Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Development of an Execution Strategy Analysis (ESA) Capability and Tool for the Management of Spent Nuclear Fuel (SNF) - 16575

An Execution Strategy Analysis (ESA) capability and tool are being developed to evaluate alternative execution strategies for future deployment of a consolidated Interim Storage Facility using a consent-based siting process per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (Strategy). Application of an ESA approach not only leverages but also goes beyond traditional project analysis tools. The ESA tool allows for ongoing performance assessment of the evolving project execution plan that takes into account significant assumptions, risks, and uncertainties throughout the project lifecycle. The ESA process and tool will be used to support the development of plans, budgets, and alternative execution/implementation strategies for meeting the goals of the Strategy. This paper describes the development of the ESA capability and tool and identifies the value of applying such a capability in implementing a long-term strategy for managing spent nuclear fuel and high-level radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using VE to Strategically Plan Our Future

The Value Engineering (VE) Methodology is an effective tool for business or project strategic planning. In conjunction with the “Balanced Scorecard Approach” (Drs. Robert Kaplan, PhD, and David Norton, PhD, from the Balanced Scorecard Collaborative/Palladium Group), function analysis can be used to develop strategy maps and scorecards. The FAST diagram provides an integrated approach to strategy map development by formulating a cause and effect relationship and establishing the “how” and “why” behind the strategy map. By utilizing the VE Job Plan, one is able to move from strategic thinking all the way through to execution of the strategy.

42 ENGINEERING↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

An Asset-Based Approach to Tribal Community Energy Planning

Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monitoring Avian Productivity and Survivorship at the Sandia Wetlands at Los Alamos National Laboratory (2014-2019)

Biologists at Los Alamos National Laboratory completed six years (2014–2019) of demographic monitoring of passerines (songbirds) during the breeding season in Los Alamos, New Mexico. We captured songbirds at a mist netting station located in the Sandia Wetlands in Sandia Canyon (Technical Areas 60 and 61). We identified, measured, and then banded captured birds with federal migratory bird bands. Banding operations took place between May and August of each year, with 10 mist netting sessions annually. We conducted this project as part of the implementation of the Biological Resources Management Plan. The project complies with the 2013 Memorandum of Understanding between the United States Fish and Wildlife Service (USFWS) and the United States Department of Energy regarding the implementation of Executive Order 13186. The overall number of birds and species captured was variable, and we saw no decreases over the course of six years in bird species diversity, abundance, or the percentage of breeding birds. Our results indicate that the Sandia Wetlands support numerous species of breeding birds, including species of conservation concern. We did not see a declining trend for the top 10 most-captured species or for any of the species of conservation concern over time; however, we need more years of data to make robust conclusions about population trends through time. Our results indicated that adult recapture rates at the Sandia Wetlands are at least twice as low when compared with estimated adult survival in migratory passerines from peer-reviewed literature. We also did not recapture any birds that were banded as juveniles in subsequent years throughout the entire six-year period. Low recapture rates for adults and the non-existent recapture rates for juveniles should be explored further. To accurately assess individual species survival rates for adults and juveniles using mark-recapture models, we need a longer dataset, which would allow for a more robust analysis.

59 BASIC BIOLOGICAL SCIENCES↗

Microelectrospray Thrusters

Propulsion technology is often a critical enabling technology for space missions. NASA is investing in technologies to enable high value missions with very small spacecraft, even CubeSats. However, these nanosatellites currently lack any appreciable propulsion capability. CubeSats are typically deployed and tumble or drift without any ability to transfer to higher value orbits, perform orbit maintenance, or perform de-orbit. Larger spacecraft can also benefit from high precision attitude control systems. Existing practices include reaction wheels with lifetime concerns and system level complexity. Microelectrospray thrusters will provide new propulsion capabilities to address these mission needs. Electric propulsion is an approach to accelerate propellant to very high exhaust velocities through the use of electrical power. Typical propulsion systems are limited to the combustion energy available in the chemical bonds of the fuel and then acceleration through a converging diverging nozzle. However, electric propulsion can accelerate propellant to ten times higher velocities and therefore increase momentum transfer efficiency, or essentially, increase the fuel economy. Fuel efficiency of thrusters is proportional to the exhaust velocity and referred to as specific impulse (Isp). The state-of-the-art (SOA) for CubeSats is cold gas propulsion with an Isp of 50-80 s. The Space Shuttle main engine demonstrated a specific impulse of 450 s. The target Isp for the Mars Exploration Program (MEP) systems is >1,500 s. This propellant efficiency can enable a 1-kg, 10-cm cube to transfer from low-Earth orbit to interplanetary space with only 200 g of propellant. In September 2013, NASA's Game Changing Development program competitively awarded three teams with contracts to develop MEP systems from Technology Readiness Level-3 (TRL-3), experimental concept, to TRL-5, system validation in a relevant environment. The project is planned for 18 months of system development. Due to the ambitious project goals, NASA has awarded contracts to mature three unique methods to achieve the desired goals. Some of the MEP concepts have been developed for more than a decade at the component level, but are now ready for system maturation. The three concepts include the high aspect ratio porous surface (HARPS) microthruster system, the scalable ion electrospray propulsion system (S-iEPS), and an indium microfluidic electrospray propulsion system. The HARPS system is under development by Busek Co. The HARPS thruster is an electrospray thruster that relies on surface emission of a porous metal with a passive capillary wicking system for propellant management. The HARPS thruster is expected to provide a simple, high ΔV and low-cost solution. The HARPS thruster concept is shown in figure 1. Figure 1 includes the thruster, integrated power processing unit, and propellant reservoir.

Dankanich, John↗

RIKEN RIBF Project - present status and future plan

Programs for studying nuclear reactions and structure of exotic nuclei available at the RIKEN Radioactive Isotope Beam Factory project are introduced and discussed through demonstrating recent highlights. Special emphasis is given to present status and future plans of new devices.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is proposing to install a series of modular trailers and install associated underground utilities in the 1400 Block at the Livermore Site. This Sampling and Analysis Plan (SAP) outlines the processes and procedures to collect environmental and geotechnical soil samples from the project area and to send the samples to the appropriate laboratory or laboratories for analysis or testing. The resulting environmental laboratory data will determine whether excavated soils can be reused on the project, or which type of landfill or landfills the soils may be sent for disposal. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2019), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

The Continuously Evolving Land Use Control Climate in FUSRAP - 12285

In recent years the topic of Land Use Controls (LUCs) has become much more prevalent in the Formerly Utilized Sites Remedial Action Program (FUSRAP) for a number of reasons. Some regulatory agencies have been placing much more emphasis on this topic than they historically did. Also as the FUSRAP has matured, more sites are approaching a point in the project lifecycle that LUCs are needed to be implemented. There are many issues, some site specific, some agency specific, and some programmatic, that may arise when addressing LUCs on a FUSRAP site. These issues can span the life of a project from planning to implementation. As the emphasis on LUCs increases at a fast pace, USACE is faced with the task of developing consistency in how we respond, and at the same time leaving enough latitude for projects to accomplish their individual missions while taking into consideration the site specific concerns. The Land Use Controls arena encompasses a large number of tools to address the matter at hand. There are numerous mechanisms that can accomplish Land Use Control goals, some of which include administrative controls and engineering controls. This paper will discuss some of the mechanisms being utilized by USACE at our FUSRAP projects. Having a better understanding of how LUCs are currently being handled in the FUSRAP will be beneficial to project delivery teams in order to make the best decisions moving through the project lifecycle. Being aware of LUC requirements and options at an early stage in a project will help a team effectively plan for and execute the chosen alternative for remedial action. There are a number of guidance tools from various other agencies that exist for consideration during Land Use Control planning and implementation. The USACE is currently evaluating these guidance tools to determine applicability and impact to FUSRAP projects. Some of these tools are under review at Army and the Department of Defense. Critical to this evaluation is internal team coordination as well as coordination and input from stakeholders. With guidance on LUCs available from a number of entities, the USACE now has the opportunity to develop consistency in determining how LUCs are handled on FUSRAP projects. The FUSRAP ER, ER 200-1-4, is currently being revised and will broadly touch on LUCs. This broad approach was a result of recognizing the magnitude of variances and site specific components that come into play when applying LUCs to our FUSRAP sites. As land use controls scenarios continue to arise on our FUSRAP sites, the methods for how our project teams address those will continue to evolve. The Program is continuing to develop guidance on how to address LUCs. In the interim, our FUSRAP projects can share lessons learned on the LUCs they are implementing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current wind tunnel capability and planned improvements at the NASA Langley Research Center

NASA Langley's major wing wind tunnels and the projected facilities planned to be completed by 1988 are presented. Special capabilities, uses, and the improvements done during the Langley's tunnel revitalization program are described for the following facilities: (1) the 30 x 60-ft subsonic tunnel, (2) the 4 x 7-m low-speed testing tunnel, (3) the Low-Turbulence Tunnel, (4) the Spin Tunnel, (5) the National Transonic Pressure Tunnel, (6) Transonic Cryogenic Tunnel, (7) the National Transonic Facility, (8) the 16-ft Transonic Tunnel, (9) the Transonic Dynamic Tunnel, (10) the Unitary Plan Wind Tunnel, and (11) a new 20-inch supersonic wind tunnel which is currently undergoing final checkout. The design concept of an extremely-low disturbance level supersonic tunnel, the upgrading plans for the hypersonic aerothermal complex, and the present and planned capabilities for testing the hydrogen-fueled Scramjet engines are also presented. In addition, uses of inexpensive simple-to-operate research wind tunnels are discussed. Tunnel diagrams and graphs of upgrade results are included.

Bower, R. E.↗

Developing a Regional Recovery Framework

Abstract A biological attack would present an unprecedented challenge for local, state, and federal agencies; the military; the private sector; and individuals on many fronts ranging from vaccination and treatment to prioritization of cleanup actions to waste disposal. To prepare the Seattle region to recover from a biological attack, the Seattle Urban Area Security Initiative (UASI) partners collaborated with military and federal agencies to develop a Regional Recovery Framework for a Biological Attack in the Seattle Urban Area. The goal was to reduce the time and resources required to recover and restore wide urban areas, military installations, and other critical infrastructure following a biological incident by providing a coordinated systems approach. Based on discussions in small workshops, tabletop exercises, and interviews with emergency response agency staff, the partners identified concepts of operation for various areas to address critical issues the region will face as recovery progresses. Key to this recovery is the recovery of the economy. Although the Framework is specific to a catastrophic, wide-area biological attack using anthrax, it was designed to be flexible and scalable so it could also serve as the recovery framework for an all-hazards approach. The Framework also served to coalesce policy questions that must be addressed for long-term recovery. These questions cover such areas as safety and health, security, financial management, waste management, legal issues, and economic development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Solarize Guidebook: A Community Guide to Collective Purchasing of Residential PV Systems

This handbook is intended as a road map for project planners and solar advocates who want to convert interest into action, to break through market barriers and permanently transform the market for residential solar installations in their communities. It describes the key elements of the Solarize campaigns in Portland, and offers several program refinements from projects beyond Portland. Thehandbook provides lessons, considerations, and step-by-step plans for project organizers to replicate the success of Solarize Portland.

14 SOLAR ENERGY↗

Solarize Guidebook: A Community Guide to Collective Purchasing of Residential PV Systems (Book)

This guidebook is intended as a road map for project planners and solar advocates who want to convert 'interest' into 'action,' to break through market barriers and permanently transform the market for residential solar installations in their communities. It describes the key elements of the Solarize campaigns in Portland, and offers several program refinements from projects beyond Portland. Theguidebook provides lessons, considerations, and step-by-step plans for project organizers to replicate the success of Solarize Portland.

14 SOLAR ENERGY↗

Experiments and Computational Theory for Electrical Breakdown in Critical Components: THz Imaging of Electronic Plasmas.

This report describes the development of ultra-short pulse laser (USPL) induced terahertz (THz) radiation to image electronic plasmas during electrical breakdown. The technique uses three pulses from two USPLs to (1) trigger the breakdown, (2) create a 2 picosecond (ps, 10 -12 s), THz pulse to illuminate the breakdown, and (3) record the THz image of the breakdown. During this three year internal research program, sub-picosecond jitter timing for the lasers, THz generation, high bandwidth (BW) diagnostics, and THz image acquisition was demonstrated. High intensity THz radiation was optically-induced in a pulse-charged gallium arsenide photoconductive switch. The radiation was collected, transported, concentrated, and co-propagated through an electro-optic crystal with an 800 nm USPL pulse whose polarization was rotated due to the spatially varying electric field of the THz image. The polarization modulated USPL pulse was then passed through a polarizer and the resulting spatially varying intensity was detected in a high resolution digital camera. Single shot images had a signal to noise of %7E3:1. Signal to noise was improved to %7E30:1 with several experimental techniques and by averaging the THz images from %7E4000 laser pulses internally and externally with the camera and the acquisition system (40 pulses per readout). THz shadows of metallic films and objects were also recorded with this system to demonstrate free-carrier absorption of the THz radiation and improve image contrast and resolution. These 2 ps THz pulses were created and resolved with 100 femtosecond (fs, 10 -15 s) long USPL pulses. Thus this technology has the capability to time-resolve extremely fast repetitive or single shot phenomena, such as those that occur during the initiation of electrical breakdown. The goal of imaging electrical breakdown was not reached during this three year project. However, plans to achieve this goal as part of a follow-on project are described in this document. Further modifications to improve the THz image contrast and resolution are proposed, and after they are made, images of photo-induced carriers in gallium arsenide and silicon will be acquired to evaluate image sensitivity versus carrier density. Finally electrical breakdown will be induced with the first USPL pulse, illuminated with THz radiation produced with the second USPL pulse and recorded with the third USPL pulse.

36 MATERIALS SCIENCE↗