Scheduling NASA's Deep Space Network: Priorities, Preferences, and Optimization

NASA's Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40\% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process --- oversubsubscription and how to "fairly'" reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

A human factors approach to range scheduling for satellite control

Range scheduling for satellite control presents a classical problem: supervisory control of a large-scale dynamic system, with unwieldy amounts of interrelated data used as inputs to the decision process. Increased automation of the task, with the appropriate human-computer interface, is highly desirable. The development and user evaluation of a semi-automated network range scheduling system is described. The system incorporates a synergistic human-computer interface consisting of a large screen color display, voice input/output, a 'sonic pen' pointing device, a touchscreen color CRT, and a standard keyboard. From a human factors standpoint, this development represents the first major improvement in almost 30 years to the satellite control network scheduling task.

Wright, Cameron H. G.↗

Space Communications and Navigation Validation: Extracting Data for the Strategic Center for Networking, Integration, and Communications Scheduling Algorithms

Efficiency in communication system architecture performance between Space Communications and Navigation (SCaN) assets and missions is crucial, as space communication is varied, complex, and often not utilized to its full potential. The SCaN Strategic Center for Networking, Integration, and Communications (SCENIC) new scheduling algorithms, which are designed to simulate the allocation of resources between SCaN assets and missions, have the potential to simulate an increase of this efficiency; however, they require real-world data to be validated against. The purpose of this project was to extract said validation data, which details the frequency and duration of utilized contact windows between missions and assets in the Near Earth Network (NEN), Space Network (SN), and Deep Space Network (DSN). Stored as images in daily operations summaries (DOSs), the tabular data existed in a variety of file formats such as.pdf, .docx, and .doc. Since the tables were stored as images, ABBYY® FineReader® (ABBYY Software Ltd.) optical character recognition (OCR) was implemented, which is a proprietary software that reads images from text. The comma separated value (CSV) output was utilized as input to a series of MATLAB® (The MathWorks, Inc.) methods for reformatting, at which point it was ready to be machine-read. Finally, the results were converted to a Microsoft Excel format for human readability. Along with being used for validation purposes, the data will also be used to map equipment degradation as a function of time to analyze the reliability of network assets.

Kontur, Noah P.↗

Improvements to Integrated Tradespace Analysis of Communications Architectures (ITACA) Network Loading Analysis Tool

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by replicating the analysis capabilities of commercially licensed software which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. SCENIC differs from current tools that perform similar analyses in that it 1) does not require any licensing fees, 2) will provide an all-in-one package for various analysis capabilities that normally requires add-ons or multiple tools to complete. As part of SCENIC's capabilities, the ITACA network loading analysis tool will be responsible for assessing the loading on a given network architecture and generating a network service schedule. ITACA will allow users to evaluate the quality of service of a given network architecture and determine whether or not the architecture will satisfy the mission's requirements. ITACA is currently under development, and the following improvements were made during the fall of 2017: optimization of runtime, augmentation of network asset pre-service configuration time, augmentation of Brent's method of root finding, augmentation of network asset FOV restrictions, augmentation of mission lifetimes, and the integration of a SCaN link budget calculation tool. The improvements resulted in (a) 25% reduction in runtime, (b) more accurate contact window predictions when compared to STK(Registered Trademark) contact window predictions, and (c) increased fidelity through the use of specific SCaN asset parameters.

analysis↗

User Preference Optimization for Oversubscribed Scheduling of NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process — oversubsubscription and how to “fairly” reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

Richards, Stephen F.↗

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

Mixed Integer Programming↗

TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks

The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.

Space Networking↗

Active Control of Wind-Tunnel Model Aeroelastic Response Using Neural Networks

NASA Langley Research Center, Hampton, VA 23681 Under a joint research and development effort conducted by the National Aeronautics and Space Administration and The Boeing Company (formerly McDonnell Douglas) three neural-network based control systems were developed and tested. The control systems were experimentally evaluated using a transonic wind-tunnel model in the Langley Transonic Dynamics Tunnel. One system used a neural network to schedule flutter suppression control laws, another employed a neural network in a predictive control scheme, and the third employed a neural network in an inverse model control scheme. All three of these control schemes successfully suppressed flutter to or near the limits of the testing apparatus, and represent the first experimental applications of neural networks to flutter suppression. This paper will summarize the findings of this project.

Scott, Robert C.↗

Scheduling the NASA Deep Space Network with Deep Reinforcement Learning

With three complexes spread evenly across the Earth, NASA’s Deep Space Network (DSN) is the primary means of communications as well as a significant scientific instrument for dozens of active missions around the world. A rapidly rising number of spacecraft and increasingly complex scientific instruments with higher bandwidth requirements have resulted in demand that exceeds the network’s capacity across its 12 antennae. The existing DSN scheduling process operates on a rolling weekly basis and is time-consuming; for a given week, generation of the final baseline schedule of spacecraft tracking passes takes roughly 5 months from the initial requirements submission deadline, with several weeks of peer-to-peer negotiations in between. This paper proposes a deep reinforcement learning (RL) approach to generate candidate DSN schedules from mission requests and spacecraft ephemeris data with demonstrated capability to address real-world operational constraints. A deep RL agent is developed that takes mission requests for a given week as input, and interacts with a DSN scheduling environment to allocate tracks such that its reward signal is maximized. A comparison is made between an agent trained using Proximal Policy Optimization and its random, untrained counterpart. The results represent a proof-of-concept that, given a well-shaped reward signal, a deep RL agent can learn the complex heuristics used by experts to schedule the DSN. A trained agent can potentially be used to generate candidate schedules to bootstrap the scheduling process and thus reduce the turnaround cycle for DSN scheduling.

Wilson, Brian↗

An Optimizing Space Data-Communications Scheduling Method and Algorithm with Interference Mitigation, Generalized for a Broad Class of Optimization Problems

NASA's space data-communications infrastructure-the Space Network and the Ground Network-provide scheduled (as well as some limited types of unscheduled) data-communications services to user spacecraft. The Space Network operates several orbiting geostationary platforms (the Tracking and Data Relay Satellite System (TDRSS)), each with its own servicedelivery antennas onboard. The Ground Network operates service-delivery antennas at ground stations located around the world. Together, these networks enable data transfer between user spacecraft and their mission control centers on Earth. Scheduling data-communications events for spacecraft that use the NASA communications infrastructure-the relay satellites and the ground stations-can be accomplished today with software having an operational heritage dating from the 1980s or earlier. An implementation of the scheduling methods and algorithms disclosed and formally specified herein will produce globally optimized schedules with not only optimized service delivery by the space data-communications infrastructure but also optimized satisfaction of all user requirements and prescribed constraints, including radio frequency interference (RFI) constraints. Evolutionary algorithms, a class of probabilistic strategies for searching large solution spaces, is the essential technology invoked and exploited in this disclosure. Also disclosed are secondary methods and algorithms for optimizing the execution efficiency of the schedule-generation algorithms themselves. The scheduling methods and algorithms as presented are adaptable to accommodate the complexity of scheduling the civilian and/or military data-communications infrastructure within the expected range of future users and space- or ground-based service-delivery assets. Finally, the problem itself, and the methods and algorithms, are generalized and specified formally. The generalized methods and algorithms are applicable to a very broad class of combinatorial-optimization problems that encompasses, among many others, the problem of generating optimal space-data communications schedules.

ground stations↗

System and Method for Network Bandwidth, Buffers and Timing Management Using Hybrid Scheduling of Traffic with Different Priorities and Guarantees

Systems and methods for network bandwidth, buffers and timing management using hybrid scheduling of traffic with different priorities and guarantees are provided. In certain embodiments, a method of managing network scheduling and configuration comprises, for each transmitting end station, reserving one exclusive buffer for each virtual link to be transmitted from the transmitting end station; for each receiving end station, reserving exclusive buffers for each virtual link to be received at the receiving end station; and for each switch, reserving a exclusive buffer for each virtual link to be received at an input port of the switch. The method further comprises determining if each respective transmitting end station, receiving end station, and switch has sufficient capability to support the reserved buffers; and reporting buffer infeasibility if each respective transmitting end station, receiving end station, and switch does not have sufficient capability to support the reserved buffers.

Varadarajan, Srivatsan↗

Development of the ITACA Network Loading Analysis Tool's Scheduling Techniques

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by creating analysis capabilities which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. The Integrated Tradespace Analysis of Communications Architectures (ITACA) will provide an all-in-one package for various analysis capabilities that normally require add-ons or multiple tools to complete. The ITACA tool will be responsible for assessing the given network architecture and generating a schedule for the missions as well as the assets. ITACA will allow users to evaluate the quality of service of a given network and determine whether or not the network will satisfy the mission's requirements. ITACA is currently under development, and during the spring of 2018 major development in the tools scheduling techniques were completed. A total of seven different techniques were completed.

space communications↗