Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

A RHIC-style IPM in the Brookhaven AGS

Beam profiles in the two storage rings of the Relativistic Heavy-Ion Collider (RHIC) at Brookhaven National Lab (BNL) are measured with ionization profile monitors (IPMs). Each ring has a vertical and horizontal detector. An IPM measures the distribution of electrons produced in the beam line by beam ionization of background gas. These detectors have been developed at BNL in a program that began in 1996. The current detectors are a design that was based on a prototype built in 2007 and used in RHIC from 2007 to 2012. During the 2012 shutdown we refurbished this prototype and installed it into the Alternating-Gradient Synchrotron (AGS). This paper describes the new AGS IPM and shows data from the detector commissioning.

43 PARTICLE ACCELERATORS↗

Data Sharing Report Characterization of Isotope Row Facilities Oak Ridge National Laboratory Oak Ridge TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort was designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The process for D&D and final dismantlement of facilities requires that the known contaminants of concern (COCs) be evaluated and quantified and to identify and quantify any additional contaminants in order to satisfy the waste acceptance criteria requirements for the desired disposal pathway. Known facility contaminants include, but are not limited to, asbestos-containing material (ACM), radiological contaminants, and chemical contaminants including polychlorinated biphenyls (PCBs) and metals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition Core Properties during Conversion of the NBSR from HEU to LEU Fuel

The transition of the NBSR from HEU to LEU fuel is challenging due to reactivity constraints and the need to maintain an uninterrupted science program, the mission of the NBSR. The transition cannot occur with a full change of HEU to LEU fuel elements since the excess reactivity would be large enough that the NBSR would violate the technical specification for shutdown margin. Manufacturing LEU fuel elements to represent irradiated fuel elements would be cost prohibitive since 26 one-of-a-kind fuel elements would need to be manufactured. For this report a gradual transition from the present HEU fuel to the proposed LEU fuel was studied. The gradual change approach would follow the present fuel management scheme and replace four HEU fuel elements with four LEU fuel elements each cycle. This manuscript reports the results of a series of calculations to predict the neutronic characteristics and how the neutronics will change during the transition from HEU to LEU in the NBSR.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CRADA Final Report For CRADA NO. CR-12-006 [Operation and Testing of an SO 2 -depolarized Electrolyzer (SDE) for the Purpose of Hydrogen and Sulfuric Acid Production]

Over the past several years, Savannah River National Laboratory (SRNL) has led a team of collaborators under the Department of Energy’s (DOE) nuclear hydrogen production program to develop the Hybrid Sulfur (HyS) Process. HyS is a 2-step water-splitting process consisting of high temperature decomposition of sulfuric acid to generate SO 2 , followed by the electrolysis of aqueous SO 2 to generate hydrogen and sulfuric acid. The latter is fed back into the high temperature reactor. SRNL designed and built an SO 2 -depolarized electrolyzer (SDE) and a test facility. Over 40 SDE’s were tested using different catalysts, membranes and other components. SRNL demonstrated that an SDE could be operated continuously for approximately 200 hours under certain conditions without buildup of sulfur at the SDE’s cathode, thus solving a key technical problem with SDE technology. Air Products and Chemicals, Inc. (APCI) is a major supplier of hydrogen production systems, and they have proprietary technology that could benefit from the SDE developed by SRNS, or some improved version thereof. However, to demonstrate that SRNL’s SDE is a truly viable approach to the electrolyzer design, continuous operation for far greater periods of time than 200 hours must be demonstrated, and the electrolyzer must be scaled up to greater hydrogen production capacities. SRNL and Air Products entered into a Cooperative Research and Development Agreement with the objective of demonstrating the effectiveness of the SDE for hydrogen and sulfuric acid production and to demonstrate long-term continuous operation so as to dramatically increase the confidence in the SDE design for commercial operation. SRNL prepared a detailed technical report documenting previous SDE development, including the current SDE design and operating conditions that led to the 200-hour sulfurfree testing. SRNL refurbished its single cell SDE test facility and qualified the equipment for continuous operation. A new membrane electrode assembly (MEA) was fabricated and installed in the single cell electrolyzer (60 cm 2 active cell area). Shakedown testing was conducted, and several modifications were made to the test facility equipment. Seven different MEAs were used during testing. Beginning on May 20, 2013, SRNL was able to test the SDE continuously for 1200 hours, including 1000 hours under power to generate hydrogen at an average rate of 10.8 liters per hour. The SDE was not removed or repaired during the 50-day test and was successfully restarted after each shutdown. The test was intentionally stopped after 1200 hours (1000 hours of hydrogen production) due to funding constraints. Post-test examination of the MEA using Scanning Electron Microscopy (SEM) and Energy Dispersive X-ray Microanalysis (EDAX) showed no elemental sulfur deposits or sulfur layer inside the cell, thus successfully achieving the test goals. The results demonstrated that the SDE could be operated for extended periods without major performance degradation or the buildup of sulfur inside the MEA. Air Products conducted an assessment of the economic viability of the SDE based on the “as tested” design. The results indicated that the SDE faces significant economic obstacles in its current state. Further development and scale-up are necessary before the SDE is ready for commercialization.

08 HYDROGEN↗

Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy

The Coastal Ohio Wind Project was created to establish the viability of wind turbines on the coastal and offshore regions of Northern Ohio. The project’s main goal was to improve operational unit strategies used for environmental impact assessment of offshore turbines on lake wildlife by optimizing and fusing data from the multi-instrument surveillance system and providing an engineering analysis of potential design/operational alternatives for offshore wind turbines. The project also developed a general economic model for offshore WTG deployment to quantify potential revenue losses due to wind turbine shutdown related to ice and avian issues. In a previous phase of this project (Award Number: DE-FG36-06GO86096), we developed a surveillance system that was used to collect different parameters such as passage rates, flight paths, flight directions, and flight altitudes of nocturnal migrating species, movements of birds and bats, and bird calls for assessing patterns and peak passage rates during migration. To derive such parameters we used thermal IR imaging cameras, acoustic recorders, and marine radar Furuno (XANK250), which was coupled with a XIR3000B digitizing card from Russell Technologies and open source radR processing software. The integration yielded a development of different computational techniques and methods, which we further developed and optimized as a combined surveillance system. To accomplish this task we implemented marine radar calibration, optimization of processing parameters, and fusion of the multi-sensor data in order to make inferences about the potential avian targets. The main goal of the data fusion from the multi-sensor environment was aimed at reduction of uncertainties while providing acceptable confidence levels with detailed information about the migration patterns. Another component comprised of an assessment of wind resources in a near lake environment and an investigation of the effectiveness of ice coating materials to mitigate adverse effects of ice formation on wind turbine structures. Firstly, a Zephir LiDAR system was acquired and installed at Woodlands School in Huron, Ohio, which is located near Lake Erie. Wind resource data were obtained at ten measurement heights, 200m, 150m, 100m, 80m, 60m, 40m, 38m, 30m, 20m, and 10m. The Woodlands School’s wind turbine anemometer also measured the wind speed at the hub height. These data were collected for approximately one year. The hub anemometer data correlated well with the LiDAR wind speed measurements at the same height. The data also showed that on several days different power levels were recorded by the turbine at the same wind speed as indicated by the hub anemometer. The corresponding LiDAR data showed that this difference can be attributed to variability in the wind over the turbine rotor swept area, which the hub anemometer could not detect. The observation suggests that single point hub wind velocity measurements are inadequate to accurately estimate the power generated by a turbine at all times since the hub wind speed is not a good indicator of the wind speed over the turbine rotor swept area when winds are changing rapidly. To assess the effectiveness of ice coatings to mitigate the impact of ice on turbine structures, a closed-loop icing research tunnel (IRT) was designed and constructed. By controlling the temperature, air speed, water content and liquid droplet size, the tunnel enabled consistent and repeatable ice accretion under a variety of conditions with temperatures between approximately 0°C and -20°C and wind speeds up to 40 miles per hour in the tunnel’s test section. The tunnel’s cooling unit maintained the tunnel temperature within ±0.2°C. The coatings evaluated in the study were Boyd Coatings Research Company’s CRC6040R3, MicroPhase Coatings Inc.’s PhaseBreak TP, ESL and Flex coatings. Similar overall performance was observed in all coatings tested in that water droplets form on the test articles beginning at the stagnation region and spreading in the downstream direction in time. When comparing ice accumulation characteristics for the four coatings tested, for ice thickness during accumulation the CRC6040R3 had the least, followed by the ESL, Flex, and TP. However, when comparing the coatings’ ability to reduce ice adhesion, the Flex showed the highest adhesion reduction, followed by the ESL, TP and CRC 6040R3 coatings. The ice accumulated on the Flex coated surface shed under gravity when rotated 90 degrees following the tests while the other coatings required application of varying degrees of force to remove the ice. In conclusion, the ice coatings tested were not sufficient in preventing ice accumulation on all surfaces. However, Flex coating shows promise in mitigating ice on the rotor blades under the gravitational and centrifugal forces. Only the effect of gravity in shedding the ice was considered in this study. Further research will be needed to evaluate this coating on rotating blades in the icing tunnel to characterize its effectiveness. Lastly, the development of economic feasibility models used existing approaches adapted for offshore deployment in marine settings to one more suitable for Lake Erie deployment. Two different wind turbine models were tested and dynamic return on investment (ROI) model scenarios were generated. For the purpose of estimating power generation three bladed wind turbines of 3 MW capacity were selected including Model1- Leitwind LTW101-3.000-kW and Model2-Vostro V90-3.0 MW. The analysis were based on the revenue aspect of decision making of deploying wind turbines in the Ohio coastal region. The installation cost, maintenance and operational aspects were disregarded due to unavailability of data. The adjusted varying price (residential and industrial sector) and projected future price of electricity in different years suggested that the Leitwind model could generate $\$ $32.4 million of revenue in 25 years if the supply electricity is in the residential sector, while it would be $\$ $14.7million if the supply is in the industrial sector. For the Vostro model these figures are $\$ $28.6 million for residential sector and $\$ $12.9 million for industrial sector for 25 years.

17 WIND ENERGY↗

Beam-based measurement of the center of the new STAR pipe

During the RHIC Shutdown preceding Run13 for polarized protons, various upgrades were brought to the STAR detector, one of which being the partial installation of the Forward GEM Tracker (FGT). This installation includes a new beam pipe at the center of the detector with an internal radius half the size of what the replaced pipe was, from 40 mm to 20 mm. The following reviews the results of a vertical aperture scans in the STAR interaction region performed at injection energy with both beams, and gives an estimate of the measured transverse offset of the new STAR pipe.

43 PARTICLE ACCELERATORS↗

Accelerator/Experiment Operations - FY 2013

The low-energy and high-energy neutrino beams, the SeaQuest beam, and the Test Beam in the Meson area were shutoff on May 1, 2012 to begin work on the accelerator upgrades for NOvA (ANU), and for overall accelerator system maintenance. The shutdown of the Main Injector ended July 30, 2013, with the startup of the Accelerator systems for commissioning. Vacuum issues in the Main Injector delayed Commissioning and neutrino running until September.

Dixon, R.↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Decline and Fall of the Superconducting Super Collider (Final Report)

In October 1993 the US Congress terminated the Superconducting Super Collider — at the time the largest pure-science project ever attempted, with a total cost estimated to exceed $10 billion. It was a stunning loss for the US high-energy physics community, which until that moment had perched for decades at the pinnacle of American science. Ever since 1993, this once-dominant scientific community has been in gradual decline. With the 2010 startup of research on the CERN Large Hadron Collider and the 2011 shutdown of the Fermilab Tevatron, world leadership in elementary-particle physics has crossed the Atlantic and returned to Europe.

43 PARTICLE ACCELERATORS↗

Report on LLRF

The RF system for the Pohang Light Source (PLS) storage ring was upgraded for the PLS-II project to improve from 2.5GeV/200mA to 3.0GeV/400mA. The key points of machine upgrade are to implement superconducting RF (SRF) cavities and digital low-level RF (LLRF) system. Two SRF cryomodules with cryogenic system were installed and tested during summer shutdown period of 2012. And the user service beam operation has started with the SRF system since 2013. The RF system is operating at 3.0GeV/200mA with two superconducting RF (SRF) cavities.

Source record↗

Advanced Gasification (Annual Report)

The Advanced Gasification team is addressing many factors that impact the current and future development and deployment of gasification-based power generation. For example, the service life of gasifiers does not meet the performance needs of users, failing to achieve an online gasifier availability of 85-95 percent in utility applications and 95 percent in applications such as chemical production. The inability to meet these goals has created a potential roadblock to widespread acceptance and commercialization of advanced gasification technologies, with refractory liners, sensors, and syngas coolers among key components identified as negatively impacting gasifier availability. Ash originating from impurities in gasifier carbon feedstock is the root cause of many problems; attacking or fouling components, leading to their unplanned shutdowns for repair, replacement, or cleaning. Technology gaps exist in the understanding of how fuel properties impact carbon conversion, slag viscosity, and downstream fouling. Fuel flexibility has potential advantages for gasifier operators to lower fuel cost or impact future carbon emission credits, but operators need to know how feedstock changes impact gasifier operation. Mixed feedstock combinations have not been studied as to how ash properties impact gasifier operation, efficiency, and capacity factors. Further gaps exist in technology which specifically target reducing the cost of multiple and mixed feed stocks at 90 percent capture, including low-rank coal (half the U.S. coal supply) and affordable gas clean-up technology.

Additives↗

AGC-3 Experiment Irradiation Monitoring Data Qualification (Final Report)

The Graphite Technology Development Program will run a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. The third experiment, Advanced Graphite Creep 3 (AGC 3), began with Advanced Test Reactor (ATR) Cycle 152B on November 27, 2012, and ended with ATR Cycle 155B on April 23, 2014. This report documents qualification of AGC 3 experiment irradiation monitoring data for use by the Very High Temperature Reactor (VHTR) Technology Development Office (TDO) Program for research and development activities required to design and license the first VHTR nuclear plant. Qualified data meet the requirements for data collection and use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements. Trend data may not meet the requirements, but may still provide some useable information. All thermocouples (TCs) functioned throughout the AGC 3 experiment. There was one interval between December 18, 2012, and December 20, 2012, where 10 NULL values were reported for various TCs. These NULL values were deleted from the Nuclear Data Management and Analysis System database. All temperature data are Qualified for use by the VHTR TDO Program. Argon, helium, and total gas flow data were within expected ranges and are Qualified for use by the VHTR TDO Program. Total gas flow was approximately 50 sccm through the AGC 3 experiment capsule. Helium gas flow was briefly increased to 100 sccm during ATR shutdowns. At the start of the AGC 3 experiment, moisture in the outflow gas line was stuck at a constant value of 335.6174 ppmv for the first cycle (Cycle 152B). When the AGC 3 experiment capsule was reinstalled in ATR for Cycle 154B, a new moisture filter was installed. Moisture data from Cycle 152B are Failed. All moisture data from the final three cycles (Cycles 154B, 155A, and 155B) are Qualified for use by the VHTR TDO Program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quantity of 135 I released from the AGR-1, AGR-2, and AGR-3/4 experiments and discovery of 131 I at the FPMS traps during the AGR-3/4 experiment

A series of three Advanced Gas Reactor (AGR) experiments have been conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). From 2006 through 2014, these experiments supported the development and qualification of the new U.S. tristructural isotropic (TRISO) particle fuel for Very High Temperature Reactors (VHTR). Each AGR experiment consisted of multiple fueled capsules, each plumbed for independent temperature control using a mix of helium and neon gases. The gas leaving a capsule was routed to individual Fission Product Monitor (FPM) detectors. For intact fuel particles, the TRISO particle coatings provide a substantial barrier to fission product release. However, particles with failed coatings, whether because of a minute percentage of initially defective particles, those which fail during irradiation, or those designed to fail (DTF) particles, can release fission products to the flowing gas stream. Because reactive fission product elements like iodine and cesium quickly deposit on cooler capsule components and piping structures as the effluent gas leaves the reactor core, only the noble fission gas isotopes of Kr and Xe tend to reach FPM detectors. The FPM system utilizes High Purity Germanium (HPGe) detectors coupled with a thallium activated sodium iodide NaI(Tl) scintillator. The HPGe detector provides individual isotopic information, while the NaI(Tl) scintillator is used as a gross count rate meter. During irradiation, the 135m Xe concentration reaching the FPM detectors is from both direct fission and by decay of the accumulated 135 I. About 2.5 hours after irradiation (ten 15.3 minute 135m Xe half lives) the directly produced 135m Xe has decayed and only the longer lived 135 I remains as a source. Decay systematics dictate that 135m Xe will be in secular equilibrium with its 135 I parent, such that its production rate very nearly equals the decay rate of the parent, and its concentration in the flowing gas stream will appear to decay with the parent half life. This equilibrium condition enables the determination of the amount of 135 I released from the fuel particles by measurement of the 135m Xe at the FPM following reactor shutdown. In this paper, the 135 I released will be reported and compared to similar releases for noble gases as well as the unexpected finding of 131 I deposition from intentional impure gas injection into capsule 11 of experiment AGR 3/4.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improved Method for the Production of Tetrahydrofuran From Biomass

Statement of the Problem: Tetrahydrofuran (THF) is a large volume, commodity chemical used as a basic building block for polyurethane stretch fibers (Spandex), other elastomers, solvents for PVC cements, pharmaceuticals, and coatings. Current THF production requires petroleum-based raw materials and significant energy inputs, representing inefficient use of petroleum resources and placing the U.S. at a manufacturing disadvantage compared to chemical manufacturers in other world areas. Pulp and paper manufacture is one of the largest industries in the U.S., representing about 6% of the manufacturing sector of the U.S. GDP. In recent decades, the pulp and paper industry has struggled with a declining market, poor profitability, and competition from other world areas, leading to the shutdown of many U.S. pulp and paper mills, and loss of U.S. employment. The production of chemicals, such as THF from pulp and paper waste hydrolysate, can provide new technologies and products from pulp and paper manufacture which can enhance industry profitability. The iCARD technology will produce and sell THF from selected pulp and paper byproduct hydrolysates without deleterious effect on ongoing pulp production of the mill. Overall Objective: The overall goal of this Small Business Innovation Research Phase II Project was to complete the research, development, and design tasks required to commercialize an innovative technology using catalytic reactive distillation to achieve process intensification for the manufacture of “green” THF from pulp mill waste hydrolysate. The new technology will benefit the U.S. pulp and paper industry by providing new technologies and products from pulp and paper manufacture, which can enhance industry profitability, and increase industry employment. Development of commercially competitive biomass based technologies will reduce consumption of scarce hydrocarbon resources, and improve long term U.S. competitiveness in global markets. Conclusions: The novel catalytic reactive distillation technology successfully demonstrated the technical and economic feasibility of the manufacture of THF production from dilute aqueous biomass solutions. New catalyst compositions were developed with catalytic activity for conversion of furfural to THF which exceed the activity of conventional catalysts by 2 to 3 orders of magnitude. The feasibility of achieving selectivity to the desired THF product approaching 100% was demonstrated. The novel catalysts also demonstrated catalyst stability far superior to conventional furfural decarbonylation catalysts. The novel technology also demonstrated the ability to produce other valuable commercial products such as tetrahydrofurfuryl alcohol, 1,5-pentanediol, 2-methyl furan, and 2-tetrahydromethylfuran as co-products with THF. Based on the use of waste pulp mill hydrolysate as the biomass raw material source, the new technology will produce THF for a total manufacturing cost less than the raw material cost for the hydrocarbon-based feed stocks for conventional THF production. Commercial Applications: Selective catalytic reactive distillation of pulp mill waste hydrolysate will allow commercial production of “green” THF from biomass feedstocks for the production of “green” elastomer fibers, and industrial solvents. The new technology will benefit the U.S. pulp and paper industry by providing new technologies and products from pulp and paper manufacture, which can enhance industry profitability, and increase industry employment. Development of commercially competitive biomass based technologies will reduce consumption of scarce hydrocarbon resources, and improve long term U.S. competitiveness in global markets.

09 BIOMASS FUELS↗

Light Water Reactor Sustainability Accomplishments Report

Welcome to the 2014 Light Water Reactor Sustainability (LWRS) Program Accomplishments Report, covering research and development highlights from 2014. The LWRS Program is a U.S. Department of Energy research and development program to inform and support the long-term operation of our nation’s commercial nuclear power plants. The research uses the unique facilities and capabilities at the Department of Energy national laboratories in collaboration with industry, academia, and international partners. Extending the operating lifetimes of current plants is essential to supporting our nation’s base load energy infrastructure, as well as reaching the Administration’s goal of reducing greenhouse gas emissions to 80% below 1990 levels by the year 2050. The purpose of the LWRS Program is to provide technical results for plant owners to make informed decisions on long-term operation and subsequent license renewal, reducing the uncertainty, and therefore the risk, associated with those decisions. In January 2013, 104 nuclear power plants operated in 31 states. However, since then, five plants have been shut down (several due to economic reasons), with additional shutdowns under consideration. The LWRS Program aims to minimize the number of plants that are shut down, with R&D that supports long-term operation both directly (via data that is needed for subsequent license renewal), as well indirectly (with models and technology that provide economic benefits). The LWRS Program continues to work closely with the Electric Power Research Institute (EPRI) to ensure that the body of information needed to support SLR decisions and actions is available in a timely manner. This report covers selected highlights from the three research pathways in the LWRS Program: Materials Aging and Degradation, Risk-Informed Safety Margin Characterization, and Advanced Instrumentation, Information, and Control Systems Technologies, as well as a look-ahead at planned activities for 2015. If you have any questions about the information in the report, or about the LWRS Program, please contact me, Richard A. Reister (the Federal Program Manager), or the respective research pathway leader (noted on pages 26 and 27), or visit the LWRS Program website (www.inl.gov/lwrs). The annually updated Integrated Program Plan and Pathway Technical Program Plans are also available for those seeking more detailed technical Information.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A User Guide to PARET/ANL (V.7.6) (Rev.1)

PARET was originally created in 1969 at what is now Idaho National Laboratory (INL), to analyze reactivity insertion events in research and test reactor cores cooled by light or heavy water, with fuel composed of either plates or pins. The use of PARET is also appropriate for fuel assemblies with curved fuel plates when their radii of curvatures are large with respect to the fuel plate thickness. The PARET/ANL version of the code has been developed at Argonne National Laboratory (ANL) under the sponsorship of the U.S. Department of Energy/NNSA, and has been used by the Reactor Conversion Program to determine the expected transient behavior of a large number of reactors. PARET/ANL models the various fueled regions of a reactor core as channels. Each of these channels consists of a single flat fuel plate/pin (including cladding and, optionally, a gap) with water coolant on each side. In slab geometry the coolant channels for a given fuel plate are of identical dimensions (mirror symmetry), but they can be of different thickness in each channel. There can be many channels, but each channel is independent and coupled only through reactivity feedback effects to the whole core. The time-dependent differential equations that represent the system are replaced by an equivalent set of finite-difference equations in space and time, which are integrated numerically. PARET/ANL uses fundamentally the same numerical scheme as RELAP5 for the time-integration of the point-kinetics equations. The one-dimensional thermal-hydraulic model includes temperature-dependent thermal properties of the solid materials, such as heat capacity and thermal conductivity, as well as the transient heat production and heat transfer from the fuel meat to the coolant. Temperature- and pressure-dependent thermal properties of the coolant such as enthalpy, density, thermal conductivity, and viscosity are also used in determining parameters such as friction factors and heat transfer coefficients. The code first determines the steady-state solution for the initial state. Then the solution of the transient is obtained by integration in time and space. Multiple heat transfer, DNB and flow instability correlations are available. The code was originally developed to model reactors cooled by an open loop, which was adequate for rapid transients in pool-type cores. An external loop model appropriate for Miniature Neutron Source Reactors (MNSR’s) was also added to PARET/ANL to model natural circulation within the vessel, heat transfer from the vessel to pool and heat loss by evaporation from the pool. PARET/ANL also contains models for decay heat after shutdown, control rod reactivity versus time or position, time-dependent pump flow, and loss-of-flow event with flow reversal as well as logic for trips on period, power, and flow. Feedback reactivity effects from coolant density changes and temperature changes are represented by tables. Feedback reactivity from fuel heat-up (Doppler Effect) is represented by a four-term polynomial in powers of fuel temperature. Photo-neutrons produced in beryllium or in heavy water may be included in the point-kinetics equations by using additional delayed neutron groups.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Isotopic Details of the Spent Catawba-1 MOX Fuel Rods at ORNL

The United States Department of Energy funded Shaw/AREVA MOX Services LLC to fabricate four MOX Lead Test Assemblies (LTA) from weapons-grade plutonium. A total of four MOX LTAs (including MX03) were irradiated in the Catawba Nuclear Station (Unit 1) Catawba-1 PWR which operated at a total thermal power of 3411 MWt and had a core with 193 total fuel assemblies. The MOX LTAs were irradiated along with Duke Energy s irradiation of eight Westinghouse Next Generation Fuel (NGF) LEU LTAs (ref.1) and the remaining 181 LEU fuel assemblies. The MX03 LTA was irradiated in the Catawba-1 PWR core (refs.2,3) during cycles C-16 and C-17. C-16 began on June 5, 2005, and ended on November 11, 2006, after 499 effective full power days (EFPDs). C-17 started on December 29, 2006, (after a shutdown of 48 days) and continued for 485 EFPDs. The MX03 and three other MOX LTAs (and other fuel assemblies) were discharged at the end of C-17 on May 3, 2008. The design of the MOX LTAs was based on the (Framatome ANP, Inc.) Mark-BW/MOX1 17 17 fuel assembly design (refs. 4,5,6) for use in Westinghouse PWRs, but with MOX fuel rods with three Pu loading ranges: the nominal Pu loadings are 4.94 wt%, 3.30 wt%, and 2.40 wt%, respectively, for high, medium, and low Pu content. The Mark-BW/MOX1 (MOX LTA) fuel assembly design is the same as the Advanced Mark-BW fuel assembly design but with the LEU fuel rods replaced by MOX fuel rods (ref. 5). The fabrication of the fuel pellets and fuel rods for the MOX LTAs was performed at the Cadarache facility in France, with the fabrication of the LTAs performed at the MELOX facility, also in France.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Imaging the Core of Fukushima Reactor with Muons

The 9.0-magnitude earthquake, followed by the vast tsunami on March 11, 2011, caused a nuclear crisis at the Fukushima Daiichi reactors. Damage of the reactor cores attracted worldwide attention to the issue of the fundamental safety of nuclear energy. The Japanese government announced a cold shutdown in December 2011, and began a new phase of cleanup and decommissioning. However, it is difficult to plan the dismantling of the reactors without a realistic estimate of the extent of the damage to the cores and knowledge of the location of the melted fuel. Access to the reactor buildings is very limited due to high radiation fields. Los Alamos researchers have used experiments and modeling to show how muon imaging with detectors external to the reactors can enable damage assessment inside Fukushima. Physical Review Letters, AIP Advances, and the Journal of Applied Physics have published different aspects of this work.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗