Feasibility Analysis for the Use of Retrofitted Air-Conditioners Using Thermal Energy Storage (TES) for High Ambient Temperature (HAT) Countries

In high ambient temperature (HAT) countries, summer temperatures exceed 35℃, degrading the performance of air-conditioning systems and straining power grids. In this paper, a feasibility analysis was conducted to investigate potential savings during the peak using latent Thermal Energy Storage (TES) at near room phase-change temperatures, replacing condensers, thus, minimizing temperature lifts. Weather data, building loads, and baseline air-conditioning systems data were gathered for Dubai. A transient vapor-compression model in Modelica was used to compare the COP, total power input and cooling capacity of the air-conditioner at peak hours when ambient temperatures range between 35 – 45 ⁰C versus the TES-Phase-Change Material (PCM) melting temperatures from 22 – 28⁰C. The results indicate that the TES-PCM can enhance the system COP at the peak by a factor 1.4 and 2 for during for outdoor temperatures of 35 – 40⁰C, and 40 – 45⁰C, respectively. Lower melting temperature PCMs were able to reduce the required power input by 30-50%, with more savings occurring at higher temperature days. On the other hand, higher temperature PCMs enhancements were minimal especially at outdoor ambient temperatures ranging between 35 – 40⁰C. Improvements to the cooling capacity range from 8 – 18 % for the outdoor temperature range of 35 – 45 ⁰C. An economic analysis was conducted to find the potential saving in utility costs for 30%, 60%, and 90% of the space cooling demands of Dubai, and find the trade-off points between utility savings and cost of PCM-TES implementation. If the peak loads are to be shifted by 6 hours daily, the percentage utility savings for the city is 18%. Using estimated costs of the PCM-TES, ranging from $200-500/kWh, the daily load shifting hours were estimated to range from 4 hours at the lowest cost systems to 2.5 hours at the highest costs.

25 ENERGY STORAGE↗

A Second Opinion is Worth the Cost - 12479

This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear disciplines and by performing a Line by Line, WBS element by WBS element review of the Projects' CD-2 baseline package helped the DOE Project Team experience success. The second opinion that PT and C provide by conducting a Pre-EIR review of the Project baseline package and the cost review of the TPC helped the DOE Team pass the CD-2 EIR and reduced the TPC. The Line-by-Line review of the DOE Project identified opportunities to reduce the TPC from $1.1 billion to $740.8 million, thus realizing a saving of approximately $359.2 million, or roughly 32% of the original TPC. This significant cost savings underscores the cost in obtaining the second opinion. This same Line by Line review can be applied to any DOE project in the Energy Management or Weapons complex. In the case of this DOE Project a second opinion was worth the cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PathParser [SWR-19-54]

PathParser is a python-based computational tool for the thermodynamics and robustness analysis of native and designed metabolic pathways. The following functionalities are provided: 1 Max-min driving force (MDF) optimization. The Gibbs free energy change of the least favorable reaction will be maximized to evaluate thermodynamic feasibility of the entire pathway. 2 Protein cost estimation. The smallest enzyme investment will be assessed by calculating the minimal total enzyme cost supporting a given pathway flux. 3 Robustness analysis. Specifically, an ensemble of models is generated to simulate the system response to enzyme perturbation based on bifurcation theory and a continuation method. Probability of system failure and flux fold change against enzyme perturbation are estimated as well as a flux control index.

Xiong, Wei↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Project Report on Development of a Safeguards Approach for Pyroprocessing

The Idaho National Laboratory has undertaken an effort to develop a standard safeguards approach for international commercial pyroprocessing facilities. This report details progress for the fiscal year 2010 effort. A component by component diversion pathway analysis has been performed, and has led to insight on the mitigation needs and equipment development needed for a valid safeguards approach. The effort to develop an in-hot cell detection capability led to the digital cloud chamber, and more importantly, the significant potential scientific breakthrough of the inverse spectroscopy algorithm, including the ability to identify energy and spatial location of gamma ray emitting sources with a single, non-complex, stationary radiation detector system. Curium measurements were performed on historical and current samples at the FCF to attempt to determine the utility of using gross neutron counting for accountancy measurements. A solid cost estimate of equipment installation at FCF has been developed to guide proposals and cost allocations to use FCF as a test bed for safeguards measurement demonstrations. A combined MATLAB and MCNPX model has been developed to perform detector placement calculations around the electrorefiner. Early harvesting has occurred wherein the project team has been requested to provide pyroprocessing technology and safeguards short courses.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.9, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

13 HYDRO ENERGY↗

Investigation of an Intermittent Binary Control Strategy for Distributed Aerodynamic Control Devices for Load Alleviation in Wind Turbine Blades

A study was conducted of an intermittent binary control strategy for trailing edge flaps and leading edge spoilers installed on wind turbine blades for the purpose of load alleviation. Cost estimation models were developed for the systems to predict overall impact on levelized cost of energy over the lifecycle of the turbine system. Aeroelastic simulations of turbines with the control strategy implemented showed improved levelized cost for some, but not all cases.

17 WIND ENERGY↗

Satellite communications for disaster relief operations

The use of existing and planned communication satellite systems to provide assistance in the implementation of disaster relief operations on a global basis was discussed along with satellite communications system implications and their potential impact on field operations in disaster situations. Consideration are given to the utilization of both INTELSAT and MARISAT systems operating at frequencies ranging from 1.5 to 4 GHz and to the size and type of ground terminals necessary for satellite access. Estimates of communication requirements for a global system are given. Some discussion of cost estimates for satellite services to support operations are included. Studies of communication satellites for both pre and post disaster applications conducted for NOAA are included as well as recent experiments conducted in conjunction with the Office of Foreign Disaster Assistance of the Agency for International Development.

Sivo, J. N.↗

High temperature thermal energy storage in moving sand

Several high-temperature (to 500 C) heat-storage systems using sand as the storage medium are described. The advantages of sand as a storage medium include low cost for sand, widespread availability, non-toxicity, non-degradation characteristics, easy containment, and safety. The systems considered include: stationary sand with closely spaced tubes throughout the volume, the use of a fluidized bed, use of conveyor belt transporter, and the use of a blower rapid transport system. For a stationary sand bed, very close spacing of heat transfer tubes throughout the volume is required, manifesting as high power related system cost. The suggestion of moving sand past or around pipes is intended to reduce the power related costs at the penalty of added system complexity. Preliminary system cost estimates are offered. These rough calculations indicate that mobile sand heat storage systems cost less than the stationary sand approach.

Turner, R. H.↗

A cost analysis for the implementation of commonality in the family of commuter airplanes, revised

The acquisition costs determined for the NASA family of commute airplanes are presented. The costs of the baseline designs are presented along with the calculated savings due to the commonality in the family. A sensitivity study is also presented to show the major drivers in the acquisition cost calculations. The baseline costs are calculated with the Nicolai method. A comparison is presented of the estimated costs for the commuter family with the actual price for existing commuters. The cost calculations for the engines and counter-rotating propellers are reported. The effects of commonality on acquisition costs are calculated. The sensitivity calculations of the cost to various costing parameters are shown. The calculations for the direct operating costs, with and without commonality are presented.

Creighton, Tom↗

An Assessment of Smallsat Technology to Future Exploration Missions

This reports the results of a general study for NASA Lewis in relation to the use of small satellites for a Mars Relay Satellite (MRS) that supports communications between Mars and Earth: commands to, and telemetry from, Mars Landers and Rover. The scope of the study encompasses a survey of small satellites, those that are lower than 800 kg in mass, by NASA, DoD, and commercial companies. Additionally, surveys in advanced technologies in the area of composite materials, propulsion subsystems, battery subsystems, communications components and subsystems, and ground operations are also provided, A summary of NASA Mars Programs and their status as relevant to MRS is also included. Attempts to draw detailed cost conclusion is generally not possible due to its proprietary nature. In any event, cost is driven by market demands rather than new technologies. A preliminary comparison with the cost estimate of the S-Tel/OSC report did suggest the possibility of cost savings for the MRS by the use of production busses. On the other hand, cost savings in normalized terms from the use of automated ground systems were obtained with some degree of details.

Chan, Steve↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

Exo-C: A Dedicated Probe-scale Space Mission for Coronagraphic Imaging and Spectroscopy of Exoplanetary Systems

"Exo-C", the Exoplanet Coronagraph, is a concept for a dedicated probe-scale (< $1B) space mission optimized for direct imaging of exoplanetary systems. It was the product of a detailed mission study carried in 2013-2015 under the sponsorship of the NASA Astrophysics Division. Exo-C was designed to be capable of spectrally characterizing 1-2 dozen nearby exoplanets in reflected visible light, discovering previously undetected planets, and imaging structure in hundreds of circumstellar disks. It would obtain unique science results on planets down to super-Earth size and serve as a technology pathfinder toward an eventual flagship-class mission to find and characterize habitable Earth-like exoplanets. Key design elements are an unobscured telescope aperture, an internal coronagraph with deformable mirrors for precise wavefront control, and an orbit and observatory design chosen for high thermal stability. ExoC’s telescope aperture, orbit, mission lifetime, and spacecraft bus are all comparable to those of the highly successful Kepler mission. Much of the needed technology development (precision pointing, wavefront sensing and correction, high contrast integral field spectroscopy, detector flight readiness) has been advanced by the WFIRST Coronagraph Instrument (CGI) project over the past several years. Mission performance, mass, power, and cost estimates have also benefited from detailed work by the WFIRST CGI team. A Cost and Technical Evaluation (CATE) was performed in 2015 by the Aerospace Corporation. Today Exo-C is a backup option to WFIRST CGI. It could nominally be implemented within seven years from project start. This white paper summarizes the study final report, with updates on performance and technical readiness as of spring 2019.

Karl R. Stapelfeldt↗

Operations and Modeling Analysis

The Reliability and Maintainability Analysis Tool (RMAT) provides NASA the capability to estimate reliability and maintainability (R&M) parameters and operational support requirements for proposed space vehicles based upon relationships established from both aircraft and Shuttle R&M data. RMAT has matured both in its underlying database and in its level of sophistication in extrapolating this historical data to satisfy proposed mission requirements, maintenance concepts and policies, and type of vehicle (i.e. ranging from aircraft like to shuttle like). However, a companion analyses tool, the Logistics Cost Model (LCM) has not reached the same level of maturity as RMAT due, in large part, to nonexistent or outdated cost estimating relationships and underlying cost databases, and it's almost exclusive dependence on Shuttle operations and logistics cost input parameters. As a result, the full capability of the RMAT/LCM suite of analysis tools to take a conceptual vehicle and derive its operations and support requirements along with the resulting operating and support costs has not been realized.

Ebeling, Charles↗

Advanced Technology Lifecycle Analysis System (ATLAS)

Developing credible mass and cost estimates for space exploration and development architectures require multidisciplinary analysis based on physics calculations, and parametric estimates derived from historical systems. Within the National Aeronautics and Space Administration (NASA), concurrent engineering environment (CEE) activities integrate discipline oriented analysis tools through a computer network and accumulate the results of a multidisciplinary analysis team via a centralized database or spreadsheet Each minute of a design and analysis study within a concurrent engineering environment is expensive due the size of the team and supporting equipment The Advanced Technology Lifecycle Analysis System (ATLAS) reduces the cost of architecture analysis by capturing the knowledge of discipline experts into system oriented spreadsheet models. A framework with a user interface presents a library of system models to an architecture analyst. The analyst selects models of launchers, in-space transportation systems, and excursion vehicles, as well as space and surface infrastructure such as propellant depots, habitats, and solar power satellites. After assembling the architecture from the selected models, the analyst can create a campaign comprised of missions spanning several years. The ATLAS controller passes analyst specified parameters to the models and data among the models. An integrator workbook calls a history based parametric analysis cost model to determine the costs. Also, the integrator estimates the flight rates, launched masses, and architecture benefits over the years of the campaign. An accumulator workbook presents the analytical results in a series of bar graphs. In no way does ATLAS compete with a CEE; instead, ATLAS complements a CEE by ensuring that the time of the experts is well spent Using ATLAS, an architecture analyst can perform technology sensitivity analysis, study many scenarios, and see the impact of design decisions. When the analyst is satisfied with the system configurations, technology portfolios, and deployment strategies, he or she can present the concepts to a team, which will conduct a detailed, discipline-oriented analysis within a CEE. An analog to this approach is the music industry where a songwriter creates the lyrics and music before entering a recording studio.

O'Neil, Daniel A.↗

Q1 2023 U.S. Solar Photovoltaic System and Energy Storage Cost Benchmarks With Minimum Sustainable Price Analysis Data File

The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) aims to accelerate the advancement and deployment of solar technology in support of an equitable transition to a decarbonized economy no later than 2050, starting with a decarbonized power sector by 2035. Its approach to achieving this goal includes driving innovations in technology, hardware, and soft cost reductions to make solar affordable and accessible for all. As part of this effort, SETO must track solar cost trends so it can focus its research and development (R&D) on the highest-impact activities. The benchmarks in this report are bottom-up cost estimates of all major inputs to PV and energy storage system installations. Bottom-up costs are based on national averages and do not necessarily represent typical costs in all local markets. Like last year's report, this year's report includes two distinct sets of benchmarks: minimum sustainable price (MSP) benchmarks and modeled market price (MMP) benchmarks. MSP benchmarks can be interpreted as the minimum price a company needs to charge to remain financially solvent in the long term based on the minimum sustainable prices of all inputs including minimum sustainable profit margins. MMP benchmarks can be interpreted as the actual cash sales price a company charges in the given benchmark period. These simplified estimates are useful for tracking technological progress, but they do not reflect all experiences. In fact, no individual estimate under any approach can reflect the diversity of the PV and storage manufacturing and installation industries.

14 SOLAR ENERGY↗

SPS cost considerations

Recent solar power satellite (SPS) system definition studies have emphasized cost estimation for the operational phase of an SPS program, in order to assess economic practicality of SPS. A cost analysis approach is described. Cost results for a silicon photovoltaic SPS are reported, showing SPS costs from $1700 to $2700 per kilowatt and busbar power costs from 3 cents to 7 cents per kilowatt-hour. Rationales behind the estimates are discussed.

Woodcock, G. R.↗

Demonstration of ACCERT Software for Nuclear Power Plant Techno-Economics

In the past few years, there has been a renewed interest in the deployment of nuclear power for decarbonizing the electricity grid as well as a range of industrial applications. As the demonstrations of advanced nuclear power plants start to begin, there will likely be a further increase in this interest. As nuclear is being considered as a part of the energy mix, understanding the cost of nuclear energy becomes increasingly important for all stakeholders including advanced reactor vendors (for making design decisions and marketing their designs), users of nuclear energy (e.g., to estimate the cost of decarbonization of other industries using nuclear), and government (e.g., in capacity expansion models that are used in framing policy). In this summary, we demonstrate a software tool called ACCERT that is currently being developed with funding from the Systems Analysis and Integration (SA&I) program under the Department of Energy’s Office of Nuclear Energy (DOE NE). ACCERT is a cost estimation and techno-economics tool for nuclear power plant applications that includes a database of (a) cost estimates of various ‘reference’ nuclear power plant designs gathered from existing literature, and (b) algorithms developed from these costs that can be used extrapolate the existing costs and perform a bottom-up cost estimation of other designs. A companion summary describes the software and its design in more detail and this summary presents a demonstration for four different nuclear power plant designs: a pressurized water reactor (PWR), high-temperature gas reactor (HTGR), sodium fast reactor (SFR), and a heat-pipe microreactor. The demonstrations include the reference cost estimates and the cost estimates of a modified design for each reference case.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗