Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical cooperation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Collaborative Research and Development Program on Explosive Detection Technology

In September 2013, at the 6th Permanent Coordinating Group Meeting between the U.S Department of Energy (DOE) and the French Institut de Radioprotection et de Sureté Nucléaire (IRSN), France expressed an interest in bilateral cooperation with the United States because its newly revised regulations that require enhanced explosives detection capabilities at nuclear and radiological facilities. In the ensuing years, PNNL (DOE/NNSA) and IRSN sought to identify an area of collaboration within explosives detection that would leverage the specific technical strengths of each organization. Based upon awareness of each other’s technical acumen gleaned from the scientific literature on explosives detection, it was clear that specific organizations within each nation could provide the needed expertise to enable enhancement of explosives detection through a collaborative development effort. The French lnstitut Saint-Louis was determined to be an optimal partner for IRSN to develop a collaboration with DOE/NNSA using PNNL’s detection team in this effort. Thus, the dialog was started between the technical experts at each organization to define where complementary expertise in explosives detection could be best leveraged. The technical plans and objectives of this project were sound with promising results. In the end, the joint action sheet was not implemented. The challenge with executing the project was in the complexity of getting a signed agreement between DOE, IRSN and ISL. Most of the obstacles surrounded the ability to protect intellectual property and obtain an agreement which included all of the parties. At a high level, this report documents the interactions and attempt to develop a cooperative framework for explosives detection development from FY 2014 through FY 2020.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

Degradation of Poly- and Perfluoroalkyl Substances (PFASs) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of this study was to evaluate the overall effectiveness of e-beam treatment in the degradation of PFASs in water treatment. This included validation of the expected process flows and required electron beam doses, with the first year dedicated to experimentally assessing the optimal electron beam treatment parameters required to decompose the contaminants of concern. In the second year, FNAL’s technical efforts focused on evaluating three different accelerator technologies that could be implemented in the treatment process of PFASs.

43 PARTICLE ACCELERATORS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

International Network of Nuclear Reaction Data Centres

This report summarizes the IAEA Technical Meeting on the International Network of Nuclear Reaction Data Centres held as a video meeting from 4 to 7 May 2021. The meeting was attended by 29 participants representing 13 cooperative Centres from eight Member States (China, Hungary, India, Japan, Korea, Russia, Ukraine and USA) and two International Organisations (NEA, IAEA) as well as a participant from Kazakhstan. A summary of the meeting is given in this report along with the conclusions and actions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Analysis of Persistent Soiling Losses: Cooperative Research and Development (Final Report)

The Contractor will analyze data from sensors and equipment provided by Participant in order to provide the basis for understanding of the processes and rates for the formation of 'persistent' soiling (soiling not removed by rain). The resulting, data, technical report, and publications will provide the basis for Participant to improve it's predictive soiling model.

14 SOLAR ENERGY↗

Summary Report of the Technical Meeting on International Network of Nuclear Reaction Data Centres IAEA Headquarters, Vienna, Austria

This report summarizes the IAEA Technical Meeting on the International Network of Nuclear Reaction Data Centres held at the IAEA Headquarters in Vienna, Austria from 14 to 17 May 2024. The meeting was attended by 26 participants representing 13 cooperative Centres from eight Member States (China, Hungary, India, Japan, Korea, Russia, Ukraine and USA) and two International Organisations (NEA, IAEA). A summary of the meeting is given in this report along with the conclusions and actions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) - Deliverable Task 7: Risk Assessment

The “Optimizing Alabama’s CO 2 Storage in Shelby County: Project OASIS” CarbonSAFE Phase II Project seeks to build on regional data sets that demonstrate that the subsurface within Shelby County, Alabama has the potential to store commercial volumes of CO 2 safely, permanently, and economically. The primary target CO 2 Storage Complex is the deep Ketona Dolomite located within a 140 square mile area of the Valley and Ridge Region of Alabama. This deep saline reservoir is beneath a confining system encompassing at least 6,500 ft of shales and other low permeability sediments. Project OASIS drilled a deep stratigraphic test well to confirm the geological properties of the confining system and storage reservoir(s) within the Storage Complex. The geological data was incorporated into numerical models to establish the areal extent of the CO 2 plume and help design the storage site and its monitoring system. The project is managed by the Southern States Energy Board (SSEB), an interstate compact organization consisting of governors and state legislative leaders from sixteen southern states, Puerto Rico, and the U.S. Virgin Islands, as well as an appointee by the President of the United States. The organizational compact provides it with access to state government organizations and legislatures. The Board also maintains an Associate Members program comprised of energy resource companies, utilities, trade groups, academic R&D science and technology experts and energy consultants. Further, the SSEB staff is experienced in managing and coordinating complex energy and environmental programs, from research programs to full-scale design and demonstrations of new and innovative technologies. Project OASIS is a public-private partnership of six entities with multiple principal investigators (PIs). SSEB’s Lead PI and Co-PI are responsible for all aspects of project performance in accordance with the DOE-NETL Cooperative Agreement. SSEB has issued subgrants to Advanced Resources International, Inc., Alabama A&M University, Auburn University, Crescent Resource Innovation, and Oklahoma State University. Advanced Resources International, Inc., issued subgrants to Baker Hughes and Loudon Technical Services for field services

20 FOSSIL-FUELED POWER PLANTS↗

Bench-Scale Development of a Hybrid Membrane-Absorption CO 2 Capture Process

This final technical report describes work conducted for the Department of Energy (DOE) on the development of a bench-scale hybrid membrane-absorption carbon dioxide (CO 2 ) capture system for coal-fired power plant applications (Cooperative Agreement number DE-FE0013118). The work was conducted by Membrane Technology and Research, Inc. (MTR) with major support from the University of Texas at Austin (UT Austin) from April 1, 2013 through September 30, 2018. The overall goal of this project was to evaluate two variations of a hybrid membrane-absorption capture system combining the MTR air-swept Polaris TM membrane technology, which enriches flue gas to ~20% CO 2 , with UT Austin’s absorption-based advanced flash stripper (AFS) using piperazine (PZ), to determine the superior hybrid variant and to assess the potential of hybrid capture systems to achieve a lower cost-of-capture, compared to NETL’s reference amine-based capture plant. This project included the evaluation, development and testing of a hybrid membrane-absorption CO 2 capture system for coal-fired power plant applications using the MTR high-gas-flow, lowpressure- drop membrane contactor. The ability of the membrane contactor to enrich coal-fired flue gas from its normal content of ~13% CO 2 into a smaller volume of gas containing 20-25% CO 2 – with minimal energy input – could reduce the cost of the final concentration process, regardless of whether it is absorption, adsorption, cryogenic, or membrane-based. In this project, we are evaluating the feasibility of a hybrid system combining the MTR sweep membrane technology with the UT Austin piperazine-based advanced flash stripper (PZAS) capture system.

99 GENERAL AND MISCELLANEOUS↗

Bench scale development of a hybrid membrane-absorption CO 2 capture process (Final Report)

This final technical report describes work conducted for the Department of Energy (DOE) on the development of a bench-scale hybrid membrane-absorption carbon dioxide (CO 2 ) capture system for coal-fired power plant applications (Cooperative Agreement number DE-FE0013118). The work was conducted by Membrane Technology and Research, Inc. (MTR) with major support from the University of Texas at Austin (UT Austin) from April 1, 2013 through September 30, 2018. The overall goal of this project was to evaluate two variations of a hybrid membrane-absorption capture system combining the MTR air-swept PolarisTM membrane technology, which enriches flue gas to ~20% CO 2 , with UT Austin’s absorption-based advanced flash stripper (AFS) using piperazine (PZ), to determine the superior hybrid variant and to assess the potential of hybrid capture systems to achieve a lower cost-of-capture, compared to NETL’s reference amine-based capture plant. This project included the evaluation, development and testing of a hybrid membrane-absorption CO 2 capture system for coal-fired power plant applications using the MTR high-gas-flow, low-pressure-drop membrane contactor. The ability of the membrane contactor to enrich coal-fired flue gas from its normal content of ~13% CO 2 into a smaller volume of gas containing 20-25% CO 2 – with minimal energy input – could reduce the cost of the final concentration process, regardless of whether it is absorption, adsorption, cryogenic, or membrane-based. In this project, we are evaluating the feasibility of a hybrid system combining the MTR sweep membrane technology with the UT Austin piperazine-based advanced flash stripper (PZAS) capture system.

20 FOSSIL-FUELED POWER PLANTS↗

Chlorine Nuclear Data Evaluation Aided Through New LANSCE Measurements

The collaboration between the Los Alamos National Laboratory Neutron Science Center (LANSCE) and TerraPower LLC enables the enhanced understanding of fast spectrum critical systems consisting of chlorine. Specifically, TerraPower is interested in updating the nuclear data for the stable isotopes of chlorine, 35 Cl and 37 Cl, because these nuclides are the primary constituents of the chloride fuel salt in the Molten Chloride Reactor Experiment (MCRE), for which TerraPower is leading the design. The Cooperative Research and Development Agreement (CRADA) between the parties is funded by DOE’s Office of Nuclear Energy’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative to provide the nuclear community with access to the technical, regulatory, and financial support necessary to motivate innovative nuclear reactor technologies toward commercialization. New measurements of 35 Cl(n,p total ) and 35 Cl(n,α total ) were completed at LANSCE to constrain the reaction theory models that are used to generate the updated evaluations. The updated evaluations were then tested across the sensitivities of the MCRE by TerraPower to provide direct feedback to the evaluation for application specific sensitivities.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Identifying Opportunities and Recommendations for the Integration of Advanced Reactors for Industrial Heat and Electricity Users

Nuclear power in the United States has been used traditionally to provide baseload electric power to the grid. Advancements in nuclear power to create smaller and safer reactors have renewed interest in nuclear as a source of both heat and electricity for a variety of applications. There is great interest in coupling nuclear reactors with industrial applications because nuclear power is a low carbon energy source that can be utilized for process heating, hydrogen generation, on-site electricity demand, and more. Idaho National Laboratory is developing guidelines to identify and assist industrial heat and electricity decarbonization by integrating with nuclear power plants (NPPs) to provide clean, abundant, and dispatchable energy. Considerations include specific industrial hazards which impact NPP siting, heat transport requirements and associated technologies, and implementation feasibility based on site-specific demand profiles. To assess integration feasibility, facility process models are developed based on real data obtained from a survey of baseline requirements and process information from industrial facilities in the United States. An assessment of safety and siting requirements is also performed to determine how nuclear industrial pairings could meet licensing requirements for NPPs. In addition, site characterization of an industrial plant is essential to determining the feasibility and suitable integration methods for each industry. Characterization includes facility distance from the nearest population center, site size, rail or water transport availability, and proximity to undeveloped land. These characteristics are important to determine reactor- or industry-side design requirements for safe, efficient operation. The siting and technical data assessment will reveal opportunities for single-use nuclear integration and co-location opportunities for industries to share benefits from a single reactor. In addition to existing facilities, this “energy-park” style cooperation could include new construction like data centers which can cost-share energy investments or provide a stable demand-and-revenue stream to the investor. Deliverables will contain a library of documents and models to guide various industries toward understanding nuclear technologies based on their users’ needs. This paper is a summary of the current project status, and provides insights on suitable pairings for specific industries and reactor technologies

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Soft X-ray measurements of transport and MHD activity in the core and edge NSTX plasma (Final Technical Report)

A comprehensive suite of innovative diagnostic instrumentation and techniques has been developed by the Johns Hopkins collaboration for measurements of transport and MHD activity in the core and edge of the National Spherical Torus Experiment (NSTX) at the Princeton Plasma Physics Laboratory (PPPL). These include ultrafast multi-energy poloidal soft X-ray arrays, high spatial resolution multi-energy tangential soft X-ray arrays, high spectral resolution transmission grating imaging VUV spectrometers and ultrafast bolometric arrays, which measure over a broad range of spatial, spectral, and temporal scales the emission from ohmic, RF, and beam driven NSTX plasmas. The instrumentation was designed to fulfill the specific measurement needs of the Spherical Torus (ST) magnetic fusion concept and is accompanied by a comprehensive set of numerical tools for data analysis and modeling, aimed at determining as many as possible plasma parameters and at extracting as much as possible physics information from NSTX experiments. The Johns Hopkins diagnostics have been and continue to be instrumental for essentially all the NSTX experiments. In addition, our own research and experiments using these diagnostics has led over the years to fundamental conclusions for the ST fusion physics, such as the establishment of near neoclassical impurity transport in the NSTX core and edge plasma, and the critical role of the Global Alfven Eigenmode (GAE) MHD activity for the ST core electron thermal transport. The Johns Hopkins Diagnostics continue to be operational on the upgraded NSTX-U and will provide key plasma information in its upcoming high field, current and power experimental campaigns. The present report summarizes the main technical characteristics and measurement capabilities of the diagnostic instrumentation and methods developed within our research and describes a key physics result achieved during this research. Success in our research was made possible also by the excellent support and cooperation of the NSTX research team and of PPPL researchers, who are warmly acknowledged here.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Azimuthal anisotropies of charged particles with high transverse momentum in Pb + Pb collisions at $\sqrt{s_{\textrm{NN}}}$ = 5.02 TeV with the ATLAS detector

A measurement is presented of elliptic (𝑣 2 ) and triangular (𝑣 3 ) azimuthal anisotropy coefficients for charged particles produced in Pb + Pb collisions at $\sqrt{s_{\textrm{NN}}}$ = 5.02 TeV using a dataset corresponding to an integrated luminosity of 0.44nb −1 collected with the ATLAS detector at the LHC in 2018. The values of 𝑣 2 and 𝑣 3 are measured for charged particles over a wide range of transverse momentum (𝑝 T ), 1–400 GeV, and Pb + Pb collision centrality, 0–60%, using the scalar-product and multiparticle cumulant methods. These methods are sensitive to event-by-event fluctuations and nonflow effects in the measurements of azimuthal anisotropies. Positive values of 𝑣 2 are observed up to a 𝑝 T of approximately 100 GeV from both methods across all centrality intervals. Positive values of 𝑣 3 are observed up to approximately 25 GeV using both methods, though the application of the three-subevent technique to the multiparticle cumulant method leads to significant changes at the highest 𝑝 T . At high 𝑝 T (𝑝 T ⪆ 10 GeV), charged particles are dominantly from jet fragmentation. These jets, and hence the measurements presented here, are sensitive to the path-length dependence of parton energy loss in the quark-gluon plasma produced in Pb + Pb collisions.

Collective flow↗

Charged-hadron and identified-hadron (𝐾$^{0}_{𝑆}$, Λ, $Ξ$ − ) yield measurements in photonuclear Pb + Pb and 𝑝 + Pb collisions at $\sqrt{s_{NN}}$ = 5.02 TeV with ATLAS

This paper presents the measurement of charged-hadron and identified-hadron (𝐾$^{0}_{𝑆}$, Λ, $Ξ$ − ) yields in photonuclear collisions using 1.7nb −1 of $\sqrt{s_{NN}}$ = 5.02 TeV Pb + Pb data collected in 2018 with the ATLAS detector at the Large Hadron Collider. Candidate photonuclear events are selected using a combination of tracking and calorimeter information, including the zero-degree calorimeter. The yields as a function of transverse momentum and rapidity are measured in these photonuclear collisions as a function of charged-particle multiplicity. These photonuclear results are compared with 0.1 nb −1 of $\sqrt{s_{NN}}$ = 5.02 TeV p + Pb data collected in 2016 by ATLAS using similar charged-particle multiplicity selections. These photonuclear measurements shed light on potential quark-gluon plasma formation in photonuclear collisions via observables sensitive to radial flow, enhanced baryon-to-meson ratios, and strangeness enhancement. The results are also compared with the Monte Carlo generator and hydrodynamic calculations to test whether such photonuclear collisions may produce small droplets of quark-gluon plasma that flow collectively.

H & He induced nuclear reactions↗

Search for decays of the Higgs boson into scalar particles decaying into four or six 𝑏 quarks using 𝑝⁢𝑝 collisions at $\sqrt{𝑠}$ = 13 TeV with the ATLAS detector

A search for exotic decays of the Higgs boson 𝐻 into new scalar or pseudoscalar particles that subsequently decay into 𝑏-quarks is presented. The search considers 𝑍⁢𝐻 production with several decay scenarios for the Higgs boson; first to a pair of identical scalars, 𝐻 → 2⁢𝑎 → 4⁢𝑏, second to a pair of scalars with different masses (𝑚 𝑎⁢1 < 𝑚 𝑎⁢2 ), either directly, 𝐻 → 𝑎 1 ⁢𝑎 2 → 4⁢𝑏, or via a longer decay chain, 𝐻 → 𝑎 1 ⁢𝑎 2 → 3⁢𝑎 1 → 6⁢𝑏. The analysis uses proton-proton collision data at $\sqrt{𝑠}$ = 13 TeV collected with the ATLAS detector at the Large Hadron Collider, corresponding to an integrated luminosity of 140 fb −1 . No significant excess above the Standard Model prediction is observed. The search sets upper limits at 95% confidence level on the ratio of the Higgs boson production cross section to the SM prediction times the branching ratio of Higgs bosons decaying into 4⁢𝑏 or 6⁢𝑏, between 4% and 25% for 𝜎⁡(𝑍⁢𝐻)/𝜎 SM ⁡(𝑍⁢𝐻) × ℬ⁡(𝐻→ 2⁢𝑎→ 4⁢𝑏), between 24% and 38% for 𝜎⁡(𝑍⁢𝐻)/𝜎 SM ⁡(𝑍⁢𝐻) × ℬ⁡(𝐻 → 𝑎 1 ⁢𝑎 2 → 4⁢𝑏), and between 10% and 20% for 𝜎⁡(𝑍⁢𝐻)/𝜎 SM ⁡(𝑍⁢𝐻) × ℬ⁡(𝐻→𝑎 1⁢ 𝑎 2 → 3⁢𝑎 1 → 6⁢𝑏), depending on the masses of the scalar particles.

extensions of Higgs sector↗