Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

High Voltage High Power Traction Inverter Thermal Management

This project develops thermal management solutions for various 530-kW inverter topologies being developed by Oak Ridge National Laboratory (ORNL). The thermal management solutions will provide high thermal performance and be designed to keep inverter components (e.g., power modules, capacitors) within allowable operating temperatures to help meet the project objectives. Steady-state and transient thermal models of the inverter and cooling system will be created and used to predict component temperatures under various drive cycle conditions.

33 ADVANCED PROPULSION SYSTEMS↗

Technology on In-Situ Gas Generation to Recover Residual Oil Reserves

This final technical report covers the period October 1, 1995 to February 29, 2008. This chapter begins with an overview of the history of Enhanced Oil Recovery techniques and specifically, CO2 flood. Subsequent chapters conform to the manner consistent with the Activities, Tasks, and Sub-tasks of the project as originally provided in Exhibit C1 in the Project Management Plan dated September 20, 1995. These chapters summarize the objectives, status and conclusions of the major project activities performed during the project period. The report concludes by describing technology transfer activities stemming from the project and providing a reference list of all publications of original research work generated by the project team or by others regarding this project. The overall objective of this project was a final research and development in the United States a technology that was developed at the Institute for Geology and Development of Fossil Fuels in Moscow, Russia. Before the technology can be convincingly adopted by United States oil and gas producers, the laboratory research was conducted at Mew Mexico Institute of Mining and Technology. The experimental studies were conducted to measure the volume and the pressure of the CO{sub 2} gas generated according to the new Russian technology. Two experimental devices were designed, built and used at New Mexico Tech facilities for these purposes. The designed setup allowed initiating and controlling the reaction between the 'gas-yielding' (GY) and 'gas-forming' (GF) agents proposed by Russian technology. The temperature was controlled, and the generated gas pressure and volume were recorded during the reaction process. Additionally, the effect of surfactant addition on the effectiveness of the process was studied. An alternative GY reactant was tested in order to increase the efficiency of the CO2 gas generation process. The slim tube and the core flood experimental studies were conducted to define the sweep efficiency of the in-situ generated CO{sub 2} gas. A set of core flood experiments were conducted to define effect of surfactant on recovery efficiency. The results demonstrated obvious advantages of the foamy system over the brine solution in order to achieve higher sweep efficiency and recovery coefficient. It is shown that a slug injection is not an efficient method for mixing GY and GF solutions and it can't generate considerable gas inside the slim-tube.

02 PETROLEUM↗

Ecological Monitoring and Compliance Program 2014 Report

The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes (Crotalus mitchellii), and several species of cacti. NSTec provided to project managers a written summary report of all survey findings and mitigation recommendations, where applicable. Of the 18 projects on the NNSS, 15 occurred within the range of the threatened desert tortoise. Approximately 2.19 ha of desert tortoise habitat were disturbed. No desert tortoises were accidentally injured or killed by project activities, and no tortoises were killed by vehicles. On 13 occasions, tortoises were moved off the road and out of harm’s way. Six tortoises were found and transmitters attached as part of an approved study to assess impacts of vehicles on tortoises on the NNSS. NSTec biologists continued to monitor 37 juvenile desert tortoises as part of a collaborative effort to study survival and temperament of translocated animals. From 1978 until 2013, there has been an average of 11.2 wildland fires per year on the NNSS with an average of about 83.7 ha burned per fire. There were no wildland fires documented on the NNSS during 2014. Results from the wildland fuel surveys showed a very low risk of wildland fire due to reduced fuel loads caused by limited natural precipitation. Limited reptile trapping and reptile roadkill surveys were conducted to better define species distribution on the NNSS. Sixteen reptiles were trapped representing five species. Combined with data from 2013, 183 road kills were detected, representing 11 snake and 8 lizard species. Selected natural water sources were monitored to assess trends in physical and biological parameters, and one new water source was found. Wildlife use at five water troughs and four radiologically contaminated sumps was documented using motion-activated cameras. As part of the statewide effort to disseminate information throughout the botanical community, NSTec prepared a shape file with site-specific data for all 17 sensitive plants on the NNSS and provided it to the Nevada Natural Heritage Program for inclusion in their statewide database. No field surveys were conducted this year for sensitive plants on the NNSS due to poor growing conditions. Surveys of sensitive and protected/regulated animals during 2014 focused on winter raptors, bats, wild horses (Equus caballus), mule deer (Odocoileus hemionus), desert bighorn sheep (Ovis Canadensis nelsoni), and mountain lions (Puma concolor). Two permanent, long-term winter raptor survey routes were established and sampled in January and February. A total of 27 raptors representing 4 species were observed. The wild horse population increased from 30 to 41, with several yearlings recruiting into the population, possibly due to the death of a mountain lion known to prey on horse foals. Mule deer abundance and density measured with standardized deer surveys was similar to 2013 and appears to be stable. Desert bighorn sheep, including rams, ewes, and lambs, were detected using motion-activated cameras at four water sources. There are plans to conduct helicopter surveys to census the population during September 2015 and then capture and radio-collar up to 20 sheep during November 2015. Over 150 sheep scat samples have been collected for genetic analysis to try to determine how sheep on the NNSS are related to surrounding sheep populations. Information is presented about bird mortalities, Migratory Bird Treaty Act compliance, and a summary of nuisance animals and their control on the NNSS. A total of 93 mountain lion images (i.e., photographs or video clips) were taken during 220,379 camera hours at 16 of 32 sites sampled and another 11,946 images of at least 29 species other than mountain lions were taken as well. A mountain lion telemetry study continued in 2014. NNSS7 was tracked from January 1 to November 15 using a global positioning system satellite transmitter. He consumed 21 mule deer, 17 desert bighorn sheep, 1 juvenile bobcat, and 3 coyotes. Mule deer were primarily taken in the summer and fall. No new mountain lions were captured. A minimum of four adult lions (two males, two females), a subadult male, and three kittens were known to inhabit the NNSS during 2014. Two previously revegetated sites on the NNSS and one on the Tonopah Test Range (TTR) were monitored in 2014. The cover cap on the U-3ax/bl disposal unit, revegetated in 2000, and the 92-Acre Site at the Area 5 Radioactive Waste Management Complex, revegetated in 2011, were the restoration sites monitored on the NNSS. The Corrective Action Unit 407 Rollercoaster RADSAFE site, revegetated in 2000, was the restoration site monitored on the TTR. Plant cover and density were recorded at all sites except U-3ax/bl (qualitative monitoring), and reclamation success standards were evaluated, where applicable.

54 ENVIRONMENTAL SCIENCES↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

Source record↗

Assessment of Biocide Impacts on Life Support (LS) and Extravehicular Activity (EVA) Architectures

The Project Manager for the Human Exploration and Operations Mission Directorate’s Advanced Exploration Systems Life Support Systems (LSS) project, requested a NASA Engineering and Safety Center (NESC) assessment to evaluate potable water system biocide options impacting Gateway, Human Lander Systems, Foundation Surface Habitat, and Exploration Command Module missions. The assessment focused on identifying feasible biocide options, evaluating the impacts of their implementation on crew health, extravehicular activity hardware, and LSS hardware, and conducting a trade on architecture options. This report contains the outcome of the NESC assessment.

Extravehicular Activity; Life Support; NASA Engine↗

Building America Case Study: Whole-House Solutions for Existing Homes: Greenbelt Homes, Inc. Pilot Retrofit Program; Whole-House Solutions for Existing Homes, Energy Efficiency & Renewable Energy (EERE)

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements. Phase 1: baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2: installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season and energy simulations supporting recommendations for HVAC and water heating upgrades to be implemented in Phase 3.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Existing Whole-House Solutions Case Study: Greenbelt Homes, Inc. Pilot Retrofit Project

In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc., (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. With the community upgrade fully funded by the cooperative through their membership without outside subsidies, this project presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects that include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy-savings benefits of improvements. Phase 1—baseline evaluation for a representative set of 28 homes sited in seven buildings; Phase 2—installation of the building envelope improvements and continued monitoring of the energy consumption for the heating season; Phase 3—energy simulations supporting recommendations for HVAC and water heating upgrades.

Attic↗

SolSmart Webinar - Community Choice Aggregation & Solar Development

This webinar focuses on community choice aggregation (CCA) as a potential strategy for local governments to achieve their clean energy goals. The webinar provides an overview of what CCA is, how it works, and considerations for local governments interested in establishing or participating in a CCA program. The webinar will highlight case studies from CCAs across the U.S. that support local renewable energy development. This webinar provides one AICP CM continuing education credit. Who: Ben Butterwoth, Senior Associate, The Cadmus Group; Megan Lynch, Analyst, The Cadmus Group; Jenna Famular, Communications Manager, MCE Clean Energy; Meghan Shaw, Outreach Director for Cambridge Energy Alliance, City of Cambridge; Daniel Falk, Project Manager, The Solar Foundation

14 SOLAR ENERGY↗

Panel Session 3: Featured Country Canada: Management and Disposal of High and Low-Level Waste

This panel featured Senior Executives accountable for the safe management and disposal of most of Canada's radioactive waste liabilities and provided their perspectives on current plans and progress made to date. Topics addressed by the panelists included national policies and programs, the regulatory framework, and actions led by the waste generators and solution implementers to ensure Canada's waste legacy is responsibly managed. Presentations proposed include: 1 - Overview of Canadian Radioactive Waste Policy and Long-Term Waste Management Projects (Dave McCauley, Natural Resources Canada (Canada)); 2 - Featured Country: Canada - National Repository (Laurie Swami, Nuclear Waste Management Organization (Canada)); 3 - Management and Disposal of Ontario Power Generation's Low and Intermediate Level Waste (Lise Morton, Ontario Power Generation (Canada)); 4 - Featured Country: Canada - National Laboratories Liabilities (Richard Sexton, Atomic Energy of Canada Limited (Canada)); 5 - Management and Disposal of High and Low-Level Waste (Mark Lesinski, Canadian Nuclear Laboratories (Canada)); 6 - Disposal in Canada: The Regulatory Perspective (Ramzi Jammal, Canadian Nuclear Safety Commission (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology Development for Assessment of Spaceport Technology Returns and Risks

As part of Kennedy Space Center's (KSC's) challenge to open the space frontier, new spaceport technologies must be developed, matured and successfully transitioned to operational systems. R&D investment decisions can be considered from multiple perspectives. Near mid and far term technology horizons must be understood. Because a multitude of technology investment opportunities are available, we must identify choices that promise the greatest likelihood of significant lifecycle At the same time, the costs and risks of any choice must be well understood and balanced against its potential returns The problem is not one of simply rank- ordering projects in terms of their desirability. KSC wants to determine a portfolio of projects that simultaneously satisfies multiple goals, such as getting the biggest bang for the buck, supporting projects that may be too risky for private funding, staying within annual budget cycles without foregoing the requirements of a long term technology vision, and ensuring the development of a diversity of technologies that, support the variety of operational functions involved in space transportation. This work aims to assist in the development of in methods and techniques that support strategic technology investment decisions and ease the process of determining an optimal portfolio of spaceport R&D investments. Available literature on risks and returns to R&D is reviewed and most useful pieces are brought to the attention of the Spaceport Technology Development Office (STDO). KSC's current project management procedures are reviewed. It is found that the "one size fits all" nature of KSC's existing procedures and project selection criteria is not conducive to prudent decision-making. Directions for improving KSC's - procedures and criteria are outlined. With help of a contractor, STDO is currently developing a tool, named Change Management Analysis Tool (CMAT)/ Portfolio Analysis Tool (PAT), to assist KSC's R&D portfolio determination. A critical review of CMAT/PAT is undertaken. Directions for the improvement of this tool are provided. STDO and KSC intend to follow up on many, if not all, of the recommendations provided.

Joglekar, Prafulla↗

Transition Time: Zero

I had been in a technical/project management assignment about two years, when one day my boss asked me to come to his office to 'discuss an opportunity.' When I arrived in his office, he indicated that the project manager of one of our biggest ($10M+) and most important projects had requested to be removed from the job immediately, and the organization was going to grant the request. He felt I was the most experienced person he had and thought I would be a perfect fit for this job.

Cameron, W. Scott↗

Wabash CarbonSAFE Subtask 4.1 - Application of Policy Frameworks for Improved Carbon Capture and Storage Social Site Characterization & Stakeholder Engagement

Anthropogenic climate change threatens environmental and human health globally. Limiting these threats requires large-scale and innovative greenhouse gas mitigation responses across carbon-intensive energy and industrial sectors. Carbon capture and storage (CCS) technologies present potential opportunities for mitigating climate change while maintaining a diverse energy resource portfolio. Successful development of CCS physical sites requires effective and efficient project management solutions that elicit and incorporate the concerns and perspectives of diverse stakeholders. Due to the urgency of climate change mitigation technology implementation and the costs of CCS development, CCS project developers cannot risk setbacks by poor stakeholder assessment that concern management processes. Thus, this report presents four prominent policy frameworks and associated case studies as opportunities to improve CCS social site characterization and stakeholder engagement. After comparing the relative effectiveness and efficiencies of each framework with regard to CCS, this report concludes that the Advocacy Coalition Framework, Narrative Policy Framework, and Policy Conflict Framework can improve the CCS social site characterization process, while the Collaborative Governance Framework paired with the Q-Methodology provides an ideal framework for direct stakeholder engagement. Overall, this report finds that the Narrative Policy Framework and the Collaborative Governance Framework are most ideally suited for the purposes of CCS social site characterization and stakeholder engagement.

01 COAL, LIGNITE, AND PEAT↗

Nevada National Security Site Waste Acceptance Criteria

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reflection and Transmission of Plane Electromagnetic Waves by a Geologic Layer.

Electric field and magnetic field reflection and transmission responses generated by a plane wave normally incident onto a finite - thickness geologic layer are mathematically derived and numerically evaluated. A thin layer with enhanced electric current conductivity and/or magnetic permeability is a reasonable geophysical representation of a hydraulic fracture inject ed with a high - contrast proppant pack. Both theory and numerics indicate that backward - and forward - scattered electromagnetic wavefields are potentially observable in a field experiment, despite the extreme thinness of a fracture compared to a typical low - frequency electromagnetic wavelength. The First Born Approximation (FBA) representation of layer scattering, significant for inversion studies, is shown to be accurate for a thin layer with mild medium parameter (i.e., conductivity, permeability, and per mittivity) contrasts with the surrounding homogeneous wholespace. However, FBA scattering theory breaks down for thick layers and strong parameter contrasts. ACKNOWLEDGEMENTS Sandia National Laboratories is a multi - mission laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the US Department of Energy's National Nuclear Security Administration under contract DE - AC04 - 94AL85000. This research is conducted under the auspices of CRADA (Cooperative Research and Development Agreement) SC11/01780.00 between Carbo Ceramics Inc. and Sandia National Laboratories. The author acknowledges former Carbo R&D Vic e - President Mr. Chad Cannan and former SNL Geophysics Department manage r Ms. Amy Halloran for their interest i n and support of this work. Technical discussions with Project Manager and Principal Investigator Dr. Chester J. Weiss of the SNL Geophysics Department greatly benefited this work. Dr. Lewis C. Bartel, formerly with S NL and presently a consultant to Carbo Ceramics, provided many useful and intuitive insights, and is acknowledged as the originator of the concept underpinning a recent patent grant (Aldridge and Bartel, 2016) involving electromagnetic wave scattering.

58 GEOSCIENCES↗

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗