Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric bus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Automated Transit Fleet Electrification Planning in Response to Route Dynamics, Vehicle Utilization, and Local Climate

Transit electrification is difficult, requiring the consideration of many factors including route dynamics, vehicle utilization, and local ambient temperatures. Incumbent planning tools typically rely upon static vehicle efficiency numbers which do not consider local factors specific to each fleet. This paper summarizes a collaboration between NREL and Microgrid Labs, which produced an automated sizing tool capable of producing vehicle battery and motor sizing for drop-in electrification. Furthermore, the workflow also exports the electric-vehicle supply equipment needed to support fleet electrification. The paper summarizes the model theory and includes a sample pilot study performed in support of the Via Mobility transit fleet.

33 ADVANCED PROPULSION SYSTEMS↗

Developing a PSCAD Model of the Reduced 240-Bus WECC Test System: Preprint

Fast-acting controls of inverter-based resources (IBR) introduce unprecedented dynamics to bulk power systems and island power grids, especially the high-frequency dynamics ranging from $>5$ Hz to hundreds of Hz. These oscillatory stability problems cannot be captured by the phasor domain simulations, e.g., in PSS/E, Powerworld and TSAT, due to insufficient modeling. Instead, they should be studied by electromagnetic transient (EMT) simulations by using proper EMT dynamic models. This paper develops and validates the PSCAD model of the reduced 240-bus Western Electricity Coordinating Council (WECC) test system. The PSCAD model will be released to the public, which can be used by both academia and power industry practitioners for studying the fast dynamic problems without any Critical Energy/Electric Infrastructure Information (CEII).

240-bus WECC test system↗

Real-Time Federated Cyber-Transmission-Distribution Testbed Architecture for the Resiliency Analysis

With the ongoing automation driven by the push toward the smart electric grid and the advancement in associated cyber infrastructure, the interaction between physical [electric transmission and distribution (T&D) systems], cyber (communication, automation, and control), and human (grid operators and decision-makers) is increasingly becoming more complex. This creates the requirement of analyzing the effect of the transmission system on the distribution system and vice versa with consideration of the additional complexity of the cyber infrastructure. Such an integrated testbed will also help with resiliency analysis, where resiliency refers to the ability of the system to continue serving energy to the critical loads even with limited extreme contingencies. Interaction of the physical power grid with the cyber layer can be effectively modeled using real-time (RT) simulator for developing and validating various operational and control algorithms. Testbeds using RT simulators with multiple capabilities have been developed at different institutions. Still, no single existing testbed can offer full scalability while simultaneously meeting high fidelity requirements for resiliency experimentation. Co-simulating federated testbed assets can provide a scalable experimentation platform that can be leveraged for verification and validation. In this article, an architecture is developed for federated cyber-physical testbed. A local federation with two real-time simulators is developed: real-time digital simulator (RTDS) and OPAL-RT have been interfaced using VILLAS framework for end-to-end testing. Also, a real-time linear predictor is developed and integrated here to address the communication latency impact on geographically allocated federated RT simulation. Finally, resiliency analysis tools are formulated and utilized for T&D systems. Finally as an illustrative use case, the resiliency of a T&D test system is simulated, and the results are analyzed. A 179-bus Western Electricity Coordinating Council (WECC) transmission system is developed using OPAL-RT/ HYPERSIM, and a modified IEEE 13 node feeder system is modeled in RTDS/RSCAD and interfaced for resiliency analysis.

42 ENGINEERING↗

Online energy consumption forecast for battery electric buses using a learning-free algebraic method

Accurately predicting the energy consumption plays a vital role in battery electric buses (BEBs) route planning and deployment. Based on the algebraic derivative estimation, we present a novel method to forecast the energy consumption in real time. In contrast to the mainstream machine-learning-based methods, the proposed method does not require access to the historical energy consumption data. It eliminates the time-consuming and computationally expensive offline training. Consequently, its prediction performance is not constrained by the quantity and quality of the training data. Moreover, the method can swiftly adapt to new situations not included in the previous driving cycles, which makes it especially suitable for emerging transport modes, e.g., on-demand transit services. In addition, its online execution only involves algebraic calculations, yielding superior calculation efficiency. Using real-world data, we comprehensively compare the performance of the proposed learning-free algebraic method with multiple representative machine-learning-based methods. Finally, the advantages and limitations of the proposed method are discussed in detail.

33 ADVANCED PROPULSION SYSTEMS↗

A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources

The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.

EMT simulation↗

Probability Density Function Control of Frequency Fluctuations in Renewable-Rich Power Systems

The stochastic nature of renewable energy sources (RESs) necessitates treating power system frequency response as a random process with a nonstationary probability density function (PDF). Here, based upon the stochastic distribution control theory originated by the second author, this paper proposes a novel stochastic controller to improve the frequency PDF in power grids when integrating a large amount of RESs, thereby minimizing the effects of uncertainties and enhancing overall system stability. The key idea is to manipulate the controllable power generation resources so that the frequency PDF is make to follow a target PDF by using the stochastic distribution control theory originated by the second author. The proposed method can easily be plugged into existing automatic generation controls for multi-area transmission grids. The proposed method is validated via a modified Kundar's two area system and 240-bus Western Electricity Coordinating Council systems. The simulation results show that the proposed control shapes the frequency PDF narrower and sharper, leading to a notable improvement toward minimizing the effects of randomness and uncertainty during grid operation.

frequency↗

Blueprinting Electrified Transit System Implementation

To achieve a more affordable and reliable transportation system, we need to smartly upgrade our power systems and install a large number of charging stations, but conventional planning methods are not up to the task. By applying advanced simulation and optimization tools, we can design a smarter, more cost-effective electric transportation network. The initial focus was on public transit systems, demonstrating how this approach can deliver broader economic, reliability, and air quality benefits nationwide.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand-adaptive Transit Design for Urban Transportation Hubs

In this study, we proposed a novel three-stage framework for planning the optimal demand-adaptive transit (DAT) at urban transportation hubs. Given the potential trip demand and road traffic condition, the proposed framework sequentially generates the optimal set of candidate routes, combines the outgoing routes and incoming routes at the hub, and derives the optimal fleet size and corresponding route frequency under the fixed budget. In particular, we build the route generation algorithm which maximizes passenger demand coverage with travel time deviation constraint. And a heuristic algorithm is further developed which yields near-optimal operation routes for real-time demand. The fleet optimization problem is formulated to minimize the weighted cost of energy savings, operation cost and trip revenue. We conduct comprehensive numerical experiments for planning DAT with electric buses at JFK airport in NYC using NYC taxi and for-hire vehicle trip data and GoogleMap speed data. The results show the superior performance of the proposed route generation algorithm which is able to cover citywide passenger demand with only 61 DAT routes. The results also suggest that the proposed DAT planning framework may serve over 47% of existing taxi and FHV demand by operating 18 routes using the fleet of 62 electric buses.

demand adaptive↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Aware Charging and Operational Optimization for Mixed-Fleet Public Transit

The rapid growth of urban populations and the increasing need for sustainable transportation solutions have prompted a shift towards electric buses in public transit systems. However, the effective management of mixed fleets consisting of both electric and diesel buses poses significant operational challenges. One major challenge is coping with dynamic electricity pricing, where charging costs vary throughout the day. Transit agencies must optimize charging assignments in response to such dynamism while accounting for secondary considerations such as seating constraints. This paper presents a comprehensive mixed-integer linear programming (MILP) model to address these challenges by jointly optimizing charging schedules and trip assignments for mixed (electric and diesel bus) fleets while considering factors such as dynamic electricity pricing, vehicle capacity, and route constraints. We address the potential computational intractability of the MILP formulation, which can arise even with relatively small fleets, by employing a hierarchical approach tailored to the fleet composition. By using real-world data from the city of Chattanooga, Tennessee, USA, we show that our approach can result in significant savings in the operating costs of the mixed transit fleets.

Sen, Rishav↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quick Start to Electrifying Your School Bus Fleet

Learn how electric school buses can work for your district by understanding the basics of electrification. Understand what is needed to electrify your fleet, how much it costs, and how the process will effect your greenhouse gas emission impacts.

ADVANCED PROPULSION SYSTEMS↗

Optimizing dynamic wireless charging for electric buses: A data-driven approach to infrastructure planning

The network configuration significantly impacts the performance of dynamic wireless charging (DWC) technology for electric buses. Here, this study presents a novel approach to planning charging infrastructure for public transit using data-driven nonconvex mixed-integer optimization. Integrating DWC and charging station technologies reveals a trade-off between enroute and stationary charging times. Our framework optimizes bus frequency settings and transmitter coil arrangements to minimize operational and infrastructure costs. A case study in Chattanooga, Tennessee, demonstrates the method's effectiveness in mitigating range anxiety and reducing charging expenses. This research implies that integrating DWC technology into public transit systems can enhance the feasibility and cost-effectiveness of electric bus operations, promoting sustainable urban mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Dataset of U.S. School Bus Depots

A large body of public health literature describes how undesirable or dangerous facilities, such as truck depots and industrial plants, located in or near communities can lead to health harms. Research also describes the high levels of traffic-related air and noise pollution that is linked to health harms and may be disproportionately distributed near many schools. Therefore, a primary use case for this dataset is to analyze the location of school bus depots and to create an evidence base that would better enable the work of community members, advocates, and other stakeholders toward improving air quality and public health. Other possible uses for this school bus depot dataset include electricity grid planning and reliability, given recent momentum toward school bus electrification. This dataset was created using an object-based approach with remote sensing data. The primary source of aerial imagery was the National Agriculture Imagery Program (NAIP) dataset. NAIP imagery was analyzed to locate individual school buses based on their color and size, and then classified clusters of school buses as potential depots, which were then verified visually. The resulting dataset contains 11,309 depots across the 48 contiguous U.S. states and Washington, D.C. Fifty-one percent (5,730 depots) are at schools, defined as being 350 meters or less from the nearest school. The accuracy of the dataset was assessed by comparing it with independent reference datasets containing 506 depots from the records of two school transportation companies. We found good agreement, with an omission error rate of 15.2% (77 depots). This dataset represents one of the only remote sensing projects to conduct object detection using data at the sub-meter to 1-meter resolution for a continental-scale application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Optimized System for On-Route Fast Charging of Battery-Electric Shuttle Buses

Electrifying cars, buses, and trucks is an attractive means of reducing energy use and emissions because it involves more efficient drivetrain components and minimal restructuring of the transportation network. Transit buses, driving fixed routes, help minimize driver range anxiety by properly sizing energy storage systems. A major challenge to fully electrifying transit buses is providing the amount of energy they consume in a day of driving. To enable a full day of operation without charging, batteries need to be large, which could be expensive and heavy. This work utilizes real-world transit bus data used in a battery-electric drivetrain model to co-optimize charger locations, charger power levels, and vehicle battery sizes.

ADVANCED PROPULSION SYSTEMS↗

Fleet-wide Electrification Impacts Assessment for the Valley Transportation Authority

This report explores the long-term electrification opportunities for the Valley Transit Authority’s (VTA) transit bus fleet. The potential for transit bus electrification at VTA as well as the economic impacts of partial and complete electrification are explored. We use the Revenue Operation and Device Optimization model to determine the optimal charging, operation and lowest capital and operating cost solution to achieve different levels of electrification to meet their existing routes. This study finds that, relying on only depot charging, around 70% of the daily trips by VTA’s transit bus fleet can be replaced with battery electric buses (BEBs) today. The benefits and drawbacks of five methods for improving the electrification potential beyond that achievable with only depot charging are discussed including (1) increase charger power, (2) purchase of larger vehicle batteries, (3) en-route charging, (4) purchasing additional buses and swapping them to enable the existing routes/blocks1 to be met, and (5) route/block redesign. A strategy is developed to enable full fleet electrification by increasing charger power or allowing intraday charging as a proxy for the options mentioned above. This method allows us to develop an understanding of the impacts and trade-offs of full fleet electrification. Two charging strategies are examined. Immediate charging, when the bus is charged as soon as it arrives at a depot or en-route charging station, and smart charging, which uses a controller to determine the best times to charge to achieve the lowest charging cost, while maintaining the same trip schedules. Smart charging is effective at reducing the peak power consumption, which can be reduced by between 31% and 65% compared to immediate charging. This translates directly to lower electricity demand charges and lower costs for possible distribution system upgrades. The total lifetime net present value (NPV) costs for different scenarios are presented in Figure ES-1. Scenarios are separated into three sections. The first stacked bar on the left is the base case (business-as-usual) where all buses are diesel hybrids, the next four bars include partial and full fleet electrification utilizing only immediate charging, and the last four bars include partial and full fleet electrification utilizing smart charging. The results show that smart charging scenarios are within ±4% of the lifetime NPV cost of the diesel-hybrid only (business-as-usual) scenario. The scenarios with full fleet electrification (i.e., including intraday charging) are 4% lower cost and those with partial fleet electrification (i.e., without intraday charging) are 2%–3% higher. However, it is important to note that the intraday charging scenarios do not include any additional costs for the equipment necessary to achieve intraday charging (e.g., additional chargers, larger batteries, new route design). Additionally, it is worth noting that the Low Carbon Fuel Standard (LCFS) credit received for implementing electric buses is essential to achieving these results.

33 ADVANCED PROPULSION SYSTEMS↗