Search NASA⌕ Search

SEARCH · Search NASA

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 721 records · Page 40

Publisher Erratum: CUPID, the Cuore upgrade with particle identification

Publisher Erratum: Eur. Phys. J. C (2025) 85:737 https://doi.org/10.1140/epjc/s10052-025-14352-1 The author M. Pavan (affiliations 9 and 10) was missing from the published author list. The online version of the article has been updated to include the author. Additionally, affiliations 4 and 17 have been corrected to reflect the proper institutional order. The publisher apologizes for the inconvenience caused.

Alfonso, K. [Virginia Polytechnic Institute and St↗

State of the Art in Thermal Catalytic Upgrading of Biomass and Biomass-Derived Intermediates

Biomass-derived energy sources represent a promising domestic route for fuel and chemical production, taking advantage of largely underutilized biological and waste resources. Heterogeneous catalysis plays a key role in these biomass conversion processes, as reflected by all American Society for Testing and Materials–approved pathways for producing sustainable aviation fuel proceeding through a catalytic step. This concise review seeks to establish the state of the art in thermal catalytic process development for various biomass-derived feedstocks and the current enabling capabilities that aid this development. Research needs are identified and described throughout the article, as further advancements in heterogeneous catalysis are required to improve the affordability and realize the full potential of biomass-derived products.

09 BIOMASS FUELS↗

HERO WEC V1 Upgrade - 2023 Laboratory Testing (processed data)

The following submission includes processed laboratory data from NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), in the form of MATLAB workspaces. This dataset was created using NREL's Large Amplitude Motion Platform (LAMP) and collected between August and September 2023. Included with this submission is a test log of all the processed data "HERO WEC LAMP test run log.xlsx" so that the user can easily find the data of interest. Additionally, more detailed descriptions of the type of data and how it was processed, or calculated, can be found in the document titled "Lamp Data Description.docx". The MATLAB workspaces can be visualized using the file "LAMP_Data_Viewer_Ver2.m/mlx". The user simply needs to upload the workspace of interest and run the file "LAMP_Data_Viewer_Ver2.m/mlx". Both the .m and .mlx file format has been provided depending on the user's preference. The MATLAB workspaces have been separated into zip files corresponding to either Drivetrain, Hydraulic, or Electric configuration runs representing the respective test cases that were run. The drivetrain runs were used to characterize the drivetrain only (no pump or generator). The Hydraulic runs represent the configuration when the seawater pump is installed, and the Electric runs represents the configuration when the generator is installed. The following sub-categories of data are included for each type: - DW - Deep water sine wave profile (not run in drivetrain configuration) - Heave - Heave only sine wave profile - Heave_NoRO (hydraulic configuration only) - Heave_ACC (hydraulic configuration only) - IR - Surge and heave irregular wave profile (not run in drivetrain configuration) - RW - Heave only profile created from real world encoder data (not run in drivetrain configuration) For those interested in the raw, unprocessed, data the authors have created a separate submission, linked below. This submission includes the raw TDMS files and associated files necessary to translate the data into either python or MATLAB formats. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

HERO WEC V1 Upgrade - 2023 Laboratory Testing (Raw Data)

This submission contains the original, unprocessed data from the 2023 Large Amplitude Motion Platform (LAMP) testing of NREL's Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC). This data serves as a companion to MHKDR #520. Data was collected using NREL's Modular Ocean Data AcQuisition (MODAQ) system in TDMS format. Specifications of TDMS files can be found on the NI website. The TDMS files have been separated into zip files corresponding to either Drivetrain, Hydraulic, or Electric configuration runs representing the respective test cases that were run. The drivetrain runs were used to characterize the drivetrain only (no pump or generator). The Hydraulic runs represent the configuration when the seawater pump is installed, and the Electric runs represents the configuration when the generator is installed. The following sub-categories of data are included for each type: - DW - Deep water (monochromatic sine wave) profile (not run in drivetrain configuration) - Heave - Heave only (monochromatic sine wave) profile - Heave_NoRO (hydraulic configuration only) - Heave_ACC (hydraulic configuration only) - IR - Surge and heave irregular wave profile (not run in drivetrain configuration) - RW - Heave only profile created from real world encoder data (not run in drivetrain configuration) Reference documents: - "HERO WEC Lamp Test Run Log.xlsx": contains specifications for each test run - "Lamp Data Description.docx": provides detailed information about data types and processing methods For those interested in the processed data the authors have created a separate submission, MHKDR #520, linked below. This data set has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

Upgrade and Operation of the ATLAS Radiation Interlock System (ARIS)

ATLAS (the Argonne Tandem Linac Accelerator Sys-tem) is a superconducting heavy ion accelerator which can accelerate nearly all stable, and some unstable, iso-topes between hydrogen and uranium. Prompt radiation fields from gamma and or neutron are typically below 1 rem/hr at 30 cm, but are permitted up to 300 rem/hr at 30 cm. The original ATLAS Radiation Interlock System (ARIS), hereafter referred to as ARIS 1.0 was installed 30 years ago. While it has been a functional critical safe-ty system, its age has exposed the facility to high risk of temporary shutdown due to failure of obsolete compo-nents. Topics discussed will be architecture, hardware improvements, functional improvements, and operation permitting personnel access to areas with low levels of radiation.

Blomberg, B. R.↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Previously, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H⁻ beam for injection into the Recycler Ring (RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a cw SRF linac, followed by a ~2-8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed. Research needed to implement the Booster replacement is described.

Neuffer, David V.↗

20-24 GeV FFA CEBAF Energy Upgrade

A proposal was formulated to increase the CEBAF energy from the present 12 GeV to 20-24 GeV by replacing the highest-energy arcs with Fixed Field Alternating Gradient (FFA) arcs. The new pair of arcs would provide six or seven new beam passes, going through this magnet array, allowing the energy to be nearly doubled using the existing CEBAF SRF cavity system. One of the immediate accelerator design tasks is to develop a proof-of-principle FFA arc magnet lattice that would support simultaneous transport of 6-7 passes with energies spanning a factor of two. We also examine the possibility of using combined function magnets to configure a cascade, six-way beam split switchyard. Finally, a novel multi-pass linac optics based on a weakly focusing lattice is being explored.

Bogacz, Slawomir Alex↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

A degrader device is being built at the CEBAF injector to degrade the electron beam phase space for machine acceptance studies. The electron beam is degraded through multiple scattering in a thin target before further transport in the injector beamline for injection into CEBAF. The degraded electron beam will approximate phase space distributions expected from a bremsstrahlung-based polarized positron source as in the PEPPo method. The effort is in broader support of the Ce+BAF positron capability that is currently under study. Two options for the degrader device are considered, and simulation results are presented.

Sy, A.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

In order to prevent emittance growth during long stores of the proton beam at the future Electron-Ion Collider (EIC), we need to have some mechanism to provide fast cooling of the dense proton beams. One promising method is coherent electron cooling (CeC), which uses an electron beam to both ?measure? the positions of protons within the bunch and then apply energy kicks which tend to reduce their longitudinal and transverse actions. In this work, we discuss the under- lying physics of this process. We then discuss simulations which constrain the electrons to move only longitudinally in order to perform fast optimizations and long-term track- ing of the bunch evolution, and benchmark these results against fully 3D codes. Additionally, we discuss practical challenges, including the necessity of a high-quality elec- tron beam and sub-micron alignment of the electrons and protons.

Deitrick, K.↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗