Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Artificial Intelligence and Machine Learning Applications in Modern Power Systems

Machine learning (ML) and artificial intelligence (AI) algorithms offer valuable tools for the analysis and interpretation of large datasets. These tools have the capability to uncover insights that may not be readily apparent within these datasets. In recent years, the integration of ML and AI has become increasingly prevalent in various applications within the power system domain. One of the earliest instances of machine learning in power systems can be traced back to demand forecasting, where artificial neural networks were employed for short-term load forecasting. In contemporary power systems, an abundance of high-resolution geospatial and temporal data is generated at various time intervals, ranging from sub-seconds (Phasor Measurement Units or PMUs) to seconds (Supervisory Control and Data Acquisition or SCADA), minutes (Process Information or PI), and extending to days, months, and years. These datasets contain valuable information concerning system reliability and performance. This information holds the potential to offer critical insights into system operations, as well as solutions for predicting and mitigating contingencies to prevent cascading outages. Despite the immense power of machine learning tools, system operators, planners, and utilities often exhibit hesitancy in fully embracing AI-enabled system operations and planning. This cautious approach persists, even as numerous diverse applications of machine learning continue to emerge in the realm of power systems. In this chapter, our focus will delve deep into ML and AI applications tailored for power systems. These applications aim to furnish system operators with enhanced situational awareness and augment their decision-making capabilities, especially during challenging operating conditions. Specific areas of interest encompass root cause analyses of electricity market datasets and the strategic selection of representative samples from vast power system databases for training ML/AI models. Finally, the chapter will conclude with a short discussion on the future of ML/AI in power systems and possible directions that the industry is moving towards.

power system applications, machine learning (ML), ↗

Ethics of large systems

Operations research and management planning methods in relation to philosophical problem of building improved social system

Churchman, C. W.↗

Review and Status of Wind Integration and Transmission in the United States. Key Issues and Lessons Learned

The objective in electric power system operation is to use generation and transmission resources within organizational constraints and operational rules and regulations to reliably and costeffectively balance load and generation. To meet this objective, system operational practices have been created to accommodate the innate variability and uncertainty that comes from a variety of sources, such as uncertainty of demand forecasts, whether a specific generating unit will be available when called upon, the variability of demand from many different types of customers, and others. As more wind power is connected to the power system, operating experiences acquired during the past several years have generally confirmed the findings of wind integration studies: wind energy increases the level of variability and uncertainty that a system operator must manage.

17 WIND ENERGY↗

Power System Protection and Resilient Metrics

During a real-time power system event, a system operator need to conservatively reduce the operating limits while changing system conditions are analyzed. The time it takes to develop new operating limits could affect millions of transmission system users especially if this event is classified by NERC as a Category D type event (extreme events resulting in the loss of two or more bulk electric system elements) . Controls for the future grid must be able to perform real-time analysis, identify new reliability risks, and set new SOLs (System Operating Limit) for real-time operations. In this paper we are inducing “Resilience Metrics” requirements that describe how systems operate at an acceptable level of normalcy despite disturbances or threats. We consider the interdependencies inherent in critical infrastructure systems and discuss some resilience metrics that can be distributed in current supervisory control and data acquisition (SCADA) to provide a level of state awareness. This level of awareness provides knowledge that can be used to characterize and reduce the risk of cascading events. A “resilience power system agent” is proposed that provides attributes to measure and perform this metrics.

42 ENGINEERING↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Computer-Aided Modeling and Analysis of Power Processing Systems (CAMAPPS), phase 1

The large-signal behaviors of a regulator depend largely on the type of power circuit topology and control. Thus, for maximum flexibility, it is best to develop models for each functional block a independent modules. A regulator can then be configured by collecting appropriate pre-defined modules for each functional block. In order to complete the component model generation for a comprehensive spacecraft power system, the following modules were developed: solar array switching unit and control; shunt regulators; and battery discharger. The capability of each module is demonstrated using a simplified Direct Energy Transfer (DET) system. Large-signal behaviors of solar array power systems were analyzed. Stability of the solar array system operating points with a nonlinear load is analyzed. The state-plane analysis illustrates trajectories of the system operating point under various conditions. Stability and transient responses of the system operating near the solar array's maximum power point are also analyzed. The solar array system mode of operation is described using the DET spacecraft power system. The DET system is simulated for various operating conditions. Transfer of the software program CAMAPPS (Computer Aided Modeling and Analysis of Power Processing Systems) to NASA/GSFC (Goddard Space Flight Center) was accomplished.

Kim, S.↗

System and operation for thermochemical renewable energy storage

Systems and methods for energy storage and energy recovery are provided. An electrical-to-electrical energy storage system includes a thermochemical energy storage device, a blower, a compressor, a turbine, and an electrical generator. The TCES device includes a vessel, a porous bed, and a heater. The porous bed is disposed within an interior volume of the vessel. The porous bed comprises a reactive material. The reactive material is configured to release oxygen upon being heated to a reduction temperature, and generate heat when exposed to oxygen. The heater is in thermal contact with the reactive material. The blower is configured to remove oxygen from the interior volume. The compressor is configured to flow oxygen into the interior volume. The turbine is configured to receive a heated, oxygen-depleted gas from the interior volume. The generator is configured to be powered by the turbine to generate electricity.

Klausner, James F.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE): Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. This presentation accompanies the paper of the same title.

Elwood F Agasid↗

Space Operations Center system analysis study extension. Volume 1: Executive summary

The analysis fo Space Operations Center (SOC) systems is summarized. Design considerations, configurations of the manned orbital space station, planned operational and research missions, and subsystem tradeoffs are considered. Integration into the space transportation system is discussed. A modular design concept permitting growth of the SOC as its functions are expanded is described. Additional considerations are special requirements for habitat modules, design modifications needed to operate in geosynchronous orbits, and use of the external tank for cryogenic propellant storage or as a pressurized hangar. A cost summary is presented.

Source record↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Launch System (ALS) actuation and power systems impact operability and cost

To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

Sundberg, Gale R.↗

Learning Koopman Operators for Systems with Isolated Critical Points

The Koopman operator provides a way to transform a (potentially) nonlinear finite-dimensional dynamical system into an infinite-dimensional linear system by lifting the nonlinear state dynamics into a functional space of observables, where the dynamics are linear. Previous literature has claimed that it is not possible to represent nonlinear dynamics with multiple isolated critical points if the set of observables is finite and contains the state; more precisely, such a set cannot be invariant under the Koopman operator. In this paper, we investigate this claim in more detail and provide an analytical counterexample to disprove it. We also consider the convergence of discretetime Koopman approximation error to the continuous-time error: we show both how this convergence occurs in general and how it can fail for systems with multiple isolated critical points. In particular, discontinuities in Koopman observables at the boundaries of basins of attraction may cause the continuous-time error to diverge; the discretetime error also suffers from this as the sampling time step goes to zero.

Bakker, Craig KR↗

Robust fault diagnosis of physical systems in operation

Ideas are presented and demonstrated for improved robustness in diagnostic problem solving of complex physical systems in operation, or operative diagnosis. The first idea is that graceful degradation can be viewed as reasoning at higher levels of abstraction whenever the more detailed levels proved to be incomplete or inadequate. A form of abstraction is defined that applies this view to the problem of diagnosis. In this form of abstraction, named status abstraction, two levels are defined. The lower level of abstraction corresponds to the level of detail at which most current knowledge-based diagnosis systems reason. At the higher level, a graph representation is presented that describes the real-world physical system. An incremental, constructive approach to manipulating this graph representation is demonstrated that supports certain characteristics of operative diagnosis. The suitability of this constructive approach is shown for diagnosing fault propagation behavior over time, and for sometimes diagnosing systems with feedback. A way is shown to represent different semantics in the same type of graph representation to characterize different types of fault propagation behavior. An approach is demonstrated that threats these different behaviors as different fault classes, and the approach moves to other classes when previous classes fail to generate suitable hypotheses. These ideas are implemented in a computer program named Draphys (Diagnostic Reasoning About Physical Systems) and demonstrated for the domain of inflight aircraft subsystems, specifically a propulsion system (containing two turbofan systems and a fuel system) and hydraulic subsystem.

Abbott, Kathy Hamilton↗

Multi-spool CO2 aircraft power system for operating multiple generators

A CO 2 bottoming cycle system includes a first compressor operatively connected to a first turbine through a first shaft. A first generator is operatively connected to the first shaft. A second compressor is fluidically connected to the first compressor. The second compressor is operatively connected to a second turbine through a second shaft. A second generator is operatively connected to the second shaft. The first turbine is fluidically connected to the second turbine.

Taylor, Stephen H.↗

Application of shuttle EVA systems to payloads. Volume 1: EVA systems and operational modes description

Descriptions of the EVA system baselined for the space shuttle program were provided, as well as a compendium of data on available EVA operational modes for payload and orbiter servicing. Operational concepts and techniques to accomplish representative EVA payload tasks are proposed. Some of the subjects discussed include: extravehicular mobility unit, remote manipulator system, airlock, EVA translation aids, restraints, workstations, tools and support equipment.

Source record↗