Search NASA⌕ Search

SEARCH · Search NASA

Results for “grid interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Flicker Mitigation for a Grid-Connected Tidal and River Power Generator Using the BESS

In the grid-connected tidal and river power generation, the water turbulence and the grid condition can induce the fluctuating output power. This power fluctuation may cause a power quality issue such as flicker, or voltage fluctuations, during the continuous operation. Hence, it is important to assess flicker emission and to mitigate flicker in order to solve this power quality issue. This paper proposes a Battery Energy Storage System (BESS)installed between the power converters of the tidal and river power system in order to mitigate flickers in different grid conditions. The BESS smooths the active power fluctuations and reduces flicker even from the weak grid with the low impedance angle in the distribution network. The feasibility of the proposed BESS system has been tested using a simplified simulation model with interconnected inverters developed in the validated simulation tool of PSCAD/EMTDC, and the obtained results from the case studies are presented.

16 TIDAL AND WAVE POWER↗

Sustainable Port Operations: Powered by NREL

Seaports are vital economic hubs that allow the United States to compete on a global scale. But the heavy vehicles and cargo equipment that enable their operations also emit harmful air pollutants and greenhouse gas emissions. For nearly two decades, National Renewable Energy Laboratory (NREL) researchers have worked toward comprehensive seaport decarbonization. They fuse world-class analysis with deep vehicle and transportation systems knowledge to guide strategic deployment of low- and zero-emissions vehicles, charging and refueling infrastructure, and grid improvements. Together, these capabilities can enable sustainable port operations. This fact sheet outlines major seaport and airport decarbonization capabilities across the laboratory, including: fleet research, energy data, and insights for decarbonization; comprehensive hydrogen infrastructure deployment; optimized charging through grid integration; strategic blueprinting for clean, optimized technology deployment; and integrating diversity, equity, inclusion, and accessibility considerations into decarbonization efforts.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

GMLC Technical Assistance to States

This presentation provides an overview of the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) efforts to provide customized technical support specific to state public utility commissions (PUCs), specifically on the integration of distributed energy resources (DERs). The goals are to increase awareness of existing materials and support to help state PUCs move forward on DER interconnection activities, to help participants make connections to colleagues with similar challenges (and solutions), and to help the GMLC/National Renewable Energy Laboratory project team understand context and implementation challenges.

DER↗

Adaptive RAS/SPS System Settings for Improving Grid Reliability and Asset Utilization through Predictive Simulation and Controls

Remedial Action Schemes (RAS) or Special Protection Schemes (SPS) are used throughout the bulk transmission system as a non-wires method of increasing transmission transfer capability. However, as the population grows within the Western Interconnection, more power needs to be transferred with less ability to build lines. This leads to a greater number of RAS, and the subsequent interaction between these disparate schemes can have unintended consequences. While the large number of RAS within the Western Electricity Coordinating Council (WECC) protect for different things, which can range from the violation of thermal limitations to transient stability issues, they can be described by common methods of operation. In order to understand these methods, a survey was sent out to members of the WECC Modeling & Validation Working Group (MVWG). The response received provides a necessary base in which to understand and build models that can be used within WECC. This report provides information on the survey results regarding RAS/SPS modeling practices for planning and operational studies within the WECC footprint, which is foundational for on-going and future work on RAS. Pacific Northwest National Laboratory (PNNL) and its industry partners are developing innovative methods for adaptively setting RAS parameters based on realistic and near real-time operational conditions to improve power grid reliability and grid asset utilization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating AI Data Centers with the Power Grid

The rapid expansion of artificial intelligence (AI) has triggered an unprecedented surge in electricity demand, with US data center energy use projected to double or triple 2023 levels by 2028. This exponential growth places strain on grid infrastructure, which can hinder timely construction of desired computing capacity. To bridge this supply-demand gap, utilities and AI developers are increasingly turning to demand flexibility, a strategy that incentivizes shifting or reducing power use during peak periods of grid stress. Data centers are uniquely equipped for flexible operations due to their digital workloads, built-in redundancy, and onsite energy assets. This article outlines four primary mechanisms to enable data center flexibility: computational load flexibility (shifting tasks temporally or geographically), flexible use of core facility infrastructure adjustments, energy storage utilization, and onsite electricity generation. To encourage adoption, utilities are deploying new tariff designs, including voluntary interruptible service riders, mandated flexibility requirements, and streamlined interconnection processes for flexible loads. For the highly capitalized and rapidly growing AI industry, the primary motivators for embracing these strategies are expediting facility interconnection, satisfying emerging regulatory mandates, and mitigating community resistance. While demand flexibility cannot substitute the long-term need for new bulk power generation, it serves as an essential, immediate solution for enabling near-term deployment. By transforming data centers from grid stressors into stabilizing assets, flexible operations can ensure reliable grid integration, ease market pressures, and support a resilient power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Graph Laplacian Spectrum and Primary Frequency Regulation: Preprint

We present a framework based on spectral graph theory that captures the interplay among network topology, system inertia, and generator and load damping in determining overall power grid behavior and performance. Specifically, we show that the impact of network topology on a power system can be quantified through the network Laplacian eigenvalues, and such eigenvalues determine the grid robustness against low frequency disturbances. Moreover, we can explicitly decompose the frequency signal along scaled Laplacian eigenvectors when damping-intertia ratios are uniform across buses. The insight revealed by this framework suggests why load-side participation in frequency regulation not only makes the system respond faster, but also helps lower the system nadir after disturbance. Finally, by presenting a new controller specifically tailored to suppress high frequency disturbances, we demonstrate that our results can provide useful guidelines in the controller design for load-side primary frequency regulation. We simulate the improved controller on the IEEE 39-bus New England interconnection system to illustrate its robustness against high frequency oscillation compared to both the conventional droop control and a recent controller design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of bifacial module technologies with combined–accelerated stress testing

In view of the increasing interest and market share of bifacial cells and modules, suitable substrates such as glass and transparent backsheets along with ethylene vinyl acetate (EVA) and polyolefin elastomer (POE) encapsulants were examined in combined-accelerated stress testing (C-AST) to evaluate and compare degradation modes. Testing with both monofacial and bifacial cells, we found glass-glass modules with monofacial cells led to greater grid finger breakage than those with polymeric backsheets. Furthermore, this is attributed to previous X-ray topography and modeling work showing higher stress in cells and interconnections in glass-glass modules than glass-backsheet modules. Consistent with the objectives of C-AST, which stresses modules at levels corresponding to the limits seen in the natural environment, we observed the UV-fluorescence signatures of modules tested in C-AST (considering the degradation associated with developing chromophores, moisture penetration and photobleaching effects) to be like those in fielded modules, more so than other chamber stress testing implemented for comparison. We found light-induced degradation (LID) in module types with regenerated (inactive) cells with C-AST, suggesting the possibility of LID destabilization in some field conditions. We could also distinguish potential-induced degradation (PID) on the back of the bifacial passivated emitter and rear cells (PERC) in C-AST. Confirming with ex-situ tests, we found polarization-type PID most prevalent in glass-glass modules with EVA as would be anticipated considering the greater leakage current through such module encapsulation. Unlike PID tests performed in the dark, which can lead to false positive PID test results, field-representative illumination is experienced by the modules on the front and back side while –1200 V system voltage is applied in C-AST, supporting the conclusion that this module type with glass-glass construction would be susceptible to PID in the field.

14 SOLAR ENERGY↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

The Array Automated Assembly Task for the Low Cost Solar Array Project, Phase 2

During the program a process sequence was proposed and tested for the fabrication of dendritic welb silicon into solar modules. This sequence was analyzed as to yield and cost and these data suggest that the price goals of 1986 are attainable. Specifically, it was shown that a low cost POCL3 is a suitable replacement for the semiconductor grade, and that a suitable CVD oxide can be deposited from a silane/air mixture using a Silox reactor. A dip coating method was developed for depositing an antireflection coating from a metalorganic precursor. Application of photoresist to define contact grids was made cost effective through use of a dip coating technique. Electroplating of both Ag and Cu was shown feasible and cost effective for producing the conductive metal grids on the solar cells. Laser scribing was used to separate the cells from the dendrites without degradation. Ultrasonic welding methods were shown to be feasible for interconnecting the cells. A study of suitable low cost materials for encapsulation suggest that soda lime glass and phenolic filled board are preferred.

Campbell, R. B.↗

Analyzing the Deployment of Large Amounts of Offshore Wind to Design an Offshore Transmission Grid in the United States: Preprint

This paper revisits the results from the U.S. Department of Energy's '20% Wind Energy By 2030' study, which envisioned that 54 GW of offshore wind would be installed by said year. The analysis is conducted using the Regional Energy Deployment System (ReEDS), a capacity expansion model developed by the National Renewable Energy Laboratory. The model is used to optimize the deployment of the 54 GW of wind capacity along the coasts and lakes of the United States. The graphical representation of the results through maps will be used to provide a qualitative description for planning and designing an offshore grid. ReEDS takes into account many factors in the process of siting offshore wind capacity, such as the quality of the resource, capital and O&M costs, interconnection costs, or variability metrics (wind capacity value, forecast error, expected curtailment). The effect of these metrics in the deployment of offshore wind will be analyzed through examples in the results.

17 WIND ENERGY↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Novel Visualization Technique for Electric Power Grid Analytics

The application of information visualization holds tremendous promise for the electric power industry, and yet its potential has not been sufficiently exploited by the visualization community. Prior work on visualizing electric power systems has been limited to depicting raw or processed information on top of a geographic layout. Little effort has been devoted to maximize the analytical strengths naturally gained by the visualization itself. This paper introduces a visualization system prototype, known as GreenGrid, that explores the planning and monitoring of the North American Electricity Infrastructure. For the purposes of visualization, the power infrastructure can be described as a network of nodes and links. The nodes represent the electrical buses where generators and loads are connected, while the links represent the transmission lines that interconnect the buses. This paper focuses mainly on a customized technique within GreenGrid that is designed to visually identify abnormal characteristics of the electricity infrastructure. In particular, we examine an extreme event that occurred within the Western United States power grid on August 10, 1996. We compare our study results with the conclusion of the post-disturbance analysis and find that many of the disturbance characteristics can be readily identified with the proper form of visualization. The paper includes a lessons learned discussion to evaluate the visualization application.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and Analysis of a Region-Wide Remotely Controllable Electrical Lock-Out System

Electric utilities have a main responsibility to protect the lives and safety of their workers when they are working on low-, medium-, and high-voltage power lines and distribution circuits. With the anticipated widespread deployment of smart grids, a secure and highly reliable means of maintaining isolation of customer-owned distributed generation (DG) from the affected distribution circuits during maintenance is necessary to provide a fully de-energized work area, ensure utility personnel safety, and prevent hazards that can lead to accidents such as accidental electrocution from unanticipated power sources. Some circuits are serviced while energized (live line work) while others are de-energized for maintenance. For servicing de-energized circuits and equipment, lock-out tag-out (LOTO) programs provide a verifiable procedure for ensuring that circuit breakers are locked in the off state and tagged to indicate that status to operational personnel so that the lines will be checked for voltage to verify they are de-energized. The de-energized area is isolated from any energized sources, which traditionally are the substations. This procedure works well when all power sources and their interconnections are known armed with this knowledge, utility personnel can determine the appropriate circuits to de-energize for isolating the target line or equipment. However, with customer-owned DG tied into the grid, the risk of inadvertently reenergizing a circuit increases because circuit connections may not be adequately documented and are not under the direct control of the local utility. Thus, the active device may not be properly de-energized or isolated from the work area. Further, a remote means of de-energizing and locking out energized devices provides an opportunity for greatly reduced safety risk to utility personnel compared to manual operations. In this paper, we present a remotely controllable LOTO system that allows individual workers to determine the configuration and status of electrical system circuits and permit them to lock out customer-owned DG devices for safety purposes using a highly secure and ultra-reliable radio signal. The system consists of: (1) individual personal lockout devices, (2) lockout communications and logic module at circuit breakers, which are located at all DG devices, and (3) a database and configuration control process located at the utility operations center. The lockout system is a close permissive, i.e., loss of control power or communications will cause the circuit breaker to open. Once the DG device is tripped open, a visual means will provide confirmation of a loss of voltage and current that verifies the disconnected status of the DG. Further the utility personnel will be able to place their own lock electronically on the system to ensure a lockout functionally. The proposed LOTO system provides enhanced worker safety and protection against unintended energized lines when DG is present. The main approaches and challenges encountered through designing the proposed region-wide LOTO system are discussed in this paper. These approaches include: (1) evaluating the reliability of the proposed approach under N-modular redundancy with voter/spares configurations and (2) conducting a system level risk assessment study using the failure modes and effects analysis (FMEA) technique to identify and rank failure modes by probability of occurrence, probability of detection, and severity of consequences. This ranking allows a cost benefits analysis to be conducted such that dollars and efforts will be applied to the failures that provide greatest incremental gains in system capability (resilience, survivability, security, reliability, availability, etc.) per dollar spent whether capital, operations, or investment. Several simulation scenarios and their results are presented to demonstrate the viability of these approaches.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Knowledge Discovery for Smart Grid Operation, Control, and Situation Awareness -- A Big Data Visualization Platform

In this paper, a big data visualization platform is designed to discover the hidden useful knowledge for smart grid (SG) operation, control and situation awareness. The spawn of smart sensors at both grid side and customer side can provide large volume of heterogeneous data that collect information in all time spectrums. Extracting useful knowledge from this big-data poll is still challenging. In this paper, the Apache Spark, an open source cluster computing framework, is used to process the big-data to effectively discover the hidden knowledge. A high-speed communication architecture utilizing the Open System Interconnection (OSI) model is designed to transmit the data to a visualization platform. This visualization platform uses Google Earth, a global geographic information system (GIS) to link the geological information with the SG knowledge and visualize the information in user defined fashion. The University of Denver's campus grid is used as a SG test bench and several demonstrations are presented for the proposed platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimating the impacts of natural gas power generation growth on solar electricity development: PJM's evolving resource mix and ramping capability

Abstract Expansion of distributed solar photovoltaic (PV) and natural gas‐fired generation capacity in the United States has put a renewed spotlight on methods and tools for power system planning and grid modernization. This article investigates the impact of increasing natural gas‐fired electricity generation assets on installed distributed solar PV systems in the Pennsylvania–New Jersey–Maryland (PJM) Interconnection in the United States over the period 2008–2018. We developed an empirical dynamic panel data model using the system‐generalized method of moments (system‐GMM) estimation approach. The model accounts for the impact of past and current technical, market and policy changes over time, forecasting errors, and business cycles by controlling for PJM jurisdictions‐level effects and year fixed effects. Using an instrumental variable to control for endogeneity, we concluded that natural gas does not crowd out renewables like solar PV in the PJM capacity market; however, we also found considerable heterogeneity. Such heterogeneity was displayed in the relationship between solar PV systems and electricity prices. More interestingly, we found no evidence suggesting any relationship between distributed solar PV development and nuclear, coal, hydro, or electricity consumption. In addition, considering policy effects of state renewable portfolio standards, net energy metering, differences in the PJM market structure, and other demand and cost‐related factors proved important in assessing their impacts on solar PV generation capacity, including energy storage as a non‐wire alternative policy technique. This article is categorized under: Photovoltaics > Economics and Policy Fossil Fuels > Climate and Environment Energy Systems Economics > Economics and Policy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power Flow Solution Methods for Combined Transmission and Distribution Systems

High distributed PV penetration makes the distribution systems more active and increases their impact on the upstream transmission grid. To facilitate the studies on this area, this paper proposes a power flow (PF) model and formulation of combined transmission and distribution (T&D) power systems. The formulation is based on the physical coupling of transmission and distribution grids. The unbalanced nature of distribution feeders and voltage regulators are modeled so that the resulting PF balance equations in distribution systems are similar to those in the interconnected transmission system. The formulated nonlinear PF equations are solved using the proposed unified and sequential methods. Both methods are verified and compared with each other using several combined T&D power systems. A multi-period PF simulation is also included to demonstrate the capability of the proposed formulation and solution methods in capturing the influences of high distributed PV penetration on transmission level.

Nguyen, Quan H.↗