Search NASA⌕ Search

SEARCH · Search NASA

Results for “ARTEMIS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Terrestrial Proving Ground Capabilities Needed for Lunar In Situ Resource Utilization (ISRU) & Construction Concepts of Operation

Incorporating any new technology or system into a human exploration mission or architecture requires development well in advance of the mission to eliminate technology, cost, and schedule risk concerns. It is often stated that technologies need to be at a Technology Readiness Level (TRL) of 6, i.e. ‘system/subsystem model or prototype demonstration in a relevant environment (ground or space)’, by Authority To Proceed (ATP) or by the Preliminary Design Review (PDR) for the mission at the latest. There are two game changing capabilities for sustained human exploration of space that can have a significant effect on the overall exploration architecture and the technologies and systems included in the architecture. The first game changing capability, known as In Situ Resource Utilization (ISRU), involves the search for, acquisition, and processing of resources on the Moon and Mars into mission consumables and usable products, and the second is the ability to utilize space resources in the construction of roads, structures, and surface infrastructure. ISRU and surface construction capabilities have the potential to greatly reduce the cost and risk of human exploration while enabling sustained lunar surface and commercial operations. However, ISRU and surface construction systems are complex and must operate in extremely harsh environments, with abrasive regolith and pervasive dust, for long-periods of time, with potentially limited opportunities for maintenance and repair by humans. The complexity of these capabilities and operations also means that there are a limited number of companies that can design, build, and operate end-to-end systems on their own. The majority of the technologies being developed for these systems are by small companies and at the component or subsystem level. With the overarching strategy of the United States National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) to enable industry to implement ISRU and surface infrastructure for Artemis and space commercialization, it is therefore important to establish processes and capabilities to promote and foster collaborations among large and small companies involved in ISRU and surface infrastructure development. For ISRU and infrastructure systems and capabilities to be used in Artemis missions and future commercial lunar surface operations, a coordinated framework with virtual/physical integration and testing locations, or ‘Proving Grounds’, needs to be established and operated on a regular basis and open to all. This paper will discuss the ISRU and surface construction near and long-term concepts of operations, and review operations and lessons-learned from the previous ISRU analog field tests. From this information, requirements and capabilities will be proposed to support and enable the integration and testing of ISRU and construction systems with industry, academia, and international agencies, as well as what facilities and organizations could help establish these Proving Grounds.

ISRU↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Crew State and Risk Model (CSRM) - Medication Impacts on Physiologic Models for Exploration Class EVA Predictive Modeling and Operations

EVA and Environmental Physiology Laboratory (EEPL) wanted to expand upon the previous CSRM Physiologic Map to visually demonstrate the impact of medications on various modeling inputs that map to the seven physiologic models. It is acknowledged various physiologic states present during EVA could impact drug pharmacokinetics (i.e. pressure changes, core body temperature), which could impact pharmacodynamics. However, that is outside the scope of this document. The medications below represent the authors’ assumption of what medications will be available and able to impact an Artemis EVA and do not include the full ISS formulary, a final Artemis medical kit, or additional personal medications for individual crewmember’s chronic medical conditions.

Emma Ives↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗

Certification of Upper Air Sounding System to Support NASA Launch Operations

A new upper air sounding system (Vaisala MW51) has been installed at the United States Space Force’s Eastern Range (ER). The NASA Marshall Space Flight Center’s Natural Environments Branch has assessed MW51 test data from the ER to certify the new system for use in Artemis Program launch operations. Certification criteria are based on legacy system capabilities and vehicle design environments, and include criteria for wind, temperature, and relative humidity, as well as effective vertical resolution (EVR) of wind data. The test data consists of near simultaneous (within 15 seconds) releases of two MW51 sondes and one legacy system sonde. Difference statistics (root mean square) between MW51 and legacy system wind, temperature, and relative humidity data are assessed against the certification criteria. Wind data from dual MW51 releases are used in spectral/coherence analyses to assess the EVR criteria. The MW51 system must demonstrate it meets these criteria to be used in NASA Artemis launch operations.

Frank Leahy↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

Lunar Infrastructure↗

Planning for a Large Space Weather Event: Preparation for and Lessons Learned from the 2024 Space Weather Interagency Tabletop Exercise

On May 8-9 2024, the Space Radiation Analysis Group (SRAG) at NASA/Johnson Space Center participated in a joint exercise with DoD, FEMA, OSTP, DOE and other agencies to assess their ability to respond to a large hypothetical space weather event. SRAG is a uniquely skilled group of scientists and engineers tasked with mitigating impacts of radiation exposure to the astronaut crew aboard the International Space Station and upcoming missions beyond Low Earth Orbit (LEO). In meeting this objective, the team has developed expertise in both modeling the impacts of an enhanced space environment and in the real-time operational support of the Flight Control Team when assessing a response to the environment. Several members of SRAG worked with the Tabletop Exercise (TTX) planners to define a realistic large event and to model the resulting radiation exposure on an Artemis crew. SRAG members participating in the TTX were blinded to the results of this analysis. As the event unfolded during the TTX, SRAG provided their assessment of the likely impact on the crew and recommendations for crew actions. During the exercise, the team tracked lessons learned for their own planning, currently in work, for Artemis-II and subsequent missions.

Janet Barzilla↗

ExMC Systems Engineering Developments

The Exploration Medical Capability (ExMC) Element within the Human Research Program (HRP) applies systems engineering (SE) principles along with the use of Model-Based Systems Engineering (MBSE) tools to identify and communicate the requirements for medical and crew health and performance (CHP) systems. In the past fiscal year, the MBSE approach sought to advance the digital engineering toolset for medical and CHP system representation. These digital artifacts provide enhanced views of the relationships among requirements, standards, functions, and capabilities, to name a few, that is best suited for a user’s objectives. The MBSE tools and SE practices were applied to the development of the revised Earth Independent Medical Operations (EIMO) medical system and the Artemis III and IV CHP System models. In addition, a System of Systems concept was integrated into the EIMO model to facilitate the identification of system interfaces that interact with the medical system. Finally, the ExMC SE team has initiated several efforts to bring operationally relevant digital engineering practices to the Human Health and Performance Directorate (HHPD). This included the development of a pilot program within the directorate to help foster utilization of tools such as MagicDraw for system modeling and Power BI for visualizing extracted data in an easily accessible dashboard format. Additionally, with the increase in complexity of the integration effort for Artemis missions, ExMC has endeavored to bring digital engineering strategies to potentially increase efficiency in review processes. This talk will provide a high-level overview of the ExMC SE team accomplishments since the last Investigators’ Workshop, an introduction to upcoming SE talks, and the ongoing systems engineering work.

systems engineering↗

On-Orbit Measurements of Solar Exclusion Angle for Modular Agile Scalable Optical Terminal (MAScOT) on the ILLUMA-T Mission

The Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) optical communications payload operated on the International Space Station (ISS) for 8 months, concluding in June 2024. ILLUMA-T made the ISS the first space-based user to communicate with NASA’s Laser Communications Relay Demonstration (LCRD). ILLUMA-T was also the first flight demonstration of the Modular, Agile, Scalable Optical Terminal (MAScOT) which will also be used in the Orion Artemis II Optical Communications (O2O) program, where it will provide an optical communications link for the crew aboard the Artemis II mission. Often optical and radio frequency communications systems have outages when they are pointing close to the Sun, where unwanted incident and scattered solar energy significantly reduces or prohibits operations. The MAScOT was designed to reduce the impact of any solar scatter through optical design, material choices, surface treatments and high cleanliness levels. Based on optical scattering models, a solar exclusion angle of 10 degrees was established for ILLUMA-T. This paper presents optical scattering modeling predictions, pre-launch laboratory testing results, and on-orbit measurements of solar scatter at angles ranging from 3 to 25 degrees.

optical communications↗

Interface Consistency: Phase I Results & Phase II Status

Future exploration missions will rely on designing and developing vehicles and complex systems from within NASA and through multiple external commercial partners to meet mission goals. Despite existing consistency-related agency requirements, NASA’s approach to commercial spaceflight development encourages providers’ flexibility and innovation. This strategy is resulting in significant design diversity across Artemis vehicles. Design best practices and guidelines champion interface consistency to promote mental model development and knowledge transfer. However, research investigating the benefits of consistency is mixed, and little is known about its role in complex systems. Determining the level of risk that system diversity presents is difficult, as there is no established method for quantifying the degree of consistency within and across interfaces, nor is there information about the differential impacts of different types of inconsistency. Phase I of this project (Characterization and Measurement) served as a starting point to better understand the construct of consistency, its application, and the range of studies and methods for measuring it. The project team created a taxonomy of consistency to apply to interfaces as a framework to guide the development of tools to assess intersystem consistency. Checklist and cognitive walkthrough methods were developed for use by human factors (HF) and human-computer interaction (HCI) experts. The Intersystem Consistency Scale (ICS) was developed for interface evaluations with crew. A pilot study evaluated the methods’ ability to distinguish differences between Artemis-like prototype pairs exhibiting either high or low design consistency. In addition, click errors and time on task were collected within the ICS (crew-like) group. Results from our exploratory analysis and lessons learned from the pilot study will be discussed. The project team will also present the status of Phase II (Risk Assessment, Standards and Guidelines). This includes incorporating feedback to redesign the assessment tools, and inputs from displays and training Subject Matter Experts to update tasks and prototype designs. The team will present the risk assessment study design to identify the types and levels of inconsistency that pose the greatest risk to performance. Plans to apply these results toward agency standards and guideline recommendations will also be discussed.

Human-Computer Interaction↗

Design and Performance of a 40W Uplink Laser Transmitter for NASA's O2O Laser Communications Mission

NASA’s Orion Artemis II Optical Communications System (O2O) will provide operational laser communications between the ground and lunar orbit for the Artemis II crewed mission. In this work we describe a 40W ground-based laser transmitter for the O2O system. The uplink transmitter operates in the optical C-band and uses an energy-efficient 32-PPM modulation format. Four spatial diversity channels are time-aligned and combined in the far field. Each channel produces up to 10 W of output power and contains both the communications signal and the 7kHz modulated beacon signal required for acquisition. The transmitter delivers data at 10 Mbits/s and 20 Mbits/s channel rates, corresponding to the 250 MHz and 500 MHz slot rates respectively.

free-space optical communications↗

Design Considerations of an Ascent Abort Monitor Algorithm for Use During Service Module Aborts

In support of human rating the Artemis missions, NASA's Orion program requires continuous abort coverage from liftoff through mission destination. During a portion of the ascent trajectory, the currently achievable abort mode is determined by an Orion algorithm using the onboard navigated vehicle state. This ascent abort monitor determines achievability for Orion's Mode 2 abort, Untargeted Abort Splashdown (UAS), by propagating the current vehicle state through ascent abort events to determine sufficient timing to perform the abort and to a ballistic touchdown point to approximate landing location relative to prescribed keep out boundaries. The algorithm was updated for Artemis 2 to allow the capability to limit loads for the majority of ascent. Performance of the algorithm has been demonstrated and verified through dispersed trajectory analysis with emulated flight software, unit testing, and hardware in the loop testing.

Esteban Guzman↗

Lunar Surface Crater Thermal Effects on Lander Radiator Performance

Lunar surface craters smaller than the spatial resolution of surface meshes used in typical Lunar surface thermal models (10 to 60 meters per pixel) may impact the accuracy of thermal model extrema predictions. The goal of this study is to investigate the thermal sensitivity of representative lander systems with realistic thermal surface orientations in bare and cratered terrain environments at relevant Artemis mission locations. This thermal analysis task investigates the impact of lunar surface craters on lander radiator performance by comparing heat rejection capability results between bare and cratered terrain environments. This study examines external body-mounted lander radiator thermal performance across varying lander heights (5.5m, 20m, 50m) and radiator orientations (horizontal, 45º tilted, and vertical) at two representative Artemis mission latitudes (-89.5ºS and -82.5ºS), spanning from the Shackleton Connecting Ridge to Mons Mouton Plateau.

Lunar Surface↗

Autonomous Detection and Classification of Lunar Minerals Using a Convolutional Neural Network Based Framework for the SUCR DALI Project

NASA’s long-term goal is to deploy humans to the Moon and, from there, advance human exploration to Mars, with Artemis missions as pivotal milestones. Raman spectroscopy can uniquely identify minerals, compounds, water states, and other materials, providing distinctive fingerprints for classification. A Raman instrument has been successfully deployed and utilized on the Mars surface via the Perseverance rover, but has not yet been utilized at the lunar surface The SUCR DALI project is working towards developing a Raman spectroscopy instrument to be applied in various lunar mission concepts, including within the Artemis program. The objective of my research is to assist in the maturation of the proposed SUCR DALI lunar Raman instrument through the development of an autonomous detection and classification model capable of identifying minerals and water states on the Moon’s surface.

Convolutional Neural Networks↗

Performance Optimization for Lunar Extravehicular Activity Readiness (POLAR) Study: Methods Paper

To better understand which aspects of physical fitness may be most related to performance during Lunar surface operations and thereby help to inform the current NASA fitness standards, much can be learned from fields encompassing the “tactical athlete.” Other physically demanding professions such as law enforcement, military, or rescue professionals often require candidates to meet occupationally-relevant fitness standards. The determination of such standards is a multistep process, including both objective and subjective measures, to determine tasks essential to occupational performance and identify the minimal fitness profile needed to meet physical demands of the job. Notably, fitness is only one component which may contribute to the demands of astronaut selection, flight assignment, and occupational performance. Utilizing a framework to systematically determine which domains of fitness most contribute to relevant job tasks can aid in the refinement of current NASA-STD-3001 fitness standards. Therefore, NASA’s Exercise Physiology & Countermeasures Laboratory conducted the Performance Optimization for Lunar Extravehicular Activity Readiness (POLAR) study to identify and examine a comprehensive list of fitness tests (including NASA-STD-3001 assessments: 1-Repetition Maximum [1-RM] bench press and deadlift) and determine preliminary relationships between identified fitness parameters and novel Artemis-relevant tasks to help inform future investigations for the continued development of aerobic and muscular fitness standards for surface EVAs. This was accomplished through 1) a review of the literature relating fitness assessments to simulated or real EVA performance to identify fitness tests that are most correlated with simulated EVA task performance; 2) a task analysis following a modified framework for physical employment standards development to down select mission critical tasks; and 3) development and pilot testing of a novel, portable Artemis-relevant EVA task circuit to relate to a battery of fitness assessments. The current report describes the methodology used to complete the task analysis, EVA task circuit development, and the pilot study.

Nicole C Strock↗

Three-Dimensional, Multi-Phase Unsteady Flow of Water Undergoing Multiple Flow Regimes (Free Surface, Droplet, and Fluid Film)

Upgrades to the Mobile Launcher Rainbird nozzles were implemented for the Artemis II launch to increase water flow rates and improve the mobile launcher deck water coverage while minimizing the water throw distance to avoid impacting the Space Launch System (SLS) rocket nozzles. This analysis describes the use of a three-dimensional, multi-phase, free surface transient computational fluid dynamics (CFD) model to simulate the water flowing out through the Rainbird nozzle and ensure compliance with current Artemis requirements. Flow rates, pressures, velocities, nozzle throw distances and coverage areas were analyzed to ensure that system requirements are met. The completed results were used to make necessary modifications to the Ignition Overpressure Protection and Sound Suppression (IOP/SS) system Rainbird design by reshaping the nozzle used in the system.

CFD↗

Generating Cryogenic Lunar Simulants Within the Planetary Exploration & Astromaterials Research Laboratory

The Planetary Exploration & Astromaterials Research Laboratory (PEARL) aims to provides capabilities for the creation of—and research on—cryogenic lunar regolith simulants (CRS) containing surface volatile analytes. CRS represent regolith samples that might be collected from lunar Permanently Shadowed Regions (PSRs) during future missions. Handling CRS requires procedural and engineering development due to extremely cold (i.e. ≤ - 196°C) working temperatures. However, there is an imperative to understand the physical and chemical alteration of samples during collection, transport, and curation processes throughout the Artemis missions. The chemistries that will be encountered within the PSRs need to be understood based upon prior mission data analysis. The ability to utilize these techniques provides future tests that could be relevant to planetary protection applications regarding future robotic sample return.

Lunar↗

A New Eclipse Algorithm for use in Spacecraft Trajectory Optimization

This paper presents a new eclipse algorithm, which determines if a spacecraft is in sunlight or shadow, that is simple to define, fast to compute, smooth and continuous in all regions external to the eclipsing body, and suitable for use in a spacecraft trajectory optimization problem. Details of the design evolution are presented, including the specifics of the algorithm's implementation in the trajectory design of NASA's Artemis I mission to a lunar DRO. Some alternate uses and discussion of future work is also presented.

Orion↗