Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Robotic Assembly of SRF Cavity Pair

Superconducting Radio Frequency (SRF) cavities for particle accelerators require tight tolerances, ultrahigh vacuum, and strict cleanliness during assembly. As in the semiconductor industry, defects such as particles and residues are deleterious to performance, possibly rendering a cavity unfit for use. This problem is addressed primarily through cleanroom assembly during sensitive steps and rigorous chemical processing to prevent and remove such defects. Human workers are often the largest source of contamination, even with proper gowning and practices. The semiconductor industry has long integrated robots in cleanroom operation, but this has not occurred for SRF cavity production; SRF cavities, unlike wafers, are complex shapes, require more hands-on mechanical assembly, and are low-volume production items. At Jefferson Laboratory, a co-operative robot (cobot) has been setup to overcome these problems. Cobots are safe for use alongside human workers and can integrate new tools such as a 3D camera part detection and gripper for item manipulation. Therefore, cobots represent a promising avenue for reducing particulate generated during a variety of assembly tasks. A mockup of a cavity pair and coupler was setup and the cobot programmed to automatically pick up the coupler and place on the mating cavity flange. Particle counting methods were setup to measure human vs cobot assembly particulate generation inside a cavity mockup. Other potential uses will be discussed for further improving SRF cavity assembly steps, where a cobot can replace or assist a human operator, and what potential gains are expected.

Duzik, Adam [Thomas Jefferson National Accelerator↗

NuMI Graphite Target Fin Removal Assembly

Materials scientists want to study the irradiated graphite target from the Neutrino at the Main Injector (NuMI) beam line. In order to gather these irradiated graphite fins from the target canister, it will have to be done remotely. Therefore, a removal assembly will need to be created in order to do this efficiently and well. This project aims to make progressive steps towards deploying the final target removal assembly. Furthermore, calculations related to the removal assembly design were done, and tests were planned to discover further information about the feasibility of this design. The main result from this project is the deflection of the cantilever arm, which is 0.354 inches due to the weight of the beam and cutting tool. Additionally, more results of this project are the testing assembly CAD model and the feasibility of design. This project concludes that there is still more work that needs to be done for the removal assembly to be deployed, but there were foundational steps that were made in the implementation of this design. Finally, there should be further steps and tests to determine the feasibility of this removal assembly.

Malovski, Azra [NIU, DeKalb]↗

Trimming and Decontamination of Metagenomic Data can Significantly Impact Assembly and Binning Metrics, Phylogenomic and Functional Analysis

Background: Investigators using metagenomic sequencing to study microbiomes often trim and decontaminate reads without knowing their effect on downstream analyses. Objective: This study was designed to evaluate the impacts JGI trimming and decontamination procedures have on assembly and binning metrics, placement of MAGs into species trees, and functional profiles of MAGs extracted from complex rhizosphere metagenomes, as well as how more aggressive trimming impacts these binning metrics. Methods: Twenty-three Miscanthus x giganteus rhizosphere metagenomes were subjected to different combinations and thresholds of force, kmer, and quality trimming and decontamination using BBDuk. Reads were assembled and binned in KBase. Phylogenomic and statistical analyses were applied to evaluate the effects of trimming and decontamination on downstream analyses. Results: We found that JGI trimmed and decontaminated reads had significant impacts on assembly and binning metrics compared to raw reads, including significantly higher total contig counts, more contigs greater than 10k bp in length, and larger total lengths of raw assemblies compared to QC assemblies, and 2.0% lower average contamination of QC MAGs compared to raw MAGs. We also found that differences in the placement of MAGs in species trees increased with decreasing completeness and contamination thresholds. Furthermore, aggressive trimming (Q20) was found to significantly reduce MAG counts. Conclusion: Trimming and decontamination of metagenomics reads prior to assembly can change an investigator’s answer to the questions, “Who is there and what are they doing?” However, mild trimming and decontamination of metagenomic reads with high-quality scores are recommended for removing sample processing and sequencing artifacts.

Whitham, Jason M.↗

Long-Term Stochasticity Combines With Short-Term Variability in Assembly Processes to Underlie Rice Paddy Sustainability

Revealing temporal patterns of community assembly processes is important for understanding how microorganisms underlie the sustainability of agroecosystem. The ancient terraced rice paddies at Longji provide an ideal platform to study temporal dynamics of agroecosystem sustainability due to their chronosequential records of soil physicochemistry and well-archived microbial information along 630-year rice cultivation. We used statistical null models to evaluate microbial assembly processes along the soil chronosequences of Longji rice paddies through time. Stochastic and deterministic assembly processes jointly governed microbial community composition within successional eras (less than 250 years), and within-era determinism was mainly driven by soil fertility and redox conditions alone or in combination. Conversely, across successional eras (i.e., over 300 years), stochasticity linearly increased with increasing duration between eras and was eventually predominant for the whole 630 years. We suggest that the impact of stochasticity vs. determinism on assembly is timescale-dependent, and we propose that the importance of stochastic assembly of microbial community at longer timescales is due to the gradual changes in soil properties under long-term rice cultivation, which in turn contribute to the sustainability of paddy ecosystem by maintaining a diverse community of microorganisms with multi-functional traits. In total, our results indicate that knowledge on the timescales at which assembly processes govern microbial community composition is key to understanding the ecological mechanisms generating agroecosystem sustainability.

59 BASIC BIOLOGICAL SCIENCES↗

Integrated Self-Assembly of the Mms6 Magnetosome Protein to Form an Iron-Responsive Structure

A common feature of biomineralization proteins is their self-assembly to produce a surface consistent in size with the inorganic crystals that they produce. Mms6, a small protein of 60 amino acids from Magnetospirillum magneticum strain AMB-1 that promotes the in vitro growth of superparamagnetic magnetite nanocrystals, assembles in aqueous solution to form spherical micelles that could be visualized by TEM and AFM. The results reported here are consistent with the view that the N and C-terminal domains interact with each other within one polypeptide chain and across protein units in the assembly. From studies to determine the amino acid residues important for self-assembly, we identified the unique GL repeat in the N-terminal domain with additional contributions from amino acids in other positions, throughout the molecule. Analysis by CD spectroscopy identified a structural change in the iron-binding C-terminal domain in the presence of Fe3+. A change in the intrinsic fluorescence of tryptophan in the N-terminal domain showed that this structural change is transmitted through the protein. Thus, self-assembly of Mms6 involves an interlaced structure of intra- and inter-molecular interactions that results in a coordinated structural change in the protein assembly with iron binding.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

EVA manipulation and assembly of space structure columns

Assembly techniques and hardware configurations used in assembly of the basic tetrahedral cell by A7LB pressure-suited subjects in a neutral bouyancy simulator were studied. Eleven subjects participated in assembly procedures which investigated two types of structural members and two configurations of attachment hardware. The assembly was accomplished through extra-vehicular activity (EVA) only, EVA with simulated manned maneuvering unit (MMU), and EVA with simulated MMU and simulated remote manipulator system (RMS). Assembly times as low as 10.20 minutes per tetrahedron were achieved. Task element data, as well as assembly procedures, are included.

Loughead, T. E.↗

Automated assembly of Gallium Arsenide and 50-micron thick silicon solar cell modules

The TRW automated solar array assembly equipment was used for the module assembly of 300 GaAs solar cells and 300 50 micron thick silicon solar cells (2 x 4 cm in size). These cells were interconnected with silver plated Invar tabs by means of welding. The GaAs cells were bonded to Kapton graphite aluminum honeycomb graphite substrates and the thin silicon cells were bonded to 0.002 inch thick single layer Kapton substrates. The GaAs solar cell module assembly resulted in a yield of 86% and the thin cell assembly produced a yield of 46% due to intermittent sticking of weld electrodes during the front cell contact welding operation. (Previously assembled thin cell solar modules produced an overall assembly yield of greater than 80%).

Mesch, H. G.↗

The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

Smith, Jeffrey H.↗

A telerobotic system for automated assembly of large space structures

Future space missions such as polar platforms and antennas are anticipated to require large truss structures as their primary support system. During the past several years considerable research has been conducted to develop hardware and construction techniques suitable for astronaut assembly of truss structures in space. A research program has recently been initiated to develop the technology and to demonstrate the potential for automated in-space assembly of large erectable structures. The initial effort will be focussed on automated assembly of a tetrahedral truss composed of 2-meter members. The facility is designed as a ground based system to permit evaluation of assembly concepts and was not designed for space qualification. The system is intended to be used as a tool from which more sophisticated procedures and operations can be developed. The facility description includes a truss structure, motionbases and a robot arm equipped with an end effector. Other considerations and requirements of the structural assembly describe computer control systems to monitor and control the operations of the assembly facility.

Rhodes, Marvin D.↗

Structural analysis of a thermal insulation retainer assembly

In January 1989 an accident occurred in the National Transonic Facility wind tunnel at NASA Langley Research Center that was believed to be caused by the failure of a thermal insulation retainer. A structural analysis of this retainer assembly was performed in order to understand the possible failure mechanisms. Two loading conditions are important and were considered in the analysis. The first is the centrifugal force due to the fact that this retainer is located on the fan drive shaft. The second loading is a differential temperature between the retainer assembly and the underlying shaft. Geometrically nonlinear analysis is required to predict the stiffness of this component and to account for varying contact regions between various components in the assembly. High, local stresses develop in the band part of the assembly near discontinuities under both the centrifugal and thermal loadings. The presence of an aluminum ring during a portion of the part's operating life was found to increase the stresses in other regions of the band. Under the centrifugal load, high bending stresses develop near the intersection of the band with joints in the assembly. These high bending stresses are believed to be the most likely cause for failure of the assembly.

Greene, William H.↗

Formulation of design guidelines for automated robotic assembly in outerspace

The approach for arriving at design guidelines for assembly by robots in outerspace is illustrated. The use of robots in a zero gravity environment necessitates that extra factors over and above normal design guidelines be taken into account. Besides, many of the guidelines for assembly by robots on earth do not apply in space. However, considering the axioms for normal design and assembly as one set, guidelines for design and robotic assembly as another, and guidelines for design and assembly in space as the third set, unions and intersections of these sets can generate guidelines for two or more of these conditions taken together - say design and manual assembly in space. Therein lies the potential to develop expert systems in the future, which would use an exhaustive database and similar guidelines to arrive at those required by a superposition of these conditions.

Dwivedi, Suren N.↗

A telerobotic system for automated assembly of large space structures

Future space missions such as polar platforms and antennas are anticipated to require large truss structures as their primary support system. During the past several years considerable research has been conducted to develop hardware and construction techniques suitable for astronaut assembly of truss structures in space. A research program has recently been initiated to develop the technology and to demonstrate the potential for automated in-space assembly of large erectable structures. The initial effort will be focused on automated assembly of a tetrahedral truss composed of 2-meter members. The facility is designed as a ground based system to permit evaluation of assembly concepts and was not designed for space qualification. The system is intended to be used as a tool from which more sophisticated procedures and operations can be developed. The facility description includes a truss structure, motionbases and a robot arm equipped with an end effector. Other considerations and requirements of the structural assembly describe computer control systems to monitor and control the operations of the assembly facility.

Rhodes, Marvin D.↗

Evaluation and selection of assembly plans

Two criteria are introduced for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences encompassed by the assembly plan. The second criterion is to maximize the amount of parallelism (i.e., simultaneity) that is possible in the execution of the assembly tasks. While the metrics corresponding to the criteria used in previous work can be expressed as a sum of terms, each being a function of a task or a state, the metrics corresponding to the criteria introduced are more complex functions of the whole assembly plan. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans introduced in previous work is presented. Admissible heuristics for each of the two criteria are presented.

Homem De Mello, L. S.↗

Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

Heard, Walter L., Jr.↗

Aeroelastic dynamics of mistuned blade assemblies with closely spaced blade modes

The aeroelastic characteristics of tuned and randomly mistuned blade assemblies which possess two blade-alone natural modes with close frequencies are studied. Modal interactions among the two blade modes are shown to be come extremely significant for small frequency separation. The two distinct loci of the aeroelastic eigenvalues, which characterize an assembly with well separated modes, fully merge into a single root locus as the blade-mode frequency separation vanishes. Also, while in the case of well separated blade modes the introduction of random mistuning into one blade mode affects only the assembly modes which are predominantly of that blade-mode type, mistuning results in the localization of all the assembly modes when the blade-alone natural frequencies are close. Results indicate that in the case of closely-spaced blade modes a single-degree of freedom blade model yields qualitatively erroneous results and that an N-blade assembly with two close blade modes behaves like an equivalent 2Nb-blade assembly with a single blade mode.

Pierre, Christophe↗

Assembly flow simulation of a radar

A discrete event simulation model has been developed to predict the assembly flow time of a new radar product. The simulation was the key tool employed to identify flow constraints. The radar, production facility, and equipment complement were designed, arranged, and selected to provide the most manufacturable assembly possible. A goal was to reduce the assembly and testing cycle time from twenty-six weeks. A computer software simulation package (SLAM 2) was utilized as the foundation for simulating the assembly flow time. FORTRAN subroutines were incorporated into the software to deal with unique flow circumstances that were not accommodated by the software. Detailed information relating to the assembly operations was provided by a team selected from the engineering, manufacturing management, inspection, and production assembly staff. The simulation verified that it would be possible to achieve the cycle time goal of six weeks. Equipment and manpower constraints were identified during the simulation process and adjusted as required to achieve the flow with a given monthly production requirement. The simulation is being maintained as a planning tool to be used to identify constraints in the event that monthly output is increased. 'What-if' studies have been conducted to identify the cost of reducing constraints caused by increases in output requirement.

Rutherford, W. C.↗

Neutral buoyancy evaluation of extravehicular activity assembly of a large precision reflector

A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og ~ (neutral buoyancy) assembly tests of a 14m-diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

Heard, Walter L., Jr.↗