Search NASA⌕ Search

SEARCH · Search NASA

Results for “execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 847 records · Page 47

Is Monte Carlo embarrassingly parallel?

Monte Carlo is often stated as being embarrassingly parallel. However, running a Monte Carlo calculation, especially a reactor criticality calculation, in parallel using tens of processors shows a serious limitation in speedup and the execution time may even increase beyond a certain number of processors. In this paper the main causes of the loss of efficiency when using many processors are analyzed using a simple Monte Carlo program for criticality. The basic mechanism for parallel execution is MPI. One of the bottlenecks turn out to be the rendez-vous points in the parallel calculation used for synchronization and exchange of data between processors. This happens at least at the end of each cycle for fission source generation in order to collect the full fission source distribution for the next cycle and to estimate the effective multiplication factor, which is not only part of the requested results, but also input to the next cycle for population control. Basic improvements to overcome this limitation are suggested and tested. Also other time losses in the parallel calculation are identified. Moreover, the threading mechanism, which allows the parallel execution of tasks based on shared memory using OpenMP, is analyzed in detail. Recommendations are given to get the maximum efficiency out of a parallel Monte Carlo calculation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Graphics processor unit with opportunistic inter-path reconvergence

A graphics processing unit and methods for comping and executing instructions with opportunistic inter-path reconvergence are provided. A graphics processing unit may access computer executable instructions mapped to code blocks of a control flow for a warp. The code blocks may include an immediate dominator block and an intermediate post dominator block. The graphics processing unit may store a first thread mask associated with the first code block. The first thread mask may include a plurality of bits indicative of the active or non-active status for the threads of the warp, respectively. The graphics processing unit may a second thread mask corresponding to an intermediate code block between the immediate dominator block and intermediate post dominator block. The graphics processing unit may execute, with threads indicated as active by the first thread mask, instructions of the intermediate code block with a first operand or a second operand depending on the second thread mask.

Kulkarni, Milind↗

Oak Ridge Cleanup Vision: Moving to the Future by Cleaning Up the Past - 13291

The Oak Ridge Office of Environmental Management (EM) strives to be the leader in the Department of Energy's (DOE's) EM Complex regarding successful and safe project execution and stakeholder interactions that yield positive results. EM's goal has been to become 'Investment Worthy' and, in order to accomplish that important objective, has also had to improve communications both within and outside of the Department. One of our most important missions is to assist the Department in achieving the sustainability goals set forth in Executive Order 13514. In this regard, EM's primary role is to return land to beneficial use and reduce energy impacts and maintenance costs by demolishing unneeded and deteriorating structures and remediating environmental contamination. Recent accomplishments toward meeting these goals include significant progress in the decontamination and demolition of the country's largest facility, the former K-25 Gaseous Diffusion Building, constructed in 1942 to enrich uranium to help end World War II; the disposition of the first phase of Uranium-233 material from the Oak Ridge National Laboratory (ORNL) which involved the transfer of Zero Power Reactor Plates to the National Nuclear Security Administration (NNSA); and a host of other project successes associated with transuranic (TRU) waste processing, hot cell decontamination and demolition, remediation of highly contaminated soils and burial grounds, and removal of mercury from storm sewers and surface waters. With regard to successful stakeholder interactions, recent accomplishments include a new method for collaboration that has renewed EM's working relationship with the regulators, and success in completing an extensive consultation process with over a dozen parties on the historic preservation of the former Oak Ridge Gaseous Diffusion Plant, which is now called the East Tennessee Technology Park (ETTP). Regarding improved communications, EM has successfully revised Program priorities and has received buy-in from the leadership in Headquarters, the regulators, and the community. Issues EM was facing in 2009 are presented. Resulting lessons learned and subsequent changes that the Office has gone through in the past several years in order to improve performance in the safe execution of work, relationships with external stakeholders, and communications both internally and externally are discussed. Results of these efforts are provided as a summary of Program accomplishments, including a strong focus on the future. EM's motto, Moving to the Future by Cleaning up the Past, will be demonstrated through the Program's mission, which includes protecting the region's health and environment; ensuring the continuation of ongoing vital missions being conducted by DOE on the Oak Ridge Reservation; and making clean land available for future use at all three sites, with a near-term focus on Re-industrialization of ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Little Engine That Could: No Project is too Small for Sustainable Remediation Moab Uranium Mill Tailings Removal Project - 16427

Executive Order 13693, 'Planning for Federal Sustainability in the Next Decade', mandates the reduction of energy use and cost and greenhouse gas emissions, and the search for renewable or alternative energy solutions. DOE EM manages the Moab Uranium Mill Tailings Remedial Action Project in Utah that involves relocating a 16-million-ton uranium mill tailings pile and associated contaminated materials at the former Atlas mill site to a permanent disposal cell constructed near Crescent Junction, Utah, predominantly by rail. Project personnel strive to support the Executive Order in making preparations for the impacts of climate change. Meeting the goals of the Executive Order in light of the remote location and limited resources of the Project sites often requires an innovative approach and perseverance. The Moab Project is a 'Small Site' within EM and has a comparatively short-term completion date. As a result, large-scale sustainability projects, such as retrofits or remodels, do not offer a cost benefit over this period. Instead, less dramatic process changes are achievable. The Project purchases renewable wind energy through the local power provider to reduce Scope 2 (purchased electricity) greenhouse gas emissions. Toward its ambitious goal of achieving zero landfill waste, the Project has diverted over 50 percent of its nonhazardous solid waste from the local landfill through composting and recycling efforts. In particular, electronics must meet various sustainable criteria prior to purchase, and be recycled through donations and certified recyclers, diverting it from the waste stream. The Project has received multiple Green Buy Awards from DOE by reaching leadership goals for purchasing energy-efficient, water-efficient, bio-based, and recycled-content products. In fiscal year 2014, in response to President Obama's June 2014 memorandum, 'Sustainable Practices for Designed Landscapes and Supporting Pollinators on Federal Landscapes', the Project decided to take a proactive approach and work with a local pollinator group, hosting two beehives in a revegetation area on the Moab site. An increase in plant growth and blossoming plants in the revegetation area has been observed and is believed to be related to the added pollinators. The Project has previously seeded disturbed areas mainly with native drought-resistant species to reduce water usage. Storm water collected in sediment basins at the Crescent Junction site is used for dust control and compaction of mill tailings in the disposal cell. The Project worked with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service to gain support for re-contouring a remediated area adjacent to the Colorado River, which borders the Moab site on the east, to allow the area to flood at a lower river stage. This re-contouring promotes more varied vegetation growth and river water that tops the west bank brings soil nutrients to inundated areas of the site. Ponded floodwater has been pumped into revegetation plots for irrigation, reducing freshwater usage. Innovation in sustainable practices comes in many different fashions. The Moab Project demonstrates that no project is too small to implement sustainable practices. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Reactor Pressure Vessels by Remote Controlled Thermal Cutting Segmentation Facilities of the ZION Nuclear Power Plant at ZION, USA - 16599

This paper presents the experiences for the segmentation of both reactor pressure vessels (RV) Units 1 and 2 at the ZION nuclear power plant. The Zion Station project was the first to use the large-scale application of thermal cutting (oxy-propane) technology in the USA. The elaborate planning and engineering was the basis for a quick, safe and flawless project execution without any aerosol migration or release of contamination. The used segmentation technology based on industry-tested methods with its big advantage of availability and spare parts inventory. For safeguarding Simulation (interfering edge analysis), animations and Trials with mock-ups dummies were executed prior. Also risk assessments and rescue concepts are part of the planning. Lean project organization for decommissioning and the flexibility, creativity, willingness to cooperate and willing for uninterrupted decisions of client and contractor are the essential basis for a successful project execution and a short project duration. The remote controlled segmentation of the RV of Unit 2 was performed in 3 month an in Unit 1 in less than 2 month.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Further Investigation of Employing Binomial Small-Sample Estimator in M-LROM

Reduced Order Modeling (ROM) is essential to enable the identification of the so-called active parameter subspace for high-fidelity models that are employed in computationally intensive analyses such as uncertainty characterization and data assimilation. Given the complexity of models for real-world application, brute force methods to identify the active subspace may not be computationally efficient to realize the value of reduction, since in realistic problems, the full scale model must be executed few hundred times, which may be computationally taxing. Earlier work has introduced a new approach, which represents a further development of our previous work on ROM, referred to as multi-level ROM (M-LROM). In M-LROM, approximate models are employed to identify the active subspace instead of the full scale model. In this summary, we present our recent results on M-LROM, specifically in regard to the construction of reliable error metrics that can bound the errors resulting from the reduction. The idea is to employ a lower fidelity model, i.e., an approximation of the full scale or high fidelity model, to build the active subspace, and via the proposed error bound, the quality of the active subspace can be determined by calculating an upper bound on the errors resulting from the reduction. For this approach to be practical, the error bound must be realistic, implying that it should be close to the actual errors expected, and not much higher. Therefore, an important goal of this summary is to compare different error bounds in terms of the relation between their estimated bounds to the actual errors. In particular, we compare the proposed error bound which numerically construct an estimator using binomial distribution to the widely used small-sample norm estimators. Unlike most probabilistic error estimation methods, the proposed bound employs a binomial distribution to construct the estimator whereas in other conventional methods, the distribution employed is typically the standard Gaussian, normalized over a unit hypersphere as initially proposed by the seminal paper of J. Dixon on random matrix theory. Previous publications provided evidence that the binomial distribution calculates more realistic bounds as compared to the Gaussian distribution, which tends to be conservative, implying that the bound is much bigger than the actual errors, which diminishes the value of the reduction, as now must increase the size of the active subspace to reach the desired upper bound on the reduction errors. This work has provided a rigorous approach by which error bounds on the reduction errors can be established without having to execute the high fidelity model during the construction of the active subspace. The high fidelity model is only need to test the error bound using small number of executions. This methodology paves the way for a more efficient application of ROM to complex engineering models, where standard ROM techniques may be too taxing to optimally realize their value in practical situations. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview of Canada's Plan for the Long-Term Management of Used Nuclear Fuel - 19537

In June 2007, the Government of Canada approved the Nuclear Waste Management Organisation's (NWMO) recommended Adaptive Phased Management (APM) approach for the long-term management of Canada's used nuclear fuel. As per this approach, used nuclear fuel will be isolated and contained in a centralized Deep Geological Repository (DGR) located in a stable crystalline or sedimentary rock formation at a nominal depth of 500 metres below ground surface. The DGR concept contains multiple barriers to safely contain and isolate the used nuclear fuel over the long-term. The used nuclear fuel bundles will be encapsulated in a copper-coated steel Used Fuel Container (UFC) and pre-packaged in a bentonite clay buffer box above ground. The UFC and bentonite clay buffer box assemblies will then be emplaced in excavated tunnel openings and sealed with clay-based backfill material and room seals, which completes the primary Engineered Barrier System (EBS). Since 2011, the NWMO has executed a design-development program to validate the design and manufacturing technologies for the EBS. Currently, the NWMO are executing a proof test program for the EBS for the purpose of demonstrating serial production. As the prototypes are produced, they will be subject to full-scale in-room emplacement trials within a custom-built above-ground mock emplacement room. The proof test program will be executed using APM reference designs, materials, processes, and procedures. An overview of this program is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

VENTSAR V3.0: A Python GUI for Estimating Contaminant Concentrations on or Near Buildings Due to Building Effects and Plume Rise and For Calculating Inhalation and Plume Shine Doses

VENTSAR: Originated as VENTAX (Smith and Weber 1983) on the IBM Mainframe at the Savannah River Site (SRS) as a Fortran program. Updated to VENTSAR XL V1.0 (Simpkins 1997) as a spreadsheet version using macros created in Microsoft Excel. Later updated to VENTSAR XL V2.0 (Dixon 2018) as a spreadsheet executing a modified version of the original VENTAX Fortran code. Estimates contaminant concentrations on or near a building from a release at a nearby location. Calculates concentrations for a given meteorological exceedance probability or for a given stability and wind speed combination. Can model a single building with or without a penthouse on top or a ground location from either a stack or ground release. Plume rise can be considered. Contaminant releases can be chemical or radioactive with downwind concentrations determined at user-specified distances. Wind passing over and around buildings creates a complicated dispersion pattern. Air-intake vents may be located on building roofs or near the ground downwind of a release source. An estimation of pollutant concentrations on or near a structure is important in determining expected pollutant levels. Meteorological data are selected based on a specific area of the site. Fortran-based VENTAX able to make fast, complex mathematical calculations. Not user-friendly VENTSAR XL V1.0 no longer supported due to obsolete Excel macros. VENTSAR XL V2.0 an interim solution using an Excel spreadsheet to interface with the modified VENTAX Fortran code. Requires user to have Microsoft Excel. Not an intuitive interface for someone unfamiliar with VENTSAR. Does not perform dose calculations. VENTSAR V3.0 goal to combine the strengths of previous versions of VENTSAR into a single, powerful yet user-friendly program with a Graphical User Interface (GUI). Not dependent upon a specific program or plug-ins. Self-contained package to be used on any computer running Microsoft Windows. User-friendly, intuitive GUI created in Python for parameter input. Executes same modified VENTAX Fortran code as VENTSAR XL V2.0. Outputs formatted text file of completed calculations for easy review and dissemination. Performs inhalation and plume shine dose calculations for up to 11 user-selected nuclides from a nuclide dose factor library of almost 500 nuclides. 12 test cases were created for verification of V1.0 and V2.0. Same test cases run in V3.0 to verify correct performance. V3.0 produced similar results to V1.0. Confirmed GUI did not alter calculations in any way. Comparisons of the test case results confirm the V3.0 GUI does not influence the VENTSAR calculations. Simply passes same input parameters to VENTAX Fortran code for execution. Provides end user an easy-to-use, intuitive tool to quickly make building effect and plume rise calculations, as well as, inhalation and plume shine dose calculations. No experience with or working knowledge of Fortran, Excel, command line, or macros required. Self-contained package allows VENTSAR be deployed to any Windows computer without the need for specific programs or plug-ins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Does practice make perfect? Lessons learned from full-scale power system incident response exercise

While threats to the energy sector occur daily, few utilities get the opportunity to fully test out their detection and response mechanisms to advanced threats in the real world. With the high demand for reliability, few grid operators would allow execution of simulated cyber-attacks on their live systems. The DOE-funded Liberty Eclipse project offers a unique opportunity for small and large utilities and coops to practice their combined IT/OT responses to a live red team executing attacks against an isolated power system on an island in New York. Both cyber teams and power operations teams must work together to detect and respond to attacks, even restoring the power system against extreme impacts. Lessons learned from these exercises reveal key takeaways for understanding what a real attack against the electric sector will look like, gaps in execution of the best-laid plans when the pressure of a real event is bearing down, and how organizations can better prepare for advanced attacks by optimizing participation in exercises. This presentation will discuss successes and opportunities for improvement both in how utilities can prepare for and respond to events, as well as how full-scale IT/OT exercises can be coordinated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Can Large Language Models Understand Intermediate Representations?

Intermediate Representations (IRs) are essential in compiler design and program analysis, yet their comprehension by Large Language Models (LLMs) remains underexplored. This paper presents a pioneering empirical study to investigate the capabilities of LLMs, including GPT-4, GPT-3, Gemma 2, LLaMA 3.1, and Code Llama, in understanding IRs. We analyze their performance across four tasks: Control Flow Graph (CFG) reconstruction, decompilation, code summarization, and execution reasoning. Our results indicate that while LLMs demonstrate competence in parsing IR syntax and recognizing high-level structures, they struggle with control flow reasoning, execution semantics, and loop handling. Specifically, they often misinterpret branching instructions, omit critical IR operations, and rely on heuristic-based reasoning, leading to errors in CFG reconstruction, IR decompilation, and execution reasoning. The study underscores the necessity for IR-specific enhancements in LLMs, recommending fine-tuning on structured IR datasets and integration of explicit control flow models to augment their comprehension and handling of IR-related tasks.

Jiang, Hailong↗

Hardware Aware Mitigation of Timing Side-Channel Vulnerabilities in Critical Infrastructure Software

Program runtime/timing attacks exploit variations in a program’s execution times to extract sensitive information from the program (e.g. encryption keys, sensitive variable data, intellectual property). State-of-the-art solutions to runtime sidechannel attacks attempt to balance the execution time of the sensitive code for different control flow paths to eliminate the timing leakage. However, during the mitigation process, most techniques do not consider the underlying hardware/device on which the target program is supposed to run on. This can lead to over-fixing (unnecessary extra operations), under-fixing (not solving the imbalance properly), and even failures. We propose DISARM, a joint hardware-software methodology (unlike any existing solution) for mitigating runtime side-channel vulnerabilities that utilizes timing values from real embedded devices to generate targeted software fixes. We implement DISARM to support C/C++/Java source codes and validate it across 22 standard benchmarks. DISARM outperforms state-of-the-art solutions such as PENDULUM and DifFuzzAR in terms of execution time overhead (up to −46%), code size overhead (up to −10%), and correctness (no failures) on five different embedded/edge devices.

Suha, Tasneem [University of Maine]↗

Classic and Quantum Task-Based Intelligent Runtime for QIRs Running on Multiple QPUs

High-performance computing systems are rapidly evolving into heterogeneous platforms that fuse quantum accelerators with traditional classical processing units (CPUs) and graphical processing units (GPUs). This convergence calls for runtimes capable of managing both classical and quantum workloads in a unified manner. We introduce an intelligent, task-based runtime that marries the Intelligent RuntIme System (IRIS) asynchronous scheduler with a quantum programming stack through the Quantum Intermediate Representation Execution Engine (QIR-EE). Our design allows programs written in the quantum intermediate representation (QIR) to be dispatched concurrently to a variety of back-ends, including multiple quantum simulators and nascent quantum processors, enabling genuine hybrid execution on a single node. To illustrate its practicality, we partition a 4-qubit and 20-qubit circuit into three sub-circuits using quantum circuit cutting via the QCut library. Each sub-circuit is simulated independently by the QIR-EE driver within IRIS, after which a classical post-processing step merges the simulation results to recover the outcome of the original full-circuit computation. This case study demonstrates how finer task granularity can enable the parallel execution and lower the simulation burden per quantum task while preserving overall accuracy, highlighting the feasibility of our hybrid approach.

Miniskar, Narasinga Rao [ORNL] (ORCID:000000018259↗

Parallel Agent-Based Simulations on Clusters of GPUs and Multi-Core Processors

An effective latency-hiding mechanism is presented in the parallelization of agent-based model simulations (ABMS) with millions of agents. The mechanism is designed to accommodate the hierarchical organization as well as heterogeneity of current state-of-the-art parallel computing platforms. We use it to explore the computation vs. communication trade-off continuum available with the deep computational and memory hierarchies of extant platforms and present a novel analytical model of the tradeoff. We describe our implementation and report preliminary performance results on two distinct parallel platforms suitable for ABMS: CUDA threads on multiple, networked graphical processing units (GPUs), and pthreads on multi-core processors. Message Passing Interface (MPI) is used for inter-GPU as well as inter-socket communication on a cluster of multiple GPUs and multi-core processors. Results indicate the benefits of our latency-hiding scheme, delivering as much as over 100-fold improvement in runtime for certain benchmark ABMS application scenarios with several million agents. This speed improvement is obtained on our system that is already two to three orders of magnitude faster on one GPU than an equivalent CPU-based execution in a popular simulator in Java. Thus, the overall execution of our current work is over four orders of magnitude faster when executed on multiple GPUs.

97 MATHEMATICS AND COMPUTING↗