Search NASA⌕ Search

SEARCH · Search NASA

Results for “project readiness level”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

SCRL-Model for Human Space Flight Operations Enterprise Supply Chain

This paper will present a Supply Chain Readiness Level (SCRL) model that can be used to evaluate and configure adaptable and sustainable program and mission supply chains at an enterprise level. It will also show that using SCRL in conjunction with Technology Readiness Levels (TRLs), Manufacturing Readiness Levels (MRLs) and National Aeronautics Space Administrations (NASA s) Project Lifecycle Process will provide a more complete means of developing and evaluating a robust sustainable supply chain that encompasses the entire product, system and mission lifecycle. In addition, it will be shown that by implementing the SCRL model, NASA can additionally define supplier requirements to enable effective supply chain management (SCM). Developing and evaluating overall supply chain readiness for any product, system and mission lifecycle is critical for mission success. Readiness levels are presently being used to evaluate the maturity of technology and manufacturing capability during development and deployment phases of products and systems. For example, TRLs are used to support the assessment of the maturity of a particular technology and compare maturity of different types of technologies. MRLs are designed to assess the maturity and risk of a given technology from a manufacturing perspective. In addition, when these measurement systems are used collectively they can offer a more comprehensive view of the maturity of the system. While some aspects of the supply chain and supply chain planning are considered in these familiar metric systems, certain characteristics of an effective supply chain, when evaluated in more detail, will provide an improved insight into the readiness and risk throughout the supply chain. Therefore, a system that concentrates particularly on supply chain attributes is required to better assess enterprise supply chain readiness.

Tucker, Brian↗

The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)

As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.

Epp, Chirold D.↗

Thermopile Energy Harvesting for Subsurface Wellbore Sensors (Final Report)

Robust in situ power harvesting underlies all efforts to enable downhole autonomous sensors for real-time and long-term monitoring of CO 2 plume movement and permeance, wellbore health, and induced seismicity. This project evaluated the potential use of downhole thermopile arrays, known as thermoelectric generators (TEGs), as power sources to charge sensors for in situ real-time, long-term data capture and transmission. Real-time downhole monitoring will enable “Big Data” techniques and machine learning, using massive amounts of continuous data from embedded sensors, to quantify short- and long-term stability and safety of enhanced oil recovery and/or commercial-scale geologic CO 2 storage. This project evaluated possible placement of the TEGs at two different wellbore locations: on the outside of the casing; or on the production tubing. TEGs convert heat flux to electrical power, and in the borehole environment, would convert heat flux into or out of the borehole into power for downhole sensors. Such heat flux would be driven by pumping of cold or hot fluids into the borehole—for instance, injecting supercritical CO 2 —creating a thermal pulse that could power the downhole sensors. Hence, wireless power generation could be accomplished with in situ TEG energy harvesting. This final report summarizes the project’s efforts that accomplished the creation of a fully operational thermopile field unit, including selection of materials, laboratory benchtop experiments and thermal-hydrologic modeling for design and optimization of the field-scale power generation test unit. Finally, the report describes the field unit that has been built and presents results of performance and survivability testing. The performance and survivability testing evaluated the following: 1) downhole power generation in response to a thermal gradient produced by pumping a heated fluid down a borehole and through the field unit; and 2) component survivability and operation at elevated temperature and pressure conditions representative of field conditions. The performance and survivability testing show that TEG arrays are viable for generating ample energy to power downhole sensors, although it is important to note that developing or connecting to sensors was beyond the scope of this project. This project’s accomplishments thus traversed from a low Technical Readiness Level (TRL) on fundamental concepts of the application and modeling to TRL-5 via testing of the fully integrated field unit for power generation in relevant environments. A fully issued United States Patent covers the wellbore power harvesting technology and applications developed by this project.

47 OTHER INSTRUMENTATION↗

Technology Readiness Assessment Best Practices Guide

This guide establishes standard definitions and best practices for conducting technology readiness assessments (TRAs) for in flight projects and NASA’s research and technology missions. These best practices originated from a NASA TRA Committee that met weekly in 2014. The team was co-led by the Headquarters (HQ) Office of the Chief Engineer (OCE) and the HQ Office of the Chief Technologist (OCT), and included one to two representatives from each Center.

Technology readiness level↗

Tunable Rapid Uptake Amino Polymer Aerogels for Direct Air Capture of Carbon Dioxide (Final Scientific/Technical Report)

The Palo Alto Research Center (PARC) developed a novel CO 2 adsorbent material, and in collaboration with Lawrence Livermore National Laboratory (LLNL), demonstrated its state-of-the-art performance for direct air capture. The target application for this technology is in direct air carbon capture and storage (DACCS), for which the adsorbent material provides the critical function of binding CO 2 from ambient air. At the beginning of the project, the technology concept and application were established, representing technology readiness level (TRL) 2. The hypothesis was that a microporous polymer comprising a high density of primary amines would make an exceptional adsorbent for direct air capture, and the goal of the project was to prove that hypothesis and advance the technology to TRL 3. To accomplish this, we approached the challenge from the perspective of materials synthesis optimization with the narrow focus of achieving the target material properties. This approach was successful, and we now have a synthetic procedure that results in a novel adsorbent material with the target material properties. The chemical name for the novel adsorbent material is poly(vinylamine-co-divinylbenzene) (PVAm-DVB).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Kilopower Project: The KRUSTY Fission Power Experiment and Potential Missions

The Kilopower Project was initiated by NASA’s Space Technology Mission Directorate/Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Kilopower Project centerpiece is the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) test, which consists of the development and testing of a ground technology demonstrator of a 1-kW(electric)–class fission power system (FPS). The technologies to be developed and validated by KRUSTY are extensible to space FPSs from 1 to 10 kW(electric), which can enable modular surface FPSs for human exploration as well as higher-power future potential deep space science missions. The KRUSTY demonstration is cofunded by NASA and the U.S. Department of Energy National Nuclear Security Administration. The KRUSTY demonstration in the National Critical Experiment Research Center’s Device Assembly Facility was completed in the first quarter of 2018.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Kilopower Project: The KRUSTY Fission Power Experiment and Potential Missions

The Kilopower Project was initiated by NASA’s Space Technology Mission Directorate/Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Kilopower Project centerpiece is the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) test, which consists of the development and testing of a ground technology demonstrator of a 1-kW(electric)–class fission power system (FPS). The technologies to be developed and validated by KRUSTY are extensible to space FPSs from 1 to 10 kW(electric), which can enable modular surface FPSs for human exploration as well as higher-power future potential deep space science missions. The KRUSTY demonstration is cofunded by NASA and the U.S. Department of Energy National Nuclear Security Administration. The KRUSTY demonstration in the National Critical Experiment Research Center’s Device Assembly Facility was completed in the first quarter of 2018.

Space nuclear reactor↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Integrating Marine Hydrokinetic and Offshore Wind Energy: A Review of Technologies, Deployment, and Challenges

Together, offshore wind (OSW) and marine hydrokinetic (MHK) technologies have vast potential to expand the world’s access to abundant energy resource. With more than 60 GW of offshore wind energy capacity and 527 MW of ocean energy deployed globally by 2023, there is a significant amount of available resources; however, technical and non-technical challenges prevent the combined large-scale deployment of these technologies. There is still a lack of research that provides a parallel review of both MHK and OSW technologies in order to better understand their synergistic working principles. This paper aimed to address that research gap by presenting a comprehensive side-by-side review of the worldwide technological landscape, global deployment trends, integration strategies, and modeling approaches for MHK and OSW. A particular focus has been given on analyzing existing modeling and simulation techniques, assessing integration and control strategies, and comparing technologies based on water depth. Furthermore, this study provides important insights into the readiness levels of both technologies by highlighting ongoing international projects. By addressing these issues, this review will give researchers and industry stakeholders an outline for assessing the maturity of OSW and MHK systems and facilitating their transition to large-scale, sustainable deployment.

16 - TIDAL AND WAVE POWER↗

High Strength, Encapsulated, Commercially Useful Components and Particles Made from Coal Combustion Residuals

This project has developed and demonstrated two high-volume applications for Coal Combustion Residuals (CCR) with annual usage on the order of billions of pounds. The CCR is encapsulated in a recently developed water-impervious inorganic resin coating to reduce leaching of toxic elements from CCR by more than 80% as a first step. Target commercial applications demonstrated for the encapsulated CCR were as reinforcement for high-strength structural columns composed of CCR embedded in a ceramic matrix and as filler in high-volume plastics such as polypropylene. The encapsulated particles produced columns with properties superior to concrete, and a 30% to 50% improvement in stiffness over current fillers in plastics. CCR from bituminous and lignite coal was evaluated and shown to provide high performance, with the bituminous CCR producing the strongest columns and the lignite-based CCR provided the best performance as coated filler in polypropylene. The two-year project advanced both material systems from a Technology Readiness Level (TRL) of 2 to TRL 4.

01 COAL, LIGNITE, AND PEAT↗

Ammonia-Based Energy Storage Technology

The University of North Dakota Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy National Energy Technology Laboratory (NETL), Basin Electric Power Cooperative, Minnkota Power Cooperative, Otter Tail Power Company, and the North Dakota Industrial Commission (energy technology research and development sponsor), undertook a project to model, validate, and advance (from Technology Readiness Level [TRL] 2 to TRL 3) the ammonia-based energy storage technology (NH 3 -BEST) concept. The concept is designed to enable electricity-generating unit (EGU) accommodation of power demand fluctuations while steadily operating within an optimal-performance baseline power output range, ensuring maximum EGU operational efficiency and minimum degradation of materials, equipment, and performance because of load-cycling-driven stresses.

25 ENERGY STORAGE↗

Next Gen High Efficiency Boosted Engine Development

This work represents an advanced engineering research project partially funded by the U.S. Department of Energy (DOE). Ford Motor Company, FEV North America, and Oak Ridge National Laboratory collaborated to develop a next generation boosted spark ignited engine concept. The project goals, specified by the DOE, were 23% improved fuel economy and 15% reduced weight relative to a 2015 or newer light-duty vehicle. The fuel economy goal was achieved by designing an engine incorporating high geometric compression ratio, high dilution tolerance, low pumping work, and low friction. The increased tendency for knock with high compression ratio was addressed using early intake valve closing (EIVC), cooled exhaust gas recirculation (EGR), an active pre-chamber ignition system, and careful management of the fresh charge temperature. Engine weight reduction measures were implemented throughout the engine system making use of composite materials, advanced manufacturing techniques, and architectural choices. This report outlines the analytical, design, fabrication, and test work conducted for the duration of the project. The combustion system stability, EGR tolerance, and knock resistance were validated on a single cylinder engine. An inline six-cylinder engine was then designed targeting application in the Ford F150. Multi-cylinder engines were produced and tested achieving the target vehicle fuel economy improvement of 23% assessed using measured engine fuel consumption combined with a vehicle drive cycle simulation. Actions were identified and designs were demonstrated to achieve the 15% weight reduction target. This project included items covering a range of technology readiness levels. Some of the technologies explored are production ready, while others were investigated to understand the limitations for what can be achieved in a stoichiometric, gasoline-fueled, spark-ignited internal combustion engine.

42 ENGINEERING↗

An Impact Sensor System for the Characterization of the Micrometeoroid and Lunar Secondary Ejecta Environment

The Impact Sensor for Micrometeoroid and Lunar Secondary Ejecta (IMMUSE) project aims to apply and integrate previously demonstrated impact sensing subsystems to characterize the micrometeoroid and lunar secondary (MMSE) environment on the surface of the Moon. Once deployed, data returned from IMMUSE will benefit: (1) Fundamental Lunar Science: providing data to improve the understanding of lunar cratering processes and dynamics of the lunar regolith. (2) Lunar Exploration Applied Science: providing an accurate MMSE environment definition for reliable impact risk assessments, cost-effective shielding designs, and mitigation measures for long-term lunar exploration activities. (3) Planetary Science: providing micrometeoroid data to aid the understanding of asteroidal collisions and the evolution of comets. A well-established link between micrometeoroid impacts and lunar regolith is also key to understanding other regolith-covered bodies from remote-sensing data. The IMMUSE system includes two components: (1) a large area (greater than or equal to 1 m2) micrometeoroid detector based on acoustic impact and fiber optic displacement sensors and (2) a 100 cm2 lunar secondary ejecta detector consisting of dual-layer laser curtain and acoustic impact sensors. The combinations of different detection mechanisms will allow for a better characterization of the MMSE environment, including flux, particle size/mass, and impact velocity. IMMUSE is funded by the NASA LASER Program through 2012. The project fs goal is to reach a Technical Readiness Level of 4 in preparation for a more advanced development beyond 2012. Several prototype subsystems have been constructed and subjected to low impact and hypervelocity impact tests. The presentation will include a status review and preliminary test results.

Liou, J.-C.↗

CHARM: A CubeSat Water Vapor Radiometer for Earth Science

The Jet Propulsion Laboratory (JPL) and Ames Research Center (ARC) are partnering in the CubeSat Hydrometric Atmospheric Radiometer Mission (CHARM), a water vapor radiometer integrated on a 3U CubeSat platform, selected for implementation under NASA Hands-On Project Experience (HOPE-3). CHARM will measure 4 channels at 183 GHz water vapor line, subsets of measurements currently performed by larger and more costly spacecraft (e.g. ATMS, AMSU-B and SSMI/S). While flying a payload that supports SMD science objectives, CHARM provides a hands-on opportunity to develop technical, leadership, and project skills. CHARM will furthermore advance the technology readiness level (TRL) of the 183 GHz receiver subsystem from TRL 4 to TRL 6 and the CubeSat 183 GHz radiometer system from TRL 4 to TRL 7.

Monolithic microwave integrated circuits (MMICs)↗

Bigelow Expandable Activity Module (BEAM) Monitoring System

What is Bigelow Expandable Activity Module (BEAM)? The Bigelow Expandable Activity Module (BEAM) is an expandable habitat technology demonstration on ISS; increase human-rated inflatable structure Technology Readiness Level (TRL) to level 9. NASA managed ISS payload project in partnership with Bigelow Aerospace. Launched to ISS on Space X 8 (April 8th, 2016). Fully expanded on May 28th, 2016. Jeff Williams/Exp. 48 Commander first entered BEAM on June 5th, 2016.

Wells, Nathan↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗