Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Investigation of Automated Corrective Actions for Special Protection Schemes

The constantly evolving nature of the grid is compelling the design process of Remedial Action Schemes (RAS) to keep up with the changes. This document proposes a flexible and computationally efficient approach to automatically determine RAS corrective actions that alleviate line overloading violations. Statistical and functional characteristics summarized from RAS implemented in real power systems are used to guide the design parameters. This report also leverages sensitivity-based techniques to determine corrective actions for specific contingencies quickly without repeated numerical simulations. Finally, future directions for implementing this approach for a fully automated, online RAS are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Criticality and Radiation Shielding Analysis for the Storage and Transfer of MARVEL Reactor Spent Nuclear Fuel

This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment Report 76376 Assess the Quality of Center 00600 Completed Assessments for FY2018

Department 00635, Performance Assurance, assessments reveal risks and opportunities for improvement Labs-wide. This assessment was conducted to identify opportunities for improving the Department 00635 Assessment Program. This evaluation was conducted to identify opportunities for improving the Center 00600 assessment process by reviewing the quality of assessments completed by Environment Safety and Health (ES&H) personnel in fiscal year (FY) 2018. Approximately 20 percent of the Center 00600 assessments completed in FY18 were reviewed. One assessment was selected from each Center 00600 department contingent on availability in the Assurance Information System (AIS).

42 ENGINEERING↗

Evaluations of the Fates of Alkali Metals, Actinides, Mercury, and Iodine During DWPF Recycle Diversion

The fates of alkali metals, actinides, mercury, and iodine in the Defense Waste Processing Facility Recycle Diversion process (as currently conceptualized) have been evaluated through paper studies based on available knowledge of the chemistry, physical properties, solubility, and volatility of the various species involved. The effect of pH in the range from 9 to 13 has been discussed. Recommendations for additional studies to close technology gaps have been provided, many of which are contingent upon the results of pending testing and sample characterization efforts. There is uncertainty in the amounts of soluble actinides passing through the process filter, though the bulk of the actinides should be captured on the filter with the Recycle Collection Tank solids and the total amounts of actinides should be relatively low. The Recycle Collection Tank pH could impact the fraction of actinides reaching the evaporator, but the primary factors determining the actinide fate are expected to be the amount of CO 2 sorption from air sparging or, for certain actinides (such as plutonium), oxidation and/or sorption to MnO 2 solids from permanganate additions to destroy the glycolate anion. Process optimization could minimize the amounts of actinides passing the filter. Depending upon the levels of mercury observed in recycle stream samples and because of the volatility of mercury, the evaporator should be designed with the capability to remove dense mercury phases from the condensate to avoid exceeding ETP WAC limits. The facility design must be adequate to transfer dense mercury phases and testing to confirm mercury transfer is needed. Simulant containing mercury is recommended for both filtration and evaporation testing. OLI Modeling of the various recycle streams is recommended to provide insight on the fate of iodine. Iodine-spiked simulants are recommended for upcoming evaporation tests. The pro) ect should consider the likelihood and impact of NAS scale formation in the evaporators. Process optimization may be needed to minimize the accumulation of NAS scale and possibly the sorption of actinides in the evaporator. Actual waste testing of the Recycle Diversion filtration and evaporation should include the analysis of actinides, mercury, and iodine to determine their partitioning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review and Analysis of Heat Transfer Correlations For Horizontal Pseudocritical CO 2 Heat Exchanger Applications

There is significant interest in the development of supercritical carbon dioxide (sCO 2 ) power cycles because of the potential for smaller and more energy efficient systems than a steam Rankine cycle. Heat exchanger designs typically use empirical correlations, but the applicability of these correlations near the CO 2 critical point is a potential issue. Though numerous correlations have been proposed in the literature, there are some disagreements when it comes to the accuracy. The current work recognizes the role of thermophysical properties, and its impacts on the heat transfer correlations and cycle efficiency. Heat transfer correlations proposed for horizontal flow inside circular pipes were analyzed with the help of numerical simulations. Steady state RANS simulations were performed using SST k-w turbulence model to evaluate the Nusselt number empirical correlations. It was found that the most of correlations (except Yoon) produced a Nusselt number that differed significantly with the one predicted numerically. Some of the correlations were developed for pure forced convection regime and as mentioned in Lin et al. do not account for mixed convection or free convection effects. Based on the limited observation, it appears that Yoon et al. predictions match well with the numerically predicted Nusselt Numbers. However, further analysis is required understand the applicability of various correlations and is contingent on accurate measurements or predictions of wall temperature profiles in the axial and the circumferential directions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Composite Solid Ion Conductor with Engineered Lithium Interface

Successful widespread commercialization of electric vehicles is contingent upon development of safe high energy density batteries capable of long cycle life. Lithium metal affords the highest theoretical capacity (3,860 mAh/g) and lowest electrochemical potential (-3.04V vs SHE), which offers the highest specific energy density of anode materials today. While Li-ion batteries are capable of delivering energy densities of 400-600 Wh/kg, the development of lithium metal batteries such as Li-S and Li-air may boost this number up to 650 and 950 Wh/kg, respectively. However, significant progress towards the passivation of lithium metal must occur before the energy density benefit can be realized. Issues with lithium dendrite formation, anode volume expansion, and continuous solid electrolyte interphase (SEI) build-up often result in significant safety concerns, high cell resistance, and poor cycle life. The intrinsic high reactivity between lithium metal with conventional lithium ion electrolytes (organic carbonate-based solvents) makes it extremely difficult to overcome these problems. In this project, Wildcat performed focused, fundamental research and development on composite polymer/ceramic electrolytes and protected lithium metal anodes to develop an all solid state lithium metal battery targeting the DOE requirements to enable commercialization. Wildcat successfully leveraged its high throughput battery platform and explored a broad composite electrolyte compositional space. Additionally, Wildcat screened large numbers of inorganic and organic coatings for lithium metal protection using in situ liquid methods and translated the best results to all solid cells. The proposed composite polymer/ceramic electrolyte and a protected lithium metal anode enabled a solid-state lithium metal battery. The ultimate targets from this effort will deliver a safe all solid-state lithium metal pouch cell with over 350 Wh/kg and over 1,000 cycles (C/3) with the cost estimate below $100/kWh. During the course of the project, we demonstrated stable cycling of 10’s of cycles with the composite SSE and our protected lithium. The work has continued after the conclusion of the DOE funding, demonstrating further improvements in catholyte composition and thinner composite solid electrolytes.

25 ENERGY STORAGE↗

Operation Upshot-Knothole

A thundering boom and sheet of fire announced a dramatic, once in a lifetime event – the firing of a nuclear projectile from a 280 mm cannon. Travelling seven miles downrange, the projectile detonated 500 feet over the Nevada Test Site’s Frenchman Flat with a force of fifteen kilotons. Although the test was successful, the massive cannon, designed for tactical battlefield use, had a critical flaw. It was too large and cumbersome for mobile combat. The cannon test, codenamed Grable, was part of Operation Upshot-Knothole, the fourth test series conducted in Nevada. Beginning with the Annie test on March 17, 1953, and concluding with the Climax test on June 4th, the Operation consisted of three airdrops, seven tower detonations, and the one artillery shot. As with previous Nevada tests, the demarcation between the weapon development series, Upshot, and the DOD effects tests, Knothole, was blurred. All eleven tests generated data in support of weapon development as well as tactical battlefield applications. During Upshot-Knothole, the University of California Radiation Laboratory (UCRL), conducted its first ever tests, Ruth and Ray. Although neither test was successful, these failures, along with another a year later at Operation Castle, provided the new laboratory with design data leading to future successful tests. The Federal Civil Defense Administration (FCDA) participated in a test series with the general goal of preparing for societal recovery from a nuclear attack. Known as Operation Doorstep, the FCDA’s experiments evaluated the effects of a nuclear attack on food supplies, housing and urban structures, and even a copse of trees transplanted from nearby Mt. Charleston. A contingent of the press witnessed test Annie from an outcropping of rocks, subsequently named News Nob. The presence of the news media, along with the FCDA’s participation, marked a fundamental change in the Nevada test program - a change that that now included the general populace, whose survival was, of course, the rationale for testing. The Department of Defense continued and expanded its Desert Rock exercises of troop exercises, helicopter operations, and evaluation of blast damage to military aircraft, tanks, and guns. Annie, Nancy, Badger, Simon, Encore, and Grable involved larger numbers of personnel than the other five shots. Below is an edited and condensed account of Desert Rock activities compiled by the Defense Threat Reduction Agency.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Operating Reserves in ReEDS

This presentation provides an overview of the formulation for operating reserves in the Regional Energy Deployment System (ReEDS), a capacity expansion model. It describes the three reserve products modeled in ReEDS--regulation, spinning (contingency), and flexibility--and highlights recent updates to the modeling approach, including modifications to how storage provides reserves, the constraints on commitment for generators that provide reserves, and the costs for thermal units to provide spinning reserve. The presentation benchmarks operating reserve provision in ReEDS against comparable simulations in PLEXOS, finding that the improved formulation is different but yields results that are holistically similar to those in production cost modeling. In this presentation we also investigate the impact of different reserve options in the model (e.g., allowing wind and solar to provide operating reserves) on the solution. The results thus far indicate that most switches related to operating reserves exert little influence on the outcome on the results. Future work will continue to explore operating reserves in capacity expansion models, particularly for models with different temporal resolution.

14 SOLAR ENERGY↗

Removal of Institutional Controls at CERCLA Site ANL-01 Ditches A, B and C at the Materials and Fuels Complex

ANL-01 is a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site within Operable Unit (OU) 9-04 at the Materials and Fuels Complex (MFC). The ANL-01 site includes the Industrial Waste Pond and its associated ditches. Ditches A, B and C within ANL-01 were remediated in accordance with the Final Record of Decision for Argonne National Laboratory - West (DOE-CH 1998a). Due to the success of the selected and contingent remedies for the ditches and the determination that they are protective of human health and the environment, institutional controls (ICs) are no longer required and Idaho National Laboratory (INL) recommends termination of the ICs. In addition, the documentation requirements of the INL Site-wide Institutional Controls, and Operations and Maintenance Plan for CERCLA Response Actions (DOE-ID 2017) have been met to allow termination to occur.

54 ENVIRONMENTAL SCIENCES↗

Blockchain for Fault-Tolerant Grid Operations

Distribution system fault/failure has a direct impact on customers. Distribution systems are not designed with the contingency of one or more elements failing as the transmission system, however, distribution systems are more likely to have faults in comparison to transmission and generation systems. Most of the distribution systems have a radial design with the protection system assumption of unidirectional power flow. The radial design results in the disconnection of customers for any given component failure. The rapid deployment of distributed energy resources conflicts with the assumption of unidirectional power flow. To maintain/improve the distribution system fault tolerance for a grid with high penetration of distributed energy resources requires improvement. Blockchain can add value to improve fault-tolerant grid operations. That can be achieved using blockchain’s core features of distributed consensus-based decision-making process and immutability. In the process of preparing for an event or system restoration, there is a need for reliable data and system situational awareness. The system situational awareness enables accurate planning for possible scenarios and system restoration after an event, an area where blockchain’s distributed architecture can help. The value of blockchain for a fault-tolerant grid operation is elaborated with three use cases: 1) fault location, isolation, and service restoration; 2) topology identification; and 3) data configuration. These use cases demonstrate how blockchain-based architecture can facilitate bridging the vulnerabilities of the existing implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

An Analysis of PNM's Renewable Reserve Requirements to Meet New Mexico's Decarbonization Goals

Over the next three years, the Public Service Company of New Mexico (PNM) plans to increase utility-scale solar photovoltaic (PV) capacity from today’s roughly 330MW to about 1600MW. This massive increase in variable generation—from about 15% to 75% of peak load—will require changes in how PNM operates their system. We characterize the 5 and 30-minute solar and wind forecast errors that the system is likely to experience in order to determine the level of reserves needed to counteract such events. Our focus in this study is on negative forecast error (in other words, shortfalls relative to forecast) – whereas excess variable generation can be curtailed if needed, a shortfall must be compensated for to avoid loss of load. Calculating forecast error requires the use of the same forecasting methods that PNM uses or a reasonable approximation thereof. For wind, we use a persistence forecast on actual 5-minute 2019 wind output data (scaled up to reflect the amount of wind capacity planned for 2025). For solar, we use a formula incorporating the clear sky index (CSI) for the forecast. As the solar on the grid now is a small fraction of what is planned for 2025, we generated 5-minute solar data using 2019 weather inputs. We find that to handle 99.9% of the 5-minute negative forecast errors, a maximum of 275MW of variable generation reserve during daylight hours, and a maximum of 75MW during non-daylight hours, should be sufficient. Note that this variable generation reserve is an additional reserve category that specifies reserves over and above what are currently carried for contingency reserve. This would require a significant increase in reserve relative to what PNM currently carries or can call upon from other utilities per reserve sharing agreements. This variable generation reserve specification may overestimate the actual level needed to deal with PNM’s planned variable generation in 2025. The forecasting methodologies used in this study likely underperform PNM’s forecasting – and better forecasting allows for less reserve. To obtain more precise estimates, it is necessary to consider load and use the same forecasting inputs and methods used by PNM.

14 SOLAR ENERGY↗

Multi-Stage and Multi-Timescale Robust Co-Optimization Planning for Reliable and Sustainable Power Systems. Final Report

In this project, Clarkson University, in collaboration with Southern Methodist University and University of Pittsburgh, conducted the research to model, design, and implement a sophisticated generation and transmission co-optimization planning decision tool, called Multi-stage and Multi-timescale robust Co-Optimization Planning (MMCOP). The MMCOP decision tool intends to facilitate generation and transmission co-optimization planning of emerging power systems, while mitigating risks and uncertainties in both short-term operation dynamics and long-term policy and technology changes. Long-term power system planning aims at optimizing asset utilization by investing in a proper mix of various generation technologies and transmission lines to supply the future load growth. In particular, the Clean Power Plan (CPP), which is designed to combat climate change and reduce carbon emissions by setting a national limit on carbon pollution from power plants, may dramatically change the landscape of the power industry by further promoting clean energy and phasing out emissions-intensive generation technologies. In addition, novel non-wire alternatives (e.g., demand response (DR), distributed generation (DG), energy efficiency (EE), and smart grid technologies) and the computational complexity for large-scale systems significantly complicate the system planning procedure even further. However, existing conventional planning approaches neglect short-term variability and uncertainty of renewable energy, hourly chronological operation details, and physical nonlinear characteristics of the alternating current transmission network. As a result, existing conventional planning approaches may not work properly, and power systems reliability could be in jeopardy. In observing the limitations of existing conventional planning approaches and addressing new challenges of emerging power systems, the main scope of this project to develop co-optimization planning models within a multi-stage and multi-timescale framework. In particular, random contingencies, key uncertainty factors, and AC power flows are included to derive expansion plans while considering both long-term reliability and short-term flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗