Search NASA⌕ Search

SEARCH · Search NASA

Results for “linear accelerator (linac)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

A Simulation of the Photoionization of H- Together with the Subsequent Tracking of the Liberated Electrons

The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection into the existing Booster ring. Measurements of the profile of the beam along the LINAC must be done by non-intercepting methods due to the superconducting cavities. The method chosen is photoionization of a small number of H- by a focused infrared laser, aka laserwire. The number of ionized electrons is measured as a function of laser position within the H- beam. To aid in the design of the collection mechanism, a simulation was written in MATLAB with input from the commercial electromagnetic simulation, CST. This simulation calculates the number and positions of the liberated electrons and tracks them through the magnetic collection and H- beam fields to the collection point. Results from this simulation for various points along the LINAC will be shown.

43 PARTICLE ACCELERATORS↗

Final Physics Design of Proton Improvement Plan-II At Fermilab

This paper presents the final physics design of the Proton Improvement Plan-II (PIP-II) at Fermilab, focusing on the linear accelerator (Linac) and its beam transfer line. We address the challenges in longitudinal and transverse lattice design, specifically targeting collective effects, parametric resonances, and space charge nonlinearities that impact beam stability and emittance control. The strategies implemented effectively mitigate space charge complexities, resulting in significant improvements in beam quality -- evidenced by reduced emittance growth, lower beam halo, decreased loss, and better energy spread management. This comprehensive study is pivotal for the PIP-II project's success, providing valuable insights and approaches for future accelerator designs, especially in managing nonlinearities and enhancing beam dynamics.

43 PARTICLE ACCELERATORS↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign, an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real-time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB650 CM.

Yoon, S. [Fermilab]↗

Machine-Protection System for the PIP-II Linear Accelerator: Architecture and Data Processing Schemes

PIP-II at Fermilab features a brand-new, 800 MeV leading-edge Linear Accelerator (Linac) that will enable the Fermilab complex to deliver more than a megawatt of beam power to the Long Base-line Neutrino Facility (LBNF), requiring a robust Machine Protection System (MPS) to prevent beam-induced damage to delicate cryomodules and vacuum components. Signals in various accelerator components, in both analog and digital format, are collected and processed to assest the operating conditions of the accelerator. In the situation a potential damage is foreseen, the beam permit signal will be drop. A critical element of this system is the fast Analog Machine Protection System, a high-bandwidth platform designed for real-time beam loss monitoring. The system utilizes a modular, FPGA-based architecture to digitize signals from beam-sensing devices, such as AC Current Transformers (ACCTs), non-invasive Ring Pickups (RPUs) and beam scrapers. To eliminate both high frequency as well as 60 Hz noise that might be picked up in the industrial environment, data processing schemes beyond regular digital filtering are planned and implemented.

Wu, Jinyuan [Fermilab] (ORCID:0000000344329521)↗

Patterns of Care, Tolerability, and Safety of the First Cohort of Patients Treated on a Novel High-Field MR-Linac Within the MOMENTUM Study: Initial Results From a Prospective Multi-Institutional Registry

High-field magnetic resonance-linear accelerators (MR-Linacs), linear accelerators combined with a diagnostic magnetic resonance imaging (MRI) scanner and online adaptive workflow, potentially give rise to novel online anatomic and response adaptive radiation therapy paradigms. The first high-field (1.5T) MR-Linac received regulatory approval in late 2018, and little is known about clinical use, patient tolerability of daily high-field MRI, and toxicity of treatments. Herein we report the initial experience within the MOMENTUM Study (NCT04075305), a prospective international registry of the MR-Linac Consortium.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

New generation bunch shape monitor for ion accelerators

Measuring longitudinal beam parameters is important for operation and development of high intensity linear accelerators, but it is notoriously difficult for proton and ion beams at non-relativistic energies. The Bunch Shape Monitor (BSM) is a device used for measuring the longitudinal bunch distribution in ion linacs. The existing BSM models have poor electron collection efficiency from the wire and are limited to one-dimensional measurements of the phase coordinate. In response to this problem, we have developed a new generation BSM with improved performance. The proposed design incorporates three major innovations: First, the collection efficiency was improved by adding a focusing field between the wire and the entrance slit, which will also allow measurements over a much wider dynamic range. Second, an improvement in the measurement speed was achieved by sampling longitudinal profiles of multiple energy slices simultaneously, where the BSM wire is placed at the exit of an ion spectrometer so that ions with different energies hit the wire at different horizontal coordinates along the wire. Finally, the design incorporates a motion system that can shift the wire and deflecting cavity together, enabling transverse profile measurements like a wire scanner. Here, in this paper, we will provide the design of the new BSM and report on its beam test results at the Spallation Neutron Source facility in Oak Ridge National Laboratory.

43 PARTICLE ACCELERATORS↗

Thermal Cross Section Measurements At The RPI LINAC

Recently, a cold moderator was designed and developed for use at the Rensselaer Polytechnic Institute Linear Accelerator (RPI LINAC). This cold moderator proved to easily and safely couple to an existing neutron producing target, while enhancing neutron flux below 0.02 eV by up to a factor of 8 by cooling polyethylene down to 29 K. This cold moderator capability allowed for significantly improved counting statistics below 0.02 eV not previously possible due to a poor signal to background ratio. Additionally, testing was performed to characterize the energy resolution of the new cold moderator system and found the system easily capable of resolving resonances in Ta-181 at 4 and 10 eV, while also clearly resolving the Bragg edges found in Be metal below 0.01 eV. Furthermore, following the design and development of a cold polyethylene moderator, a series of thermal total cross section measurements were performed for polyethylene, polystyrene, Plexiglas and yttrium hydride in the thermal region. These measurements serve to help validate thermal scattering law (TSL) evaluations in the 0.0005 – 1 eV energy range. For polyethylene and polystyrene, two sets of experiments were performed – one with the Enhanced Thermal Target (ETT) and another with the ETT plus the new cold moderator capability (ETTC). The yttrium hydride and Plexiglas measurements were only performed with the ETTC. The measurements for polyethylene help to validate the data processing methodology when using the ETTC, while extending the measured range of polyethylene down to 0.0005 eV. Two different Plexiglas, Plexiglas G and Plexiglas G-UVT, and two different concentrations of yttrium hydride, H/Y = 1.85 and 1.68, were measured. Overall, all materials had generally good agreement with their ENDF/B-VIII.0 TSL evaluations, though some discrepancies were noticed. In the case of the yttrium hydride, the high energy oscillations in the hydrogen cross section and the low energy Bragg edges in the yttrium cross section were clearly seen. These measurements represent the first total cross section measurements that encompass the entire thermal region from 0.0005 – 1 eV for polystyrene and yttrium hydride.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PID-Regulated Heating System for PIP-II Reference Line

The Proton Improvement Project-2 centers on building a new superconducting linear particle accelerator (Linac) at Fermilab. At the heart of the accelerator is the reference line, a critical system that defines the ideal path for the particle beam as it passes through magnets, RF cavities, and other beamline elements. Temperature stability is crucial for the reliable operation of RF components, such as mixers and filters. Fluctuations affect key performance parameters like conversion loss, isolation, and linearity. To mitigate any drift caused by ambient temperature changes, a heating plate assembly is utilized to maintain key components at a controlled temperature of 40°C. The system utilizes an aluminum 36”x36”x0.5” heat plate powered by a MOSFET-based control circuit, delivering approximately 460 W of thermal energy through a resistor array. Real-time temperature feedback is provided by a PT100 Resistance Temperature Detector (RTD), which interfaces with a Proportional–Integral–Derivative (PID) control algorithm to maintain closed-loop temperature regulation. The control signal actively modulates the gate voltage of an N channel MOSFET, dynamically adjusting power delivery in response to deviations from the temperature setpoint. Simulations and LTspice models validate the functionality and responsiveness of the circuit under varying conditions. The prototype has successfully demonstrated stable thermal control, paving the way for integration into the PIP-II infrastructure. The final design will feature an expanded resistor array, as well as communication with a PLC for continuous data acquisition and diagnostics. This work directly supports Fermilab’s broader mission by contributing to the stability and reliability of core accelerator systems, enhancing the precision of particle beam delivery for future physics experiments.

Mosher, Alexander [Fermilab]↗

PID-Regulated Heating System for PIP-II Reference Line

The Proton Improvement Plan 2 (PIP-II) centers on building a new superconducting linear particle accelerator (Linac) at Fermilab. At the heart of the accelerator is the reference line. It is a critical system that defines the ideal path for the beam as it passes through magnets, RF cavities, and other beamline elements. Temperature stability is crucial for the reliable operation of RF components, such as mixers and filters. Fluctuations affect key performance parameters like conversion loss, isolation, and linearity. To mitigate any drift caused by ambient temperature changes, a heating plate assembly is utilized to maintain key components at a controlled temperature of 40 C. Utilizing an actively regulated heating system, a metal-oxide-semiconductor field-effect transistor (MOSFET) based power control circuit which provides input to a controller; forming a closed-loop system that maintains the desired setpoints with high precision.

Mosher, Alexander [U. Illinois, Chicago]↗

Demonstration of an intense lithium beam for forward-directed pulsed neutron generation

Abstract As an alternative to research nuclear reactors, a compact accelerator-driven neutron generator that uses a lithium beam driver could be a promising candidate since it produces almost no undesired radiation. However, providing an intense lithium-ion beam has been difficult, and it has been thought that the practical application of such a device would be impossible. The most critical problem of insufficient ion fluxes has been solved by applying a direct plasma injection scheme. In this scheme, a pulsed high-density plasma from a metallic lithium foil generated by laser ablation is efficiently injected and accelerated by a radio-frequency quadrupole linear accelerator (RFQ linac). We have obtained a peak beam current of 35 mA accelerated to 1.43 MeV, which is two orders of magnitude higher than a conventional injector and accelerator system can deliver.

43 PARTICLE ACCELERATORS↗

Neutron generator based on intense lithium beam driver

We are proposing a compact neutron generator based on a Li beam driver. The proposed neutron generator comprises a laser ion source, a radio-frequency quadrupole linear accelerator (RFQ linac), a drift tube linac, and a target containing protons. In the generator, the lithium ion is used as a projectile instead of protons to utilize the kinematic focusing technique. The technique enables us to enhance the neutron flux without increasing the beam energy, which is important to develop a clean compact neutron generator. Moreover, the combination of a laser ion source and a RFQ linac with the direct plasma injection scheme will provide several tens of mA of a fully ionized lithium beam, which is much higher than that of conventional heavy ion sources comparable with proton drivers. Neutrons are generated by the nuclear reaction of the lithium ions and protons in the beam target. In this paper, we reported the current status of the development. For RFQ, we designed the RFQ rods to accelerate 40 mA of 7Li3+. We fabricated and installed the rods into a cavity, and, as a first test, accelerated 10 mA of C6+ successfully.

Ikeda, Shunsuke (ORCID:0000000339800577)↗

High-Efficiency Inductive Output Tubes Using a Third Harmonic Drive on the Grid

In this article, we discuss the use of a third harmonic component to the drive voltage on the grid of an inductive output tube (IOT). High-efficiency IOTs are typically characterized by efficiencies up to 70%–75%. However, the achievement of efficiencies greater than 80% would substantially reduce the operating costs of next-generation accelerators. In order to achieve this goal, we consider the addition of a third harmonic component to the drive signal on the grid of an IOT. The use of a third harmonic drive component in IOT guns has been considered in order to apply such a gun as the injector of radio frequency linear accelerators (RF linacs). Furthermore, we consider that the IOT will be used to provide the rf power to drive RF linacs and apply the third harmonic with the intention of increasing the efficiency of the RF output of the IOT. We consider a model IOT with a 700-MHz resonant cavity and using an annular beam with a voltage of 30 kV, an average current of 6.67 A yielding a perveance of about 1.3 μP. We simulate this IOT using the NEMESIS simulation code which has been successfully validated by comparison with the K5H90W-2 IOT developed by Communications and Power Industries. It is found that the effect of the third harmonic on the efficiency is greatest when the phase of the third harmonic is shifted by radians with respect to the fundamental drive signal and with third harmonic powers greater than about 50% that of the fundamental drive power. For the present example, we show that efficiencies approaching 86% are possible by this means.

43 PARTICLE ACCELERATORS↗

Initial Feasibility and Clinical Implementation of Daily MR-Guided Adaptive Head and Neck Cancer Radiation Therapy on a 1.5T MR-Linac System: Prospective R-IDEAL 2a/2b Systematic Clinical Evaluation of Technical Innovation

This prospective study is, to our knowledge, the first report of daily adaptive radiation therapy (ART) for head and neck cancer (HNC) using a 1.5T magnetic resonance imaging-linear accelerator (MR-linac) with particular focus on safety and feasibility and dosimetric results of an online rigid registration-based adapt to position (ATP) workflow.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

Coincident learning for beam-based rf station fault identification using phase information at the SLAC linac coherent light source

Anomalies in radio-frequency (rf) stations can result in unplanned downtime and performance degradation in linear accelerators such as SLAC’s Linac Coherent Light Source (LCLS). Detecting these anomalies is challenging due to the complexity of accelerator systems, high data volume, and scarcity of labeled fault data. Prior work identified faults using beam-based detection, combining rf amplitude and beam position monitor data. Due to the simplicity of the rf amplitude data, classical methods are sufficient to identify faults, but the recall is constrained by the low-frequency and asynchronous characteristics of the data. In this work, we leverage high-frequency, time-synchronous rf phase data to enhance anomaly detection in the LCLS accelerator. Due to the complexity of phase data, classical methods fail, and we instead train deep neural networks within the Coincident Anomaly Detection (CoAD) framework. We find that applying CoAD to phase data detects nearly 3 times as many anomalies as when applied to amplitude data, while achieving broader coverage across rf stations. Furthermore, the rich structure of phase data enables us to cluster anomalies into distinct physical categories. Through the integration of auxiliary system status bits, we link clusters to specific fault signatures, providing additional granularity for uncovering the root cause of faults. We also investigate interpretability via Shapley values, confirming that the learned models focus on the most informative regions of the data and providing insight for cases where the model makes mistakes. This work demonstrates that phase-based anomaly detection for rf stations improves both diagnostic coverage and root cause analysis in accelerator systems and that deep neural networks are essential for effective analysis.

Accelerator Physics (physics.acc-ph)↗

Facility upgrade for superheavy-element research at RIKEN

The RIKEN Nishina Center (RNC) executed an accelerator upgrade project for the heavy-ion linac (called RILAC). A superconducting RIKEN linear accelerator (SRILAC) and a new superconducting electron-cyclotron-resonance ion source (SC-ECRIS) to boost the final energy and intensity were constructed, aimed at synthesizing a new superheavy element, 119, through a hot fusion reaction. The project included the construction of a gas-filled recoil ion separator (GARIS-III) suitable for detecting the residues of the hot-fusion reaction. To avoid research interruption during the SRILAC construction period (2017–2019) and gain experience in hot-fusion reaction processes, GARIS-II located in the GARIS experimental hall in LINAC building was moved to the E6 experimental hall in Nishina building. Certain exploratory measurements were performed employing the beams accelerated by RILAC2 and the RIKEN ring cyclotron (RRC), which is a part of the existing accelerator complex of the radioactive isotope beam factory (RIBF). Further, commissioning experiments with the upgraded facility (SRILAC and GARIS-III) were performed. The upgrade project and its commissioning results are chronologically described in this article.

43 PARTICLE ACCELERATORS↗