Search NASA⌕ Search

SEARCH · Search NASA

Results for “ARTEMIS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Extravehicular Activity (EVA) & Human Surface Mobility (HSM) Program (EHP) Joint EVA & HSM Test Team (JETT) Field Test 3 (JETT3) Report

The purpose of this field test and corresponding report is to evolve the lunar surface EVA concept of operations and hardware via developmental testing. This report compiles and summarizes the goals, infrastructure, test configuration, conclusions, and recommendations from the JETT3 field test. These insights are intended to inform future integrated testing efforts and broader Artemis campaign development activities.

NASA↗

On The Incorporation of Both Function-Driven Requirements and Topology Optimization in The Development of Lunar Launch & Landing Pads

In the design of additively manufactured structures, there can be a constant battle between focusing on function-driven design and topology optimization in an attempt to improve a products ability to meet all requirements. Function-driven optimization is defined as the process of identifying the best design parameters that satisfy project functionality requirements. Function-driven optimization is typically implemented by a designer(s) who, instead of computational limitations, has human bias for the input or inputs determined. On the other hand, topology optimization is defined as a mathematical method that optimizes material layout within a given design space, for a given set of loads, boundary conditions, and constraints with the goal of maximizing the performance of the system. In topology optimization, the work is defined by the limited mathematical inputs and computationally available goals/restraints. If not evaluated simultaneously, these two approaches can result in fundamentally different design concepts meant to address the same requirements. NASA’s Artemis program includes the development of a base camp near the lunar South Pole. After site selection is made, one of the first infrastructure elements needed will be a launch and landing pad (LLP). The construction of such a pad will prevent damage to nearby structures from plume-surface interaction (PSI) while also providing a stable platform for the lander. These benefits reduce the required distance between the established landing zones and other settlement infrastructure. In this paper, the authors evaluate the requirements associated with lunar LLP development, application of both functional and topological optimization techniques, methodologies to combine the two techniques, and potential impacts on final design of such a pad.

In-situ↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

NASA Lunar Exploration – Gateway’s Power and Propulsion Element Communications Links

As a key part of NASA’s Artemis program to return to the moon, the Lunar Gateway will provide a platform for staging lunar missions, for gaining experience in operations beyond earth orbit, and for creating sustainable infrastructure. Of specific interest, the Lunar Gateway will provide communications support to landers, orbiters, and surface systems, including in the South Polar Region where direct line of sight (LOS) to Earth is limited or non-existent. A foundational segment of the Gateway is the Power and Propulsion Element (PPE), which will carry: solar arrays to provide power to the Gateway; electric propulsion to maintain the Gateway in its operational orbit; and communication links between the Earth and Gateway, the Moon and Gateway, and relays from the Moon to the Earth. PPE Communication Links include an X-band link to Earth for Command, Ranging, and Telemetry (CR&T), which also carries low to medium rate data; a Ka-band Direct to Earth(DTE) link for high rate data transmissions; and a Ka-band Lunar link for high data rate connections to lunar systems. This paper describes the PPE communication links from a technical perspective. Other Gateway links supported by other modules are outside the scope of this paper.

ARTEMIS↗

Habitability Considerations for a Notional Five-Day Small Pressurized Rover Excursion

Within the Artemis program, the Pressurized Rover (PR) is intended to support two-person mobile habitation up to roughly thirty days in duration. Lunar surface use of the PR, however, assumes a crew swap approximately halfway through a 33-day surface mission. Within that shorter duration, a rover crew may perform one or more excursions to remote sites in support of specific mission science or operational objectives. An important consideration in rover design is ensuring that the habitation accommodations in the vehicle support these types of missions. No pressurized rovers have ever been used in human spaceflight, but several have been proposed. The current NASA pressurized rover reference configuration is based on the third generation of the prototype small pressurized rover initially developed under Constellation. Using the NASA reference configuration, habitability considerations are discussed in the context of a notional five-day science excursion. The primary focus will be on the time the crew spends in the cabin, as opposed to time spent outside the vehicle on science-based EVAs. On each day of the excursion, the specific crew activities will be detailed. Crew activities that will be assessed include post sleep, EVA preparation, daily planning conference, private medical conference, traverse driving, EVA cabin egress, EVA cabin ingress, post-EVA activity, crew meals, pre-egress site observation and analysis, crew exercise, pre-sleep, and sleep. Considerations for crew fatigue will be discussed, including lessons learned from field testing. Finally, the assessment will identify hypotheses to assess in future analog missions and suitable test campaigns to evaluate them.

Pressurized Rover↗

Probabilistic Risk Assessment of a Sustained Lunar Presence

The Artemis Base Camp will be our first sustainable foothold on the lunar frontier. The base camp includes a lunar surface habitat, power systems, and infrastructure needed to develop capabilities on future missions to Mars. NASA Probabilistic Risk Assessment (PRA) methodologies tend to focus on in-flight Loss of Crew (LOC) or Loss of Vehicle (LOV) risk estimates for short mission durations. However, lunar habit support systems and power generation systems will need to continuously operate. Existing risk methodologies will need to adapt to understand risk drivers in new environments under different operating conditions, such as lunar dust and increased micro-meteoroid exposure. Insights from the nuclear and oil industries can provide guidance to NASA risk practitioners to tackle this new challenge.

risk assessment↗

Exploring de Gerlache Crater

The campaign of Artemis missions will result in the first crewed missions to the surface of the Moon in the 21stCentury. As outlined by the Lunar Exploration Analysis Group (LEAG) United States Lunar Exploration Roadmap (US-LER), human missions to the Moon will result in significant advances across a wide variety of scientific and engineering disciplines[1]contributing significantly to scientific discovery, economic prosperity, and world security. A significant focus is exploring lunar Permanently Shadowed Regions (PSRs). PSRs can contain volatiles, including water ice, which makes them high priority for scientific investigation and economic activity.

Moon↗

Field Geology Boot Camp for NASA Engineers and Managers

Introduction: With planning efforts for Artemis missions to the Moon in full swing, including plans for operations and EVAs (extra-vehicular activities or space walks) focused on planetary surface exploration, a team of geologists from NASA, the USGS, and academia have been working together to provide training to the NASA engineering and management community.

Field geology↗

Lunar Science Objectives and Opportunities

This presentation provides information on NASA strategic and top level Artemis lunar science objectives from publicly available documents. Also, it provides top level information on science, instruments, and hardware solicitation opportunities and institutes and analysis groups important to the space biology science, engineering, and technology communities

Space Biology↗

All-Metal Antennas for Applications in Extreme Space Environments

The feasibility of an all-metal antenna for transmission of science data by spacecraft, landers, and rovers operating in the extreme environment of space is investigated. The all-metal antenna is of the short backfire type with a waveguide feed and generates a linearly polarized radiation. The investigation includes the modeling, design, fabrication, and characterization of the antenna. The paper summarizes the preliminary results. Potential applications of an all-metal antenna include communication systems required to operate in the extreme hot environment of Mercury and Venus, extreme cold and high radiation environment of Jupiter’s icy moon, and Artemis missions that involve human/robotic exploration and long-term presence on the Moon.

Extreme Environment↗

Wide Bandgap Semiconductor Devices & Systems for Communications in Extreme Environment

The feasibility of Ka-band gallium nitride (GaN) based high power amplifier (HPA) for signal amplification in extreme planetary environment is investigated and its measured performance is presented. The data includes Pout, PAE, EVM for several waveforms and data rates, output spectrum, IMD, Noise Figure, and Gain. The data indicates excellent overall performance. Potential application of this HPA includes communication systems required to operate in the extreme hot environment of Mercury and Venus, extreme cold and high radiation environment of Jupiter’s icy moons, and Artemis missions that involve human/robotic exploration and long-term presence on the Moon.

Gallium Nitride↗

Replication of Segments of STS-94 as a Lunar Surface Mission

The Artemis exploration plan will progress from initial Commercial Lunar Payloads Services (CLPS) landers to human landings to an established surface infrastructure supporting four crew for surface missions of a month or greater. NASA teams are currently working with partners to define the surface assets that will comprise this infrastructure, including habitation and laboratory facilities. However, design engineers often have limited insight into the laboratory capabilities needed inside a pressurized habitat or the demands such a facility will place upon crew availability. The Space Shuttle STS-94 Microgravity Science Laboratory (MSL-1) mission is used as an intravehicular activity science analog for the Surface Habitat. The STS-94 primary physical science instruments and crew activity in support of physical science investigations will be examined. Based on recent reference concepts for the Surface Habitat, options for incorporating the instruments and options for dividing physical science tasks among the Surface Habitat crew are discussed, based on STS94 crew tasks and assumptions for Surface Habitat operations. Crew size considerations are raised along with recommendations to reassess some of the current assumptions. Having shown that STS-94’s physical science investigations can be applied to a lunar surface mission, recommendations are made for increased attention to pressurized laboratory objectives, capabilities, and crew size.

Surface Habitat↗

Preparing for Lunar Exploration: Geology and Field Training for Astronauts

NASA astronauts will soon return to the Moon, this time to the lunar south pole. Astronauts will perform traverses, make geologic observations, and collect samples to return to Earth. Lessons from Apollo show that science returns were optimized because crews were well-trained in both spacewalk operations and field geology. In that spirit, our team of geologists introduced a revised geologic training program for in-coming NASA astronauts that includes classroom activities and fieldwork and is split over 2 years. Year 1 focuses on an introduction to geologic concepts capped by a field exercise. Year two focuses on climate change, the Moon, other planets, and additional fieldwork. Our geology curriculum supports astronaut observations from the ISS and is the foundation for future Artemis geology training, which will include lunar science and increasingly complex field training in planetary-relevant locations. A final piece of our training program provides geology and field mapping experiences for NASA engineers, flight controllers, and managers, to help them understand the principles of fieldwork and relevance to lunar exploration. The Year 1 geology training must be an effective introduction for astronauts who have little or no background in geology. We focus the training around a narrowly defined field problem and use a week of classroom training to prepare the astronauts with the specific skills and background they need to carry out a field exercise on volcanic features, structures, and landforms of the Taos Plateau, New Mexico. Classroom modules are hands-on, using satellite imagery, maps, analog models, and samples, and provide the astronauts with specific and relevant experience in how to make observations and describe what they see, recognize, and interpret patterns, infer processes from products, and analyze relationships to build a story based on evidence from a variety of data sources. At the end of each classroom day, astronauts work in teams to build a preliminary geologic map of the field area, adding new observations and interpretations as they learn about topics in the classroom. Each team’s bucket list of target areas to visit helps shape their investigations during their week in the field. On the final day in the field, each astronaut team presents a geologic map, cross section, and geologic interpretation

Geology↗

BioSentinel SmallSat 2022 Presentation

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation.

BioSentinel↗

Gateway Utilization Capabilities and Status

Gateway will be a space station orbiting the Moon that will enable long-term presence in deep space. As part of the National Aeronautics and Space Administration’s (NASA) Artemis mission, Gateway will serve as a cornerstone of human deep space exploration and scientific discovery and a steppingstone to Mars. NASA leads the Gateway Program and serves as the integrator of spaceflight capabilities and contributions of U.S. commercial and international partners, European Space Agency (ESA), Japanese Aerospace Exploration Agency (JAXA) and the Canadian Space Agency (CSA), to develop and utilize Gateway. This paper provides an overview of the following utilization capabilities of Gateway: spacecraft overview, internal and external accommodations, resources for utilization, and vantage point for Earth, Sun, and Moon observations. Three utilization payloads have already been selected to fly on Gateway as part of the initial modules, Habitation and Logistics Outpost (HALO) and Power and Propulsion Element (PPE) modules: European Radiation Sensors Array (ERSA), Heliophysics Environmental and Radiation Measurement Experiment Suite (HERMES), and Internal Dosimeter Array (IDA). This paper will provide a short summary of each payload, the value behind conducting each payload, and share an overview of future utilization goals of Gateway.

Gateway↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

Gateway Program Status and Overview

This paper provides an overview and status of Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of each component of Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Trajectory Design Considerations for Low Lunar Orbit to Near Rectilinear Halo Orbit Transfers

NASA’s Artemis program plans to use a Near-Rectilinear Halo Orbit (NRHO) to stage assets for a lunar exploration campaign. While the proximity operations in the NRHO are simple and very similar to flat-space dynamics, the far-field ren-dezvous has considerations that are non-intuitive, especially to those that may be steeped in the dynamics of rendezvous in Keplerian orbits. This paper will discuss some key drivers to the delta-V performance of far-field rendezvous from Low Lunar Orbit to the Gateway space station in its 9:2 resonant south-ward NRHO.

NRHO↗