Search NASA⌕ Search

SEARCH · Search NASA

Results for “Worker”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46

Soft Robotic Glove System for Wearable Haptic Teleoperation - 18373

Managing nuclear waste is a difficult, dangerous, and costly task. Teleoperation of robotic operators is an important functionality for this application, allowing robotic devices to operate in dangerous environments while still leveraging the existing abilities and technical knowledge of human workers. One difficulty in implementing effective teleoperation systems is that human operators rely on more senses beside sight: in particular, touch. The sense of touch could provide significant benefits for teleoperation, preventing environmental mishaps that could cost millions of dollars. To help remedy this problem, we present a soft haptic feedback glove system. The primary functionality of this system is to provide tactile and force feedback on the user's hands. This was achieved using custom cylindrical pneumatic actuators. These actuators consist of plastic sheeting folded into a hollow-walled cylinder which is connected to a pressure source. When pressurized, the cylinder walls expand and the cylinder straightens, with the force being related to the pressure. The glove system has one of these actuators over each of the user's three main fingers (index, middle, and thumb), where pressurizing the actuator applies a reaction force to the finger of the user, mimicking the resistance of a grasped object. The expansion of these actuators also causes them to physically press against the user's fingers, giving them the feeling of contact. To demonstrate the usability of this system, we implemented a virtual environment in V-REP simulating the interactions between a robotic Jaco Arm and a floating ball. This simulation receives hand and figure positions from the haptic glove and used them to drive the state of the simulated Jaco Arm. In response to the interactions between the Jaco and the floating ball, the simulation returns commands to the glove, instructing it to pressurize or depressurize its actuators as appropriate, allowing the user to feel the ball in their hand. We tested users in their ability to prevent the ball from floating away using this system with and without the haptic feedback. Results show that the addition of haptic feedback significantly improved the ability of users to interact precisely with the environment. We also used the finger positions of the haptic glove to control a physical robotic hand, and demonstrated the system's usability for control of real robots, though the lack of sensors on the robot made providing the tactile feedback impractical. However, there is more to grasping and holding an object than just the feeling of contact and the resistance to closing one's hand. The weight of the object will apply forces to the user's other joints as they hold it. To this end, we added a haptic feedback device for the user's wrist, a technique that can be generalized to the user's other joints. This is made up of reverse Pneumatic Artificial Muscles (rPAMs) stretching across the wrist between mounts on the hand and forearm. These rPAM actuators are tubes of silicone wrapped in thread such that they extend when pressurized. This extension can apply torque on the user's wrist, mimicking the feeling of gravity, or allowing the simulation of additional contact forces (such as the user's hand impacting an object). We tested this wrist device independently using a simulated path-following experiment. Users showed a significant improvement in performance when aided by haptic feedback during sinusoidal path experiments, demonstrating the usability of this approach. We then integrated the two systems, further demonstrating the usability of this approach. This project represents the first step towards a more effective robotic teleoperation system, allowing skilled human workers to perform tasks more effectively while remaining out of danger. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Mobile Examination and Remediation Facility for On-Site Remediation of Dry Storage Systems - 18389

Most of the spent nuclear fuel (SNF) in dry storage in the United States is safely and securely stored in dual-purpose (i.e., storage and transportation) canisters [1]. However, some of the SNF is stored in storage-only (i.e., non-transportable) packages, or packages that may become nonconforming for continued storage or transportation for a variety of reasons. Currently, the capability to remediate dry storage systems (DSSs) for SNF that are not transportable or that need to be repaired to maintain confinement boundary integrity during storage service does not exist without on-site access to a spent fuel pool. Hence, there is a potential future need for a mobile facility with remediation capabilities that can be used at multiple storage installations. These capabilities would permit needed repairs to an existing DSS to support continued storage or for the dry transfer of fuel to a new conveyance suitable for transport, if necessary. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. A novel design concept for a Mobile Examination and Remediation Facility (MERF) is proposed with functions and capabilities to remediate a DSS. The proposed MERF would be a multi-purpose facility, remotely operated and computer-controlled with semi-automated equipment to allow trained operators to safely perform remediation activities while keeping worker radiation dose as low as reasonably achievable. It would include a shielded rotating platform with support towers and would use commercial off- the-shelf examination and repair equipment. A slip ring arrangement underneath the rotating platform would allow for the power supply without impeding the continuous rotation and would simplify cable management. The support towers would be mounted on the rotating platform, and each tower would have vertical and horizontal positioning capability for axial and radial tool location. The rotating platform would be attached to the main MERF structure. Capabilities would include visual, surface, and volumetric examinations to fully characterize physical conditions on canister surface before and after a repair; repair techniques, e.g., laser beam welding, friction stir welding, or cold spray, to perform needed remediation activities; and associated equipment for surface preparation such as cutting and grinding equipment. The proposed design would be simple, modular, robust, economically viable, and easily transportable and would have a small footprint. The modular design would present several advantages including compatibility with a variety of different DSSs, on-site assembly, and transportability; it also would be built in interchangeable sections to facilitate decontamination. Further, shielding would be supplemented through interface with the existing transfer cask and storage overpack. Robustness and canister stability would be achieved using pneumatic holders and steel support structures designed with vibration absorbers to reduce impacts and/or a 'pendulum' effect during a seismic event. Thus, the proposed MERF would be designed to: (i) minimize handling of an affected DSS to the extent practicable, (ii) provide radiation shielding and minimize dose to operators and the public during remediation activities, and (iii) enable examination, repair, and repackaging. This paper describes the proposed MERF design concept and capabilities, main components, equipment, different modes of operation, and operating procedures. Structural and safety assessments would need to be performed before final design, licensing, and deployment. The MERF is evaluated with respect to regulatory impact (first of a kind, prior experience), operational impact (safety, security, staffing, ongoing operations, constraints), worker dose (low, medium, high), cost (low, medium, high), schedule (duration, time sequence), and technology readiness level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing Excess Contaminated Facilities and Mercury Cleanup At the Department of Energy's Oak Ridge Reservation - 18408

The U.S. Department of Energy's Oak Ridge Office of Environmental Management (OREM) and its prime cleanup contractor, URS | CH2M Oak Ridge LLC (UCOR) are executing an aggressive program of cleanup and risk reduction in excess contaminated facilities on the Oak Ridge Reservation (ORR). Across the complex, DOE has designated more than 2,300 of its facilities 'excess'. Excess means 'nonoperational' and refers to a facility for which DOE no longer has a mission need. Many of these facilities pose high risk to workers and/or the environment. Delayed cleanup increases risk as well as cost. OREM and UCOR initiated a Working Group on Excess Facilities to identify and prioritize activities that are needed to enhance worker safety, minimize further degradation of the facilities, and reduce the environmental risk. Six Excess Contaminated Facilities projects on the ORR were identified as priorities. Three of the projects are located at ORNL - the Building 7500 Homogenous Reactor Experiment, the Building 3026 Radioisotope Development Laboratory and Buildings 3028/3029 Isotope Facilities. At Y-12, priority excess facilities include the Column Exchange Equipment (COLEX), the Alpha-4 Lithium Enrichment Facility and the Biology Complex Research Facilities. Work on these projects is aimed at stabilization of degraded higher risk facilities, characterization of conditions and hazards, removal of hazardous materials and placement of the facility in the lowest risk condition possible pending demolition. At the same time, DOE and UCOR are preparing to undertake a comprehensive program to remediate the presence of mercury in the water stemming from historical operations at the Y-12 National Security Complex. Over decades of operations, mercury migrated into the environment. Deteriorating conditions of large post-operation mercury-use buildings may be contributing to additional releases. Mercury cleanup is a high priority for Y-12 and the Oak Ridge Reservation. UCOR is completing the final design on a new Mercury Treatment Facility with construction expected to begin in late 2017. When constructed the treatment facility will reduce the amount of mercury in local waters, lower environmental contamination levels and serve as a guard against future releases. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Robotics in Liquid Waste System - {sup 3}H Evaporator, Tank Closure and Defense Waste Processing Facility - 18525

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Salt-stone Production Facility (SPF). At Savannah River Remediation (SRR), the liquid waste contractor, robotic technologies are needed to enter areas and spaces that are otherwise inaccessible or prohibit direct access by workers due to unsafe, unstable, or unknown physical or structural conditions; or configurations that are hard to reach or beyond reach without taking extraordinary mechanical measures. As discussed below, SRR uses robotic technologies at various LWS facilities to reduce dose to the workers as well as provide access to unreachable locations due to the presence of radiological or chemical hazards. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building a Decommissioning Army - 19259

It is safe to say that Canada has, for the greater part, seen the end of large-scale commercial nuclear new build projects. In spite of a renaissance in the last decade, and the fact that nuclear is now widely viewed by many as the original green energy, refurbishment projects both underway and scheduled will likely be the last of the megaprojects. In a sense, the future of large-scale nuclear power generation is the end of large scale nuclear power generation. Just as the construction and operation of these facilities has, for decades, employed scores of highly skilled workers, so too will the decommissioning process. Today, Canadian decommissioning activities are first-of-kind (FOAK)projects. There are very few experts in the field and certainly no plan in place to educate and prepare the numbers of workers we will need to safely and successfully execute the programs. It is to this end that I propose a national education centre be created to recruit, educate and mobilize all manner of professionals needed to meet this challenge. In an effort to meet the human and technological needs of the industry in the future, I propose the development of a Canadian Institute where the students study and learn how to decommission a nuclear power plant. The student body of the institute would comprise graduate students with backgrounds in a wide variety of studies such as engineering, physics, chemistry, commerce, environmental studies, and communications. Collectively, their time spent at the institute shall not only prepare them for a career in nuclear but will also vastly improve the technical readiness level of the Canadian nuclear industry to transition from large-scale nuclear utilities to a future of small modular reactors (SMRs) and renewable energy resources. Staff at the institute would be selected from leaders in the industry -those who have shown a passion for nuclear and have demonstrated innovative problem solving and leadership. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-Line Monitoring and Real-Time Characterization of Low Level Waste and Off-Gas Condensate Samples using Raman Spectroscopy - 19274

The demand for Hanford waste property analysis is expected to significantly increase as the U.S. Department of Energy River Protection Project progresses toward transferring waste to the Hanford Waste Treatment and Immobilization Plant. The analysis of waste includes chemical, radionuclide, and physical property characterizations, with the goal of achieving safe/informed transfer and processing. Waste sampling followed by offline laboratory analysis is the current baseline analytical approach. The addition of field-deployed/in situ instruments has the potential to provide improvements and benefits over offline analysis in the areas of 1) Worker Safety: by reducing the need for sampling and thereby reducing the need for worker interaction with waste during sample handling; 2) Operational Efficiency: by reducing analysis turnaround times and offsetting demand on analytical laboratories; and 3) Accuracy: continuous analysis of a flowing waste stream allows cumulative results to be produced for the batch, which is more representative than discrete samples of batch properties. This paper describes the development and application of an online monitor to provide chemical characterizations; specifically, Raman spectroscopy is utilized to identify and quantify tank components. Accurate quantification is achieved through the use of chemometric analysis, which can be configured to provide real-time analysis in field deployment settings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Picture Speaks 360,000 Words - Virtual Reality as a Decommissioning Planning Tool - 19364

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. Decommissioning of Whiteshell Laboratories has been ongoing since 2002 under Atomic Energy of Canada (AECL) and, more currently, since 2015 under the WL Closure Project managed by Canadian Nuclear Laboratories (CNL). One of the key steps to ensuring safe decommissioning operations is effective planning, including pre-job briefings, and post-job verification and review. Effective planning involves clear and concise communication of the field conditions, system configurations, hazards, and task goals or achievements to front line employees, and task approvers and verifiers. In many instances, employees can enter, view, inspect, verify or otherwise familiarize themselves with the task and task location. However, in several cases, hazardous conditions in the task location make it difficult for employees to easily access the location themselves, due to hazardous conditions, PPE requirements, training qualification gaps or space limitations. Since 2016, 360 deg. cameras have been used to create a virtual 'tour' of the hazardous task locations at Whiteshell Laboratories, which can be viewed by one or all of the employees involved in a task, from a position of safety. This allows a task to be discussed with all employees involved without the need for added risk of exposure to dose or industrial hazards or costly PPE, and supports ALARA control techniques of removing the hazard by moving work planning walk downs away from hazardous locations and guarding the worker by limiting the time a worker is exposed to the hazard. This paper provides an overview of the technologies used to capture and present the 360 virtual tours, the benefits from a safety, schedule and cost perspective, and the limitations of the current implementation that could be improved upon in a future iteration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modern Integrated Decommissioning at Chalk River Laboratories - 19401

Canadian Nuclear Laboratories (CNL), formerly Atomic Energy of Canada Limited (AECL) is Canada's premier nuclear science and technology (S and T) organization in Canada. Over the next decade, CNL will be transforming its many different sites through the revitalization of essential site infrastructure, the decommissioning of aging infrastructure and a significant investment in new, world-class science facilities. In particular, the main site for CNL resides at the Chalk River Laboratories (CRL), where the majority of parallel activities of revitalization and decommissioning will take place. In 2016, CRL started an ambitious ten year plan to decommission more than 120 buildings. In order to ensure this project remains on track and the ALARA (as low as reasonably achievable) principle is maintained, a strategy is required. This strategy is to focus on integrated activities, which meet/exceed international best practices, to ensure the work is carried out as efficiently as possible. Given the complexity of CRL operations and the legacy issues accumulated over 60 years of operation, CNL needed to adopt a modern and integrated approach to handle competing project priorities. As a starting point, achieving complete radiological characterization of many building structures is required. CNL engaged various vendors to modernize radiological surveys from paper records to electronic documentation, deploying modern survey tools such as data-logging instruments, gamma cameras, robotic surveying tools, and introducing tablets to improve the flow of information while workers are in the field. Once fully implemented, these improvements will ensure that quality information is readily available at all stages of decommissioning, which greatly reduces project schedules and results in important company savings. These techniques will ensure that, during planning, historic radiological survey data is easily searchable from the electronic documentation system. Any additional data required can be quickly and safety collected using robotic surveying tools in areas of higher radiation to reduce possible exposure to individuals. As decommissioning progresses, individuals in the field can use tablets, gamma cameras and data-logging instruments to accurately retrieve, collect and share data. As a result of these efforts, CNL is progressing towards becoming a leader in the field of decommissioning within Canada, applying modern techniques and best practices to reduce decommissioning project risk. Access to high quality information results in improved decommissioning plans, which will reduce the amount of rework and scheduling delays required and improve worker safety as the project is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Decontamination Evolution and Revolution - 20349

Decontamination, one of the oldest practices in the nuclear industry, is about to change. While no single approach to decontamination is appropriate in all situations, decontamination of highly contaminated surfaces is historically viewed as difficult and/or marginally effective and fixatives and strippable coatings are often called on to manage time sensitive contamination control issues. The deferral of proper decontamination can lead to accumulated concentrations of radioactive material increasing the risk of cross-contamination of workers and equipment while also increasing radiation levels, which further discourages decontamination. The results of the subject testing demonstrate that superior decontamination factors are readily achievable and the ALARA benefit of decontamination is viable through advanced decontamination technologies in conjunction with innovative application techniques. The collateral benefits will save countless radiological man-hours and personnel radiological exposure. The appropriate use of radiological decontamination techniques can prevent or limit the adverse effects of highly radioactive contamination in the work area. High levels of radiological contamination are typically associated with some of the most physically demanding work in the nuclear industry. Additionally, working in highly contaminated environments increases the risk of exposure to elevated levels of airborne radioactivity and radiation from the source term of the contamination, particularly in hard to reach areas or complex equipment. Veolia's Alaron Nuclear Services (Alaron), a fully integrated nuclear facility, has provided the nuclear industry waste treatment, consolidation, repackaging, and broad decontamination services for almost 35 years. In looking at solutions for its customers, as well as for their own facility, Alaron has recently collaborated with Environmental Alternatives, Inc. (EAI), which has provided innovative solutions addressing difficult nuclear decontamination and industrial cleaning challenges since 1989. This broad range of experience along with the products to support the work created an ideal partner for Alaron's needs at their facility. The benefits of collaboration were immediately recognizable to the management of both companies although the decontamination challenge was significant. Due to the nature of the services offered, contamination at the Alaron facility is routine. The recent decontamination experience at Alaron utilized an innovative surfactant process that quickly produces remarkably higher decontamination factors for both removable surface contamination and fixed contamination. Considering the time to decontaminate areas historically designated for high radiological hazard work, the results from this decontamination effort not only reduced contamination levels but also significantly lowered exposure rates in the working environment. The relative ease with which the surfactant is applied, combined with extraordinary decontamination test results, indicates the potential to alter current radiological work processes in a way that improves worker comfort, and removes radiological engineering barriers, allowing Alaron to complete complex radiological tasks more efficiently and effectively. In a series of two simple applications of the decontamination agent to contaminated high bay vertical surfaces, as well as a variety of horizontal and vertical surfaces with variable porousness and surface sealants, there was an overall reduction in removable contamination of approximately 73% with a reduction in area dose of approximately 93%. The results indicate additional reduction in fixed contamination with application of the surfactant. These values are much higher than experienced with more traditional decontamination agents. In conjunction with demonstrating EAI's surfactant on room surfaces, additional studies were conducted on complex geometry equipment including waste processing equipment, tools, and heavily contaminated parts normally handled from Alaron's customers. Evaluations were made with straight application of EAI's surfactant as well as adding additional techniques to the treatment which afforded revolutionary improvements in the levels of contamination removed. Successful decontamination with up to 95% reduction in removable contamination with just one application were demonstrated in several of the trials. This paper outlines the planned approach to use this technology, the variety of surfaces and equipment treated, and the results of the decontamination efforts. Furthermore, this paper discusses options for pretreatment of certain heavily contaminated equipment prior to employees handling and/or working with the equipment. The potential for dose saving and the reduced risk of cross-contamination with the added benefit of lower PPE requirements, produces an enormous potential for cost and time savings. Attendees will benefit from Alaron's experiences and more fully understand the capabilities of EAI's decontamination process. With the variety of contamination agents, forms and surfaces on which the technology was demonstrated, the information will be valuable to a broad cross-section of industry users. The significance of this report demonstrates superior decontamination factors are achievable utilizing the next evolution of decontamination technology and that the ALARA benefits of decontamination are available through advanced and modern decontamination efforts. The collateral benefits will save countless radiological man-hours and valuable personnel radiological exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of a Robotic Exoskeleton Device for use in Glove Boxes - 20374

Glovebox operators in nuclear facilities often operate under radioactive environment and typically perform monotonous, dull and repetitive work. This can result in muscle fatigue leading to increased levels of accidents. Current research work aims in assisting the glovebox operators by designing a novel upper limb exoskeleton device to reduce injuries and increase worker efficiency. Almost none of the commercially available hand and upper body exoskeletons are directly suitable for use in gloveboxes. This explains the novelty of the present work in developing a wearable powered robotic exoskeleton device. The device consists of electronics, motors and spring systems mounted on adjustable plates and is supported by a stationary frame behind the worker. The device is intended to be portable and adjustable according to the operator height. The elbow has a flexion movement assisted with motor control by way of a Bowden cable system. The system is floated on a spring and pulley combination that allows for extra safety and smoothness of operation. The end points are fixed near the pivot points to help minimize unwanted movement/torque. The extension movement of the upper and lower arm are assisted by gravity and a counter spring. The shoulder and upper arm movement are held in a neutral position with a spring system for counter balance allowing small movements within the glovebox. This initial concept considers only the vertical movement of the arm. The abduction and adduction movement will not be assisted or impeded by the over shoulder plate or at the forearm plate allowing for full range of motion. Several glovebox aspects such as the level of task assistance, ergonomic design, minimum hindrance in dexterity/operator movements and tear resistance for hazardous safety reasons will be considered in the design of the exoskeleton. Computer models will be simulated to test the load levels and stress conditions on the exoskeleton to enhance the designs. The exoskeleton focusses on major muscular involvement reduction through weight offset and active assistance with minimal parts and hence the device is derived with several joint links and contains both passive and active joints. The paper details the various stages in the design development and prototype testing of the exoskeleton device. Upon successful prototype device development, human testing will be conducted in a replica of the SRS-235F hot cell facility constructed at FIU-ARC. The final stage of the project will be potential testing/deployment of the exoskeleton device in one of the glovebox facilities in Savannah River Nuclear Waste site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Perspective on the Successes of the NNSS Underground Test Area (UGTA) Activity - 20221

Between 1951 and 1992, 828 underground nuclear tests were performed at the Nevada National Security Site (NNSS). Underground testing was done in five major testing areas, which included (1) Frenchman Flat, (2) Rainier Mesa/Shoshone Mountain, (3) Yucca Flat/Climax Mine (4) Central Pahute Mesa, and (5) Western Pahute Mesa. About one third of the underground tests were detonated near, at or below the water table, and thus radioactive contamination was introduced to the groundwater system. The U.S. Department of Energy's Underground Test Area (UGTA) Activity was established in the late 1990's to address the fate and movement of residual radioactivity in groundwater, and characterize the risk that it may pose to NNSS workers and the offsite public. It has accomplished this goal through a process of iterative groundwater sampling and numerical groundwater flow and transport modeling, and long-term monitoring. The UGTA Activity draws on the expertise of scientists in the fields of geology, hydrology, radiochemistry, and risk assessment from the U.S. DOE staff, the lead contractor (currently Navarro) and many other organizations, in cooperation with the governing regulatory body, the State of Nevada's Division of Environmental Protection (NDEP). Los Alamos National Laboratory (LANL) is one of the participating research organizations involved with the UGTA Activity. Under the direction of DOE and the lead contractor, LANL's role in UGTA has evolved over time from an initial focus on geologic characterization, to conducting field and laboratory experiments, and finally to its current role of providing modeling and geochemistry expertise to characterize the rates and directions of groundwater and radionuclide movement. In its current role, LANL has either developed or provided the numerical tools for developing flow and transport models in each of the four major testing areas. In addition, LANL has provided an independent assessment of future groundwater flow and transport behavior through the analysis of naturally-occurring geochemical and isotopic tracers in groundwater. The five major testing areas are now in different stages of investigation or closure: (1) Frenchman Flat is in its fifth year of post closure modeling; (2) The Rainier Mesa/Shoshone Mountain Closure Report has been submitted to NDEP and is awaiting approval; (3) The Yucca Flat/Climax Mine Closure Report is under development; and (4) Central and (5) Western Pahute Mesa is still undergoing investigation and flow and transport model development. The success of the UGTA Activity in reaching or approaching closure in three of the five major testing areas is primarily due to the DoE's focus on regulatory closure requirements, but also is in part attributable to a rigorous internal review process and the involvement of NDEP and Nye County water professionals as participants and observers in the reviews. County and state involvement in the internal review process has promoted trust that the U.S. DOE is deeply committed to ensuring the present and future safely of NNSS workers and the surrounding communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leveraging 3D CAD and Virtual Reality in Design of the Calcine Disposition Project - 20512

Fluor Idaho's Calcine Disposition Project (CDP) is leveraging the power of three-dimensional (3D) visualization, light detection and ranging (Lidar), and virtual reality to improve designs and worker safety. With the use of computer-aided design (CAD) modeling software, the CDP has created 3D models of the facility and systems to aid in the design, development, and operation of its retrieval and transfer system. This by itself is nothing new and has been done in industry for years. The CDP project however is taking this a few steps farther with the use of Lidar and virtual reality software. The CRP is tasked with removing a radioactive granular material from stainless steel bins located in concrete vaults that were constructed in the late 1950's and early 1960's. While construction drawings are available, it is not certain that the drawings are as-built or how accurate they truly are. Part of the project requires precise placement of equipment on to bins around multiple pipe, electrical lines, and bin stiffeners. Relying solely on the existing drawings and models created from these drawings is highly risky and prone to failure. The first step to determine the precise location and orientation of all obstructions in the vault the project will use a Lidar system to scan the vault structure and precisely locate all vault and bin components. Once this information is obtained, the data will be integrated into the CAD model. The model will then be verified, and a true as-built model developed. Precise component location, size, and orientation will be used for final design and placement of retrieval components. The second step will be to take the verified 3D model and scan data and import it into virtual reality software creating a virtual world. While some work on the project requires all work to be completed remotely due to high radiation fields, some areas have low enough radiation levels that personnel can enter and perform work. With the use of a virtual reality headset, operators and technicians will be able to enter our virtual world and become familiar with the surroundings and perform work prior to ever entering the radiation environment. This training is expected to pay dividends by improving worker efficiency, reducing errors, and improving confidence that the work can be performed as expected. It will play a key aspect in as low as reasonably achievable (ALARA) principles. An additional aspect in using the Lidar scans and virtual environment, is that it will give engineers and managers an opportunity to revisit the facility, especially radiation areas, at any time to obtain design information and measurements that may be costly or impossible to obtain once the facility transitions into radiation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chernobyl, the HBO miniseries: Fact and fiction (Part II)

Several considerations arose immediately after the accident, including whether to evacuate people living in Pripyat, a purpose-built city (atomic city) only four kilometers from the NPF and how to deal with injured emergency response personnel. Readers may wonder why there was a city of almost 50,000 people near a NPF.The answer lies in the poor infrastructure of the Soviet Union. In the U.S. and Europe, there is no need to build a city near a NPF, because it is easy and efficient to transport workers and materials to the site over considerable distances. This was not so in the Soviet Union, such that planners built a new city near each of nine NPFs where workers could live and materials needed for plant repairs could be fabricated.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Enhancing workload assessments for validation activities associated with DBA and BDBA scenarios - 165

After the Fukushima Daiichi accident, nuclear regulators around the world have required that power reactor licensees develop more extensive emergency mitigating responses and severe accident management provisions beyond the defense-in-depth measures for design basis accidents (DBAs), previously in place. Workload assessments represent common validation techniques that are used to demonstrate that workers are able to perform tasks without unacceptable performance degradation. High workload is known to induced stress and fatigue and may severely diminish a worker's capacity to perceive, recognize, and respond appropriately during emergency or unanticipated events, which may result in undesirable consequences. In estimating workload during emergency and severe accident scenarios, power reactor licensees tend to rely on subjective measures of workload, such as NASA-TLX. Due to reported mismatches in the literature between subjective and physiologically-derived estimates of workload, it is prudent to see what more can be done to improve the current state of practice, in the context of emergency and severe accident conditions. To improve confidence in workload estimates, it is advocated that the nuclear industry integrate physiological-based measures into current practices by making use of 'on-body' or 'wearable' physiological sensors. In this paper, an overview of three different types of empirical workload approaches is provided. The advantages of wearable physiological sensors are considered in the context of extreme environments and occupations, with tangible examples including heat stress and pupillometry. Suggestions for a consensus forum on workload are provided and a research plan directed at improving the current practice of workload estimation is offered for consideration. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Aircrew, Cancer and Probability of Causation - Paper 60

Aircrew are radiation workers who normally are not provided with dosimetry. The Energy Employees Occupational Illness Compensation Policy Act (EEOICPA) established an important legal precedent that fundamentally changed employer liability for companies that expose workers to radiation. We have applied the method used by EEOICPA (Interactive Radio Epidemiological Program (IREP)) to cancers found in excess in published epidemiological studies of aircrew. Our results show that from 4 to 8 of the 12 cancers reported in the literature in typical aircrew may be compensable using EEOICPA methods. The other cancers may be compensable as well, given an unusual flight career with greater exposures than typical. Our research demonstrates there are cancers that have a 50% POC at annual exposures within the range of those asserted by the FAA for aircrew. The FAA currently estimates aircrew annual exposure as up to 6 mSv from GCR alone. While dosimetry is urgently needed for existing aircrew, historical dose reconstructions will be needed to address POC for aircrew diagnosed with a radiogenic cancer. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Direct Current Arc-Flash Hazards of Solar Photovoltaic Systems

An arc-flash is a rapid release of thermal energy, pressure waves, and electromagnetic interference from a high-power electrical system, caused by such events as unintentional shorting or equipment malfunction. Arc-flashes are hazardous to people and equipment. Incident energy (IE) is a means of quantifying the degree of thermal hazard posed by an arc-flash event. The calculated IE value dictates what level of personal protective equipment (PPE) workers are required to wear when servicing equipment. Overly burdensome PPE may increase a worker’s discomfort and decrease dexterity, which could lead to unintentional shorting, while inadequate PPE also comes with increased safety risks. The majority of arc-flash research to date has focused on alternating current (ac) systems. For example, IE calculations and PPE for ac systems are relatively well understood and have been applied across many equipment types and voltages. IE calculation methodologies in ac systems are backed by a wide range of industry tests and are included in Institute of Electrical and Electronics Engineers (IEEE) and National Fire Protection Association (NFPA) standards. However, very little is known about direct current (dc) arc-flash and its hazards. This is a significant knowledge gap, as an increasing number of dc systems are being deployed: solar photovoltaic (PV) plants, battery storage, and electric vehicles and their charging infrastructure. The dc arc-flash hazard publications are rooted primarily in theory, and their IE calculation methods contradict each other. Insufficient knowledge and data are preventing the formation of industry consensus and standards around dc arc-flash hazard assessment. Here, this white paper highlights the current status and research opportunities for assessing arc-flash hazards in dc systems, with a focus on PV plants. The nonlinear current-voltage characteristics of PV modules make them unique in comparison to other linear dc sources, such as batteries. Also, PV equipment has rapidly evolved from 600 Vdc to 1,500 Vdc (in the United States), increasing potential arc-flash hazards. The operating regime of a PV-array within its I-V characteristic curve during an arc-flash event and the sustainability of arc-flash events in a utility-scale PV plant need to be investigated. Arc-flash experiments on a 1-MWdc nameplate capacity utility-owned ground-mount photovoltaic plant suggest that the PV array acts as a constant-current supply with currents near the short-circuit portion of the I-V characteristic curve of the array, with median arc voltage as 1/3 of the rated voltage. Various engineering software packages (CYME7 by EATON, PTW by SKM, ArcFlash™ by EasyPower, ETAP, and so on) have started offering dc arc-flash calculation features to estimate the risk of arc-flash in dc and PV systems. However, they are reliant on the same simplified arc-flash models, which contradict each other due to differences in assumptions such as characteristics of the power source, arc current, voltage and impedance, arc-operating regime, and so on. Physical arc-flash testing and improved physics-based modeling with correct assumptions representing practical scenarios are two methods to improve understanding and quantify the risks associated with dc arc-flash hazards. The results would inform development of a more accurate calculation procedure for IE and proper PPE levels.

14 SOLAR ENERGY↗