Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

More Frequent Cloud Free Sky and Less Surface Solar Radiation in China from 1955-2000

In this study, we used newly available data frorn extended weather stations and time period to reveal that much of China has experienced significant decreases in cloud cover over the last half of the Twentieth century. This conclusion is supported by analysis of the more reliably observed frequency of cloud-free sky and overcast sky. We estimated that the total cloud cover and low cloud cover in China have decreased 0.88% and 0.33% per decade, respectively, and cloud-free days have increased 0.60% and overcast days decreased 0.78% per decade from 1954-2001. Meanwhile, both solar radiation and pan evaporation have decreased in China, with'solar radiation decreasing 3.1 w/square m and pan evaporation decreasing 39 mm per decade. Combining these results with findings of previous studies, we speculated that increased air pollution may have produced a fog-like haze that reflected/absorbed radiation from the sun and resulted in less solar radiation reaching the surface, despite concurrent increasing trends in cloud-free sky over China.

Qian, Yun↗

Large-Eddy Simulation: Current Capabilities, Recommended Practices, and Future Research

This paper presents the results of an activity by the Large Eddy Simulation (LES) Working Group of the AIAA Fluid Dynamics Technical Committee to (1) address the current capabilities of LES, (2) outline recommended practices and key considerations for using LES, and (3) identify future research needs to advance the capabilities and reliability of LES for analysis of turbulent flows. To address the current capabilities and future needs, a survey comprised of eleven questions was posed to LES Working Group members to assemble a broad range of perspectives on important topics related to LES. The responses to these survey questions are summarized with the intent not to be a comprehensive dictate on LES, but rather the perspective of one group on some important issues. A list of recommended practices is also provided, which does not treat all aspects of a LES, but provides guidance on some of the key areas that should be considered.

Georgiadis, Nicholas J.↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA's next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be leading the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO is responsible for performing the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orionilander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. For the Ares IVGVT, the current plan is to test six configurations in three unique test positions inside TS 4550. Position 1 represents the entire launch stack at liftoff (using inert first stage segments). Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Because of long disuse, TS 4550 is being repaired and reactivated to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. The electrical power distribution system for TS 4550 was upgraded. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal railhead where first stage segments will be received in 2011. The Hydrodynamic Support systems (HDSs) used for Saturn and Shuttle have been disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGVT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010. In the next three years, the team will complete the updates to TS 4550, upgrade the test and data collection equipment, and finalize the configurations of the test articles to be used in the IVGVT. With NASA's GVT capabilities reestablished, the FITO team will be well positioned to perform similar work on Ares V, the largest exploration launch vehicle NASA has ever built. The GVT effort continues NASA's 50-year commitment to using testing and data analysis for safer, more reliable launch vehicles.

Tuma, M. L.↗

Prediction Interval Development for Wind-Tunnel Balance Check-Loading

Results from the Facility Analysis Verification and Operational Reliability project revealed a critical gap in capability in ground-based aeronautics research applications. Without a standardized process for check-loading the wind-tunnel balance or the model system, the quality of the aerodynamic force data collected varied significantly between facilities. A prediction interval is required in order to confirm a check-loading. The prediction interval provides an expected upper and lower bound on balance load prediction at a given confidence level. A method has been developed which accounts for sources of variability due to calibration and check-load application. The prediction interval method of calculation and a case study demonstrating its use is provided. Validation of the methods is demonstrated for the case study based on the probability of capture of confirmation points.

Landman, Drew↗

Comparative Study of foF2 Measurements with IRI-2007 Model Predictions During Extended Solar Minimum

The unusually deep and extended solar minimum of cycle 2324 made it very difficult to predict the solar indices 1 or 2 years into the future. Most of the predictions were proven wrong by the actual observed indices. IRI gets its solar, magnetic, and ionospheric indices from an indices file that is updated twice a year. In recent years, due to the unusual solar minimum, predictions had to be corrected downward with every new indices update. In this paper we analyse how much the uncertainties in the predictability of solar activity indices affect the IRI outcome and how the IRI values calculated with predicted and observed indices compared to the actual measurements.Monthly median values of F2 layer critical frequency (foF2) derived from the ionosonde measurements at the mid-latitude ionospheric station Juliusruh were compared with the International Reference Ionosphere (IRI-2007) model predictions. The analysis found that IRIprovides reliable results that compare well with actual measurements, when the definite (observed and adjusted) indices of solar activityare used, while IRI values based on earlier predictions of these indices noticeably overestimated the measurements during the solar minimum.One of the principal objectives of this paper is to direct attention of IRI users to update their solar activity indices files regularly.Use of an older index file can lead to serious IRI overestimations of F-region electron density during the recent extended solar minimum.

Ionosphere↗

X-Ray Computed Tomography: The First Step in Mars Sample Return Processing

The Mars 2020 rover mission will collect and cache samples from the martian surface for possible retrieval and subsequent return to Earth. If the samples are returned, that mission would likely present an opportunity to analyze returned Mars samples within a geologic context on Mars. In addition, it may provide definitive information about the existence of past or present life on Mars. Mars sample return presents unique challenges for the collection, containment, transport, curation and processing of samples [1] Foremost in the processing of returned samples are the closely paired considerations of life detection and Planetary Protection. In order to achieve Mars Sample Return (MSR) science goals, reliable analyses will depend on overcoming some challenging signal/noise-related issues where sparse martian organic compounds must be reliably analyzed against the contamination background. While reliable analyses will depend on initial clean acquisition and robust documentation of all aspects of developing and managing the cache [2], there needs to be a reliable sample handling and analysis procedure that accounts for a variety of materials which may or may not contain evidence of past or present martian life. A recent report [3] suggests that a defined set of measurements should be made to effectively inform both science and Planetary Protection, when applied in the context of the two competing null hypotheses: 1) that there is no detectable life in the samples; or 2) that there is martian life in the samples. The defined measurements would include a phased approach that would be accepted by the community to preserve the bulk of the material, but provide unambiguous science data that can be used and interpreted by various disciplines. Fore-most is the concern that the initial steps would ensure the pristine nature of the samples. Preliminary, non-invasive techniques such as computed X-ray tomography (XCT) have been suggested as the first method to interrogate and characterize the cached samples without altering the materials [1,2]. A recent report [4] indicates that XCT may minimally alter samples for some techniques, and work is needed to quantify these effects, maximizing science return from XCT initial analysis while minimizing effects.

Welzenbach, L. C.↗

A Prognostic Launch Vehicle Probability of Failure Assessment Methodology for Conceptual Systems Predicated on Human Causal Factors

Lessons learned from past failures of launch vehicle developments and operations were used to create a new method to predict the probability of failure of conceptual systems. Existing methods such as Probabilistic Risk Assessments and Human Risk Assessments were considered but found to be too cumbersome for this type of system-wide application for yet-to-be-flown vehicles. The basis for this methodology were historic databases of past failures, where it was determined that various faulty human-interactions were the predominant root causes of failure rather than deficient component reliabilities evaluated through statistical analysis. This methodology contains an expert scoring part which can be used in either a qualitative or a quantitative mode. The method produces two products: a numerical score of the probability of failure and guidance to program management on critical areas in need of increased focus to improve the probability of success. In order to evaluate the effectiveness of this new method, data from a concluded vehicle program (USAF's Titan IV with the Centaur G-Prime upper stage) was used as a test case. The theoretical vs. actual probability of failure was found to be 4.46% vs. 6.67% respectively. Recommendations are made for future applications of this method to ongoing launch vehicle development programs.

Launch Vehicle↗

Prognostic Launch Vehicle Probability of Failure Assessment Methodology for Conceptual Systems Predicated on Human Causal Factors

Lessons learned from past failures of launch vehicle developments and operations were used to create a new method to predict the probability of failure of conceptual systems. Existing methods such as Probabilistic Risk Assessments and Human Risk Assessments were considered but found to be too cumbersome for this type of system-wide application for yet-to-be-flown vehicles. The basis for this methodology were historic databases of past failures, where it was determined that various faulty human-interactions were the predominant root causes of failure rather than deficient component reliabilities evaluated through statistical analysis. This methodology contains an expert scoring part which can be used in either a qualitative or a quantitative mode. The method produces two products: a numerical score of the probability of failure or guidance to program management on critical areas in need of increased focus to improve the probability of success. In order to evaluate the effectiveness of this new method, data from a concluded vehicle program (USAF's Titan IV with the Centaur G-Prime upper stage) was used as a test case. Although the theoretical vs. actual probability of failure was found to be in reasonable agreement (4.46% vs. 6.67% respectively) the underlying sub-root cause scoring had significant disparities attributable to significant organizational changes and acquisitions. Recommendations are made for future applications of this method to ongoing launch vehicle development programs.

Craig H Williams↗

Potential Alteration of Analogue Regolith by X-Ray Computed Tomography

The Mars 2020 rover mission will collect and cache samples from the martian surface for possible retrieval and subsequent return to Earth. Mars Returned Samples may provide definitive information about the presence of organic compounds that could shed light on the existence of past or present life on Mars. Post-mission analyses will depend on the development of a set of reliable sample handling and analysis procedures that cover the full range of materials which may or may not contain evidence of past or present martian life [1].

Welzenbach, L. C.↗

Extraction Efficiency of Organics From Mars Regolith Analogue Samples

The Mars 2020 rover mission has collected and cached samples from the martian surface for possible retrieval and subsequent return to Earth. Mars Sample Return (MSR) materials are believed to contain organic compounds that will be thoroughly examined to test the hypothesis of the existence of past or present life on Mars. Post-mission analyses will depend on the development of a set of reliable sample handling and analysis procedures that cover the full range of materials, which may or may not contain evidence of past or present martian life.

L.C.Welzenbach↗

Error analysis of finite element results on plates with nonuniform grids

Discrete Dirac delta functions in two dimensions and the governing plate differential equations are used to produce continuous approximations from discrete finite-element data on nonuniform grids. The resulting continuous approximation when compared to the discrete data provides an error analysis. Moreover, the continuous approximation can be differentiated to compute continuous stresses needed for component failure prediction. Stresses can then be calculated accurately at boundaries and at interfaces where finite-element analysis alone may not provide reliable results. The continuous solution along with the differential equations also provides a residual error which is used in the error analysis. This is a unique feature of this approach. Two application examples of the procedure are provided. One example involves the linear response of a clamped square plate under uniform transverse load. Results from finite-element analysis and the continuous solution from the present analysis are compared to a closed-form elasticity solution. The continuous solution is used in a Zienkiewicz-Zhu error estimator to assess the performance of the present analysis. The continuous solution is observed to dramatically correct the finite-element results. In a second example, results for the nonlinear response of a stiffened panel are compared to the finite-element solution.

Sistla, Rajaram↗

Importance of Contrast-to-Noise Ratio Sensitivity Function in Nondestructive Evaluation

A reliable nondestructive evaluation (NDE) technique provides minimum 90% probability of detection (POD) with 95% confidence for detection of cracklike flaws of a specific size. This requirement comes from fracture control. Fracture control is a risk assessment and control approach for preventing structural failure of fracture critical hardware during its service life. One of the approaches of fracture control is damage tolerance safe life analysis, which assumes that NDE reliably detectable size flaw may exist in the hardware post nondestructive evaluation. Analysis and/or testing are performed to verify that the hardware will not fail during its service life despite existence of such a flaw. NDE methods are conventionally qualified by probability of detection (POD) demonstration testing to ensure reliable flaw detection. Here, a novel and alternative to POD flaw detection reliability approach that uses contrast-to-noise ratio (CNR) is given. The approach uses CNR sensitivity function (SF) and CNR. CNR SF is the minimum CNR needed for reliable flaw detection as a function of certain flaw indication characteristics. Primary difference between POD approaches and CNR flaw detection reliability approach is resolution of flaw detection system. POD approach does not account for the resolution of the system, while CNR approach accounts for the flaw detection resolution. Resolution is determined from the modulation transfer function (MTF) of the flaw detection system. CNR flaw detection reliability approach emphasizes quantitative assessment of “how well each flaw indication is detected”. Therefore, CNR approach is helpful in reducing number of flaws in the sample used in NDE procedure qualification, resulting in cost and time savings. CNR approach is also a case of multi-hit flaw detection analysis which has better flaw detectability size than conventional single-hit flaw detectability. Thus, CNR approach, where applicable, may be superior to conventional POD approach. The paper is an overview of development of CNR modeling, CNR SF modeling and measurement by the author. The paper gives key references to currently used NDE procedure POD qualification approaches including those specific to CNR and CNR SF development in multi-hit flaw detection in NDE. The paper covers core topics in nondestructive evaluation engineering.

Contrast-to-noise ratio↗

Coupled structural, thermal, phase-change and electromagnetic analysis for superconductors, volume 1

This research program has dealt with the theoretical development and computer implementation of reliable and efficient methods for the analysis of coupled mechanical problems that involve the interaction of mechanical, thermal, phase-change and electromagnetic subproblems. The focus application has been the modeling of superconductivity and associated quantum-state phase-change phenomena. In support of this objective the work has addressed the following issues: (1) development of variational principles for finite elements; (2) finite element modeling of the electromagnetic problem; (3) coupling of thermal and mechanical effects; and (4) computer implementation and solution of the superconductivity transition problem. The research was carried out over the period September 1988 through March 1993. The main accomplishments have been: (1) the development of the theory of parametrized and gauged variational principles; (2) the application of those principled to the construction of electromagnetic, thermal and mechanical finite elements; and (3) the coupling of electromagnetic finite elements with thermal and superconducting effects; and (4) the first detailed finite element simulations of bulk superconductors, in particular the Meissner effect and the nature of the normal conducting boundary layer. The grant has fully supported the thesis work of one doctoral student (James Schuler, who started on January 1989 and completed on January 1993), and partly supported another thesis (Carmelo Militello, who started graduate work on January 1988 completing on August 1991). Twenty-three publications have acknowledged full or part support from this grant, with 16 having appeared in archival journals and 3 in edited books or proceedings.

Felippa, Carlos A.↗

Failure environment analysis tool applications

Understanding risks and avoiding failure are daily concerns for the women and men of NASA. Although NASA's mission propels us to push the limits of technology, and though the risks are considerable, the NASA community has instilled within, the determination to preserve the integrity of the systems upon which our mission and, our employees lives and well-being depend. One of the ways this is being done is by expanding and improving the tools used to perform risk assessment. The Failure Environment Analysis Tool (FEAT) was developed to help engineers and analysts more thoroughly and reliably conduct risk assessment and failure analysis. FEAT accomplishes this by providing answers to questions regarding what might have caused a particular failure; or, conversely, what effect the occurrence of a failure might have on an entire system. Additionally, FEAT can determine what common causes could have resulted in other combinations of failures. FEAT will even help determine the vulnerability of a system to failures, in light of reduced capability. FEAT also is useful in training personnel who must develop an understanding of particular systems. FEAT facilitates training on system behavior, by providing an automated environment in which to conduct 'what-if' evaluation. These types of analyses make FEAT a valuable tool for engineers and operations personnel in the design, analysis, and operation of NASA space systems.

Pack, Ginger L.↗

Failure environment analysis tool applications

Understanding risks and avoiding failure are daily concerns for the women and men of NASA. Although NASA's mission propels us to push the limits of technology, and though the risks are considerable, the NASA community has instilled within it, the determination to preserve the integrity of the systems upon which our mission and, our employees lives and well-being depend. One of the ways this is being done is by expanding and improving the tools used to perform risk assessment. The Failure Environment Analysis Tool (FEAT) was developed to help engineers and analysts more thoroughly and reliably conduct risk assessment and failure analysis. FEAT accomplishes this by providing answers to questions regarding what might have caused a particular failure; or, conversely, what effect the occurrence of a failure might have on an entire system. Additionally, FEAT can determine what common causes could have resulted in other combinations of failures. FEAT will even help determine the vulnerability of a system to failures, in light of reduced capability. FEAT also is useful in training personnel who must develop an understanding of particular systems. FEAT facilitates training on system behavior, by providing an automated environment in which to conduct 'what-if' evaluation. These types of analyses make FEAT a valuable tool for engineers and operations personnel in the design, analysis, and operation of NASA space systems.

Pack, Ginger L.↗