Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 793 records · Page 44

Magnetic disk

Magnetic disk recording was invented in 1953 and has undergone intensive development ever since. As a result of this 38 years of development, the cost per byte and the areal density has halved and doubled, respectively every 2 to 2 1/2 years. Today, the cost per byte is lower than 10(exp -6) dollars per byte and area densities exceed 100 x 10(exp 6) bits per square inch. The recent achievements in magnetic disk recording will first be surveyed briefly. Then the principal areas of current technical development will be outlined. Finally, some comments will be made about the future of magnetic disk recording.

Mallinson, John C.↗

Aluminum-fueled rockets for the space transportation system

Aluminum-fueled engines, used to propel orbital transfer vehicles (OTV's), offer benefits to the Space Transportation System (STS) if scrap aluminum can be scavenged at a reasonable cost. Aluminum scavenged from Space Shuttle external tanks could replace propellants hauled from Earth, thus allowing more payloads to be sent to their final destinations at the same Shuttle launch rate. To allow OTV use of aluminum fuel, two new items would be required: a facility to reprocess aluminum from external tanks and an engine for the OTV which could burn aluminum. Design of the orbital transfer vehicle would have to differ substantially from current concepts for it to carry and use the aluminum fuel. The aluminum reprocessing facility would probably have a mass of under 15 metric tons and would probably cost less that $200,000,000. Development of an aluminum-burning engine would no doubt be extremely expensive (1 to 2 billion dollars), but this amount would be adequately repaid by increased STS throughput. Engine production cost is difficult to estimate, but even an extremely high cost (e.g., $250,000,000 per engine) would not significantly increase orbit-raising expenses.

Cutler, Andrew Hall↗

The Edge supersonic transport

As intercontinental business and tourism volumes continue their rapid expansion, the need to reduce travel times becomes increasingly acute. The Edge Supersonic Transport Aircraft is designed to meet this demand by the year 2015. With a maximum range of 5750 nm, a payload of 294 passengers and a cruising speed of M = 2.4, The Edge will cut current international flight durations in half, while maintaining competitive first class, business class, and economy class comfort levels. Moreover, this transport will render a minimal impact upon the environment, and will meet all Federal Aviation Administration Part 36, Stage III noise requirements. The cornerstone of The Edge's superior flight performance is its aerodynamically efficient, dual-configuration design incorporating variable-geometry wingtips. This arrangement combines the benefits of a high aspect ratio wing at takeoff and low cruising speeds with the high performance of an arrow-wing in supersonic cruise. And while the structural weight concerns relating to swinging wingtips are substantial, The Edge looks to ever-advancing material technologies to further increase its viability. Heeding well the lessons of the past, The Edge design holds economic feasibility as its primary focus. Therefore, in addition to its inherently superior aerodynamic performance, The Edge uses a lightweight, largely windowless configuration, relying on a synthetic vision system for outside viewing by both pilot and passengers. Additionally, a fly-by-light flight control system is incorporated to address aircraft supersonic cruise instability. The Edge will be produced at an estimated volume of 400 aircraft and will be offered to airlines in 2015 at $167 million per transport (1992 dollars).

Agosta, Roxana↗

RTJ-303: Variable geometry, oblique wing supersonic aircraft

This document is a preliminary design of a High Speed Civil Transport (HSCT) named the RTJ-303. It is a 300 passenger, Mach 1.6 transport with a range of 5000 nautical miles. It features four mixed-flow turbofan engines, variable geometry oblique wing, with conventional tail-aft control surfaces. The preliminary cost analysis for a production of 300 aircraft shows that flyaway cost would be 183 million dollars (1992) per aircraft. The aircraft uses standard jet fuel and requires no special materials to handle aerodynamic heating in flight because the stagnation temperatures are approximately 130 degrees Fahrenheit in the supersonic cruise condition. It should be stressed that this aircraft could be built with today's technology and does not rely on vague and uncertain assumptions of technology advances. Included in this report are sections discussing the details of the preliminary design sequence including the mission to be performed, operational and performance constraints, the aircraft configuration and the tradeoffs of the final choice, wing design, a detailed fuselage design, empennage design, sizing of tail geometry, and selection of control surfaces, a discussion on propulsion system/inlet choice and their position on the aircraft, landing gear design including a look at tire selection, tip-over criterion, pavement loading, and retraction kinematics, structures design including load determination, and materials selection, aircraft performance, a look at stability and handling qualities, systems layout including location of key components, operations requirements maintenance characteristics, a preliminary cost analysis, and conclusions made regarding the design, and recommendations for further study.

Antaran, Albert↗

Scheduling revisited workstations in integrated-circuit fabrication

The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.

Kline, Paul J.↗

Reliability of solid rocket motor cases and nozzles

A recent article in Aerospace America claims that 'the average success ratio of the current U.S. stable of launch vehicles, including upper stages, is about 92 percent (without upper stages it is close to 95 percent). The 8 percent failure probability implies an expected loss of $12M per flight, not including the lost opportunity costs'. Since payload costs are likely to be much greater than launch costs and even more so for the new launch vehicles for the Advanced Launch Development Program (ALDP), the cost of rocket motor unreliability at the current 8 percent rate can run into billions of dollars if expected increases in demand are realized. At an 8 percent failure rate, it is extremely unlikely that failure will occur during the first few ground tests of a new system. At that time, most of the design, analysis and tooling costs of the program have not expended. Since most systems are expected to be used ten to a hundred or more times, the likelihood of one or more failures is very large, and it can be expected that the above losses will be realized in the future. This will occur unless the problems are addressed and remedied. Recent trends suggest the problem is not being addressed adequately.

Crose, James G.↗

Canadian Space Agency Space Station Freedom utilization plans

Under the terms of the NASA/CSA Memorandum of Understanding, Canada will contribute the Mobile Servicing System and be entitled to use 3 percent of all Space Station utilization resources and user accommodations over the 30 year life of the Station. Equally importantly Canada, like NASA, can begin to exploit these benefits as soon as the Man-Tended Capability (MTC) phase begins, in early 1997. Canada has been preparing its scientific community to fully utilize the Space Station for the past five years; most specifically by encouraging, and providing funding, in the area of Materials Science and Applications, and in the area of Space Life Sciences. The goal has been to develop potential applications and an experienced and proficient Canadian community able to effectively utilize microgravity environment facilities such as Space Station Freedom. In addition, CSA is currently supporting four facilities; a Laser Test System, a Large Motion Isolation Mount, a Canadian Float Zone Furnace, and a Canadian Protein Crystallization Apparatus. In late April of this year CSA sent out a Solicitation of Interest (SOI) to potential Canadian user from universities, industry, and government. The intent of the SOI was to determine who was interested, and the type of payloads which the community at large intended to propose. The SOI will be followed by the release of an Announcement of Opportunity (AO) following governmental approval of the Long Term Space plan later this year, or early next year. Responses to the AO will be evaluated and prioritized in a fair and impartial payload selection process, within the guidelines set by our international partners and the Canadian Government. Payload selection is relatively simple compared to the development and qualification process. An end-to-end user support program is therefore also being defined. Much of this support will be provided at the new headquarters currently being built in St. Hubert, Quebec. It is recognized that utilizing the Space Station could be expensive for users; costing in many cases millions of dollars to get a payload from conception to retrieval. It is also recognized that some of the potential users cannot or will not invest a lot of money or effort into Space Station utilization, unless there is a perceived significant commercial potential. How best to fund Space Station payloads is under study. Space Station Freedom will provide the first opportunity for Canada to conduct experiments in a long-duration microgravity environment. CSA have been developing and funding potential users for some time, and considerable interest has been shown by the response to our SOI earlier this year. Canada can be one of the two earliest users for the Space Station, along with NASA. We hope to take full advantage of this opportunity.

Faulkner, James↗

Space Station Furnace Facility. Volume 3: Program cost estimate

The approach used to estimate costs for the Space Station Furnace Facility (SSFF) is based on a computer program developed internally at Teledyne Brown Engineering (TBE). The program produces time-phased estimates of cost elements for each hardware component, based on experience with similar components. Engineering estimates of the degree of similarity or difference between the current project and the historical data is then used to adjust the computer-produced cost estimate and to fit it to the current project Work Breakdown Structure (WBS). The SSFF Concept as presented at the Requirements Definition Review (RDR) was used as the base configuration for the cost estimate. This program incorporates data on costs of previous projects and the allocation of those costs to the components of one of three, time-phased, generic WBS's. Input consists of a list of similar components for which cost data exist, number of interfaces with their type and complexity, identification of the extent to which previous designs are applicable, and programmatic data concerning schedules and miscellaneous data (travel, off-site assignments). Output is program cost in labor hours and material dollars, for each component, broken down by generic WBS task and program schedule phase.

Source record↗

The importance of cost considerations in the systems engineering process

This paper examines the question of cost, from the birth of a program to its conclusion, particularly from the point of view of large multi-center programs, and suggests how to avoid some of the traps and pitfalls. Emphasis is given to cost in the systems engineering process, but there is an inevitable overlap with program management. (These terms, systems engineering and program management, have never been clearly defined.) In these days of vast Federal budget deficits and increasing overseas competition, it is imperative that we get more for each research and development dollar. This is the only way we will retain our leadership in high technology and, in the long run, our way of life.

Hodge, John D.↗

The Global Ocean Observing System

A Global Ocean Observing System (GOOS) should be established now with international coordination (1) to address issues of global change, (2) to implement operational ENSO forecasts, (3) to provide the data required to apply global ocean circulation models, and (4) to extract the greatest value from the one billion dollar investment over the next ten years in ocean remote sensing by the world's space agencies. The objectives of GOOS will focus on climatic and oceanic predictions, on assessing coastal pollution, and in determining the sustainability of living marine resources and ecosystems. GOOS will be a complete system including satellite observations, in situ observations, numerical modeling of ocean processes, and data exchange and management. A series of practical and economic benefits will be derived from the information generated by GOOS. In addition to the marine science community, these benefits will be realized by the energy industries of the world, and by the world's fisheries. The basic oceanic variables that are required to meet the oceanic and predictability objectives of GOOS include wind velocity over the ocean, sea surface temperature and salinity, oceanic profiles of temperature and salinity, surface current, sea level, the extent and thickness of sea ice, the partial pressure of CO2 in surface waters, and the chlorophyll concentration of surface waters. Ocean circulation models and coupled ocean-atmosphere models can be used to evaluate observing system design, to assimilate diverse data sets from in situ and remotely sensed observations, and ultimately to predict future states of the system. The volume of ocean data will increase enormously over the next decade as new satellite systems are launched and as complementary in situ measuring systems are deployed. These data must be transmitted, quality controlled, exchanged, analyzed, and archived with the best state-of-the-art computational methods.

Kester, Dana↗

Solid-state Isotopic Power Source for Computer Memory Chips

Recent developments in materials technology now make it possible to fabricate nonthermal thin-film radioisotopic energy converters (REC) with a specific power of 24 W/kg and a 10 year working life at 5 to 10 watts. This creates applications never before possible, such as placing the power supply directly on integrated circuit chips. The efficiency of the REC is about 25 percent which is two to three times greater than the 6 to 8 percent capabilities of current thermoelectric systems. Radio isotopic energy converters have the potential to meet many future space power requirements for a wide variety of applications with less mass, better efficiency, and less total area than other power conversion options. These benefits result in significant dollar savings over the projected mission lifetime.

Brown, Paul M.↗

Elastomer Compound Developed for High Wear Applications

The U.S. Army is currently spending 300 million dollars per year replacing rubber track pads. An experimental rubber compound has been developed which exhibits 2 to 3 times greater service life than standard production pad compounds. To improve the service life of the tank track pads various aspects of rubber chemistry were explored including polymer, curing and reinforcing systems. Compounds that exhibited superior physical properties based on laboratory data were then fabricated into tank pads and field tested. This paper will discuss the compounding studies, laboratory data and field testing that led to the high wear elastomer compound.

Crawford, D.↗

NASA'S information technology activities for the 90's

The Office of Aeronautics, Exploration and Technology (OAET) is completing an extensive assessment of its nearly five hundred million dollars of proposed space technology development work. The budget is divided into four segments which are as follows: (1) the base research and technology program; (2) the Civil Space Technology Initiative (CSTI); (3) the Exploration Technology Program (ETP); and (4) the High Performance Computing Initiative (HPCI). The programs are briefly discussed in the context of Astrotech 21.

Holcomb, Lee↗

Modeling and control design of a wind tunnel model support

The 12-Foot Pressure Wind Tunnel at Ames Research Center is being restored. A major part of the restoration is the complete redesign of the aircraft model supports and their associated control systems. An accurate trajectory control servo system capable of positioning a model (with no measurable overshoot) is needed. Extremely small errors in scaled-model pitch angle can increase airline fuel costs for the final aircraft configuration by millions of dollars. In order to make a mechanism sufficiently accurate in pitch, a detailed structural and control-system model must be created and then simulated on a digital computer. The model must contain linear representations of the mechanical system, including masses, springs, and damping in order to determine system modes. Electrical components, both analog and digital, linear and nonlinear must also be simulated. The model of the entire closed-loop system must then be tuned to control the modes of the flexible model-support structure. The development of a system model, the control modal analysis, and the control-system design are discussed.

Howe, David A.↗

Small spacecraft conceptual design for a Fast Pluto Flyby mission

The main objective of the Pluto Fast Flyby mission is to conduct first reconnaissance level science at Pluto before its atmospheric collapse in the next two to three decades. The design approach is driven by the consideration of cost (with the objective to deliver two 164-kg spacecraft to Pluto for less than 400 million dollars development cost). The paper describes the mission-design approach and the Pluto Fast Flyby conceptual flight system 1992 baseline. Attention is also given to the design history of the spacecraft concept and the current and future activity of the Pluto Fast Flyby team.

Salvo, Christopher G.↗

A comparison of nuclear thermal rocket development cost and schedule for piloted missions to Mars

In Fiscal Year 1992, NASA led a team, including DOE, universities, and industry, that evaluated various schedule and cost scenarios for development of nuclear thermal rocket propulsion systems for piloted Mars exploration. This paper summarizes the results of two of these studies: (1) a so-called 'Fast Track' approach, that would result in technology readiness level 6 (TRL-6-system ground testing complete) by the year 2000, and (2) a slower program that results in TRL-6 by 2006. Both scenarios included a concurrent engineering approach. Costs and schedules for the two scenarios are compared. In addition to the six-year schedule delay, the TRL-6 in 2006 scenario is estimated to increase the cost of the program from $4.7 billion to $5.8 billion (in real-year dollars). On the positive side, the technical program should be better, since nuclear testing of fuel elements may be possible prior to concept down-select, resulting in a more informed decision.

Clark, John S.↗

Space-based laser-powered orbital transfer vehicle (Project SLICK)

The project SLICK (Space Laser Interorbital Cargo Kite) involves conceptual designs of reusable space-based laser-powered orbital transfer vehicle (LOTV) for ferrying 16,000 kg cargo primarily between low Earth orbit (LEO) and geosynchronous earth orbit (GEO). The power of LOTV is beamed by a single 32-MW solar-pumped iodide laser orbiting the Earth at an altitude of one Earth radius. The laser engine selected for the LOTV is based on a continuous-wave, steady-state propulsion scheme and uses an array of seven discrete plasmas in a flow of hydrogen propellant. Both all-propulsive and aerobraked LOTV configurations were analyzed and developed. The all-propulsive vehicle uses a rigid 11.5-m aperture primary mirror and its engine produces a thrust of 2000 N at a specific impulse of 1500 sec. For the LEO-to-GEO trip, the payload ratio, m(sub payload/m(sub propellant)+m(sub dry vehicle) = 1.19 and the trip time is about 6 days. The aerobraked version uses a lightweight, retractable wrapped-rib primary mirror which is folded for aerobraking and a 20-m-diameter inflatable-ballute aeroshield which is jettisoned after aeromaneuver. Lifecycle cost analysis shows that the aerobraked configuration may have an economic advantage over the all-propulsive configuration as long as the cost of launching the propellant to LEO is higher than about $500/kg in current dollars.

Source record↗

Preliminary system design of a Three Arm Capture Mechanism (TACM) flight demonstration article

The overall objective of the Three Arm Capture Mechanism (TACM) is to serve as a demonstration of capability for capture of objects in space. These objects could be satellites, expended boosters, pieces of debris, etc.; anything of significant size. With this capability we can significantly diminish the danger of major collisions of debris with valuable space assets and with each other, which would otherwise produce many smaller, high velocity pieces of debris which also become concerns. The captured objects would be jettisoned into the atmosphere, relocated in 'parking' orbits, or recovered for disposition or refurbishment. The dollar value of satellites launched into space continues to grow along with the cost of insurance; having a capture capability takes a positive step towards diminishing this added cost. The effort covered is a planning step towards a flight demonstration of the satellite capture capability. Based on the requirement to capture a communication class satellite, its associated booster, or both, a preliminary system definition of a retrieval kit is defined. The objective of the flight demonstration is to demonstrate the techniques proposed to perform the mission and to obtain data on technical issues requiring an in situ space environment. The former especially includes issues such as automated image recognition techniques and control strategies that enable an unmanned vehicle to rendezvous and capture a satellite, contact dynamics between the two bodies, and the flight segment level of automation required to support the mission. A development plan for the operational retrieval capability includes analysis work, computer and ground test simulations, and finally a flight demonstration. A concept to perform a selected mission capturing a precessing communications satellite is described. Further development efforts using analytical tools and laboratory facilities are required prior to reaching the point at which a full commitment to the flight demonstration design can be made.

Schaefer, Otto↗