Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

An Approach to Dynamic Human Reliability Analysis and Its Data Collection Framework

Human reliability analysis (HRA) is a method for evaluating human errors in a variety of complex systems such as nuclear power plants, military systems, aircraft, and chemical plants. Most HRA methods currently used by regulatory institutes or utilities are called static HRA and are carried out by simple worksheets or simple calculators. To date, there are many unsolved or intrinsic challenges in static HRA. For example, existing static HRA does not realistically model and evaluate human actions as they would be performed at actual systems. There is no method with HRA to objectively estimate the time required for human actions despite being essential to HRA processes. In addition, many HRA methods still rely on a dataset generated prior to the 1980s, from unrelated industry experience or simply from expert judgment. Accordingly, this study attempted to research how to overcome the challenges of existing HRA via dynamic risk assessment (a.k.a., simulation-based or computation-based risk assessment) techniques. First, this study developed a dynamic HRA method, named as PRocedure-based Investigation Method of EMRALD Risk Assessment – HRA (PRIMERA-HRA). The PRIMERA-HRA mainly concentrates on providing HRA analysts with specific guidelines on how to reasonably model human actions, assign human reliability data and evaluate output of simulation within a dynamic probabilistic risk assessment tool, called as Event Modeling Risk Assessment using Linked Diagrams (EMRALD). Second, this study also developed a module for performance shaping factors (i.e., the key concept in HRA quantification) applicable to dynamic HRA, then implemented it based on PRIMERA-HRA within the EMRALD tool. Third, this study developed an HRA data collection framework to support dynamic HRA, called as Simplified Human Error Experimental Program (SHEEP). Originally, the SHEEP study aimed to support static HRA and its data collection, but recently extended the scope to the new technologies such as dynamic HRA or HRA for advanced reactors. SHEEP focuses on the use of data collected from simplified simulators to complement—but not replace—data collection studies using full-scope simulators and actual operators. To date, many experiments were conducted under the SHEEP framework. Multiple analyses, such as human performance analysis, human error analysis, task complexity analysis, learning effect analysis and time distribution analysis, were also carried out using the collected data. Then, based on the major insights, an approach to inferring full-scope data based on simplified simulator data was proposed. The PRIMERA-HRA and SHEEP research are expected to evaluate human actions more realistically than existing static HRA, provide an opportunity to collect more HRA data with reasonable cost and labor, then contribute to enhance the quality of HRA.

99 - GENERAL AND MISCELLANEOUS↗

An Approach to Dynamic Human Reliability Analysis and Its Data Collection Framework

Human reliability analysis (HRA) is a method for evaluating human errors in a variety of complex systems such as nuclear power plants, military systems, aircraft, and chemical plants. Most HRA methods currently used by regulatory institutes or utilities are called static HRA and are carried out by simple worksheets or simple calculators. To date, there are many unsolved or intrinsic challenges in static HRA. For example, existing static HRA does not realistically model and evaluate human actions as they would be performed at actual systems. There is no method with HRA to objectively estimate the time required for human actions despite being essential to HRA processes. In addition, many HRA methods still rely on a dataset generated prior to the 1980s, from unrelated industry experience or simply from expert judgment. Accordingly, this study attempted to research how to overcome the challenges of existing HRA via dynamic risk assessment (a.k.a., simulation-based or computation-based risk assessment) techniques. First, this study developed a dynamic HRA method, named as PRocedure-based Investigation Method of EMRALD Risk Assessment – HRA (PRIMERA-HRA). The PRIMERA-HRA mainly concentrates on providing HRA analysts with specific guidelines on how to reasonably model human actions, assign human reliability data and evaluate output of simulation within a dynamic probabilistic risk assessment tool, called as Event Modeling Risk Assessment using Linked Diagrams (EMRALD). Second, this study also developed a module for performance shaping factors (i.e., the key concept in HRA quantification) applicable to dynamic HRA, then implemented it based on PRIMERA-HRA within the EMRALD tool. Third, this study developed an HRA data collection framework to support dynamic HRA, called as Simplified Human Error Experimental Program (SHEEP). Originally, the SHEEP study aimed to support static HRA and its data collection, but recently extended the scope to the new technologies such as dynamic HRA or HRA for advanced reactors. SHEEP focuses on the use of data collected from simplified simulators to complement—but not replace—data collection studies using full-scope simulators and actual operators. To date, many experiments were conducted under the SHEEP framework. Multiple analyses, such as human performance analysis, human error analysis, task complexity analysis, learning effect analysis and time distribution analysis, were also carried out using the collected data. Then, based on the major insights, an approach to inferring full-scope data based on simplified simulator data was proposed. The PRIMERA-HRA and SHEEP research are expected to evaluate human actions more realistically than existing static HRA, provide an opportunity to collect more HRA data with reasonable cost and labor, then contribute to enhance the quality of HRA.

99 - GENERAL AND MISCELLANEOUS↗

Multiple Degradation Mechanisms in Reinforced Concrete Structures, Modeling and Risk Analysis

The overarching goal of this project is to complement ongoing Department of Energy (DOE) Light Water Reactor Sustainability (LWRS)-funded Grizzly concrete modeling development efforts by providing improved multi-physics models for incorporation into the Grizzly and BlackBear codes. Objectives of this work identified at the outset of this project include: 1. Coupling between mechanical damage and transport processes. The mechanical damage will be characterized by nonlinear mechanical constitutive models appropriate for concrete used in nuclear power plants (NPPs). 2. Improved representation of the coupling among the transport process, building on the current moisture and thermal transport models in Grizzly. The parameters for coupling among heat and mass transport in the multi-physics model will be experimentally determined. 3. Coupling among different scale levels of concrete constituents, fine and coarse aggregates, cement paste, hydration products, and pore structure. 4. Probabilistic analysis of the random nature of the heterogeneous concrete structure and the environmental factors (ambient temperature and humidity) and their multiple effects on concrete deterioration. 5. Benchmark verification, validation and uncertainty quantification of the thermo-hygro- chemo-mechanical (THCM) concrete formulation. The end goal of this work was to provide a comprehensive and robust simulation capability that can be applied at the engineering scale for analysis of realistic deterioration scenarios in NPP concrete structures.

36 MATERIALS SCIENCE↗

Assessing Crew Medical Officer Preparedness for International Space Station Missions

INTRODUCTION Astronaut crew medical officers (CMO) undergo additional, specialized training to provide medical support onboard the International Space Station (ISS). CMO training focuses on utilizing resources on-station and optimizing communication with ground-based expertise to manage both common minor conditions as well as emergency/trauma situations. As NASA moves towards future Artemis and exploration class missions, we sought CMO perspectives on past, present, and future CMO training and medical resourcing to help inform mission planners regarding medical risk mitigation considerations. We present an interview-based qualitative assessment of CMO preparedness for the International Space Station with the aim to help iterate future training flows for Low Earth Orbit, Artemis, and exploration-class missions. METHODS A semi-structured interview tool was developed to assess CMO experience and their recommendations for future mission training considerations. Participants were recruited from former or current US astronauts who were designated as CMO and subsequently flew to the International Space Station. 10 former CMOs took part in the study. Interview transcripts were deidentified and evaluated for qualitative thematic analysis by two independent coders with NVivo Software suite (Lumivero, Denver, CO), and emergent themes were compiled. RESULTS Former CMO crew expressed appropriate preparedness for current ISS medical capabilities and requirements. They identified the role of the CMO as serving as a healthcare extender to ground-based flight surgeons for ISS and other LEO missions. Individuals with prior medical experience were preferred though not felt to be necessary for LEO missions. For exploration class missions with limitations in ground communication, a physician-as-CMO and more rigorous training curricula for both the CMO and astronaut crew were desired. DISCUSSION Former NASA astronaut crew were interviewed to retrospectively assess their preparedness as ISS crew medical officers and hypothesize future medical knowledge, skill, and ability needs. Along with medical operations subject matter expert opinion and advanced probabilistic risk assessment modeling, past CMO experience can help inform future CMO training considerations and responsibilities for future Artemis and exploration class missions.

M A Labarbera↗

A Decentralized Bi-Level Fuzzy Two-Stage Decision Model for Flood Management

Flood, as a serious worldwide environment problem, can lead to detrimental economic losses and fatalities. Effective flood control is desired to mitigate the adverse impacts of flooding and the associated flood risk through development of cost-effective and efficient flood management decisions and policies. A bi-level fuzzy two-stage stochastic programming model, named BIFS model is developed in this study to provide decision support for economic analysis of flood management. The BIFS model is capable of not only addressing the sequential decision making issue involving the two-level decision makers, but also correcting the pre-regulated flood management decisions before the occurrence of a flood event in the two-stage environment. The probabilistic and non-probabilistic uncertainties expressed as probability density functions and fuzzy sets are quantitatively analyzed. The overall satisfaction solution is obtained for meeting the goals of the two-level decision makers by compromising, reflecting the tradeoffs among various decision makers in the two decision-making levels. The results of application of the BIFS model to a representative case study indicate informed decision strategies for flood management. Tradeoffs between economic objectives and uncertainty-averse attitudes of decision makers are quantified.

54 ENVIRONMENTAL SCIENCES↗

Multi-Agent simulation of generation capacity expansion decisions.

In this paper, we use a multi-agent simulation model, EMCAS, to analyze generation expansion in the Iberian electricity market. The expansion model simulates generation investment decisions of decentralized generating companies (GenCos) interacting in a complex, multidimensional environment. A probabilistic dispatch algorithm calculates prices and profits for new candidate units in different future states of the system. Uncertainties in future load, hydropower conditions, and competitorspsila actions are represented in a scenario tree, and decision analysis is used to identify the optimal expansion decision for each individual GenCo. We run the model using detailed data for the Iberian market. In a scenario analysis, we look at the impact of market design variables, such as the energy price cap and carbon emission prices. We also analyze how market concentration and GenCospsila risk preferences influence the timing and choice of new generating capacity.

99 GENERAL AND MISCELLANEOUS↗

Estimating Orion Heat Shield Failure Due To Ablator Cracking During The EFT-1 Mission

The Orion EFT-1 heatshield suffered from two major certification challenges: First, the mechanical properties used in design were not evident in the flight hardware and second, the flight article itself cracked during fabrication. The combination of these events motivated the Orion Program to pursue an engineering-level Probabilistic Risk Assessment (PRA) as part of heatshield certification rationale. The PRA provided loss of Mission (LOM) likelihoods considering the probability of a crack occurring during the mission and the likelihood of subsequent structure over-temperature. The methods and input data for the PRA are presented along with a discussion of the test data used to anchor the results. The Orion program accepted an EFT-1 Loss of Vehicle (LOV) risk of 1-in-160,000 due to in-mission Avcoat cracking based on the results of this analysis. Conservatisms in the result, along with future considerations for Exploration Missions (EM) are also addressed.

Avcoat↗

RAVEN: a GUI and an Artificial Intelligence Engine in a Dynamic PRA Framework

Increases in computational power and pressure for more accurate simulations and estimations of accident scenario consequences are driving the need for Dynamic Probabilistic Risk Assessment (PRA) [1] of very complex models. While more sophisticated algorithms and computational power address the back end of this challenge, the front end is still handled by engineers that need to extract meaningful information from the large amount of data and build these complex models. Compounding this problem is the difficulty in knowledge transfer and retention, and the increasing speed of software development. The above-described issues would have negatively impacted deployment of the new high fidelity plant simulator RELAP-7 (Reactor Excursion and Leak Analysis Program) at Idaho National Laboratory. Therefore, RAVEN that was initially focused to be the plant controller for RELAP-7 will help mitigate future RELAP-7 software engineering risks. In order to accomplish this task, Reactor Analysis and Virtual Control Environment (RAVEN) has been designed to provide an easy to use Graphical User Interface (GUI) for building plant models and to leverage artificial intelligence algorithms in order to reduce computational time, improve results, and help the user to identify the behavioral pattern of the Nuclear Power Plants (NPPs). In this paper we will present the GUI implementation and its current capability status. We will also introduce the support vector machine algorithms and show our evaluation of their potentiality in increasing the accuracy and reducing the computational costs of PRA analysis. In this evaluation we will refer to preliminary studies performed under the Risk Informed Safety Margins Characterization (RISMC) project of the Light Water Reactors Sustainability (LWRS) campaign [3]. RISMC simulation needs and algorithm testing are currently used as a guidance to prioritize RAVEN developments relevant to PRA.

97 MATHEMATICS AND COMPUTING↗

Scaling Input Distributions for Probabilistic Models - 19472

It is important to address scaling issues when building models to support risk-based decisions for radioactive waste disposal sites. Currently, probabilistic risk assessment and probabilistic performance assessment models are run for multiple realizations where each realization uses one value from each input distribution over the entire modeled time. The input distributions represent the current state of knowledge in the mean of the input variable over the spatial region of interest and over the time period of the model run. This paper focuses on the time factor in input distribution scaling because it presents more serious conceptual and distributional challenges than the spatial factor. One of the challenges in temporal scaling is the effect of non-linearity on propagation of distribution uncertainty through to uncertainty in results. Radioactive waste disposal models tend to have both linear and non-linear components in their models. Dose assessment calculations are typically represented by linear models, while contaminant transport models have linear and non-linear components. In principle, temporal scaling of input parameter distributions for a linear model is straightforward, but scaling of input distributions for non-linear models is not. This paper uses examples to investigate the effects of input distribution temporal scaling on simple linear and non-linear models. Different scaling scenarios were investigated by comparing three analysis tools: analytical mathematical representations, statistical software programming, and GoldSim Monte Carlo simulation software. R statistical software is an open source statistical programming language often used for statistical analyses and graphical representation of data. GoldSim is a robust probabilistic dynamic modeling platform used in performance assessment modeling of radioactive waste sites. A simple linear model, a quadratic model and a multiplicative model were the cases explored for each of these tools. For the three analysis tools considered and with each of the scaling cases, 1,000 realizations were implemented from distributions of the random variables of interest. This is a sufficient number of realizations for simple models to capture the model space. An annual temporal resolution of a 100-year simulation period was chosen for all models and analysis tools. The effects of temporal scaling were demonstrated by investigating two different options for time scaling. Option 1 was set up so that the input distributions represented the expected value on an annual time scale, and a new value from that distribution was chosen every year (at every time step which equaled a year) for 100 years. In Option 2, the input distributions were scaled to represent the expected mean value of the input variable over the 100 years of simulation, and one value from that distribution was chosen for the entire elapsed time. Results show agreement across the three analysis tools. As expected, the linear models have identical results for the two different scaling Options, and the non-linear models diverge in the results for different time scale implementation. The implications of this work point to the need for careful consideration of input distribution temporal scaling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

Effects of Moist Convection on Hurricane Predictability

This study exemplifies inherent uncertainties in deterministic prediction of hurricane formation and intensity. Such uncertainties could ultimately limit the predictability of hurricanes at all time scales. In particular, this study highlights the predictability limit due to the effects on moist convection of initial-condition errors with amplitudes far smaller than those of any observation or analysis system. Not only can small and arguably unobservable differences in the initial conditions result in different routes to tropical cyclogenesis, but they can also determine whether or not a tropical disturbance will significantly develop. The details of how the initial vortex is built can depend on chaotic interactions of mesoscale features, such as cold pools from moist convection, whose timing and placement may significantly vary with minute initial differences. Inherent uncertainties in hurricane forecasts illustrate the need for developing advanced ensemble prediction systems to provide event-dependent probabilistic forecasts and risk assessment.

Zhang, Fuqing↗

Physics-informed machine learning for fault-leakage reduced-order modeling

Geologic carbon storage (GCS) is a promising technology for mitigating CO 2 emissions. The overall success of GCS depends on safe operations that are informed by risk assessment and have proper mitigation plans in place. Performing quantitative probabilistic risk assessment for a GCS site using traditional reservoir simulators can be challenging due to the high computational costs. To overcome this challenge, the US Department of Energy’s National Risk Assessment Partnership (NRAP) project has developed an integrated assessment modeling approach that utilizes computationally efficient reduced-order models (ROM) for simulating various parts of a GCS storage site to quantify uncertainty. Here, in this study, we develop a reduced-order model for fault leakage risk assessment. We use a deep learning approach to build the reduced-order model. We perform a sensitivity analysis and find that the deep learning model yields high accuracy with a much smaller computational cost than full-physics simulation. We also evaluate the performance of the model in scenarios where simulations are not possible to run, providing analysis not previously performed in fault-leakage ROM analyses. Based on a sensitivity analysis of the model, we suggest a simplified conceptual model for fault leakage and site monitoring.

58 GEOSCIENCES↗

Probabilistic Risk Assessment of Spent Fuel Pool Cooling System Failure Considering Safety and Security Initiating Events

In order to quantify the probable risk associated with a safety system, nuclear safety risk evaluation process is applied which is generally performed in three steps. The first step is to calculate the damage frequency of a critical system. This step is followed by the radioactive source term estimation due to the potential system damage. The final step is the assessment of off-site consequences. The safety risk formula is shown by Eq. (1). P{sub F} is the probability of safety system failure (the probability used describes a random, independent event), and C is the consequence value. R{sub SAF} = P{sub F} * C (1) The security risk associated with an attack on critical infrastructure and/or special nuclear materials theft is usually evaluated using three- term risk equation (probability of attack, probability of adversary success, and consequence). A security threat and the related initiating events are not considered in a pure safety risk analysis. The vulnerability of the physical protection system is performed independently even though the consequence resulting from a security initiating event can be similar to a safety related initiating event and thus gets double counted. The security risk can be calculated using Eq. (2) R{sub SEC} = P{sub A} * P{sub S} * C (2) PA is the probability of attack, P{sub S} is the probability of adversary success (P{sub S} = 1 - P{sub I} P{sub N}). P{sub I} being the probability of interruption which accounts for the probabilities of detection of all timely detection elements along an adversary path. PN being the probability of neutralization: the result of engagement of the response force with the adversaries after the interruption has occurred. C is the consequence magnitude from a successful attack. The two security probabilities do not describe random, independent events. As a result, because of the differences in the randomness and independence of the respective safety and security probabilities, the safety and the security risks are currently calculated separately. The consequence term in nuclear safety and security risk evaluation have the same definition. An effort is made here to study the effect on the overall risk by considering security initiating events along with the subsequent failure of the intermediate safety element. The target selected is a spent fuel storage pool for analyzing the public risk arising from the interplay between nuclear security and safety initiating events. EASI (Estimate of Adversary Sequence Interruption) model is used to calculate the probability of interruption related to a security system that leads to the calculation of the security initiating event frequency. Further progression of this initiating security event to a top event is analyzed using a Probabilistic Safety Assessment (PSA) tool, SAPHIRE (version 8) to obtain a joint pool damage frequency. For the progression of events leading to a top event, the failure of the intermediate safety elements is assumed to be external random events such as heavy load drop and fire events. The objectives of this study is to (1) determine the double accounting of frequency of failure, risk and allocated resources in the scenario of a non-random security initiating event leading to a safety random event chain (2) compare the damage frequency from pure security with the frequency of combined security-safety failure event and pure safety failure events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 35, No. 1, January-June 1994]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: THE CHERNOBYL ACCIDENT: 1 Chernobyl Accident Management Actions, A. R Sich 25 The IAEA-ASSET Approach to Avoiding Accidents is to Recognize the Precursors to Prevent Incidents, F. Reisch; ACCIDENT ANALYSIS: 36 A Review of the Available Information on the Triggering Stage of a Steam Explosion, D. F. Fletcher; 58 Analysis and Modeling of Flow-Blockage-Induced Steam Explosion Events in the High-Flux Isotope Reactor, R. P. Taleyarkhan, V. Georgevich, C. W. Nestor, U. Gat, B. L. Lepard, D. H. Cook, J. Freels, S. J. Chang, C. Luttrell, R. C. Gwaltney, and J. Kirkpatrick; 74 An Analysis of Disassembling the Radial Reflector of a Thermionic Space Nuclear Reactor Power System, M. S. El-Genk and D. V. Paramonov; CONTROL AND INSTRUMENTATION: 86 Standards for High-Integrity Software, D. R. Wallace, D. R. Kuhn, L M. Ippolito, and L. Beltracchi; DESIGN FEATURES: 98 Adoption of New Design Features for the Next Generation Nuclear Power Reactors, L. S. Tong; 114 Review of Nuclear Piping Seismic Design Requirements, G. C. Slagis and S. E. Moore; ENVIRONMENTAL EFFECTS: 128 PC-Based Probabilistic Safety Assessment Study for a Geological Waste Repository Placed in a Bedded Salt Formation, S. A. Khan; OPERATING EXPERIENCES: 142 Managing Aging in Nuclear Power Plants: Insights from NRC’s Maintenance Team Inspection Reports, A. Fresco and M. Subudhi; 150 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 153 Selected Safety-Related Events, Compiled by G. A. Murphy; RECENT DEVELOPMENTS: 158 Reports, Standards, and Safety Guides, D. S. Queener; 168 Proposed Rule Changes as of Dec. 31, 1993; ANNOUNCEMENTS: 177 Symposium on Radioactive and Mixed Waste—Risk as a Basis for Waste Classification; 177 1995 Incineration Conference 178 Ninth Power Plant Dynamics Control and Testing Symposium; 174 The Authors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic Structural Analysis Methods (PSAM) for select space propulsion system components, part 2

The technical effort and computer code enhancements performed during the sixth year of the Probabilistic Structural Analysis Methods program are summarized. Various capabilities are described to probabilistically combine structural response and structural resistance to compute component reliability. A library of structural resistance models is implemented in the Numerical Evaluations of Stochastic Structures Under Stress (NESSUS) code that included fatigue, fracture, creep, multi-factor interaction, and other important effects. In addition, a user interface was developed for user-defined resistance models. An accurate and efficient reliability method was developed and was successfully implemented in the NESSUS code to compute component reliability based on user-selected response and resistance models. A risk module was developed to compute component risk with respect to cost, performance, or user-defined criteria. The new component risk assessment capabilities were validated and demonstrated using several examples. Various supporting methodologies were also developed in support of component risk assessment.

Source record↗

RECOVERY ACT - Robust Optimization for Connectivity and Flows in Dynamic Complex Networks

The goal of this project was to study robust connectivity and flow patterns of complex multi-scale systems modeled as networks. Networks provide effective ways to study global, system level properties, as well as local, multi-scale interactions at a component level. Numerous applications from power systems, telecommunication, transportation, biology, social science, and other areas have benefited from novel network-based models and their analysis. Modeling and optimization techniques that employ appropriate measures of risk for identifying robust clusters and resilient network designs in networks subject to uncertain failures were investigated in this collaborative multi-university project. In many practical situations one has to deal with uncertainties associated with possible failures of network components, thereby affecting the overall efficiency and performance of the system (e.g., every node/connection has a probability of partial or complete failure). Some extreme examples include power grid component failures, airline hub failures due to weather, or freeway closures due to emergencies. These are also situations in which people, materials, or other resources need to be managed efficiently. Important practical examples include rerouting flow through power grids, adjusting flight plans, and identifying routes for emergency services and supplies, in the event network elements fail unexpectedly. Solutions that are robust under uncertainty, in addition to being economically efficient, are needed. This project has led to the development of novel models and methodologies that can tackle the optimization problems arising in such situations. A number of new concepts, which have not been previously applied in this setting, were investigated in the framework of the project. The results can potentially help decision-makers to better control and identify robust or risk-averse decisions in such situations. Formulations and optimal solutions of the considered problems need to capture uncertainty and risk using appropriate probabilistic, statistical and optimization concepts. The main difficulty arising in addressing these issues is the dramatic increase in the computational complexity of the resulting optimization problems. This project studied novel models and methodologies for risk-averse network optimization- specifically, network design, network flows and cluster detection problems under uncertainty. The approach taken was to incorporate a quantitative risk measure known as conditional value-at-risk that is widely used in financial applications. This approach presents a viable alternate modeling and optimization framework to chance-constrained optimization and mean-variance optimization, one that also facilitates the detection of risk-averse solutions.

97 MATHEMATICS AND COMPUTING↗

Nuclear Safety [Vol. 35, No. 1, January-June 1994]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Chernobyl Accident Management Actions, A. R Sich; GENERAL SAFETY CONSIDERATIONS: 25 The IAEA-ASSET Approach to Avoiding Accidents is to Recognize the Precursors to Prevent Incidents, F. Reisch; ACCIDENT ANALYSIS: 36 A Review of the Available Information on the Triggering Stage of a Steam Explosion, D. F. Fletcher; 58 Analysis and Modeling of Flow-Blockage-Induced Steam Explosion Events in the High-Flux Isotope Reactor, R. P. Taleyarkhan, V. Georgevich, C. W. Nestor, U. Gat, B. L. Lepard, D. H. Cook, J. Freels, S. J. Chang, C. Luttrell, R. C. Gwaltney, and J. Kirkpatrick; 74 An Analysis of Disassembling the Radial Reflector of a Thermionic Space Nuclear Reactor Power System, M. S. El-Genk and D. V. Paramonov; CONTROL AND INSTRUMENTATION: 86 Standards for High-Integrity Software, D. R. Wallace, D. R. Kuhn, L M. Ippolito, and L. Beltracchi; DESIGN FEATURES: 98 Adoption of New Design Features for the Next Generation Nuclear Power Reactors, L. S. Tong; 114 Review of Nuclear Piping Seismic Design Requirements, G. C. Slagis and S. E. Moore; ENVIRONMENTAL EFFECTS: 128 PC-Based Probabilistic Safety Assessment Study for a Geological Waste Repository Placed in a Bedded Salt Formation, S. A. Khan; OPERATING EXPERIENCES: 142 Managing Aging in Nuclear Power Plants: Insights from NRC’s Maintenance Team Inspection Reports, A. Fresco and M. Subudhi; 150 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 153 Selected Safety-Related Events, Compiled by G. A. Murphy; RECENT DEVELOPMENTS: 158 Reports, Standards, and Safety Guides, D. S. Queener; 168 Proposed Rule Changes as of Dec. 31, 1993; ANNOUNCEMENTS: 177 Symposium on Radioactive and Mixed Waste—Risk as a Basis for Waste Classification; 177 1995 Incineration Conference 178 Ninth Power Plant Dynamics Control and Testing Symposium; 174 The Authors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ramping and Uncertainty Prediction Tool - Analysis and Visualization of Wind Generation Impact on Electrical Grid

RUT software is designed for use by the Balancing Authorities to predict and display additional requirements caused by the variability and uncertainty in load and generation. The prediction is made for the next operating hours as well as for the next day. The tool predicts possible deficiencies in generation capability and ramping capability. This deficiency of balancing resources can cause serious risks to power system stability and also impact real-time market energy prices. The tool dynamically and adaptively correlates changing system conditions with the additional balancing needs triggered by the interplay between forecasted and actual load and output of variable resources. The assessment is performed using a specially developed probabilistic algorithm incorporating multiple sources of uncertainty including wind, solar and load forecast errors. The tool evaluates required generation for a worst case scenario, with a user-specified confidence level.

Etingov, Pavel↗