Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 757 records · Page 42

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Solid-state Distributed Temperature Control for International Space Station

A newly developed solid-state temperature controller will offer greater flexibility in the thermal control of aerospace vehicle structures. A status of the hardware development along with its implementation on the Multi- Purpose Logistics Module will be provided. Numerous advantages of the device will also be discussed with regards to current and future flight vehicle implementations.

Holladay, Jon B.↗

Printed Flexible Sensors for NASA Applications

As human spaceflight pushes beyond Low Earth Orbit (LEO), resupply of consumables becomes a significant challenge. One solution to this problem is In-Space Manufacturing (ISM), the capability to perform on-demand manufacturing and repair of consumables in an in-space environment. ISM offers significant flexibility to missions as it allows for a high degree of tailorability and reduction in launch mass. Leveraging advancements in fabrication, repair and recycling, ISM provides a highly sustainable and affordable solution to Exploration mission operations and logistics. In this talk, advances in printed electronics and sensors, ranging from nanomaterial ink development and hands-free fabrication methodologies to devices will be presented. Applications presented will include sensors for crew health monitoring, structural health monitoring and power generation.

sensors↗

Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management

Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

Gavert, Raymond B.↗

STS-105/Discovery/ISS 7A.1: Pre-Launch Activities, Launch, Orbit Activities and Landing

The crew of Space Shuttle Discovery on STS-105 is introduced at their pre-launch meal and at suit-up. The crew members include Commander Scott Horowitz, Pilot Rick Sturckow, and Mission Specialists Patrick Forrester and Daniel Barry, together with the Expedition 3 crew of the International Space Station (ISS). The Expedition 3 crew includes Commander Frank Culbertson, Soyuz Commander Vladimir Dezhurov, and Flight Engineer Mikhail Tyurin. When the astronauts depart for the launch pad in the Astrovan, their convoy is shown from above. Upon reaching the launch pad, they conduct a walk around of the shuttle, display signs for family members while being inspected in the White Room, and are strapped into their seats onboard Disciovery. The video includes footage of Discovery in the Orbiter Processing Facility, and some of the pre-launch procedures at the Launch Control Center are shown. The angles of launch replays include: TV-1, Beach Tracker, VAB, Pad A, Tower 1, UCS-15, Grandstand, OTV-70, Onboard, IGOR, and UCS-23. The moment of docking between Discovery and the ISS is shown from inside Discovery's cabin. While in orbit, the crew conducted extravehicular activities (EVAs) to attach an experiments container, and install handrails on the Destiny module of the ISS. The video shows the docking and unloading of the Leonardo Multipurpose Logistics Module (MPLM) onto the ISS. The deployment of a satellite from Discovery with the coast of the Gulf of Mexico in the background is shown. Cape Canaveral is also shown from space. Landing replays include VAB, Tower 1, mid-field, South End SLF, North End SLF, Tower 2, Playalinda DOAMS, UCS-23, and Pilot Point of View (PPOV). NASA Administrator Dan Goldin meets the crew upon landing and participates in their walk around of Discovery. The video concludes with a short speech by commander Horowitz.

Source record↗

Development and Execution of Autonomous Procedures Onboard the International Space Station to Support the Next Phase of Human Space Exploration

Now that major assembly of the International Space Station (ISS) is complete, NASA's focus has turned to using this high fidelity in-space research testbed to not only advance fundamental science research, but also demonstrate and mature technologies and develop operational concepts that will enable future human exploration missions beyond low Earth orbit. The ISS as a Testbed for Analog Research (ISTAR) project was established to reduce risks for manned missions to exploration destinations by utilizing ISS as a high fidelity micro-g laboratory to demonstrate technologies, operations concepts, and techniques associated with crew autonomous operations. One of these focus areas is the development and execution of ISS Testbed for Analog Research (ISTAR) autonomous flight crew procedures intended to increase crew autonomy that will be required for long duration human exploration missions. Due to increasing communications delays and reduced logistics resupply, autonomous procedures are expected to help reduce crew reliance on the ground flight control team, increase crew performance, and enable the crew to become more subject-matter experts on both the exploration space vehicle systems and the scientific investigation operations that will be conducted on a long duration human space exploration mission. These tests make use of previous or ongoing projects tested in ground analogs such as Research and Technology Studies (RATS) and NASA Extreme Environment Mission Operations (NEEMO). Since the latter half of 2012, selected non-critical ISS systems crew procedures have been used to develop techniques for building ISTAR autonomous procedures, and ISS flight crews have successfully executed them without flight controller involvement. Although the main focus has been preparing for exploration, the ISS has been a beneficiary of this synergistic effort and is considering modifying additional standard ISS procedures that may increase crew efficiency, reduce operational costs, and raise the amount of crew time available for scientific research. The next phase of autonomous procedure development is expected to include payload science and human research investigations. Additionally, ISS International Partners have expressed interest in participating in this effort. The recently approved one-year crew expedition starting in 2015, consisting of one Russian and one U.S. Operating Segment (USOS) crewmember, will be used not only for long duration human research investigations but also for the testing of exploration operations concepts, including crew autonomy.

beyond low earth orbit (BLEO)↗

Spares Management : Optimizing Hardware Usage for the Space Shuttle Main Engine

The complexity of the Space Shuttle Main Engine (SSME), combined with mounting requirements to reduce operations costs have increased demands for accurate tracking, maintenance, and projections of SSME assets. The SSME Logistics Team is developing an integrated asset management process. This PC-based tool provides a user-friendly asset database for daily decision making, plus a variable-input hardware usage simulation with complex logic yielding output that addresses essential asset management issues. Cycle times on critical tasks are significantly reduced. Associated costs have decreased as asset data quality and decision-making capability has increased.

Gulbrandsen, K. A.↗

STS-100 Photo-op/Shut-up/Depart O&C/Launch Endeavour On Orbit/Landing/Crew Egress

This video shows an overview of crew activities from STS-100. The crew of Space Shuttle Shuttle Endeavour includes: Commander Kent Rominger; Pilot Jeffrey Ashby; and Mission Specialists Chris Hadfield, John Phillips, Scott Parazynski, Umberto Guidoni, and Yuri Lonchakov. Sections of the video include: Photo-op; Suit-up; Depart O&C; Ingress; Launch with Playbacks; On-orbit; Landing with Playbacks; Crew Egress & Departure. Voiceover narration introduces the astronauts at their pre-flight meal, and continues during the video, except for the launch and landing sequences. Launch playback views include: NEXT; Beach Tracker; VAB; PAD-A; Tower-1; UCS-15; Grandstand; OTV-60; OTV-70; OTV-71; DOAMS; UCS-10 Tracker; UCS-23 Tracker; On-board Ascent Camera. The On-orbit section of the video shows preparations for an extravehicular activity (EVA) to install Canadarm 2 on the International Space Station (ISS). Preparation for docking with the ISS, and the docking of the orbiter and ISS are shown. The attachment of Canadarm 2 and the Raffaello Logistics Module, a resupply vehicle, are shown. The crew also undertakes some maintenance of the ISS. Landing playback views include: TV-1; TV-2; LRO-1; LRO-2; PPOV.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham of NASA Public Affairs hosted this press conference. Wayne Hill, Space Shuttle Deputy Program Manager; John Muratore, Shuttle Systems and Integration Manager; Mike Wetmore, Director for Shuttle Processing were present. Wayne started with a video from Shuttle Logistics Depot showing details of a point sensor box commonly named the black box. Work with the trouble shooting continues on a day to day basis, no definite launching date is set. John reports that they are in a mission support mode all over the country until the sensor problem is solved. Mike reports his team will complete scrub and securing tasks through the next day, restore the facility to its normal mode, and will start to a four day process of getting back to launch once trouble shooting is completed. Tanking test, thermal environment, problem identification, engine cut-off sensor problems, sensors, risk, design reviews, test and analysis, correlation of the problem with Columbia, are some of the topics covered with the News media.

Source record↗

Structural Design and Analysis of Un-pressurized Cargo Delivery Vehicle

As part of the Exploration Systems Architecture Study, NASA has defined a family of vehicles to support lunar exploration and International Space Station (ISS) re-supply missions after the Shuttle s retirement. The Un-pressurized Cargo Delivery Vehicle (UCDV) has been envisioned to be an expendable logistics delivery vehicle that would be used to deliver external cargo to the ISS. It would be launched on the Crew Launch Vehicle and would replace the Crew Exploration Vehicle. The estimated cargo would be the weight of external logistics to the ISS. Determining the minimum weight design of the UCDV during conceptual design is the major issue addressed in this paper. This task was accomplished using a procedure for rapid weight estimation that was based on Finite Element Analysis and sizing of the vehicle by the use of commercially available codes. Three design concepts were analyzed and their respective weights were compared. The analytical structural weight was increased by a factor to account for structural elements that were not modeled. Significant reduction in weight of a composite design over metallic was achieved for similar panel concepts.

Martinovic, Zoran N.↗

Spaceflight Alters Bacterial Gene Expression and Virulence and Reveals Role for Global Regulator Hfq

A comprehensive analysis of both the molecular genetic and phenotypic responses of any organism to the spaceflight environment has never been accomplished due to significant technological and logistical hurdles. Moreover, the effects of spaceflight on microbial pathogenicity and associated infectious disease risks have not been studied. The bacterial pathogen Salmonella typhimurium was grown aboard Space Shuttle mission STS-115 and compared to identical ground control cultures. Global microarray and proteomic analyses revealed 167 transcripts and 73 proteins changed expression with the conserved RNA-binding protein Hfq identified as a likely global regulator involved in the response to this environment. Hfq involvement was confirmed with a ground based microgravity culture model. Spaceflight samples exhibited enhanced virulence in a murine infection model and extracellular matrix accumulation consistent with a biofilm. Strategies to target Hfq and related regulators could potentially decrease infectious disease risks during spaceflight missions and provide novel therapeutic options on Earth.

Wilson, J. W.↗

Web: A Wireless Experiment Box for the Dextre Pointing Package ELC Payload

The Wireless Experiment Box (WEB) was proposed to work with the International Space Station (ISS) External Wireless Communication (EWC) system to support high-definition video from the Dextre Pointing Package (DPP). DPP/WEB was a NASA GSFC proposed ExPRESS Logistics Carrier (ELC) payload designed to flight test an integrated suite of Autonomous Rendezvous and Docking (AR&D) technologies to enable a wide spectrum of future missions across NASA and other US Government agencies. The ISS EWC uses COTS Wireless Access Points (WAPs) to provide high-rate bi-directional communications to ISS. In this paper, we discuss WEB s packaging, operation, antenna development, and performance testing.

Bleier, Leor Z.↗

WEB - A Wireless Experiment Box for the Dextre Pointing Package ELC Payload

The Wireless Experiment Box (WEB) was proposed to work with the International Space Station (ISS) External Wireless Communication (EWC) system to support high-definition video from the Dextre Pointing Package (DPP). DPP/WEB was a NASA GSFC proposed ExPRESS Logistics Carrier (ELC) payload designed to flight test an integrated suite of Autonomous Rendezvous and Docking (AR&D) technologies to enable a wide spectrum of future missions across NASA and other US Government agencies. The ISS EWC uses COTS Wireless Access Points (WAPs) to provide high-rate bi-directional communications to ISS. In this paper, we discuss WEB s packaging, operation, antenna development, and performance testing.

Bleier, Leor Z.↗

Using Paraffin with -10 deg C to 10 deg C Melting Point for Payload Thermal Energy Storage in SpaceX Dragon Trunk

A concept of using paraffin wax phase change material (PCM) with a melting point between -10 deg C and 10 deg C for payload thermal energy storage in a Space Exploration Technologies (SpaceX) Dragon trunk is presented. It overcomes the problem of limited heater power available to a payload with significant radiators when the Dragon is berthed to the International Space Station (ISS). It stores adequate thermal energy to keep a payload warm without power for 6 hours during the transfer from the Dragon to an ExPRESS logistics carrier (ELC) on the ISS.

Choi, Michael K.↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

Understanding the Impact of Unobservable Variables on the Performance of Predictive Models: The Need for Feature Space Partitioning and Fusion

When developing predictive models over a dataset, the model is globally optimized across the entire feature space to learn a decision boundary. However, when unobservable variables—which cannot be measured or estimated—interact with the observable variables, this can negatively impact the optimization applied to the decision boundary since the data samples introduced by unobservable variables may have little to no association with the applied global optimization. This, consequently, penalizes the entire decision boundary and model performance. This paper examines some of the detrimental effects of unobservable variables, particularly their role in creating new modes in the distribution of observable variables and reducing the separability of class distributions. Such challenges result in skewed or warped decision boundaries and decreased accuracy of model predictions, particularly for interpretable models like logistic regression and decision trees. Through two illustrative case examples, we highlight the need to address the challenges imposed by unobservable variables. We propose a strategy to mitigate these challenges by creating local regions within the feature space through partitioning. This enables the optimization of local models within the regions to overcome the impact of unobservability in different feature space localities. Research into a more sophisticated partitioning strategy and where the partition should be relative to the sample of interest is left as future work. Through the analysis of the impact of unobservability and the development of a partitioning method, we demonstrate the clear need for a partitioning strategy that integrates knowledge from multiple local models to estimate risk factors using information fusion. Thus, we establish the foundation and motivation for using partitioning and information fusion to overcome the effects of unobservability in predictive models. Formal fusion methods, such as Dempster-Shafer theory, can better leverage the information from local regions to improve the performance of interpretable predictive models in the presence of unobservable variables.

Time Series Data↗