Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Solar power satellite system definition study. Volume 1: Executive summary

Configuration concepts, option sizes, and systems definitions study design evolutions are reviewed. The main features of the present reference design silicon solar cell solar power satellite are described, as well as the provisions for space construction and support systems. The principal study accomplishments and conclusions are summarized according to the following tasks: (1) baseline critique; (2) construction and maintenance; (3) industrial complex needs, cost estimates, and production capacity; (4) launch complex requirements at KSC or at an offshore facility; (5) integration of the SPS/ground power network; (6) technology advancement and development; (7) costs and schedules; and (8) exploratory technology: laser annealing of solar cells degraded by proton irradiation, and a fiber-optic phase distribution link at 980 MHz.

Source record↗

Mechanical System Reliability and Cost Integration Using a Sequential Linear Approximation Method

The development of new products is dependent on product designs that incorporate high levels of reliability along with a design that meets predetermined levels of system cost. Additional constraints on the product include explicit and implicit performance requirements. Existing reliability and cost prediction methods result in no direct linkage between variables affecting these two dominant product attributes. A methodology to integrate reliability and cost estimates using a sequential linear approximation method is proposed. The sequential linear approximation method utilizes probability of failure sensitivities determined from probabilistic reliability methods as well a manufacturing cost sensitivities. The application of the sequential linear approximation method to a mechanical system is demonstrated.

Kowal, Michael T.↗

Commercial-Scale Front-End Engineering Design (Feed) Study for MTR’s Membrane CO 2 Capture Process

This is the final report for a DOE sponsored project (DE-FE00031846) where MTR, Sargent & Lundy (S&L), Trimeric Corporation (Trimeric), in cooperation with Basin Electric Power Cooperative (BEPC), and Electric Power Research Institute (EPRI), completed a full-scale Front End Engineering and Design (FEED) study to evaluate the retrofit of MTR’s membrane-based post-combustion carbon dioxide (CO2) capture technology to the BEPC Dry Fork Station (DFS) Unit 1. The capture plant is designed to treat the entire flue gas flow from DFS; it is estimated that this system will capture 6,560 tonnes per day (TPD) of carbon dioxide. The overall goal of the project was to develop an AACE Level 2 Capital Cost Estimate with an accuracy of ±15% to demonstrate the economic feasibility of constructing and operating the MTR CO2 capture plant.

01 COAL, LIGNITE, AND PEAT↗

DCS - A global satellite environmental data collection system.

This paper presents a summary of the results of a comparative study of satellite data collection systems which utilize remote ground data collection platforms transmitting data directly to a satellite and down to low-cost direct read-out local user terminals. The general objective of the study was to evaluate cost and technical feasibility of five medium orbiting and six geo-synchronous satellite data collection system (DCS) configurations with varying degrees of spacecraft and local user terminal (LUT) complexity. The goal of trading spacecraft and LUT complexity was to determine practical feasible systems with low-cost terminals, yet with a reasonable overall system cost the would permit the broad worldwide utilization of a highly beneficial data collection system. Results presented include data collection system analyses, satellite and local user terminal designs, and estimated costs. A summary of the types of local users and their requirements is also included.

Claire, E. J.↗

Solar pond power plant feasibility study for Davis, California

The feasibility of constructing a solar pond power plant at Davis, California was studied. Site visits, weather data compilation, soil and water analyses, conceptual system design and analyses, a material and equipment market survey, conceptual site layout, and a preliminary cost estimate were studied. It was concluded that a solar pond power plant is technically feasible, but economically unattractive. The relatively small scale of the proposed plant and the high cost of importing salt resulted in a disproportionately high capital investment with respect to the annual energy production capacity of the plant. Cycle optimization and increased plant size would increase the economical attractiveness of the proposed concept.

Wu, Y. C.↗

Solid Oxide Cell Manufacturing Cost Tool

NETL has developed a detailed solid oxide cell (SOC) cost modeling tool. The tool provides a fully customizable spreadsheet that aids in cost estimation of large volume manufacturing of SOC (both fuel cell and electrolysis cell). The tool can be used to assist commercial developers and other end users to evaluate the costs of producing cells and stack components as SOC systems increase in scale. The manufacturing materials, labor, component costs, and specific equipment can be tailored to accurately reflect the desired manufacturing process. The tool is paired with a detailed user manual to assist in the understanding of the full functionality. This document is the spreadsheet tool. To access the associated user guide, please visit: <a href="https://netl.doe.gov/energy-analysis/details?id=f5823130-0d20-4a04-9c53-341682e58ac1" rel="noopener noreferrer">Energy Analysis | netl.doe.gov</a>

cost modeling↗

Accurately estimating and minimizing costs for the cellulosic biomass supply chain with statistical process control and the Taguchi Loss Function

This research focuses on the statistical evaluation of the feedstock attributes of the biomass supply chain and the estimation of attribute costs as a function of the feedstock variability. Challenges of using cellulosic feedstocks include the variability of feedstock quality (e.g., ash content and moisture content), which impacts the final cost of the manufactured product. Statistical Process Control (SPC), Taguchi Loss Function, and components of variance techniques were illustrated for quantifying cumulative variance in the biomass supply chain. Costs in the presence of cumulative variance were estimated for switchgrass (Panicum virgatum L.) and loblolly pine residues (Pinus taeda L.). Findings of the study indicated that additional costs from ash content variability in switchgrass increased the net cost by $\$19.15$ per dry tonne. Additional costs from densification due to particle size variation increased net cost by $\$11.59$ per dry tonne. Moisture content variation increased costs by $\$14.86$ per dry tonne. This would represent a 50 to 100% increase in costs due to variation based on a $\$60$ to $\$70$ per dry tonne manufactured product cost. This study illustrates that total costs may be considerably underestimated if the influence of variance for key factors in the supply chain and associated costs are not estimated.

59 BASIC BIOLOGICAL SCIENCES↗

Advanced Small Modular Reactor Economics Status Report

This report describes the data collection work performed for an advanced small modular reactor (AdvSMR) economics analysis activity at the Oak Ridge National Laboratory. The methodology development and analytical results are described in separate, stand-alone documents as listed in the references. The economics analysis effort for the AdvSMR program combines the technical and fuel cycle aspects of advanced (non-light water reactor [LWR]) reactors with the market and production aspects of SMRs. This requires the collection, analysis, and synthesis of multiple unrelated and potentially high-uncertainty data sets from a wide range of data sources. Further, the nature of both economic and nuclear technology analysis requires at least a minor attempt at prediction and prognostication, and the far-term horizon for deployment of advanced nuclear systems introduces more uncertainty. Energy market uncertainty, especially the electricity market, is the result of the integration of commodity prices, demand fluctuation, and generation competition, as easily seen in deregulated markets. Depending on current or projected values for any of these factors, the economic attractiveness of any power plant construction project can change yearly or quarterly. For long-lead construction projects such as nuclear power plants, this uncertainty generates an implied and inherent risk for potential nuclear power plant owners and operators. The uncertainty in nuclear reactor and fuel cycle costs is in some respects better understood and quantified than the energy market uncertainty. The LWR-based fuel cycle has a long commercial history to use as its basis for cost estimation, and the current activities in LWR construction provide a reliable baseline for estimates for similar efforts. However, for advanced systems, the estimates and their associated uncertainties are based on forward-looking assumptions for performance after the system has been built and has achieved commercial operation. Advanced fuel materials and fabrication costs have large uncertainties based on complexities of operation, such as contact-handled fuel fabrication versus remote handling, or commodity availability. Thus, this analytical work makes a good faith effort to quantify uncertainties and provide qualifiers, caveats, and explanations for the sources of these uncertainties. The overall result is that this work assembles the necessary information and establishes the foundation for future analyses using more precise data as nuclear technology advances.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydropower Baseline Cost Modeling, Version 2

Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.

13 HYDRO ENERGY↗

Transformative Building Envelope Retrofit Using Insulation-Inflatable Walls Assisted by Automation

This work highlights the effort to develop a low-cost envelope retrofit for homes built prior to the implementation of energy conservation measures established by the Department of Energy. Inflatable structures were constructed to conform to the exterior envelope (a corner wall construction with a fenestration was used as a prototype). The structures were then filled with spray polyurethane foam insulation. The flexibility in construction and the ability to fill with spray polyurethane foam insulation were demonstrated. In addition, hygrothermal simulations showed that the installation of these systems does not compromise the moisture durability of uninsulated and insulated building envelopes across eight climate zones from hot humid to subarctic. Preliminary cost estimates, based on retail pricing, of the inflatable retrofit including 3 inches of spray foam insulation (insulation value of approximately R 20) is $\$ 4.25$ per square foot uninstalled. The installed cost was calculated using two labor rates, the labor rate for the installation of a weather resistive barrier and the installation of spray foam insulation. Aggregating those values into one labor rate results in an installed cost between $\$ 11$ and $\$ 28$ per square foot. The low end includes the installation of vinyl siding as the exterior cladding. The higher value includes an exterior stucco finish.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Control and Cost-benefit Analysis of Fast Spreading Diseases: The case of Ebola

Mitigating the spread of infectious disease is of great importance for policy makers. Taking the recent outbreak of Ebola as an example, it was difficult for policy makers to identify the best course of action based on the cost-effectiveness of what was available. In effort to address the needs of policy makers to mitigate the spread of infectious disease before an outbreak becomes uncontrollable, we have devised a cost-benefit disease control model to simulate the effect of various control methods on disease incidence and the cost associated with each of the scenarios. Here, we present a case study of Ebola used to quantify the cost effectiveness of vaccination and isolation methods to minimize the spread of the disease. We evaluate the impact of changing strategy levels on the incidence of the disease and address the benefits of choosing one strategy over the other with regards to cost of vaccine and isolation. Disease. We use a general SEIRJ model for disease transmission. Here, S-Susceptible, E- Exposed (latent), IA– Infected (asymptomatic),IM– Infected (mild symptoms), IS– Infected (severe symptoms),JM– Isolated (mild symptoms at home), JS– Isolated (severe symptoms in hospital), and R- Recovered individuals. In this model, we consider the dynamics of the system and the effect of the relative transmissibility of isolated individuals (L) compared to other infected individuals. Cost. Ebola vaccination and treatment are very expensive and not widely available. Some preliminary data shows that it will take$73 million (M) to produce 27 M vaccines plus the cost for vaccine delivery and health care professionals (not included here). On the other hand, the treatment for Ebola in the U.S. would cost $25,000dollars a day per person to ensure proper isolation and adequate care(treatment, health care professionals, facilities and special equipment).Although not included in this research, the proper isolation of Ebola patients would also lead to a loss in hospital revenue of $148,000per day due to reduced patient capacity3. Here, we use $27,000 per individual hospitalized per day and $2.70 per person vaccinated. Model. To evaluate the cost-effectiveness of control methods on disease transmission, we assessed the affect of different levels of vaccination coverage on the resulting number of infected individuals. Then, we calculated the overall estimated cost of vaccination and resulting hospitalization for each scenario to identify the lowest cost-benefit ratio. Using a base population of 10 M individuals, we ran scenarios for different levels of vaccination (μ= 0.01, 0.05, 0.1) while varying the relative transmissibility of isolated individuals (L = 0.5, 0.6, 0.65).For each combination, we calculated the incidence, vaccination and hospitalization cost per individual per day (Fig 1). We note that an increase in the relative transmissibility of isolated individuals leads to a higher number of infected people and, therefore, a reduced number of candidates for vaccination and an overall increase in cost. Since the cost of vaccination is 1 ten-thousandth of the cost of hospitalization, our results clearly show the cost-benefit of vaccinating over hospital treatment. In every scenario studied, we observed a measurable reduction in disease incidence when vaccinating a higher fraction of the population compared to isolating individuals post infection. Given these preliminary results, we plan to extend the framework of our model to a dynamic control system where we consider the cost of vaccination and isolation embedded in the system of differential equations. This approach will allow us see the best available control implementation while minimizing the cost of treatment and vaccination.

EBOLA↗

Cost Assessment of Building Envelope Retrofits

About 65% of US buildings were constructed before the Department of Energy established the Building Energy Codes Program in 1992; therefore, their envelopes are likely significant contributors to heating and cooling loads. Numerous techniques to improve the thermal, airtightness, and water tightness performance of existing envelopes have been explored; however, these tend to be lengthy and disruptive because most of the material assembly occurs at the job site. Overclad panels that are fabricated offsite and include most of the envelope components are a potential mechanism to reduce construction time and minimize disturbance to building occupants. These benefits have been demonstrated by European programs such as Energiesprong and MORE-CONNECT, as well as a few case studies in the US. Nevertheless, preliminary evaluations appear to indicate that overclad panels may be too costly to be implemented in the US. This paper summarizes cost estimates, strengths and weaknesses from several envelope retrofit techniques; assesses the feasibility of overclad panels in the US; and proposes methods, such as advanced manufacturing techniques, that could decrease the cost of building envelope retrofits.

Salonvaara, Mikael↗

Estimating the Life Cycle Cost of Space Systems

A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

Life cycle cost↗

Economic Evaluation of Promising Options

This report presents the efforts, undertaken in FY15, aimed at enhancing the Fuel Cycle Options (FCO) Campaign’s capability to perform credible fuel cycle cost estimates and evaluation of financial risk. This effort builds on the work performed in FY14 (Ganda 2014), which focused extensively on understanding the principal drivers of Light Water Reactors (LWR) construction costs, based on historical data. That framework has received further confirmation from the work and the extensive data uncovered in FY15.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Manned orbital systems concept study. Book 4: Programmatics for extended-duration missions

The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.

Source record↗

Shuttle user analysis (study 2.2): Volume 3. Business Risk And Value of Operations in space (BRAVO). Part 4: Computer programs and data look-up

Computer program listings as well as graphical and tabulated data needed by the analyst to perform a BRAVO analysis were examined. Graphical aid which can be used to determine the earth coverage of satellites in synchronous equatorial orbits was described. A listing for satellite synthesis computer program as well as a sample printout for the DSCS-11 satellite program and a listing of the symbols used in the program were included. The APL language listing for the payload program cost estimating computer program was given. This language is compatible with many of the time sharing remote terminals computers used in the United States. Data on the intelsat communications network was studied. Costs for telecommunications systems leasing, line of sight microwave relay communications systems, submarine telephone cables, and terrestrial power generation systems were also described.

Source record↗

Present Status of the ILC Project and Development

The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

43 PARTICLE ACCELERATORS↗

Mixed time slicing in path integral simulations

A simple and efficient scheme is presented for using different time slices for different degrees of freedom in path integral calculations. This method bridges the gap between full quantization and the standard mixed quantum-classical (MQC) scheme and, therefore, still provides quantum mechanical effects in the less-quantized variables. Underlying the algorithm is the notion that time slices (beads) may be 'collapsed' in a manner that preserves quantization in the less quantum mechanical degrees of freedom. The method is shown to be analogous to multiple-time step integration techniques in classical molecular dynamics. The algorithm and its associated error are demonstrated on model systems containing coupled high- and low-frequency modes; results indicate that convergence of quantum mechanical observables can be achieved with disparate bead numbers in the different modes. Cost estimates indicate that this procedure, much like the MQC method, is most efficient for only a relatively few quantum mechanical degrees of freedom, such as proton transfer. In this regime, however, the cost of a fully quantum mechanical simulation is determined by the quantization of the least quantum mechanical degrees of freedom.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗