Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 775 records · Page 43

Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kW Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate (STMD) and is intended to be used as the electric propulsion system on the Power and Propulsion Element (PPE) of the recently announced Deep Space Gateway (DSG). The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet-Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 (VF-6) for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU)-1 and TDU-3 Hall thrusters are also included.

Peterson, Peter Y.↗

Development of Guidelines for In-Situ Repair of SLS-Class Composite Flight Hardware

The purpose of composite repair development at KSC (John F. Kennedy Space Center) is to provide support to the CTE (Composite Technology for Exploration) project. This is a multi-space center effort with the goal of developing bonded joint technology for SLS (Space Launch System) -scale composite hardware. At KSC, effective and efficient repair processes need to be developed to allow for any potential damage to composite components during transport or launch preparation. The focus of the composite repair development internship during the spring of 2018 was on the documentation of repair processes and requirements for process controls based on techniques developed through hands-on work with composite test panels. Three composite test panels were fabricated for the purpose of repair and surface preparation testing. The first panel included a bonded doubler and was fabricated to be damaged and repaired. The second and third panels were both fabricated to be cut into lap-shear samples to test the strength of bond of different surface preparation techniques. Additionally, jointed composite test panels were impacted at MSFC (Marshall Space Flight Center) and analyzed for damage patterns. The observations after the impact tests guided the repair procedure at KSC to focus on three repair methods. With a finalized repair plan in place, future work will include the strength testing of different surface preparation techniques, demonstration of repair methods, and repair of jointed composite test panels being impacted at MSFC.

Weber, Thomas P., Jr.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Environmental Enrichment in the ISS Rodent Habitat Hardware System

Responses of animals exposed to microgravity during in-space experiments were observed via available video recording stored in the NASA Ames Life Sciences Data Archive. These documented observations of animal behavior, as well as the range and level of activities during spaceflight, demonstrate that weightlessness conditions and the extreme novelty of the surroundings may exert damaging psychological stresses on the inhabitants. In response to a recognized need for in-flight animals to improve their wellbeing we propose to reduce such stresses by shaping and interrelating structures and surroundings to satisfying vital physiological needs of inhabitants. A Rodent Habitat Hardware System (RHHS) based housing facility incorporating a tubing network system, to maintain and monitor rodent health environment with advanced accessories has been proposed. Placing mice in a tubing-configured environment creates more natural space-restricted nesting environment for rodents, thereby facilitating a more comfortable transition to living in microgravity. A sectional tubing structure of the RHHS environment will be more beneficial under microgravity conditions than the provision of a larger space area that is currently utilized. The new tubing configuration was found suitable for further incorporation of innovative monitoring technology and accessories in the animal holding habitat unit which allow to monitor in real-time monitoring of valuable health related biological parameters under weightlessness environment of spaceflight.

modifications↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

NASA’s Space Launch System: First Mission Hardware Nears Completion

The Space Launch System (SLS) Program (Fig. 1) completed several significant production milestones in 2018 for its first mission and is poised for greater accomplishments in 2019. With manufacturing and hardware installation complete, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success and scientific discovery. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

Environmental Enrichment in the ISS Rodent Habitat Hardware System

Responses of animals exposed to microgravity during in-space experiments were reviewed from NASAs and ESA available video recording archives. These documented observation of animal behavior, as well as the range and level of activities during spaceflight, clearly demonstrate that weightlessness conditions and the extreme novelty of the surroundings exert damaging psychological stresses on the inhabitants. In response to a recognized need for in-flight animals to improve their wellbeing we propose to reduce such stresses by shaping and interrelating structures and surroundings to satisfying vital physiological needs of inhabitants. Rodent Habitat Hardware System based housing facility incorporating a tubing network system, to maintain and monitor rodent health environment with advanced accessories has been proposed. The new tubing configuration was found suitable for further incorporation of innovative monitoring technology and accessories in the animal holding habitat unit which allow to monitor in real-time the most valuable health related biological parameter under weightlessness environment of spaceflight.

Orr, Sophie↗

Microbiological Analysis of Mizuna Grown in the Veggie Hardware to Define Critical Control Points and Ensure the Safety of Space Grown Crops

The Veggie facility on the International Space Station has been utilized as a “pick and eat” plant growth system to provide fresh produce for crew consumption. The VEG-04 experiments completed in 2019 examined the effect of red-rich and blue-rich light treatments on the growth of mizuna as well as harvest method and resulting yield. Analysis was performed on plant tissues and associated hardware to evaluate the influence of these experimental variables on the microbial population. VEG-04A plant pillows with pre-planted Mizuna mustard seeds were launched on SpaceX-16 in December 2018. The pillows were initiated, and a single 35-day harvest was performed. Veg 04B pillows were pre-planted with Mizuna seeds and launched on SpaceX-18 in July 2019, initiated and subsequently harvested at days 29, 43 and 58. The crew consumed approximately half of the produce, and the remainder was frozen and returned for analysis. Leaves, swabs, wicking material, substrate, and roots were processed and plated on media for the enumeration and isolation of bacteria and fungi. Isolated bacterial colonies were identified using Biolog Micro ID system or MicroSEQ16S rDNA sequencing technique. Fungal colonies were identified using the MicroSEQ D2 rDNA kit. Sample extracts were plated onto specialized media to identify Escherichia coli/coliforms, Staphylococcus aureus and Salmonella sp. Results indicate that bacterial and fungal counts were higher in plants grown in red-rich lightin VEG-04A, while the opposite was true in the Veg-04B third harvest. Microbial counts increased with the repeated harvest method used in Veg-04B. These data support the understanding of environmental and horticultural practices that can affect the microbiological quality of space-grown produce grown and aid in identification of critical control points for the development of a hazard analysis critical control point plan for ISS-grown crops. This research was co-funded by the NASA’s Human Research Program and Space Biology.

Mary E Hummerick↗

Novel Hardware for a Lunar Plant Experiment

We propose an experiment, LPX (Lunar plant growth experiment), on the surface of the Moon that will conduct a fundamental investigation into the response of the plant Arabidopsis to lunar gravity and lunar radiation. For statistical significance, we will include more than 50 seeds. The experiment begins after lunar landing with water added to the seed platform and continues for 10 days or more. The growth of the plants, reaching ~ 1 cm high with typically 3-4 leaves in 10 days, will be monitored by camera and the carbon dioxide in the sealed chamber also will be monitored. The hardware for the LPX is based on proven technology flown on the ISS in Dec 2019 (Kitto et al. 2021, Life Sci. Space Res. in press) and the “Phytofuge” canister for Techshot MVP (Multi-use Variable-gravity Platform) centrifuge – both on ISS now. Both of these systems are TRL 9. This approach will allow identical units to be sent to the Moon and to be flown on ISS - allowing direct comparisons to partial gravity experiments done on the ISS experiment. Germination and growth of Arabidopsis requires temperature range of 20–25°C with the optimum being 22–23°C (Shymanovich and Kiss 2020, Gravit. & Space Res., 8, 1-7). This level of thermal control is a challenge on a small lunar lander and is effectively set by the latitude of the landing site. Given the mass and power limitations on a small lander, and the internal power of the LPX (~ 5W) the landing site needs to be between 73° and 77° − for which the noon time lunar surface temperatures are +15°C and -3°C (Hurley et al. 2015, Icarus 255,159-163). Within this range the temperature can be set with a small thermostatically-controlled heater These proposed experiments would be the first to grow plants on another planet and would provide important insights in terms of growth of plants on the Moon as part of bioregenerative life support.

Christopher P Mckay↗

Keys to Subcontracting Space Hardware with JPL

The Jet Propulsion Laboratory’s (JPL), process of subcontracting space systems and hardware with suppliers varies somewhat from the industry-standard supply chain process. This paper is an overview of the contracting process with JPL, a division of the California Institute of Technology (Caltech), in Pasadena, CA. The goal of this paper is to present and clarify the JPL way of subcontracting in order to help both current and potential suppliers understand the JPL nuances and ease their process of contracting with JPL.

Pasko Heuchert, Susan↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 μm in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 μm or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Rohit Shastry↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 h of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Ion engine↗

Mars 2020 sample caching system contamination: how to clean hardware and keep it clean

The Mars 2020 Rover will have the capability to collect and cache samples for potential Mars sample return. Specifically, the sample caching system (SCS) is designed for coring Mars samples and acquiring regolith samples as well as handling, sealing and caching on Mars. As the potential first Martian samples that could be returned to Earth, assuring low levels of terrestrial contamination is of the utmost concern. In developing the SCS, the project prioritizes limiting sample contamination in organic, inorganic and biological areas. The focus of this paper is on the strategies being implemented to clean the assemble the sampling hardware to meet and maintain stringent contamination requirements.

Rainen, Richard↗

Hold Down and Release Mechanism Hardware Simulator for Ground Deployment Testing

Hold Down and Release Mechanisms (HDRMs) are a common piece of spacecraft hardware which restrain components during launch, transit, and later allow them to be extended, jettisoned, separated, etc. at the spacecraft’s destination. Due to prohibitively high cost, long lead times, and limited reset capability, testing of mechanisms that require HDRMs is often difficult. This project explored the possibility of designing HDRM-analogue devices that would replicate the function of flight HDRMs during ground-based testing for a fraction of the cost of a flight HDRM. These devices were designed with the requirements of the Spin Eject Mechanism to be used on the Mars Sample Return (MSR) Capture, Containment, and Return System (CCRS) in mind. A trade study was conducted to determine the optimal internal mechanism design of the device, comparing several mechanisms from existing HDRMs to several simpler, more novel mechanisms. CAD software was used to create a preliminary design of the device utilizing a mix of commercial off-the-shelf parts and custom-manufactured parts. Several straightforward analyses were conducted to determine the most effective models for the off-the-shelf parts. A prototype largely composed of 3D-printed components was also created to proof the design concept. Although this HDRM simulator was designed for a particular mechanism for the CCRS mission, its general design is useful for ground testing of a variety of mechanisms requiring similar HDRM simulators.

Kian Vilhauer↗

Classifications and Requirements for Testing Systems and Hardware to be Exposed to Dust in Planetary Environments

The purpose of this NASA Technical Standard is to establish minimum requirements and provide effective guidance regarding methodologies and best practices for testing systems and hardware to be exposed to dust in dust laden and generating environments. The intent is to facilitate consistency and efficiency in testing space systems, subsystems, or components with operations and missions in dusty environments.

Kristen Kathleen John↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout and a longer nominal use. This paper will summarize operations of the Toilet and Toilet Integration Hardware in both of those configurations, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

life support↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work-arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout. This paper will summarize operations of the Toilet and Toilet Integration Hardware in this limited configuration, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗