Search NASA⌕ Search

SEARCH · Search NASA

Results for “Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Multiscale Machine-Learned Modeling Infrastructure Core

MuMMI Core is the central component of the Multiscale Machine-Learned Modeling Infrastructure (MuMMI), a scalable and generalizable framework that couples pairs of models using machine learning and in situ feedback across three scales of resolution.

Bhatia, Harsh↗

Multiscale Machine-Learned Modeling Infrastructure RAS

MuMMI RAS is the application component of the Multiscale Machine-Learned Modeling Infrastructure (MuMMI). It simulates RAS protein interactions at three scales of resolution coupled with ML-based selection and in-situ feedback. MuMMI RAS is particularly configured for massive scale, running thousands of simultaneous jobs with several terabytes of data on Lassen and Summit.

Moon, JosephY.↗

Data Science Infrastructure SOFTWARE

LANL science workflows generate complex data sets and ensembles of data requiring significant compute and storage resources. The Data Science Infrastructure (DSI) project focuses on data-driven approaches to make data more readily available to LANL projects. DSI workflows leverage metadata stored in data-agnostic databases, supported by an abstraction layer API to simplify searching and accessing data across simulation runs, experimental runs, filesystems and environments. The abstraction layer API allows the user to query a range of data types: raw output, processed data, configuration data, machine learning models, performance data, etc. In addition to the abstraction backend API, the DSI project is developing client-driven query APIs and UIs to support specific user workflows.

Turton, Terece↗

Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) Model

The Behind-the-meter Infrastructure Costs for Electrification Progression (BICEP) model quantifies the behind-the-meter (BTM) electrical upgrades required for decarbonization through electrification by comparing the expected change in capacity requirements from the electrification technologies to the existing capacity in distributed energy resources (DER) stock (including buildings).

Yoder, Tim↗

Impact of electric vehicles on the IEEE 34 node distribution infrastructure

With the growing penetration of the electric vehicles to our daily life owing to their economic and environmental benefits, there will be both opportunities and challenges to the utilities when adopting plug-in electric vehicles (PEV) to the distribution network. In this study, a thorough analysis based on real-world project is conducted to evaluate the impacts of electric vehicles infrastructure on the grid relating to system load flow, load factor, and voltage stability. IEEE 34 node test feeder was selected and tested along with different case scenarios utilizing the electrical distribution design (EDD) software to find out the potential impacts to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Files for 'The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure'

This data set includes modeling results from The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure, including region-specific (i.e., national, state, and core-based statistical area cities and towns) electric vehicle supply equipment port count requirements in 2025 and 2030 for multiple scenarios described in the study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an Open Global Oil and Gas Infrastructure Inventory and Geodatabase

This submission contains a technical report describing the development process and visual graphics for the Global Oil and Gas Infrastructure database. Access the GOGI database using the following link: https://edx.netl.doe.gov/dataset/global-oil-gas-features-database There is a web-mapping tool that allows you to visualize and interact with this data also available here: https://edxspatial.arcgis.netl.doe.gov/maps/edxspatial-gogi-index.html Acknowledgement: This work was performed under a CRADA between NETL and EDF, and was funded under the Climate and Clean Air Coalition (CCAC) Oil and Gas Methane Science Studies. The studies are managed by United Nations Environment in collaboration with the Office of the Chief Scientist, Steven Hamburg of the Environmental Defense Fund. Funding was provided by the Environmental Defense Fund, OGCI Companies (Shell, BP, ENI, Petrobras, Repsol, Total, Equinor, CNPC, Saudi Aramco, Exxon, Oxy, Chevron, Pemex) and CCAC.

GOGI↗

Advanced Infrastructure Integrity Modeling (AIIM) Onshore Pipeline Database

The Advanced Infrastructure Integrity Modeling (AIIM) Onshore Pipeline Database is an interoperable spatial resource containing critical environmental, operational, and reported stressors tied to publicly available oil and gas pipeline locations across the contiguous U.S. and Alaska. This database contains two layers: 1. Pipeline point locations (‘pipeline_points’) – More than 500,000 points (at every kilometer along pipelines, and end points) to which more than 350 stress-related variables have been appended. 2. Merged pipelines (‘merged_pipelines’) – The original, publicly available pipeline data (see table below) merged together into one feature class.

Carbon Transport↗

Innovations in Nuclear Infrastructure and Education

The decision to implement the Innovation in Nuclear Infrastructure and Engineering Program (INIE) was an important first step towards ensuring that the United States preserves its worldwide leadership role in the field of nuclear science and engineering. Prior to INIE, university nuclear science and engineering programs were waning, undergraduate student enrollment was down, university research reactors were being shut down, while others faced the real possibility of closure. For too long, cutting edge research in the areas of nuclear medicine, neutron scattering, radiochemistry, and advanced materials was undervalued and therefore underfunded. The INIE program corrected this lapse in focus and direction and started the process of drawing a new blueprint with positive goals and objectives that supports existing as well the next generation of educators, students and researchers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Revegetation Plan for Areas of the Fitzner-Eberhardt Arid Lands Ecology Reserve Affected by Decommissioning of Buildings and Infrastructure and Debris Clean-up Actions

The U.S. Department of Energy (DOE), Richland Operations Office is working to remove a number of facilities on the Fitzner Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument. Decommissioning and removal of buildings and debris on ALE will leave bare soils and excavated areas that need to be revegetated to prevent erosion and weed invasion. Four main areas within ALE are affected by these activities (DOE 2009;DOE/EA-1660F): 1) facilities along the ridgeline of Rattlesnake Mountain, 2) the former Nike missile base and ALE HQ laboratory buildings, 3) the aquatic research laboratory at Rattlesnake Springs area, and 4) a number of small sites across ALE where various types of debris remain from previous uses. This revegetation plan addresses the revegetation and restoration of those land areas disturbed by decommissioning and removal of buildings, facilities and associated infrastructure or debris removal. The primary objective of the revegetation efforts on ALE is to establish native vegetation at each of the sites that will enhance and accelerate the recovery of the native plant community that naturally persists at that location. Revegetation is intended to meet the direction specified by the Environmental Assessment (DOE 2009; DOE/EA-1660F) and by Stipulation C.7 of the Memorandum of Agreement (MOA) for the Rattlesnake Mountain Combined Community Communication Facility and InfrastructureCleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland Washington(DOE 2009; Appendix B). Pacific Northwest National Laboratory (PNNL) under contract with CH2M Hill Plateau Remediation Company (CPRC) and in consultation with the tribes and DOE-RL developed a site-specific strategy for each of the revegetation units identified within this document. The strategy and implementation approach for each revegetation unit identifies an appropriate native species mix and outlines the necessary site preparation activities and specific methods for seeding and planting at each area. evegetation work is scheduled to commence during the first quarter of FY 2011 to minimize the amount of time that sites are unvegetated and more susceptible to invasion by non-native weedy annual species.

54 ENVIRONMENTAL SCIENCES↗

Infrastructure Development of Single Cell Testing Capability at A0 Facility

The objective of this technical note is to document the details of the infrastructure development process that was realized at the A0 photo injector facility to establish RF cold testing capability for 1.3 GHz superconducting niobium single cell cavities. The activity began the last quarter of CY 2006 and ended the first quarter of CY 2009. The whole process involved addressing various aspects such as design of vertical insert and lifting fixture, modification of existing RF test station and design of new couplers, development of a Temperature Mapping (T-Map) system, radiation considerations for the test location (north cave), update of existing High Pressure Rinse (HPR) system, preparation of necessary safety documents and eventually obtaining an Operational Readiness Clearance (ORC). Figure 1 illustrates the various components of the development process. In the past, the north cave test station at A0 has supported the cold testing 3.9 GHz nine cell and single cell cavities, thus some of the components were available for use and some needed modification. The test dewar had the capacity to accommodate 1.3 GHz single cells although a new vertical insert that could handle both cavity types (1.3 and 3.9 GHz) had to be designed. The existing cryogenic system with an average capacity of {approx} 0.5 g/sec was deemed sufficient. The RF system was updated with broadband components and an additional amplifier with higher power capacity to handle higher gradients usually achieved in 1.3 GHz cavities. The initial testing phase was arbitrated to proceed with fixed power coupling. A new temperature mapping system was developed to provide the diagnostic tool for hot spot studies, quench characterization and field emission studies. The defining feature of this system was the use of diode sensors instead of the traditional carbon resistors as sensing elements. The unidirectional current carrying capacity (forward bias) of the diodes provided for the ease of multiplexing of the system, thus substantially reducing the number of cables required to power the sensors. The high gradient capacity of the 1.3 GHz cavities required a revision of the radiation shielding and interlocks. The cave was updated as per the recommendations of the radiation safety committee. The high pressure rinse system was updated with new adapters to assist the rinsing 1.3 GHz single cell cavities. Finally, a proposal for cold testing 1.3 GHz single cell cavities at A0 north cave was made to the small experiments approval committee, radiation safety committee and the Tevatron cryogenic safety sub-committee for an operational readiness clearance and the same was approved. The project was classified under research and development of single cell cavities (project 18) and was allocated a budget of $200,000 in FY 2007.

43 PARTICLE ACCELERATORS↗

CU-ICAR Hydrogen Infrastructure Final Report

The goal of this project was to establish an innovation center to accelerate the transition to a 'hydrogen economy' an infrastructure of vehicles, fuel resources, and maintenance capabilities based on hydrogen as the primary energy carrier. The specific objectives of the proposed project were to: (a) define the essential attributes of the innovation center; (b) validate the concept with potential partners; (c) create an implementation plan; and (d) establish a pilot center and demonstrate its benefits via a series of small scale projects.

08 HYDROGEN↗

Earthquake warning system for infrastructures : a scoping analysis.

This report provides the results of a scoping study evaluating the potential risk reduction value of a hypothetical, earthquake early-warning system. The study was based on an analysis of the actions that could be taken to reduce risks to population and infrastructures, how much time would be required to take each action and the potential consequences of false alarms given the nature of the action. The results of the scoping analysis indicate that risks could be reduced through improving existing event notification systems and individual responses to the notification; and production and utilization of more detailed risk maps for local planning. Detailed maps and training programs, based on existing knowledge of geologic conditions and processes, would reduce uncertainty in the consequence portion of the risk analysis. Uncertainties in the timing, magnitude and location of earthquakes and the potential impacts of false alarms will present major challenges to the value of an early-warning system.

99 GENERAL AND MISCELLANEOUS↗

Compatibility Study for Plastic, Elastomeric, and Metallic Fueling Infrastructure Materials Exposed to Aggressive Formulations of Ethanol-blended Gasoline

In 2008 Oak Ridge National Laboratory began a series of experiments to evaluate the compatibility of fueling infrastructure materials with intermediate levels of ethanol-blended gasoline. Initially, the focus was elastomers, metals, and sealants, and the test fuels were Fuel C, CE10a, CE17a and CE25a. The results of these studies were published in 2010. Follow-on studies were performed with an emphasis on plastic (thermoplastic and thermoset) materials used in underground storage and dispenser systems. These materials were exposed to test fuels of Fuel C and CE25a. Upon completion of this effort, it was felt that additional compatibility data with higher ethanol blends was needed and another round of experimentation was performed on elastomers, metals, and plastics with CE50a and CE85a test fuels. Compatibility of polymers typically relates to the solubility of the solid polymer with a solvent. It can also mean susceptibility to chemical attack, but the polymers and test fuels evaluated in this study are not considered to be chemically reactive with each other. Solubility in polymers is typically assessed by measuring the volume swell of the polymer exposed to the solvent of interest. Elastomers are a class of polymers that are predominantly used as seals, and most o-ring and seal manufacturers provide compatibility tables of their products with various solvents including ethanol, toluene, and isooctane, which are components of aggressive oxygenated gasoline as described by the Society of Automotive Engineers (SAE) J1681. These tables include a ranking based on the level of volume swell in the elastomer associated with exposure to a particular solvent. Swell is usually accompanied by a decrease in hardness (softening) that also affects performance. For seal applications, shrinkage of the elastomer upon drying is also a critical parameter since a contraction of volume can conceivably enable leakage to occur. Shrinkage is also indicative of the removal of one or more components of the elastomers (by the solvent). This extraction of additives can negatively change the properties of the elastomer, leading to reduced performance and durability. For a seal application, some level of volume swell is acceptable, since the expansion will serve to maintain a seal. However, the acceptable level of swell is dependent on the particular application of the elastomer product. It is known that excessive swell can lead to unacceptable extrusion of the elastomer beyond the sealed interface, where it becomes susceptible to damage. Also, since high swell is indicative of high solubility, there is a heightened potential for fluid to seep through the seal and into the environment. Plastics, on the other hand, are used primarily in structural applications, such as solid components, including piping and fluid containment. Volume change, especially in a rigid system, will create internal stresses that may negatively affect performance. In order to better understand and predict the compatibility for a given polymer type and fuel composition, an analysis based on Hansen solubility theory was performed for each plastic and elastomer material. From this study, the solubility distance was calculated for each polymer material and test fuel combination. Using the calculated solubility distance, the ethanol concentration associated with peak swell and overall extent of swell can be predicted for each polymer. The bulk of the material discussion centers on the plastic materials, and their compatibility with Fuel C, CE25a, CE50a, and CE85a. The next section of this paper focuses on the elastomer compatibility with the higher ethanol concentrations with comparison to results obtained previously for the lower ethanol levels. The elastomers were identical to those used in the earlier study. Hansen solubility theory is also applied to the elastomers to provide added interpretation of the results. The final section summarizes the performance of the metal coupons.

02 PETROLEUM↗

Scientific Data Management Integrated Software Infrastructure Center (SDM/ISIC): Scientific Process Automation (SPA) (Final Report)

The KEPLER project has made a significant impact and established a sustained leadership in the field of scientific workflows. The open source KEPLER project started in 2003 when members of the SciDAC-SDM Center/SPA Team, sponsored by this DOE-funded project (DE-FC02-01ER25486) and members of the SEEK project (NSF/ITR awards DBI-0225674 and DBI-0533368) decided to collaborate and jointly develop a scientific workflow system based on the open source PTOLEMY II system (Ludäscher was a co-PI on both projects). In the first project phase, between 2001 and 2003, the SDSC team (Altintas, Ludäscher) worked closely with a domain scientist (Matt Coleman, LLNL) and created early versions of a Promoter Identification Workflow (PIW). Towards the end of that period, the open source PTOLEMY II system was adopted by SciDAC-SDM and SEEK as the basis for a general scientific workflow system and problem-solving environment to design and execute scientific workflows, giving rise to Kepler. Once started through SciDAC-SDM and SEEK, the KEPLER leadership team was able to attract further support from funding agencies including from DOE (as part of SciDAC-2), NSF, NIH, and the Gordon and Betty Moore Foundation. Important advances to KEPLER were made by the SciDAC/SDM-SPA team during the report period (2001–2007), in particular by the SDSC team (and after Ludäscher's move) the UC Davis team, including (i) research and development of the workflow infrastructure, (ii) library (actor) development, and (iii) development of concrete scientific workflows, in collaboration with scientists. Years later, the KEPLER system was listed as one of the prominent “Big Data” research outcomes of DOE in the White House Big Data Factsheet, announced as part of the White House Big Data press release.

97 MATHEMATICS AND COMPUTING↗