Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 739 records · Page 41

A piloted-simulation evaluation of two electronic display formats for approach and landing

The results of a piloted-simulation evaluation of the benefits of adding runway symbology and track information to a baseline electronic-attitude-director-indicator (EADI) format for the approach-to-landing task were presented. The evaluation was conducted for the baseline format and for the baseline format with the added symbology during 3 deg straight-in approaches with calm, cross-wind, and turbulence conditions. Flight-path performance data and pilot subjective comments were examined with regard to the pilot's tracking performance and mental workload for both display formats. The results show that the addition of a perspective runway image and relative track information to a basic situation-information EADI format improve the tracking performance both laterally and vertically during an approach-to-landing task and that the mental workload required to assess the approach situation was thus reduced as a result of integration of information.

Steinmetz, G. G.↗

Landing performance by low-time private pilots after the sudden loss of binocular vision - Cyclops II

Study of low-time general aviation pilots, who, in a series of spot landings, were suddenly deprived of binocular vision by patching either eye on the downwind leg of a standard, closed traffic pattern. Data collected during these landings were compared with control data from landings flown with normal vision during the same flight. The sequence of patching and the mix of control and monocular landings were randomized to minimize the effect of learning. No decrease in performance was observed during landings with vision restricted to one eye, in fact, performance improved. This observation is reported at a high level of confidence (p less than 0.001). These findings confirm the previous work of Lewis and Krier and have important implications with regard to aeromedical certification standards.

Lewis, C. E., Jr.↗

Alertness management in two-person long-haul flight operations

Long-haul flight operations involve cumulative sleep loss, circadian disruption, and extended and irregular duty schedules. These factors reduce pilot alertness and performance on the flightdeck. Conceptually and operationally, alertness management in flight operations can be divided into preventive strategies and operational countermeasures. Preventive strategies are utilized prior to a duty period to mitigate or reduce the effects of sleep loss, circadian disruption and fatigue during subsequent flight operations. Operational countermeasures are used during operations as acute techniques for maintaining performance and alertness. Results from previous NASA Ames field studies document the sleep loss and circadian disruption in three-person long-haul flying and illustrate the application of preventive strategies and operational countermeasures. One strategy that can be used in both a preventive and operational manner is strategic napping. The application and effectiveness of strategic napping in long-haul operations will be discussed. Finally, long-haul flying in two-person highly automated aircraft capable of extended range operations will create new challenges to maintaining pilot alertness and performance. Alertness management issues in this flight environment will be explored.

Rosekind, M. R.↗

A Novel High‐Performance Electrolyte for Extreme Fast Charging in Pilot Scale Lithium‐Ion Pouch Cells

Realizing extreme fast charging (XFC) in lithium-ion batteries for electric vehicles is still challenging due to the insufficient lithium-ion transport kinetics, especially in the electrolyte. Herein, a novel high-performance electrolyte (HPE) consisting of lithium bis(fluorosulfonyl)imide (LiFSI), lithium hexafluorophosphate (LiPF 6 ) and carbonates is proposed and tested in pilot-scale, 2-Ah pouch cells. Moreover, the origin of improved electrochemical performance is comprehensively studied via various characterizations, suggesting that the proposed HPE exhibits high ionic conductivity and excellent electrochemical stability at high charging rate of 6-C. Furthermore, the HPE-based pouch cells deliver improved discharge specific capacity and excellent long-term cyclability up to 1500 cycles under XFC conditions, which is superior to the conventional state-of-the-art baseline electrolyte.

25 ENERGY STORAGE↗

Development of Computational Capabilities to Predict the Corrosion Wastage of Boiler Tubes in Advanced Combustion Systems

A comprehensive corrosion research project consisting of pilot-scale combustion testing and long-term laboratory corrosion study has been successfully performed. A pilot-scale combustion facility available at Brigham Young University was selected and modified to enable burning of pulverized coals under the operating conditions typical for advanced coal-fired utility boilers. Eight United States (U.S.) coals were selected for this investigation, with the test conditions for all coals set to have the same heat input to the combustor. In addition, the air/fuel stoichiometric ratio was controlled so that staged combustion was established, with the stoichiometric ratio maintained at 0.85 in the burner zone and 1.15 in the burnout zone. The burner zone represented the lower furnace of utility boilers, while the burnout zone mimicked the upper furnace areas adjacent to the superheaters and reheaters. From this staged combustion, approximately 3% excess oxygen was attained in the combustion gas at the furnace outlet. During each of the pilot-scale combustion tests, extensive online measurements of the flue gas compositions were performed. In addition, deposit samples were collected at the same location for chemical analyses. Such extensive gas and deposit analyses enabled detailed characterization of the actual combustion environments existing at the lower furnace walls under reducing conditions and those adjacent to the superheaters and reheaters under oxidizing conditions in advanced U.S. coal-fired utility boilers. The gas and deposit compositions were then carefully simulated in a series of 1000-hour laboratory corrosion tests, in which the corrosion performances of different commercial candidate alloys and weld overlays were evaluated at various temperatures for advanced boiler systems. Results of this laboratory study led to significant improvement in understanding of the corrosion mechanisms operating on the furnace walls as well as superheaters and reheaters in coal-fired boilers resulting from the coexistence of sulfur and chlorine in the fuel. A new corrosion mechanism, i.e., “Active Sulfidation Corrosion Mechanism,” has been proposed to account for the accelerated corrosion wastage observed on the furnace walls of utility boilers burning coals containing sulfur and chlorine. In addition, a second corrosion mechanism, i.e., “Active Sulfide-to-Oxide Corrosion Mechanism,” has been identified to account for the rapid corrosion attack on superheaters and reheaters. Both of the newly discovered corrosion mechanisms involve the formation of iron chloride (FeCl2) vapor from iron sulfide (FeS) and HCl, followed by the decomposition of FeCl2 via self-sustaining cycling reactions. For higher alloys containing sufficient chromium, the attack on superheaters and reheaters is dominated by Hot Corrosion in the presence of a fused salt. Furthermore, two stages of the hot corrosion mechanism have been identified and characterized in detail. The initiation of hot corrosion attack induced by molten sulfate leads to Stage 1 “acidic” fluxing and re-precipitation of the protective scale formed initially on the deposit-covered alloy surfaces. Once the protective scale is penetrated, Stage 2 Hot Corrosion is initiated, which is dominated by “basic” fluxing and re-precipitation of the scale in the fused salt. Based on the extensive corrosion information generated from this project, corrosion modeling was performed using non-linear regression analysis. As a result of the modeling efforts, two predictive equations have been formulated, one for furnace walls and the other for superheaters and reheaters. These first-of-the-kind equations can be used to estimate the corrosion rates of boiler tubes based on coal chemistry, alloy compositions, and boiler operating conditions for advanced boiler systems.

Coal-Environmental Processes↗

Assessing Helicopter Pilots’ Detect and Avoid and Collision Avoidance Performance With ACAS Xr

The latest variant of the Federal Aviation Administration’s Airborne Collision Avoidance System (ACAS X) is being designed for both crewed and uncrewed rotorcraft. Referred to as ACAS Xr, the system joins a suite of other ACAS X variants poised to replace the Traffic Alert and Collision Avoidance System (TCAS II). ACAS Xr is tuned to support current-day helicopter platforms as well as electric Vertical Takeoff and Landing (eVTOL) vehicles that are still under development. Given this flexibility, ACAS Xr may be used by helicopter crews currently in operation or by remotely-operated eVTOL aircraft in the emerging Advanced Air Mobility (AAM) market. To cover the range of potential uses, two distinct configurations are being proposed for ACAS Xr: Collision Avoidance System (CAS) and Detect and Avoid (DAA). Under the CAS configuration, ACAS Xr provides minimal caution-level alerting but issues directive warning-level alerting and guidance. The DAA configuration, by contrast, provides caution-level alerting and guidance, in addition to the warning-level alerting and guidance. The current study was performed as part of the National Aeronautics and Space Administration’s AAM project. Six helicopter pilots were recruited to fly a variety of scripted traffic scenarios in a full-motion, crewed eVTOL simulator. Participants flew 60 encounters over two days, reacting to pre-recorded intruder aircraft that were scripted to fly into the participant’s aircraft from different approach angles, relative altitudes, and during different phases of flight. The pilots flew half of the encounters with the CAS configuration and half with the DAA configuration. Within each block of 30 encounters, pilots experienced 10 conflicts while in cruise, 10 in hover, and 10 while on approach to a heliport. Results showed that pilot response times were consistently under 5 seconds for RAs and under 10 seconds for DAA alerts, when present, during all three phases of flight. Unsurprisingly, the DAA configuration was associated with lower rates of en-route and high-severity losses of DAA well clear compared to the CAS configuration in all phases of flight except for the terminal area. Rates of losses of DAA well clear were found to be substantially higher in the Hover scenario, compared to Cruise. Pilots failed to fully comply with RAs at a rate of 0.10-0.18 in all conditions except for the DAA configuration in the Hover scenario, which was associated with a higher non-compliance rate of 0.4 due to Descend RAs issued at low altitudes. The implications of these results with regards to the ongoing development of ACAS Xr is discussed.

air taxis↗

Assessing Helicopter Pilots’ Detect and Avoid and Collision Avoidance Performance with ACAS Xr

The latest variant of the Federal Aviation Administration’s Airborne Collision Avoidance System (ACAS X) is being designed for both crewed and uncrewed rotorcraft. Referred to as ACAS Xr, the system joins a suite of other ACAS X variants poised to replace the Traffic Alert and Collision Avoidance System (TCAS II). ACAS Xr is tuned to support current-day helicopter platforms as well as electric Vertical Takeoff and Landing (eVTOL) vehicles that are still under development. Given this flexibility, ACAS Xr may be used by helicopter crews currently in operation or by remotely-operated eVTOL aircraft in the emerging Advanced Air Mobility (AAM) market. To cover the range of potential uses, two distinct configurations are being proposed for ACAS Xr: Collision Avoidance System (CAS) and Detect and Avoid (DAA). Under the CAS configuration, ACAS Xr provides minimal caution-level alerting but issues directive warning-level alerting and guidance. The DAA configuration, by contrast, provides caution-level alerting and guidance, in addition to the warning-level alerting and guidance. The current study was performed as part of the National Aeronautics and Space Administration’s AAM project. Six helicopter pilots were recruited to fly a variety of scripted traffic scenarios in a full-motion, crewed eVTOL simulator. Participants flew 60 encounters over two days, reacting to pre-recorded intruder aircraft that were scripted to fly into the participant’s aircraft from different approach angles, relative altitudes, and during different phases of flight. The pilots flew half of the encounters with the CAS configuration and half with the DAA configuration. Within each block of 30 encounters, pilots experienced 10 conflicts while in cruise, 10 in hover, and 10 while on approach to a heliport. Results showed that pilot response times were consistently under 5 seconds for RAs and under 10 seconds for DAA alerts, when present, during all three phases of flight. Unsurprisingly, the DAA configuration was associated with lower rates of en-route and high-severity losses of DAA well clear compared to the CAS configuration in all phases of flight except for the terminal area. Rates of losses of DAA well clear were found to be substantially higher in the Hover scenario, compared to Cruise. Pilots failed to fully comply with RAs at a rate of 0.10-0.18 in all conditions except for the DAA configuration in the Hover scenario, which was associated with a higher non-compliance rate of 0.4 due to Descend RAs issued at low altitudes. The implications of these results with regards to the ongoing development of ACAS Xr is discussed.

air taxis↗

STS-114: Discovery TCDT Flight Crew Test Media Event at Pad 39-B

The STS-114 Space Shuttle Discovery Terminal Countdown Demonstration Test (TCDT) flight crew is shown at Pad 39-B. Eileen Collins, Commander introduces the astronauts. Andrew Thomas, mission specialist talks about his primary responsibility of performing boom inspections, Wendy Lawrence, Mission Specialist 4 (MS4) describes her role as the robotic arm operator supporting Extravehicular Activities (EVA), Stephen Robinson, Mission Specialist 3 (MS3) talks about his role as flight engineer, Charlie Camarda, Mission Specialist 5 (MS5) says that his duties are to perform boom operations, transfer operations from the space shuttle to the International Space Station and spacecraft rendezvous. Soichi Noguchi, Mission Specialist 1 (MS1) from JAXA, introduces himself as Extravehicular Activity 1 (EVA1), and Jim Kelley, Pilot will operate the robotic arm and perform pilot duties. Questions from the news media about the safety of the external tank, going to the International Space Station and returning, EVA training, and thoughts about the Space Shuttle Columbia crew are answered.

Source record↗

The effect of spurious angular accelerations on tracking in dynamic simulation

A laboratory study was conducted to investigate the effect of spurious simulator yaw motions on a pilot's control performance. A second objective was to compare the efficiency of static and dynamic simulator tracking in previously unexamined vehicle dynamics. Twelve airline pilots served as subjects in a moving-base flight simulator under congruent-motion, spurious-motion, and no-motion conditions. The results indicated a significant increase in the amount of error with increasing levels of spurious motion during the initially administered series of trials. The influence of spurious motion, however, was absent in a second series of trials. The data suggest that the pilots learned to compensate in their performance for the spurious inputs. It was also found that congruent visual and rotational cueing produced superior performance to that of tracking with visual information alone.

Beck, L. J.↗

Helicopter simulation validation using flight data

A joint NASA/Army effort to perform a systematic ground-based piloted simulation validation assessment is described. The best available mathematical model for the subject helicopter (UH-60A Black Hawk) was programmed for real-time operation. Flight data were obtained to validate the math model, and to develop models for the pilot control strategy while performing mission-type tasks. The validated math model is to be combined with motion and visual systems to perform ground based simulation. Comparisons of the control strategy obtained in flight with that obtained on the simulator are to be used as the basis for assessing the fidelity of the results obtained in the simulator.

Key, D. L.↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗