cold start, packaging, acceleration, refueling time and range has progressed to the point where vehicles that could be brought to market in 2015 will satisfy customer expectations. However, cost and the lack of refueling infrastructure remain significant barriers. Costs have been dramatically reduced over the past decade, yet are still about twice what appears to be needed for sustainable market success. While all four countries have plans for the early deployment of hydrogen refueling infrastructure, the roles of government, industry and the public in creating a viable hydrogen refueling infrastructure remain unresolved. The existence of an adequate refueling infrastructure and supporting government policies are likely to be the critical factors that determine when and where hydrogen FCVs are brought to market.

fuel cell industry↗

WLCG Transition from X.509 to Tokens. Status, Plans, and Timeline

Since 2017, the Worldwide LHC Computing Grid (WLCG) has been working towards enabling token-based authentication and authorization throughout its entire middleware stack. Following the initial publication of the WLCG Token Schema v1.0 in 2019, OAuth2.0 token workflows have been integrated across grid middleware. There are many complex challenges to be addressed before the WLCG can be end-to-end token-based, including not just technical hurdles but also interoperability with the wider authentication and authorization landscape. This paper presents the status of the WLCG coordination and deployment work, and how it relates to software providers and partner communities. The authors also detail how the WLCG token transition timeline has progressed, and how it has changed since its publication.

97 MATHEMATICS AND COMPUTING↗

An Artificially Intelligent Physical Model-Checking Approach to Detect Switching-Related Attacks on Power Systems

Decentralized and hierarchical microgrid control strategies have lain the groundwork for shaping the future smart grid. Such control approaches require the cooperation between microgrid operators in control centers, intelligent microcontrollers, and remote terminal units via secure and reliable communication networks. In order to enhance the security and complement the work of network intrusion detection systems, this paper presents an artificially intelligent physical model-checking that detects tampered-with circuit breaker switching control commands whether, due to a cyber-attack or human error. In this technique, distributed agents, which are monitoring sectionalized areas of a given microgrid, will be trained and continuously adapted to verify that incoming control commands do not violate the physical system operational standards and do not put the microgrid in an insecure state. The potential of this approach has been tested by deploying agents that monitor circuit breakers status commands on a 14-bus IEEE benchmark system. The results showed the accuracy of the proposed framework in characterizing the power system and successfully detecting malicious and/or erroneous control commands.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Thermal control system for Space Station Freedom photovoltaic power module

The electric power for Space Station Freedom (SSF) is generated by the solar arrays of the photovoltaic power modules (PVM's) and conditioned, controlled, and distributed by a power management and distribution system. The PVM's are located outboard of the alpha gimbals of SSF. A single-phase thermal control system is being developed to provide thermal control of PVM electrical equipment and energy storage batteries. This system uses ammonia as the coolant and a direct-flow deployable radiator. The description and development status of the PVM thermal control system is presented.

Hacha, Thomas H.↗

A Deployable Primary Mirror for Space Telescopes

NASA Langley Research Center, Composite Optics, Inc., and Nyma/ADF have developed jointly a deployable primary mirror for space telescopes that combines over five years of research on deployment of optical-precision structures and over ten years of development of fabrication techniques for optical-precision composite mirror panels and structures. The deployable mirror is directly applicable to a broad class of non-imaging "lidar" (Light direction and ranging) telescopes whose figure-error requirements are in the range of one to ten microns RMS. Furthermore, the mirror design can be readily modified to accommodate imaging-quality reflector panels and active panel-alignment control mechanisms for application to imaging telescopes. The present paper: 1) describes the deployable mirror concept; 2) explains the status of the mirror development; and 3) provides some technical specifications for a 2.55- m-diameter, proof-of-concept mirror.

Lake, Mark S.↗

A Deployable Primary Mirror for Space Telescopes

NASA Langley Research Center, Composite Optics, Inc., and Nyma/ADF have developed jointly a deployable primary mirror for space telescopes that combines over five years of research on deployment of optical-precision structures and over ten years of development of fabrication techniques for optical-precision composite mirror panels and structures. The deployable mirror is directly applicable to a broad class of non-imaging "lidar" (light direction and ranging) telescopes whose figure-error requirements are in the range of one to ten microns RMS. Furthermore, the mirror design can be readily modified to accommodate imaging-quality reflector panels and active panel-alignment control mechanisms for application to imaging telescopes. The present paper: 1) describes the deployable mirror concept; 2) explains the status of the mirror development; and 3) provides some technical specifications for a 2.55-m-diameter, proof-of-concept mirror.

Lake, Mark S.↗

Final Focus Test Facility ATF2 Status

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometre level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European and American scientists. In this paper, the present status and performance of the recently deployed ATF2 systems are briefly described, based on the first experience with beam measurements and tuning during winter, spring and early autumn of 2009. The near and longer term plans are outlined as well. The ATF collaboration has completed the construction of ATF2 and has started its commissioning. Important experience operating the new cavity BPM and BSM instrumentation in real conditions has been gained and first beam measurements have been performed in a magnetic configuration with reduced optical demagnification. Both horizontal and vertical emittances were successfully tuned and measured in the extraction line, with values approaching the design values of 2 nm and 12 pm, respectively. First checks of the first order optics along the beam line and at the IP were also done. Hardware developments for the second ATF2 goal are being pursued in parallel with the present commissioning work for the first goal. The collaboration is also preparing several near and long terms plans for ATF2. In the next few years, information very valuable for any future collider with local chromaticity correction and tuning of very low emittance beams can be expected. In the previous experience at the FFTB, the smallest vertical beam sizes which were achieved were about 70 nanometers. The work described here continues to address this largely unexplored regime in a systematic way.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Use of Deception to Improve Client Honeypot Detection of Drive-by-Download Attacks

This paper presents the application of deception theory to improve the success of client honeypots at detecting malicious web page attacks from infected servers programmed by online criminals to launch drive-by-download attacks. The design of honeypots faces three main challenges: deception, how to design honeypots that seem real systems; counter-deception, techniques used to identify honeypots and hence defeating their deceiving nature; and counter counter-deception, how to design honeypots that deceive attackers. The authors propose the application of a deception model known as the deception planning loop to identify the current status on honeypot research, development and deployment. The analysis leads to a proposal to formulate a landscape of the honeypot research and planning of steps ahead.

97 MATHEMATICS AND COMPUTING↗

SECARB Complete Subcontract and Begin Deployment of Surface Monitoring Plan

This report documents the status of planning and progresses for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tool sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

The MSAT spacecraft of Telesat Mobile Inc.

The MSAT spacecraft of the Canadian mobile satellite operator, Telesat Mobile Inc. (TMI) is described. When launched in 1994, the large geostationary MSAT spacecraft which is currently under construction by Hughes Aircraft Co. and Spar Aerospace Ltd. will enable TMI to provide mobile and transportable communications services to its customers even in the most remote parts of the North American continent. The main elements of TMI's mobile satellite system (described in a companion paper) are the space segment and the ground segment. TMI's space segment will employ one of two nearly identical satellites, one of which will be owned and operated by TMI, the other by the U.S. mobile satellite operator, American Mobile Satellite Corporation (AMSC). The two companies are participating in a joint spacecraft procurement in order to reduce the nonrecurring costs and to ensure system compatibility between the two systems; and they have also agreed to provide in-orbit backup to each other in the event of a catastrophic satellite failure. The program status, performance requirements, main parameters, and configuration of the MSAT spacecraft are reviewed. The major features of the communications subsystem are discussed in some detail, and a brief summary is presented of the spacecraft service module. Key technology items include the L-band RF power amplifier, which must operate with a high DC to RF power efficiency and generate low intermodulation when loaded with multi-carrier signals; and the large diameter deployable L-band antenna. The development status and expected performance of these spacecraft components is examined.

Bertenyi, E.↗

The Realities of Managing Complex Space Missions like the James Webb Space Telescope

An overview of the James Webb Space Telescope (JWST) project and its status are presented. The JWST is a deployable infrared telescope with a 6.5 meter diameter segmented, adjustable primary mirror. It has a cryogenic temperature telescope and instruments suited for infrared performance. It will be launched in 2013 on an European Space Agency-supplied Ariane 5 rocket 20 Sun-Earth L2 for a 5-year mission. Compared to other telescopes the JWST: has a 2.7 time longer diameter and 2.7 time longer wavelength capability than the Hubble Space Telescope (HST), 38 times increased sensitivity at K band and 8 times increased sensitivity at H band than the HST NICMOS; and, 8-24 times better angular resolution than the Spitzer. An instrument overview and integration and test flow overview are provided. The JWST project management approach, including organizational chart, program phases, technology status, and project critical path summary, are included. Additionally, project management tools and guidelines are are outlined.

Sabelhaus, Phil↗

Impact of GPS Signal Loss and Its Mitigation in Power System Synchronized Measurement Devices

With the aid of global positioning system (GPS), synchronized measurement devices (SMDs) are increasingly deployed across power systems to monitor the status of electric grids by providing accurate measurement data along with unified time stamps. Unfortunately, GPS receivers tend to lose signal lock when certain uncontrollable and unpredictable factors arise. In order to investigate the presence of GPS signal loss (GSL) issues on measurement devices, analysis is performed on historical data from both phasor data concentrators and FNET/GridEye servers. Meanwhile, the impact of GSL on field measurement accuracy has not been previously explored in depth. Through analysis and experimental tests, this paper discovers angle drift caused by GSL, which consequently leads to the total vector error exceeding the IEEE standard C37.118.1-2011. Furthermore, a compensation method is proposed to rectify the angle drift and laboratory experiments demonstrate that the proposed method does effectively reduce angle drift and mitigate the impact of GSL in SMDs.

47 OTHER INSTRUMENTATION↗

Z Facility Sustainment Status (April FY 2023) [Slides]

98% of the budget is deployed, remaining $325,000 to be assigned by the end of May. Costs plus Commitments total 58% of the deployed budget. 29 projects have been kicked off and are in progress. Five project plans are being finalized and will be kicked off early summer. The February start has contributed to the risk of not costing all of the FY23 budget.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗