Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 811 records · Page 45

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of zion comparative analysis project for assessment of Boral{sup R} neutron absorber material performance and monitoring in spent fuel pools - 14618

Neutron absorber materials are used in spent fuel pool (SFP) storage racks to control reactivity. In the United States, about half of the operating plants currently use BORAL{sup R} neutron absorber material in SFP racks. Although operational experience spanning more than 25 years has not shown any loss of the BORAL{sup R} core material, corrosion effects, including blisters and pits, have been observed and reported. To improve understanding for the behavior of BORAL{sup R} in SFPs and evaluate the performance of monitoring approaches, EPRI initiated the Zion comparative analysis project in 2014. The Zion project involves three phases. During the first phase of the project, in situ measurements were performed on selected SFP rack panels in December 2014. Panels for in situ measurements were selected after an extensive analysis of each panel in the pool to ensure that the selected panels represented the pool in terms of variation in neutron and gamma dose values. As part of the second phase of the project, the remaining 10 coupons from the Zion SFP were shipped to a Penn State University (PSU) laboratory for analysis in January 2015. During the final phase of the project, a subset of the panels for which in situ measurements were performed will be harvested from the Zion SFP, cut into samples, and analyzed at PSU. The overall scope of this project will allow comparison of in situ measurements to real panel data as well as data obtained from coupon analysis. In this paper, an overview of the Zion comparative analysis project, the criteria and procedure for panel selection for in situ measurements and harvesting, preliminary coupon analysis results and in situ measurement results are presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Better Climate Challenge Working Groups Non-Energy Benefits of Energy Projects-Improving Financial Payback

Energy efficiency is a key strategy recently identified by the United States Department of Energy as a pillar of industrial decarbonization. For manufacturing companies, improving energy efficiency will reduce money spent on energy utilities such as gas, electricity, and oil. Energy improvement projects also provide valuable benefits outside of simple operating cost reductions, such as reducing the carbon footprint, improving safety metrics and even enhancing quality and productivity. Unfortunately, energy efficiency projects have typically faced an adoption gap, even when they meet criteria such as payback period for capital projects. The inclusion and quantification of non-energy benefits (NEBs), also known as co-benefits, in the decision-making process for energy efficiency projects can improve the overall financial payback periods for those projects as well as potentially improve the company's key performance metrics aligned with business strategies. There are no readily available tools that facilitate this, however, and the most used tools for energy audits address NEBs in a perfunctory way if at all. We integrated research for finding and quantifying non-energy benefits of energy efficiency projects into a commonly recognized continuous improvement practice, the Define, Measure, Analyze, Improve and Control (DMAIC) Process. This process, along with software and supplemental materials, guides energy assessments to find and to quantify NEBs associated with energy conservation opportunities. Our aim is to deliver an easy to use and effective process and software tool and to maximize return on investment for energy efficiency projects as well as contribute to companies' strategic performance goals.

DMAIC↗

Status of the LANSCE refurbishment project

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The preliminary design phase for the project is funded and underway. The 6 year, $150M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The project requirements will be discussed, the preliminary technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project↗

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project↗

Projecting species’ vulnerability to climate change: Which uncertainty sources matter most and extrapolate best?

Species distribution models (SDMs) are commonly used to assess potential climate change impacts on biodiversity, but several critical methodological decisions are often made arbitrarily. We compare variability arising from these decisions to the uncertainty in future climate change itself. We also test whether certain choices offer improved skill for extrapolating to a changed climate and whether internal cross-validation skill indicates extrapolative skill.We compared projected vulnerability for 29 wetland-dependent bird species breeding in the climatically dynamic Prairie Pothole Region, USA. For each species we built 1,080 SDMs to represent a unique combination of: future climate, class of climate covariates, collinearity level, and thresholding procedure. We examined the variation in projected vulnerability attributed to each uncertainty source. To assess extrapolation skill under a changed climate, we compared model predictions with observations from historic drought years. Uncertainty in projected vulnerability was substantial, and the largest source was that of future climate change. Large uncertainty was also attributed to climate covariate class with hydrological covariates projecting half the range loss of bioclimatic covariates or other summaries of temperature and precipitation. We found that choices based on performance in cross-validation improved skill in extrapolation. Qualitative rankings were also highly uncertain. Given uncertainty in projected vulnerability and resulting uncertainty in rankings used for conservation prioritization, a number of considerations appear critical for using bioclimatic SDMs to inform climate change mitigation strategies. Our results emphasize explicitly selecting climate summaries that most closely represent processes likely to underlie ecological response to climate change. For example, hydrological covariates projected substantially reduced vulnerability, highlighting the importance of considering whether water availability may be a more proximal driver than precipitation. However, because cross-validation results were correlated with extrapolation results, the use of cross-validation performance metrics to guide modeling choices where knowledge is limited was supported.

thresholds↗

Multiple Metrics Informed Projections of Future Precipitation in China

Predicting how regional precipitation will respond to future warming is among the most challenging undertaking in climate change projection. Despite sustained efforts to improve modeling and understanding of precipitation, the overall uncertainty in projecting regional precipitation has not been reduced substantially. In this work, the potential for more robust precipitation projections is demonstrated through the use of discriminating metrics to subsample the multimodel ensemble. Using a two-dimensional metric of precipitation and its relationship with large-scale circulation indices in East Asia, 31 models in the Coupled Model Intercomparison Project Phase 5 (CMIP5) are classified into three groups. Models in the top performing group projected statistically significant increasing trends in precipitation and the regional precipitation patterns are more similar to each other than to the patterns in the bottom performing group. In contrast, models in the bottom performing group projected diverse responses, with overall small drying or no significant trends in precipitation.

54 ENVIRONMENTAL SCIENCES↗

Multivariate Drought Monitoring, Propagation, and Projection Using Bias-Corrected General Circulation Models

Understanding how droughts are characterized, propagated, and projected, particularly multivariate droughts, is necessary to explain the variability and changes in drought characteristics. This study aims to understand multimodel global drought monitoring, propagation, and projection by utilizing a multivariate standardized drought index (MSDI) during the historical (1959–2014) and future (2045–2100) periods under two socioeconomic pathways SSPs (370 and 585), derived from the bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6). Based on the energy metrics, the multivariate bias correction method outperformed other techniques in correcting the biases in the CMIP6 drought representation. The drought indicators demonstrate distinct categories for meteorological, hydrological, and multivariate droughts. There were significant high cross correlations between Heatwave Total Length (HWTL) and MSDI in Africa and South America for all lagged times. Europe and North America generally saw the maximum MSDI drought duration (228 months) during the historical period. For future projections, Africa recorded the maximum drought duration (197 months), while Europe witnessed the minimum drought duration for SSP 370 (171 months), and North America (149 months) for SSP 585. Furthermore, during the historical period in tropical Africa, the propagation of meteorological to hydrological drought was slower during the wet months than during the dry months. Under the SSP 370 future projection, there was a shift in the long period of meteorological-hydrological propagation from the middle and late wet months to the beginning of the wet months in tropical Africa. Therefore, tracking and projecting drought characteristics is vital for understanding the risk of drought-related consequences.

54 ENVIRONMENTAL SCIENCES↗

Projected income data under different shared socioeconomic pathways for Washington state

Abstract High-resolution income projections under different Shared Socioeconomic Pathways (SSPs) are essential for the climate change research communities to devise climate change adaptation and mitigation strategies. To generate income projections for Washington state, we obtain state-level GDP per capita projections and convert them into projected annual household income. The resulting state-level income projections are subsequently downscaled to the census block-level based on the Longitudinal Origin-Destination Employment Statistics (LODES) dataset. For accuracy assessment, we downscale historical income data from state- level to block- and block group-level and compare the downscaled results against the actual income data from LODES. County-level accuracy assessment is also conducted based on American Community Survey. The results demonstrate a good agreement (Average R 2 of 0.67, 0.8, and 0.99 for block-, block group-, and county-level, respectively) between the downscaled income data and the reference data, thereby validating the methodology employed. Our approach is applicable to other states for income projections, which can be utilized by a broader audience, including those involved in demographic analysis, economic research, and urban planning.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Locally-Adaptive, Spatially-Explicit Projection of U.S. Population for 2030 and 2050

Localized adverse events, including natural hazards, epidemiological events, and human conflict, underscore the criticality of quantifying and mapping current population. Moreover, knowing the spatial distribution of future population allows for increased preparation in the event of an emergency. Building on the spatial interpolation technique previously developed for high resolution population distribution data (LandScan Global and LandScan USA), we have constructed an empirically-informed spatial distribution of the projected population of the contiguous U.S. for 2030 and 2050. Whereas most current large-scale, spatially explicit population projections typically rely on a population gravity model to determine areas of future growth, our projection model departs from these by accounting for multiple components that affect population distribution. Modelled variables, which included land cover, slope, distances to larger cities, and a moving average of current population, were locally adaptive and geographically varying. The resulting weighted surface was used to determine which areas had the greatest likelihood for future population change. Population projections of county level numbers were developed using a modified version of the U.S. Census s projection methodology with the U.S. Census s official projection as the benchmark. Applications of our model include, but are not limited to, suitability modelling, service area planning for governmental agencies, consequence assessment, mitigation planning and implementation, and assessment of spatially vulnerable populations.

97 MATHEMATICS AND COMPUTING↗

Indirect aerosol effect increases CMIP5 models projected Arctic warming

Phase 5 of the Coupled Model Intercomparison Project (CMIP5) climate models’ projections of the 2014–2100 Arctic warming under radiative forcing from representative concentration pathway 4.5 (RCP4.5) vary from 0.9° to 6.7°C. Climate models with or without a full indirect aerosol effect are both equally successful in reproducing the observed (1900–2014) Arctic warming and its trends. However, the 2014–2100 Arctic warming and the warming trends projected by models that include a full indirect aerosol effect (denoted here as AA models) are significantly higher (mean projected Arctic warming is about 1.5°C higher) than those projected by models without a full indirect aerosol effect (denoted here as NAA models). The suggestion is that, within models including full indirect aerosol effects, those projecting stronger future changes are not necessarily distinguishable historically because any stronger past warming may have been partially offset by stronger historical aerosol cooling. In conclusion, the CMIP5 models that include a full indirect aerosol effect follow an inverse radiative forcing to equilibrium climate sensitivity relationship, while models without it do not.

54 ENVIRONMENTAL SCIENCES↗

Enhanced mesoscale climate projections in TAR and AR5 IPCC scenarios: a case study in a Mediterranean climate (Araucanía Region, south central Chile)

Here, climate change scenarios are computed on a large scale, not accounting for local variations presented in historical data and related to human scale. Based on historical records, we validate a baseline (1962–1990) and correct the bias of A2 and B2 regional projections for the end of twenty-first century (2070–2100) issued from a high resolution dynamical downscaled (using PRECIS mesoscale model, hereinafter DGF-PRECIS) of Hadley GCM from the IPCC 3rd Assessment Report (TAR). This is performed for the Araucanía Region (Chile; 37°–40°S and 71°–74°W) using two different bias correction methodologies. Next, we study high-resolution precipitations to find monthly patterns such as seasonal variations, rainfall months, and the geographical effect on these two scenarios. Finally, we compare the TAR projections with those from the recent Assessment Report 5 (AR5) to find regional precipitation patterns and update the Chilean `projection. To show the effects of climate change projections, we compute the rainfall climatology for the Araucanía Region, including the impact of ENSO cycles (El Niño and La Niña events). The corrected climate projection from the high-resolution dynamical downscaled model of the TAR database (DGF-PRECIS) show annual precipitation decreases: B2 (-19.19 %, -287 ± 42 mm) and A2 (-43.38 %, -655 ± 27.4 mm per year. Furthermore, both projections increase the probability of lower rainfall months (lower than 100 mm per month) to 64.2 and 72.5 % for B2 and A2, respectively.

54 ENVIRONMENTAL SCIENCES↗

Project 57 Air Monitoring Report: January 1 through December 31, 2017

On April 24, 1957, the Atomic Energy Commission (AEC) (now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley northeast of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DOD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a non-nuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Various radiological surveys were performed in the area and in 2007, the DOE expanded the demarked Contamination Area (CA) by posting signs 200 to 400 ft (60 to 120 m) outside of the original fence. Plutonium in soil attaches preferentially to smaller particles (Tamura, 1985; Friesen, 1992; Murarik et al., 1992; and Misra et al., 1993). Therefore, redistribution of soil particles by wind (dust) and water are the mechanisms most likely to transport plutonium beyond the boundary of the Project 57 CA. Monitoring was implemented in 2011 by Desert Research Institute (DRI) to determine if radionuclide contamination was detectable in samples of airborne dust and to characterize meteorological and environmental parameters that influence dust transport. Initially, two monitoring stations consisting of radiological, meteorological, and dust sampling equipment were installed near the southeast and northeast corners of the CA. In January 2015, the original monitoring stations were dismantled and moved farther to the west along the CA boundary. This move was made to place the monitoring stations downwind of ground zero and the High Contamination Area (HCA) during the dominant northerly and southerly winds. Samples of particles suspended in the air are collected every two weeks and submitted for laboratory assessments of gross alpha and gross beta radioactivity, and for determinations of gamma-emitting radionuclides. In calendar year (CY) 2017, the mean gross alpha concentration at monitoring station P57-4 was approximately 4.25 times the value at monitoring station P57-3. In CY2015 and CY2016, the difference in mean gross alpha concentration at the two stations was approximately 1.5. The mean gross alpha concentrations at P57-3 and P57-4 were approximately 1.9 and 7.9 times, respectively, the mean gross alpha concentrations at the surrounding Community Environmental Monitoring Program (CEMP) stations. The minimum gross alpha concentrations reported for the Project 57 stations are in the range of the minimum values observed at the CEMP stations. However, maximum gross alpha concentrations are greater than the maximum concentrations observed at the surrounding CEMP stations. Gamma spectroscopy analyses resulted in the detection of seven radionuclides. Except for americium-241 (Am-241), all reported radionuclides occur naturally in the environment. The Am-241 detection by gamma spectroscopy was confirmed by alpha spectroscopy. During each quarter of CY2017, four suspended particulate matter samples were selected for alpha spectroscopy analysis. Two were selected each quarter from the regular biweekly samples collected at each of the two monitoring stations. Of the eight samples from P57-3, one was reported to have plutonium-238 (Pu-238) above the minimum detectable activity (MDA) and five were reported to have plutonium 239/240 (Pu-239/240) above the MDA. Of the eight samples from P57-4, three were reported to have Pu-238 above the MDA and six were reported to have Pu-239/240 above the MDA. Soil material is also transported by saltation, which is a wind driven phenomena that bounces sand-sized soil particles across the land surface because they are too heavy to be suspended in the air. Samples of particles transported by saltation were collected downwind and upwind of the CA at both monitoring stations in May 2017 after a 190-day deployment and again in September 2017 after a 114-day deployment. Mass of the saltation samples was determined after oven drying. The September sample had greater mass than the May sample. The same relationship was observed for the suspended particulate matter samples during periods of saltation sample collection. The difference in the collected mass appears to be because of the amount of soil moisture. Higher soil moisture exerts additional isotopic bonds between soil particles and water molecules, and between water molecules that envelop soil particles, making it more difficult for wind to raise the particles as dust. In general, samples collected from saltation traps facing south contained more material than samples collected from traps facing north. This suggests that although saltation material may have been moving back and forth in conjunction with the two dominant wind directions, there was a net trend for saltation material to be transported toward the north. Radiological analyses of the saltation samples show that the smaller particle size faction (<63 μm) generally produced the highest activity levels of Am-241, Pu-238, and Pu-239/240. In general, the isotope activity levels decreased as the particle size increased. These results are consistent with the expectation that the greatest potential for transport of radiological contamination is with the smaller particles. Thermoluminescent dosimeters (TLDs) indicated that the average annual external radioactivity dose at the monitoring stations is slightly higher than the dose determined at the surrounding CEMP stations, but approximately half of the estimated national average dose received by the general public from exposure to natural sources. The TLDs at the Project 57 monitoring stations are exposed to both natural sources (terrestrial and cosmic) and radioactive releases from the Project 57 CA. Winds in excess of approximately 15 mph (24 km/hr) begin to generate dust movement by saltation or suspension, as determined by the monitoring instruments. Saltated particles, PM10 (i.e., inhalable dust), and PM2.5 (i.e., fine particulate dust) exhibit an approximately exponential increase with increasing wind speed. The greatest concentrations of dust occurred for winds exceeding 20 mph (32 km/hr). When the wind/dust analysis was performed for winds separated into the dominant northerly and southerly wind directions, it was evident that the northerly winds generated the higher PM10 concentrations and had the dominate influence on the PM10 concentration determined for all wind speeds when all wind directions were evaluated together. During the year, winds in excess of 20 mph (32 km/hr) occurred approximately one percent of the time. Although winds sufficient to generate dust occur at the Project 57 site, they are infrequent and of short duration. A preliminary assessment of individual wind events suggests that dust generation in response to specific wind conditions is highly variable. Wind speeds that would be expected to generate noticeable dust may not do so in every instance. Additionally, saltation transport in response to wind conditions was less common than expected. These variations were likely because of the influence of meteorological and environmental parameters other than wind.

54 ENVIRONMENTAL SCIENCES↗

Developing a corss-project support system during mission operations: Deep Space 1 extended mission flight control

NASA is focusing on small, low-cost spacecraft for both planetary and earth science missions. Deep Space 1 (DS1) was the first mission to be launched by the NMP. The New Millennium Project (NMP) is designed to develop and test new technology that can be used on future science missions with lower cost and risk. The NMP is finding ways to reduce cost not only in development, but also in operations. DS 1 was approved for an extended mission, but the budget was not large, so the project began looking into part time team members shared with other projects. DS1 launched on October 24, 1998, in it's primary mission it successfully tested twelve new technologies. The extended mission started September 18, 1999 and ran through the encounter with Comet Borrelly on September 22,2001. The Flight Control Team (FCT) was one team that needed to use part time or multi mission people. Circumstances led to a situation where for the few months before the Borrelly encounter in September of 2001 DSl had no certified full time Flight Control Engineers also known as Aces. This paper examines how DS 1 utilized cross-project support including the communication between different projects, and the how the tools used by the Flight Control Engineer fit into cross-project support.

New Millennium Project NMP DS flight control↗

Exploring uncertainties in global crop yield projections in a large ensemble of crop models and CMIP5 and CMIP6 climate scenarios

Concerns over climate change are motivated in large part because of their impact on human society. Assessing the effect of that uncertainty on specific potential impacts is demanding, since it requires a systematic survey over both climate and impacts models. We provide a comprehensive evaluation of uncertainty in projected crop yields for maize, spring and winter wheat, rice, and soybean, using a suite of nine crop models and up to 45 CMIP5 and 34 CMIP6 climate projections for three different forcing scenarios. To make this task computationally tractable, we use a new set of statistical crop model emulators. We find that climate and crop models contribute about equally to overall uncertainty. While the ranges of yield uncertainties under CMIP5 and CMIP6 projections are similar, median impact in aggregate total caloric production is typically more negative for the CMIP6 projections (+1% to −19%) than for CMIP5 (+5% to −13%). In the first half of the 21st century and for individual crops is the spread across crop models typically wider than that across climate models, but we find distinct differences between crops: globally, wheat and maize uncertainties are dominated by the crop models, but soybean and rice are more sensitive to the climate projections. Climate models with very similar global mean warming can lead to very different aggregate impacts so that climate model uncertainties remain a significant contributor to agricultural impacts uncertainty. These results show the utility of large-ensemble methods that allow comprehensively evaluating factors affecting crop yields or other impacts under climate change. The crop model ensemble used here is unbalanced and pulls the assumption that all projections are equally plausible into question. Better methods for consistent model testing, also at the level of individual processes, will have to be developed and applied by the crop modeling community.

crop yield projections↗

The Regional Aerosol Model Intercomparison Project (RAMIP)

Changes in anthropogenic aerosol emissions have strongly contributed to global and regional trends in temperature, precipitation, and other climate characteristics and have been one of the dominant drivers of decadal trends in Asian and African precipitation. These and other influences on regional climate from changes in aerosol emissions are expected to continue and potentially strengthen in the coming decades. However, a combination of large uncertainties in emission pathways, radiative forcing, and the dynamical response to forcing makes anthropogenic aerosol a key factor in the spread of near-term climate projections, particularly on regional scales, and therefore an important one to constrain. For example, in terms of future emission pathways, the uncertainty in future global aerosol and precursor gas emissions by 2050 is as large as the total increase in emissions since 1850. In terms of aerosol effective radiative forcing, which remains the largest source of uncertainty in future climate change projections, CMIP6 models span a factor of 5, from −0.3 to −1.5 W m−2. Both of these sources of uncertainty are exacerbated on regional scales. The Regional Aerosol Model Intercomparison Project (RAMIP) will deliver experiments designed to quantify the role of regional aerosol emissions changes in near-term projections. This is unlike any prior MIP, where the focus has been on changes in global emissions and/or very idealised aerosol experiments. Perturbing regional emissions makes RAMIP novel from a scientific standpoint and links the intended analyses more directly to mitigation and adaptation policy issues. From a science perspective, there is limited information on how realistic regional aerosol emissions impact local as well as remote climate conditions. Here, RAMIP will enable an evaluation of the full range of potential influences of realistic and regionally varied aerosol emission changes on near-future climate. From the policy perspective, RAMIP addresses the burning question of how local and remote decisions affecting emissions of aerosols influence climate change in any given region. Here, RAMIP will provide the information needed to make direct links between regional climate policies and regional climate change. RAMIP experiments are designed to explore sensitivities to aerosol type and location and provide improved constraints on uncertainties driven by aerosol radiative forcing and the dynamical response to aerosol changes. The core experiments will assess the effects of differences in future global and regional (Africa and the Middle East, East Asia, North America and Europe, and South Asia) aerosol emission trajectories through 2051, while optional experiments will test the nonlinear effects of varying emission locations and aerosol types along this future trajectory. All experiments are based on the shared socioeconomic pathways and are intended to be performed with 6th Climate Model Intercomparison Project (CMIP6) generation models, initialised from the CMIP6 historical experiments, to facilitate comparisons with existing projections. Requested outputs will enable the analysis of the role of aerosol in near-future changes in, for example, temperature and precipitation means and extremes, storms, and air quality.

anthropogenic aerosol emissions↗

A First Look at the Impact of Electric Vehicle Charging on the Electric Grid in the EV Project

ECOtality was awarded a grant from the U.S. Department of Energy to lead a large-scale electric vehicle charging infrastructure demonstration, called The EV Project. ECOtality has partnered with Nissan North America, General Motors, the Idaho National Laboratory, and others to deploy and collect data from over 5,000 Nissan LEAFsTM and Chevrolet Volts and over 10,000 charging systems in 18 regions across the United States. This paper summarizes usage of residential charging units in The EV Project, based on data collected through the end of 2011. This information is provided to help analysts assess the impact on the electric grid of early adopter charging of grid-connected electric drive vehicles. A method of data aggregation was developed to summarize charging unit usage by the means of two metrics: charging availability and charging demand. Charging availability is plotted to show the percentage of charging units connected to a vehicle over time. Charging demand is plotted to show charging demand on the electric gird over time. Charging availability for residential charging units is similar in each EV Project region. It is low during the day, steadily increases in evening, and remains high at night. Charging demand, however, varies by region. Two EV Project regions were examined to identify regional differences. In Nashville, where EV Project participants do not have time-of-use electricity rates, demand increases each evening as charging availability increases, starting at about 16:00. Demand peaks in the 20:00 hour on weekdays. In San Francisco, where the majority of EV Project participants have the option of choosing a time-of-use rate plan from their electric utility, demand spikes at 00:00. This coincides with the beginning of the off-peak electricity rate period. Demand peaks at 01:00.

33 ADVANCED PROPULSION SYSTEMS↗