Search NASA⌕ Search

SEARCH · Search NASA

Results for “PHASE STUDIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Magnetometer instrument team studies for the definition phase of the outer planets grand tour

The work performed by the magnetic fields investigation team during the mission definition phases of the Outer Planets Grand Tour (OPGT) and the Mariner Jupiter Saturn (MJS) Missions is reported. This work involved three tasks: (1) defining the objectives of the magnetic fields investigations, (2) defining the magnetometer systems required to meet these objectives, and (3) developing and testing hardware elements in certain mission-specific areas.

Coleman, P. J., Jr.↗

Feasibility study of modern airships, phase 1. Volume 2: Parametric analysis (task 3)

Various types of lighter-than-air vehicles from fully buoyant to semibuoyant hybrids were examined. Geometries were optimized for gross lifting capabilities for ellipsoidal airships, modified delta planform lifting bodies, and a short-haul, heavy-lift vehicle concept. It is indicated that: (1) neutrally buoyant airships employing a conservative update of materials and propulsion technology provide significant improvements in productivity; (2) propulsive lift for VTOL and aerodynamic lift for cruise significantly improve the productivity of low to medium gross weight ellipsoidal airships; and (3) the short-haul, heavy-lift vehicle, consisting of a simple combination of an ellipsoidal airship hull and existing helicopter componentry, provides significant potential for low-cost, near-term applications for ultra-heavy lift missions.

Lancaster, J. W.↗

Feasibility study of modern airships, phase 1. Volume 3: Historical overview (task 1)

The history of lighter-than-air vehicles is reviewed in terms of providing a background for the mission analysis and parametric analysis tasks. Data from past airships and airship operations are presented in the following areas: (1) parameterization of design characteristics; (2) markets, missions, costs, and operating procedures, (3) indices of efficiency for comparison; (4) identification of critical design and operational characteristics; and (5) definition of the 1930 state-of-the-art and the 1974 state-of-the-art from a technical and economic standpoint.

Faurote, G. L.↗

Feasibility study of modern airships, phase 1, volume 1

The history of the airship is examined from a technical and operational/mission point of view. The impact on a modern airship design by present technology is defined in some selected, representative areas through a comparison between 1930 and 1975 state-of-the-art. A survey of missions with a potential for the airship was made and some viable applications are established. Several concepts of modern airships were taken through a parametric design analysis in the missions previously established, evolving in a new configuration of a hybrid airship - the Helipsoid -, combining static lift and dynamic lift from tilting propeller/rotors and the planform. Cruise speeds in the 150-200 kt (77-103 m/s) will be possible with this configuration with reasonable engine power. The Helipsoid offers at the same time a realistic and practicable solution to the ballast problem, which is inherent in a vehicle generating its lift (fully or partially) from a medium lighter than air.

Joner, B.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 1: Executive summary

A data base for the comparison of advanced energy conversion systems for utility applications using coal or coal-derived fuels was developed. Estimates of power plant performance (efficiency), capital cost, cost of electricity, natural resource requirements, and environmental intrusion characteristics were made for ten advanced conversion systems. Emphasis was on the energy conversion system in the context of a base loaded utility power plant. All power plant concepts were premised on meeting emission standard requirements. A steam power plant (3500 psig, 1000 F) with a conventional coal-burning furnace-boiler was analyzed as a basis for comparison. Combined cycle gas/steam turbine system results indicated competitive efficiency and a lower cost of electricity compared to the reference steam plant. The Open-Cycle MHD system results indicated the potential for significantly higher efficiency than the reference steam plant but with a higher cost of electricity.

Corman, J. C.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 2: Advanced energy conversion systems. Part 1: Open-cycle gas turbines

Ten energy conversion systems are defined and analyzed in terms of efficiency. These include: open-cycle gas turbine recuperative; open-cycle gas turbine; closed-cycle gas turbine; supercritical CO2 cycle; advanced steam cycle; liquid metal topping cycle; open-cycle MHD; closed-cycle inert gas MHD; closed-cycle liquid metal MHD; and fuel cells. Results are presented.

Brown, D. H.↗

Energy Conversion Alternatives Study (ECAS), General Electric Phase 1. Volume 3: Energy conversion subsystems and components. Part 3: Gasification, process fuels, and balance of plant

Results are presented of an investigation of gasification and clean fuels from coal. Factors discussed include: coal and coal transportation costs; clean liquid and gas fuel process efficiencies and costs; and cost, performance, and environmental intrusion elements of the integrated low-Btu coal gasification system. Cost estimates for the balance-of-plant requirements associated with advanced energy conversion systems utilizing coal or coal-derived fuels are included.

Boothe, W. A.↗