Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Hardware Testing and Implementation of RapidIO Protocol on the ISAAC iBoard for Use in the NEXUS Testbed

I am assisting the NEXUS (NEXtbUS) and ISAAC (Instrument ShAred Artifact for Computing) teams in achieving a highly reusable, highly configurable FPGA (Field Programmable Gate Array) system which uses a unified, high-speed bus standard. One of my tasks is to verify that all new ISAAC iBoards features are functioning as expected by using my previous builds to test these features and resolving any errors found. My other task is to investigate and implement the RapidIO protocol and to implement it onto the new ISAAC iBoards to be used in the NEXUS testbed. Completing these tasks will demonstrate the potential of both NEXUS and ISAAC technology. This will allow others to see the power in making use of a unified, modular system.

RapidIO Protocol↗

Flight-Tested Hardware Options Currently Available to Support Fruit Fly Science Missions on ISS

The Fruit Fly Lab team at Ames Research Center has developed and flown several versions of hardware to ISS that have been utilized to conduct research using the model organism, Drosophila melanogaster. These sets of hardware vary in complexity and capabilities and can be matched to experiments based on specific aims objectives and considerations for cost, updownmass, and crew time requirements. The team has multiple investigators slated to utilize this hardware on near-term missions to ISS, and is expecting more from future calls for proposals.

Fruit Fly↗

Thermodynamic performance testing of the orbiter flash evaporator system

System level testing of the space shuttle orbiter's development flash evaporator system (FES) was performed in a thermal vacuum chamber capable of simulating ambient ascent, orbital, and entry temperature and pressure profiles. The test article included the evaporator assembly, high load and topping exhaust duct and nozzle assemblies, and feedwater supply assembly. Steady state and transient heat load, water pressure/temperature and ambient pressure/temperature profiles were imposed by especially designed supporting test hardware. Testing in 1978 verified evaporator and duct heater thermal design, determined FES performance boundaries, and assessed topping evaporator plume characteristics. Testing in 1979 combined the FES with the other systems in the orbiter active thermal control subsystem (ATCS). The FES met or exceeded all nominal and contingency performance requirements during operation with the integrated ATCS. During both tests stability problems were encountered during steady state operations which resulted in subsequent design changes to the water spray nozzle and valve plate assemblies.

Jaax, J. R.↗

In-flight rain damage tests of the shuttle thermal protection system

NASA conducted in-flight rain damage tests of the Shuttle thermal protection system (TPS). Most of the tests were conducted on an F-104 aircraft at the Dryden Flight Research Facility of NASA's Ames Research Center, although some tests were conducted by NOAA on a WP-3D aircraft off the eastern coast of southern Florida. The TPS components tested included LI900 and LI2200 tiles, advanced flexible reusable surface insulation, reinforced carbon-carbon, and an advanced tufi tile. The objective of the test was to define the damage threshold of various thermal protection materials during flight through rain. The test hardware, test technique, and results from both F-104 and WP-3D aircraft are described. Results have shown that damage can occur to the Shuttle TPS during flight in rain.

Meyer, Robert R., Jr.↗

Multiple Hollow Cathode Wear Testing

A hollow cathode-based plasma contactor has been baselined for use on the Space Station to reduce station charging. The plasma contactor provides a low impedance connection to space plasma via a plasma produced by an arc discharge. The hollow cathode of the plasma contactor is a refractory metal tube, through which xenon gas flows, which has a disk-shaped plate with a centered orifice at the downstream end of the tube. Within the cathode, arc attachment occurs primarily on a Type S low work function insert that is next to the orifice plate. This low work function insert is used to reduce cathode operating temperatures and energy requirements and, therefore, achieve increased efficiency and longevity. The operating characteristics and lifetime capabilities of this hollow cathode, however, are greatly reduced by oxygen bearing contaminants in the xenon gas. Furthermore, an optimized activation process, where the cathode is heated prior to ignition by an external heater to drive contaminants such as oxygen and moisture from the insert absorbed during exposure to ambient air, is necessary both for cathode longevity and a simplified power processor. In order to achieve the two year (approximately 17,500 hours) continuous operating lifetime requirement for the plasma contactor, a test program was initiated at NASA Lewis Research Center to demonstrate the extended lifetime capabilities of the hollow cathode. To date, xenon hollow cathodes have demonstrated extended lifetimes with one test having operated in excess of 8000 hours in an ongoing test utilizing contamination control protocols developed by Sarver-Verhey. The objectives of this study were to verify the transportability of the contamination control protocols developed by Sarver-Verhey and to evaluate cathode contamination control procedures, activation processes, and cathode-to-cathode dispersions in operating characteristics with time. These were accomplished by conducting a 2000 hour wear test of four hollow cathodes with different xenon gas purities and activation processes. The following will be presented: a description of the facility and test hardware, testing procedures and operating conditions, a discussion of test results, and conclusions.

Soulas, George C.↗

GOES Type III Loop Heat Pipe Life Test Results

The GOES Type III Loop Heat Pipe (LHP) was built as a life test unit for the loop heat pipes on the GOES N-Q series satellites. This propylene LHP was built by Dynatherm Corporation in 2000 and tested continuously for approximately 14 months. It was then put into storage for 3 years. Following the storage period, the LHP was tested at Swales Aerospace to verify that the loop performance hadn t changed. Most test results were consistent with earlier results. At the conclusion of testing at Swales, the LHP was transferred to NASA/GSFC for continued periodic testing. The LHP has been set up for testing in the Thermal Lab at GSFC since 2006. A group of tests consisting of start-ups, power cycles, and a heat transport limit test have been performed every six to nine months since March 2006. Tests results have shown no change in the loop performance over the five years of testing. This presentation will discuss the test hardware, test set-up, and tests performed. Test results to be presented include sample plots from individual tests, along with conductance measurements for all tests performed.

Ottenstein, Laura↗

Measurement of the UH-60A Hub Large Rotor Test Apparatus Control System Stiffness

This purpose of this report is to provides details of the measurement of the control system stiffness of the UH-60A rotor hub mounted on the Large Rotor Test Apparatus (UH-60A/LRTA). The UH-60A/LRTA was used in the 40- by 80-Foot Wind Tunnel to complete the full-scale wind tunnel test portion of the NASA / ARMY UH-60A Airloads Program. This report describes the LRTA control system and highlights the differences between the LRTA and UH-60A aircraft. The test hardware, test setup, and test procedures are also described. Sample results are shown, including the azimuthal variation of the measured control system stiffness for three different loadings and two different dynamic actuator settings. Finally, the azimuthal stiffness is converted to fixed system values using multi-blade transformations for input to comprehensive rotorcraft prediction codes.

Large Rotor Test Apparatus↗

Artemis Internal Science Team Update: Hardware and Integrated Testing

The Artemis program will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis program is a collaboration of space agencies and companies from around the world. In support of the Artemis program a cross disciplinary effort integrating science, engineering, operations, and human factors is currently being developed to identify methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. NASA’s Science Mission Directorate (SMD) and Exploration Systems Development Mission Directorate (ESDMD) established a comprehensive Science Team structure to support the Artemis program. This structure includes 1) an Artemis Internal Science Team (AIST), 2) a Geology Team (GT) with additional Participating Scientists (PS) roles, and 3) Payload Teams (PT) for the inclusion of scientific instruments. The GT, PS and PT will be competitively selected for each mission as part of NASA’s Research Opportunities in Space and Earth Sciences (ROSES) solicitations. The AIST provides multi-mission continuity and has been working closely with Artemis program elements to best integrate science into all aspects of planning and development. This abstract serves to provide an AIST update on science relevant hardware developments and integrated testing efforts that occurred in 2022.

Trevor George Graff↗

Exploration Extravehicular Mobility Unit (xEMU) Chamber B Thermal Vacuum “Suit 2” Pressure Garment System Hardware and Test Design

NASA’s Exploration Extravehicular Mobility Unit (xEMU) is the government reference next-generation space suit design and is engineered to protect astronauts from extreme lunar environmental temperatures. To evaluate the xEMU hardware thermal requirements, the xEMU Testing Team invented, designed, and executed a dual-suit, uncrewed thermal vacuum (TVAC) test at Johnson Space Center’s (JSC) Chamber B. This paper details the test hardware design and test methodology for the “Suit 2” Pressure Garment System (PGS) test article. The uncrewed “Suit 2” PGS test article consisted of a full PGS assembly with simulated Portable Life Support System (PLSS) functionality provided by test equipment, including a ventilation loop and two distinct thermal control loops. This paper will discuss in depth the test hardware design, including internal suit thermal boundary simulation, sensor quantity and placement, test support equipment rigs for gas flow, water flow, and power. Custom hardware designed to add additional penetrations to the suit or provide additional interfaces for sensors will also be discussed. This paper will also address the assembly and integration sequence for the test article. In addition to test hardware design, this paper will provide insights into the test methodology for this test article, including a discussion of thermal steady-state testing, simultaneous dual suit thermal vacuum testing, and hazard mitigation and controls.

xEMU↗

MSAP Hardware Verification: Testing Multi-Mission System Architecture Platform Hardware Using Simulation and Bench Test Equipment

The Multi-Mission System Architecture Platform (MSAP) project aims to develop a system of hardware and software that will provide the core functionality necessary in many JPL missions and can be tailored to accommodate mission-specific requirements. The MSAP flight hardware is being developed in the Verilog hardware description language, allowing developers to simulate their design before releasing it to a field programmable gate array (FPGA). FPGAs can be updated in a matter of minutes, drastically reducing the time and expense required to produce traditional application-specific integrated circuits. Bench test equipment connected to the FPGAs can then probe and run Tcl scripts on the hardware. The Verilog and Tcl code can be reused or modified with each design. These steps are effective in confirming that the design operates according specifications.

Crossin, Kent R.↗

Thermal Performance of a Customized Multilayer Insulation (MLI). Design and Fabrication of Test Facility Hardware

The design, fabrication, and assembly of hardware for testing the performance of a customized multilayer insulation are discussed. System components described include the thermal payload simulator, the modified cryoshroud, and a tank back pressure control device designed to maintain a constant liquid boiling point during the thermal evaluation of the multilayer insulation. The thermal payload simulator will provide a constant temperature surface in the range of 20.5 to 417K (37 to 750R) for the insulated tank to view. The cryoshroud was modified to establish a low temperature black body cavity while limiting liquid hydrogen usage to a minimum feasible rate.

Leonhard, K. E.↗

VEG-01: Veggie Hardware Verification Testing

The Veggie plant/vegetable production system is scheduled to fly on ISS at the end of2013. Since much of the technology associated with Veggie has not been previously tested in microgravity, a hardware validation flight was initiated. This test will allow data to be collected about Veggie hardware functionality on ISS, allow crew interactions to be vetted for future improvements, validate the ability of the hardware to grow and sustain plants, and collect data that will be helpful to future Veggie investigators as they develop their payloads. Additionally, food safety data on the lettuce plants grown will be collected to help support the development of a pathway for the crew to safely consume produce grown on orbit. Significant background research has been performed on the Veggie plant growth system, with early tests focusing on the development of the rooting pillow concept, and the selection of fertilizer, rooting medium and plant species. More recent testing has been conducted to integrate the pillow concept into the Veggie hardware and to ensure that adequate water is provided throughout the growth cycle. Seed sanitation protocols have been established for flight, and hardware sanitation between experiments has been studied. Methods for shipping and storage of rooting pillows and the development of crew procedures and crew training videos for plant activities on-orbit have been established. Science verification testing was conducted and lettuce plants were successfully grown in prototype Veggie hardware, microbial samples were taken, plant were harvested, frozen, stored and later analyzed for microbial growth, nutrients, and A TP levels. An additional verification test, prior to the final payload verification testing, is desired to demonstrate similar growth in the flight hardware and also to test a second set of pillows containing zinnia seeds. Issues with root mat water supply are being resolved, with final testing and flight scheduled for later in 2013.

Massa, Gioia↗

Restore-L Satellite Servicing Internship Final Report

This paper reviews the Restore-L mission purpose and the necessary research and simulations to meet mission specification for the Propellant Transfer Subsystem (PTS). It is essential the PTS undergoes functionality testing, environmental testing, and calculations to understand the capabilities of the system. For the testing of components from PTS, a proper test setup is required. It is vital for test hardware, such as hoses and valves, to stay in place while the test is being performed. For the test hardware to operate correctly, positioning, orientation, and alignment are critical as well. In addition to the testing, calculations for pressure drop were explored. To meet requirements for test setups, designs for test hardware mounts were sketched, 3D modeled, and manufactured. Using fluid mechanics for calculations, a pressure drop equation was applied with known variables from mission specification. With the test hardware mounts designed and manufactured, the test setup was assembled with mounts installed. Test hardware mounts met all design requirements. Calculation for pressure drop were concluded and an answer was achieved. Meeting design requirement, mission specification, and calculating correct results allow the Restore-L mission to make further progress and help understand the effectiveness of the Propellant Transfer Subsystem.

PTS↗

Veggie Hardware Validation Test Preliminary Results and Lessons Learned

The Veggie hardware validation test, VEG-01, was conducted on the International Space Station during Expeditions 39 and 40 from May through June of 2014. The Veggie hardware and the VEG-01 experiment payload were launched to station aboard the SpaceX-3 resupply mission in April, 2014. Veggie was installed in an Expedite-the-Processing-of-Experiments-to-Space-Station (ExPRESS) rack in the Columbus module, and the VEG-01 validation test was initiated. Veggie installation was successful, and power was supplied to the unit. The hardware was programmed and the root mat reservoir and plant pillows were installed without issue. As expected, a small amount of growth media was observed in the sealed bags which enclosed the plant pillows when they were destowed. Astronaut Steve Swanson used the wet/dry vacuum to clean up the escaped particles. Water insertion or priming the first plant pillow was unsuccessful as an issue prevented water movement through the quick disconnect. All subsequent pillows were successfully primed, and the initial pillow was replaced with a backup pillow and successfully primed. Six pillows were primed, but only five pillows had plants which germinated. After about a week and a half it was observed that plants were not growing well and that pillow wicks were dry. This indicated that the reservoir was not supplying sufficient water to the pillows via wicking, and so the team reverted to an operational fix which added water directly to the plant pillows. Direct watering of the pillows led to a recovery in several of the stressed plants; a couple of which did not recover. An important lesson learned involved Veggie's bellows. The bellows tended to float and interfere with operations when opened, so Steve secured them to the baseplate during plant tending operations. Due to the perceived intensity of the LED lights, the crew found it challenging to both work under the lights and read crew procedures on their computer. Although the lights are not a safety hazard, for visual comfort crewmembers were advised to wear sunglasses when working with the plants and then they can lift glasses to read procedures. Steve Swanson had already trail-blazed this procedure when he initiated VEG-01. The temperature and humidity data logger was relocated mid-experiment to provide measurements on both sides of the unit. Images of the plants were downlinked weekly, and videos of installation and harvest were recorded. This imaging frequency was not sufficient to monitor and respond to changes in plant growth. Plants, samples, and data loggers will be returned on SpaceX-4, scheduled to return the fall of 2014. Lessons learned will be translated into hardware and operational modifications for future Veggie payloads.

International Space Station↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history has demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Vacuum Chamber↗

The Certification of Environmental Chambers for Testing Flight Hardware

The JPL chamber certification process for ensuring that test chambers used to test flight hardware meet a minimum standard is critical to the safety of the hardware and personnel. Past history as demonstrated that this process is important due to the catastrophic incidents that could occur if the chamber is not set up correctly. Environmental testing is one of the last phases in the development of a subsystem, and it typically occurs just before integration of flight hardware into the fully assembled flight system. A seemingly insignificant -miscalculation or missed step can necessitate rebuilding or replacing a subsystem due to over-testing or damage from the test chamber. Conversely, under-testing might fail to detect weaknesses that might cause failure when the hardware is in service. This paper describes the process that identifies the many variables that comprise the testing scenario and screening of as built chambers, the training of qualified operators, and a general "what-to-look-for" in minimum standards.

Thermal↗