Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hourly data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

System Study: High-Pressure Safety Injection 1998-2024

This report presents an unreliability evaluation of the high-pressure safety injection system (HPSI) at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10-year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in both the HPSI system start-only unreliability and 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Parallel Computing Infrastructure for Building Energy Simulation

In order to study grid-interactive efficient buildings, Pacific Northwest National Laboratories (PNNL) needs an infrastructure for urban-scale building energy modeling. Such an infrastructure should be fast, scalable, and easy-to-use. Given a set of data from the Energy Information Administration’s Commercial Building Energy Consumption Survey (CBECS) and tool to translate survey data into simulation inputs, this project aimed to conduct the simulation of the entire dataset in parallel. Before running the simulations, the necessary software was bundled into a container for use on the PNNL supercomputing network. Then, the parallel simulation workflow was designed using GNU Make, a file creation software, and submitted to a supercomputing partition which could run hundreds of simulations simultaneously. The EnergyPlus simulations output hourly electric meter data for each CBECS sample, which represents the electricity consumption of similar commercial buildings across the United States. Analyzing and visualizing the meter data is important to the future of the work, and this project wrote code to make common analysis methods simple, fast, and accessible. Moving forwards, the model will need to be expanded to include data from other sources and its accuracy will need to be improved and eventually validated.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Facility for Atmospheric Remote Sensing (FARS) Cirrus Measurements for FIRE III

From our Facility of Atmospheric Remote Sensing (FARS) in Salt Lake City, Utah, we have since December 1986 collected ground-truth data from cirrus clouds for aiding in satellite cloud detection algorithm testing and improvement, the development of cirrus radiative parameterizations, and basic cloud physics research. This research program has involved data regularly collected with a polarization ruby (0.694 micrometer) lidar system and a suit of passive (visible, infrared, and microwave) radiometers, although a number of comprehensive cloud case studies using the full compliment of remote sensors (i.e., 95 GHz polarimetric Doppler radar and high-resolution dual-wavelength Polarization Diversity Lidar, PDL) have also been obtained. Since our program began, a total of approximately 3,200 hours of lidar/radiometer data have been collected, resulting in a uniquely comprehensive, and climatologically-representative, high cloud dataset. In this report, we highlight our research accomplishments over the period of performance of this grant.

Sassen, Kenneth↗

System Study: Reactor Core Isolation Cooling 1998–2012

This report presents an unreliability evaluation of the reactor core isolation cooling (RCIC) system at 31 U.S. commercial boiling water reactors. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trend was identified in the HPCI results. Statistically significant decreasing trends were identified for RCIC start-only and 8-hour trends.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Estimation of total cloud cover from solar radiation observations at Lake Rotorua, New Zealand

The DYRESM-CAEDYM model is a valuable tool for simulating water temperature for biochemical studies in aquatic ecosystem. The model requires inputs of surface short-wave radiation and long-wave radiation or total cloud cover fraction (TC). Long-wave radiation is often not measured directly so a method to determine TC from commonly measured short-wave solar irradiance (E{sub 0}) and theoretical short-wave solar irradiance under a clear sky (E{sub c}) has broad application. A more than 17-year (15 November 1991 to 20 February 2009) hourly solar irradiance data set was used to estimate the peak solar irradiance for each ordinal date over one year, which was assumed to be representative of solar irradiance in the absence of cloud. Comparison between these daily observed values and the modelled clear-sky solar radiation over one year was in close agreement (Pearson correlation coefficient, r = 0.995 and root mean squared error, RMSE = 12.54 W m{sup -2}). The downloaded hourly cloudiness measurements from 15 November 1991 to 20 February 2009 was used to calculate the daily values for this period and then the calculated daily values over the 17 years were used to calculate the average values for each ordinal date over one year. A regression equation between (1 - E{sub 0}/E{sub c}) and TC produced a correlation coefficient value of 0.99 (p > 0.01, n = 71). The validation of this cloud cover estimation model was conducted with observed short-wave solar radiation and TC at two sites. Values of TC derived from the model at the Lake Rotorua site gave a reasonable prediction of the observed values (RMSE = 0.10, r = 0.86, p > 0.01, n = 61). The model was also tested at Queenstown (South Island of New Zealand) and it provided satisfactory results compared to the measurements (RMSE = 0.16, r = 0.67, p > 0.01, n = 61). Therefore the model's good performance and broad applicability will contribute to the DYRESM-CAEDYM accuracy of water temperature simulation when long-wave radiation is not available. (author)

14 SOLAR ENERGY↗

Meteorological data from the Billy Bar site at the East River, Colorado

This dataset includes Quality Assessed and Quality Controlled (QA/QC) meteorological data from the Billy Bar field site in the East River Watershed, Colorado in order to inform watershed hydrobiogeochemical processes. The data includes 1-hour aligned time series of Solar Radiation, Wind Speed, Wind Direction, Air Temperature, Relative Humidity, Barometric Pressure, and Precipitation. For each parameter, the QA flags are given: 1 is for extreme (potential abnormal values), and 0 is for values in the expected range. The Rmarkdown document is a stand-alone file/notebook that preserves the text, code, and code results, as well as formatting contained in the original R script. The Data profiling report is a summary and graphical presentation of the data exploration process for data analysis and model building, so that users could focus on understanding data and extracting insights. The report provides a summary of each variable and does data profiling.

54 ENVIRONMENTAL SCIENCES↗

Advanced Stirling Convertor (ASC-E2) Performance Testing at NASA Glenn Research Center

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG Project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, four pairs of ASCs capable of operating to 850 C and designated with the model number ASC-E2, were delivered by Sunpower of Athens, Ohio, to GRC in 2010. The ASC-E2s underwent a series of tests that included workmanship vibration testing, performance mapping, and extended operation. Workmanship vibration testing was performed following fabrication of each convertor to verify proper hardware build. Performance mapping consisted of operating each convertor at various conditions representing the range expected during a mission. Included were conditions representing beginning-of-mission (BOM), end-of-mission (EOM), and fueling. This same series of tests was performed by Sunpower prior to ASC-E2 delivery. The data generated during the GRC test were compared to performance before delivery. Extended operation consisted of a 500-hr period of operation with conditions maintained at the BOM point. This was performed to demonstrate steady convertor performance following performance mapping. Following this initial 500-hr period, the ASC-E2s will continue extended operation, controller development and special durability testing, during which the goal is to accumulate tens of thousands of hours of operation. Data collected during extended operation will support reliability analysis. Performance data from these tests is summarized in this paper.

Oriti, Salvatore↗

Time Dependence of Methane Generation Rates from Saltstone

This report documents the tests performed to address the requirements listed in the Technical Request, which resulted in a Task Technical & Quality Assurance Plan (TTQAP) and a Run Plan to obtain the required information. The research expands previous scoping work to better understand methane generation in the Saltstone Disposal Facility (SDF). That scoping work demonstrated that methane is produced when sulfide-containing material is added to methylmercury (MeHg), which is found in the SDF Tank 50 feed waste. When Tank 50 waste is combined with grout premix solids dry feed ingredients of cement, slag cement, and fly ash, sulfides are released from the slag cement component of the premix. The prior testing results showed that while the concentration of total mercury was not affected in the pH 14 waste, the MeHg likely reacted with the sulfide contained in the slag. The scoping tests were performed in sealed reactors and thus, methane generation was not measured continuously; rather, it was measured after one hour and after 24 hours. After 24 hours, a large percentage of the MeHg was converted to methane, but after 1 hour only a small percentage of methane was released. It is noteworthy that the methane generation rate (MGR) was greater at the one-hour measurement. The data compiled from the scoping work needed to be expanded to better understand the generation of methane released from grout mixed with Tank 50 waste. This expanded study developed a more extensive knowledge of how and when methane is generated to inform the Documented Safety Analysis (DSA) of the SDF. As such, employing 8 sealed reactors, the methane generation time periods were extended to 2, 4, 6, 18, 30, 48, 72, and 96 hours (4 days). Results are documented herein to determine the capacity for MeHg, contained within Tank 50 salt solution (T50SS) simulant, to produce methane when mixed with saltstone dry feed ingredients, i.e., individual components (cement, slag, and fly ash) or a combination of those components.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The effect of exercise on venous gas emboli and decompression sickness in human subjects at 4.3 psia

The contribution of upper body exercise to altitude decompression sickness while at 4.3 psia after 3.5 or 4.0 hours of 100% oxygen prebreathing at 14.7 psia was determined by comparing the incidence and patterns of venous gas emboli (VGE), and the incidence of Type 1 decompression sickness (DCS) in 43 exercising male subjects and 9 less active male Doppler Technicians (DT's). Each subject exercised for 4 minutes at each of 3 exercise stations while at 4.3 psia. An additional 4 minutes were spent monitoring for VGE by the DT while the subject was supine on an examination cot. In the combined 3.5 and 4.0 hour oxygen prebreathe data, 13 subjects complained of Type 1 DCS compared to 9 complaints from DT's. VGE were detected in 28 subjects compared to 14 detections from DT's. A chi-square analysis of proportions showed no statistically significantly difference in the incidence of Type 1 DCS or VGE between the two groups; however, the average time to detect VGE and to report Tyep 1 DCS symptoms were statistically different. It was concluded that 4 to 6 hours of upper body exercise at metabolic rates simulating EVA metabolic rates hastens the initial detection of VGE and the time to report Type 1 DCS symptoms as compared to DT's.

Conkin, Johnny↗

Demographics, sleep, and daily patterns of caffeine intake of shift workers in a nationally representative sample of the US adult population

Abstract Study Objective Caffeine is the most widely consumed stimulant in the world, and sociodemographic factors including occupation are associated with intake. Shift work, required in various occupations, is associated with poor sleep, inadequate diet, and adverse health effects. Using a large nationally representative database, demographics, sleep, and caffeine intake of US adults working various shifts were assessed. Methods The 24-hour dietary recall data from NHANES 2005–2010 (N = 8,500) were used to estimate caffeine intake from foods and beverages. Work shifts were self-reported as follows: regular day shift; evening shift; night shift; rotating shift; or other shift. Regression analyses assessed associations of shift work with caffeine intake after adjustment for sociodemographic factors. Results Approximately 74% of employed adults were day-shift workers and 26% were nonday-shift workers. Night-shift workers slept for 6.25 ± 0.09 hours per day, somewhat less than day-shift workers who only slept 6.83 ± 0.02 hours (p < .0001). Mean 24-hour weekday caffeine intake of evening-, night-, and rotating-shift workers (217 ± 23, 184 ± 19, and 206 ± 15 mg, respectively) was similar (p > .3) to day-shift workers (203 ± 5 mg). Regardless of work schedule, individuals consumed the most caffeine during morning hours. Evening- and night-shift workers reported consuming 36%–46% less caffeine during their work hours and 72%–169% more during nonwork hours than day-shift workers (p < .01). Conclusions Total daily caffeine intake of shift workers is similar to nonshift workers; most caffeine is consumed in the morning regardless of shift. Because shift workers consume less caffeine during regular work hours and more during nonwork hours than day workers, they may be using caffeine to, in part, optimize off-duty alertness.

Lieberman, Harris R.↗

System Study: Auxiliary Feedwater 1998-2020

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 69 U.S. commercial nuclear reactors. Demand, run hour, and failure data from calendar year 1998–2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability and AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

Solar-to-Grid Public Data File for Utility-scale (UPV) and Distributed Photovoltaics (DPV) Generation, Capacity Credit, and Value

Lawrence Berkeley National Laboratory (Berkeley Lab) estimates hourly project-level generation data for utility-scale solar projects and hourly county-level generation data for residential and non-residential distributed photovoltaic (PV) systems in the seven organized wholesale markets and 10 additional Balancing Areas. To encourage its broader use, Berkeley Lab has made this data file public here at OEDI. The public project-level dataset is updated annually with data from the previous calendar year. For more information about the research project, including a technical report, briefing material, visualizations, and additional data, please visit the project homepage linked in this submission. A newer version of the data exists and can be found linked in the resources of this submission under "Solar-to-Grid Public Data File Updated 2021".

annual solar value↗

System Study: Emergency Power System 1998-2020

This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from 1998 through 2020 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. Statistically significant decreasing trends were identified in the industry-wide estimates of EPS system start-only mission as well as EPS system unreliability (8-hour mission).

99 GENERAL AND MISCELLANEOUS↗

System Study: Residual Heat Removal 1998-2024

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant and highly statistically significant decreasing trends were observed for RHR low-pressure injection mode start-only unreliability and RHR low-pressure injection model 24-hour unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Emergency Power System 1998-2022

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Emergency Power System 1998-2024

This report presents an unreliability evaluation of the emergency power system (EPS) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of EPS system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of EPS system 24-hour mission unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

System Study: Auxiliary Feedwater 1998-2022

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar year 1998–2022 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a highly statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 8-hour mission unreliability.

99 GENERAL AND MISCELLANEOUS↗

System Study: Auxiliary Feedwater 1998-2024

This report presents an unreliability evaluation of the auxiliary feedwater (AFW) system at 62 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from calendar years 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations Industry Reporting and Information System. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing or decreasing trends were identified in the industry-wide estimates of AFW system start-only unreliability, but a statistically significant decreasing trend was identified in the industry-wide estimates of AFW system 24-hour mission unreliability.