Search NASA⌕ Search

SEARCH · Search NASA

Results for “Advanced Baseline Imager”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The Goes-R Geostationary Lightning Mapper (GLM): Algorithm and Instrument Status

The Geostationary Operational Environmental Satellite (GOES-R) is the next series to follow the existing GOES system currently operating over the Western Hemisphere. Superior spacecraft and instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES capabilities include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved capability for the Advanced Baseline Imager (ABI). The Geostationary Lighting Mapper (GLM) will map total lightning activity (in-cloud and cloud-to-ground lighting flashes) continuously day and night with near-uniform spatial resolution of 8 km with a product refresh rate of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency. In parallel with the instrument development (a prototype and 4 flight models), a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms, cal/val performance monitoring tools, and new applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. A joint field campaign with Brazilian researchers in 2010-2011 will produce concurrent observations from a VHF lightning mapping array, Meteosat multi-band imagery, Tropical Rainfall Measuring Mission (TRMM) Lightning Imaging Sensor (LIS) overpasses, and related ground and in-situ lightning and meteorological measurements in the vicinity of Sao Paulo. These data will provide a new comprehensive proxy data set for algorithm and application development.

Goodman, Steven J.↗

The GOES-R GeoStationary Lightning Mapper (GLM)

The Geostationary Operational Environmental Satellite (GOES-R) is the next series to follow the existing GOES system currently operating over the Western Hemisphere. Superior spacecraft and instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES capabilities include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved capability for the Advanced Baseline Imager (ABI). The Geostationary Lighting Mapper (GLM) will map total lightning activity (in-cloud and cloud-to-ground lighting flashes) continuously day and night with near-uniform spatial resolution of 8 km with a product refresh rate of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency among a number of potential applications. In parallel with the instrument development (a prototype and 4 flight models), a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms (environmental data records), cal/val performance monitoring tools, and new applications using GLM alone, in combination with the ABI, merged with ground-based sensors, and decision aids augmented by numerical weather prediction model forecasts. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. An international field campaign planned for 2011-2012 will produce concurrent observations from a VHF lightning mapping array, Meteosat multi-band imagery, Tropical Rainfall Measuring Mission (TRMM) Lightning Imaging Sensor (LIS) overpasses, and related ground and in-situ lightning and meteorological measurements in the vicinity of Sao Paulo. These data will provide a new comprehensive proxy data set for algorithm and application development.

Goodman, Steven J.↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

Bailey, J. C.↗

The Goes-R Geostationary Lightning Mapper (GLM)

The Geostationary Operational Environmental Satellite (GOES-R) is the next series to follow the existing GOES system currently operating over the Western Hemisphere. Superior spacecraft and instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES capabilities include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved storm diagnostic capability with the Advanced Baseline Imager. The GLM will map total lightning activity (in-cloud and cloud-to-ground lighting flashes) continuously day and night with near-uniform spatial resolution of 8 km with a product refresh rate of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms, cal/val performance monitoring tools, and new applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. In this paper we will report on new Nowcasting and storm warning applications being developed and evaluated at various NOAA Testbeds.

Goodman, Steven J.↗

Development of RGB Composite Imagery for Operational Weather Forecasting Applications

The NASA Short-term Prediction Research and Transition (SPoRT) Center, in collaboration with the Cooperative Institute for Research in the Atmosphere (CIRA), is providing red-green-blue (RGB) color composite imagery to several of NOAA s National Centers and National Weather Service forecast offices as a demonstration of future capabilities of the Advanced Baseline Imager (ABI) to be implemented aboard GOES-R. Forecasters rely upon geostationary satellite imagery to monitor conditions over their regions of responsibility. Since the ABI will provide nearly three times as many channels as the current GOES imager, the volume of data available for analysis will increase. RGB composite imagery can aid in the compression of large data volumes by combining information from multiple channels or paired channel differences into single products that communicate more information than provided by a single channel image. A standard suite of RGB imagery has been developed by the European Organization for the Exploitation of Meteorological Satellites (EUMETSAT), based upon the Spinning Enhanced Visible and Infrared Imager (SEVIRI). The SEVIRI instrument currently provides visible and infrared wavelengths comparable to the future GOES-R ABI. In addition, the Moderate Resolution Imaging Spectroradiometer (MODIS) instruments aboard the NASA Terra and Aqua satellites can be used to demonstrate future capabilities of GOES-R. This presentation will demonstrate an overview of the products currently disseminated to SPoRT partners within the GOES-R Proving Ground, and other National Weather Service forecast offices, along with examples of their application. For example, CIRA has used the channels of the current GOES sounder to produce an "air mass" RGB originally designed for SEVIRI. This provides hourly imagery over CONUS for looping applications while demonstrating capabilities similar to the future ABI instrument. SPoRT has developed similar "air mass" RGB imagery from MODIS, and through a case study example, synoptic-scale features evident in single-channel water vapor imagery are shown in the context of the air mass product. Other products, such as the "nighttime microphysics" RGB, are useful in the detection of low clouds and fog. Nighttime microphysics products from MODIS offer some advantages over single-channel or spectral difference techniques and will be discussed in the context of a case study. Finally, other RGB products from SEVIRI are being demonstrated as precursors to GOES-R within the GOES-R Proving Ground. Examples of "natural color" and "dust" imagery will be shown with relevant applications.

Molthan, Andrew L.↗

Comparison Between GOES-12 Overshooting-Top Detections, WSR-88D Radar Reflectivity, and Severe Storm Reports

Studies have found that convective storms with overshooting-top (OT) signatures in weather satellite imagery are often associated with hazardous weather, such as heavy rainfall, tornadoes, damaging winds, and large hail. An objective satellite-based OT detection product has been developed using 11-micrometer infrared window (IRW) channel brightness temperatures (BTs) for the upcoming R series of the Geostationary Operational Environmental Satellite (GOES-R) Advanced Baseline Imager. In this study, this method is applied to GOES-12 IRW data and the OT detections are compared with radar data, severe storm reports, and severe weather warnings over the eastern United States. The goals of this study are to 1) improve forecaster understanding of satellite OT signatures relative to commonly available radar products, 2) assess OT detection product accuracy, and 3) evaluate the utility of an OT detection product for diagnosing hazardous convective storms. The coevolution of radar-derived products and satellite OT signatures indicates that an OT often corresponds with the highest radar echo top and reflectivity maximum aloft. Validation of OT detections relative to composite reflectivity indicates an algorithm false-alarm ratio of 16%, with OTs within the coldest IRW BT range (less than 200 K) being the most accurate. A significant IRW BT minimum typically present with an OT is more often associated with heavy precipitation than a region with a spatially uniform BT. Severe weather was often associated with OT detections during the warm season (April September) and over the southern United States. The severe weather to OT relationship increased by 15% when GOES operated in rapid-scan mode, showing the importance of high temporal resolution for observing and detecting rapidly evolving cloud-top features. Comparison of the earliest OT detection associated with a severe weather report showed that 75% of the cases occur before severe weather and that 42% of collocated severe weather reports had either an OT detected before a severe weather warning or no warning issued at all. The relationships between satellite OT signatures, severe weather, and heavy rainfall shown in this paper suggest that 1) when an OT is detected, the particular storm is likely producing heavy rainfall and/or possibly severe weather; 2) an objective OT detection product can be used to increase situational awareness and forecaster confidence that a given storm is severe; and 3) this product may be particularly useful in regions with insufficient radar coverage.

Dworak, Richard↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment, Operation and Initial Data Analysis

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of the main precipitation systems in Brazil: A contribution to cloud resolving modeling and to the GPM (Global Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luiz do Paraitinga intensive operation period (IOP) in November-December 2011, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sao Luiz do Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sao Jos dos Campos.

Blakeslee, R.↗

NASA/SPoRT's GOES-R Activities in Support of Product Development, Management, and Training

The NASA Short-term Prediction Research and Transition (SPoRT) Center supports many activities within the GOES-R Proving Grounds (PG). These include the development of imagery from existing instrumentation as a proxy to future Advanced Baseline Imager (ABI) capabilities on GOES-R. The Moderate Resolution Imaging Spectroradiometer (MODIS) and the Visible/Infrared Imager/Radiometer Suite (VIIRS) instruments are used to provide a glimpse of the multi-spectral capabilities that will become the norm as the number of channels and data rate dramatically increase with GOES-R. The NOAA/NWS has plans to provide operational users with all ABI channels at the highest resolution. Data fusion of individual channels into composite red, green, and blue imagery products will assist the end user with this future wave of information. While increasing the efficiency in the operational use of ABI channels, these composites provide only qualitative information. Within the GOES-R PG, SPoRT and other partners are exploring ways to include quantitative information as part of the composite imagery. However, limitations in local hardware processing and/or data bandwidth for users of the GOES-R data stream are challenges to overcome. This presentation will discuss the creation of these composite images as well as possible solutions to address these processing challenges. In a similar manner the Geostationary Lightning Mapper (GLM) to be launched on GOES-R presents several data management challenges. The GLM is a pioneering instrument to quantify total lightning from a geostationary platform. The expected data frequency from the GLM is to be at a sub-minute interval. Users of such a data set may have little experience in handling such a rapid update of information. To assist users, SPoRT is working with the NWS to develop tools within the user fs decision support system to allow tracking and analysis of total lightning from a storm-based perspective. This presentation will discuss the challenges and progress of this tool development work. With new data and products comes the need for user Training. Within the GOES-R PG SPoRT is supporting the demonstration of these future products by providing various training materials to end users. A summary of training provided to operational users will be discussed.

Fuell, Kevin K.↗

The GOES-R Geostationary Lightning Mapper (GLM) and the Global Observing System for Total Lightning

for the existing GOES system currently operating over the Western Hemisphere. New and improved instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved temporal, spatial, and spectral resolution for the next generation Advanced Baseline Imager (ABI). The GLM will map total lightning continuously day and night with near-uniform spatial resolution of 8 km with a product latency of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency among a number of potential applications. The GLM will help address the National Weather Service requirement for total lightning observations globally to support warning decision-making and forecast services. Science and application development along with pre-operational product demonstrations and evaluations at NWS national centers, forecast offices, and NOAA testbeds will prepare the forecasters to use GLM as soon as possible after the planned launch and check-out of GOES-R in 2016. New applications will use GLM alone, in combination with the ABI, or integrated (fused) with other available tools (weather radar and ground strike networks, nowcasting systems, mesoscale analysis, and numerical weather prediction models) in the hands of the forecaster responsible for issuing more timely and accurate forecasts and warnings.

Goodman, Steven J.↗

Initial Navigation Alignment of Optical Instruments on GOES-R

Post-launch alignment errors for the Advanced Baseline Imager (ABI) and Geospatial Lightning Mapper (GLM) on GOES-R may be too large for the image navigation and registration (INR) processing algorithms to function without an initial adjustment to calibration parameters. We present an approach that leverages a combination of user-selected image-to-image tie points and image correlation algorithms to estimate this initial launch-induced offset and calculate adjustments to the Line of Sight Motion Compensation (LMC) parameters. We also present an approach to generate synthetic test images, to which shifts and rotations of known magnitude are applied. Results of applying the initial alignment tools to a subset of these synthetic test images are presented. The results for both ABI and GLM are within the specifications established for these tools, and indicate that application of these tools during the post-launch test (PLT) phase of GOES-R operations will enable the automated INR algorithms for both instruments to function as intended.

geolocation↗

GOES-R L1b Readiness Implementation and Management Plan

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation Readiness↗

Development of Level 2 Calibration and Validation Plans for GOES-R; What is a RIMP?

Calibration and Validation (CalVal) plans for Geostationary Operational Environmental Satellite version R (GOES-R) Level 2 (L2) products were documented via Resource, Implementation, and Management Plans (RIMPs) for all of the official L2 products required from the GOES-R Advanced Baseline Imager (ABI). In 2015 the GOES-R program decided to replace the typical CalVal plans with RIMPs that covered, for a given L2 product, what was required from that product, how it would be validated, and what tools would be used to do so. Similar to Level 1b products, the intent was to cover the full spectrum of planning required for the CalVal of L2 ABI products. Instead of focusing on step-by-step procedures, the RIMPs concentrated on the criteria for each stage of the validation process (Beta, Provisional, and Full Validation) and the many elements required to prove when each stage was reached.

Validation↗

Development of Level 2 Calibration and Validation Plans for GOES-R; What is a RIMP?

Calibration and Validation (CalVal) plans for Geostationary Operational Environmental Satellite version R (GOES-R) Level 2 (L2) products were documented via Resource, Implementation, and Management Plans (RIMPs) for all of the official L2 products required from the GOES-R Advanced Baseline Imager (ABI). In 2015 the GOES-R program decided to replace the typical CalVal plans with RIMPs that covered, for a given L2 product, what was required from that product, how it would be validated, and what tools would be used to do so. Similar to Level 1b products, the intent was to cover the full spectrum of planning required for the CalVal of L2 ABI products. Instead of focusing on step-by-step procedures, the RIMPs concentrated on the criteria for each stage of the validation process (Beta, Provisional, and Full Validation) and the many elements required to prove when each stage was reached.

Validation↗

An Overview of the Design and Development of the Geostationary Operational Environmental Satellite R-Series (GOES-R) Space Segment

The first of the National Oceanic and Atmospheric Administration (NOAA) Geostationary Operational Environmental Satellite R-series (GOES-R) satellites was launched in November 2016. GOES-R has been developed by NOAA in partnership with the National Aeronautics and Space Administration (NASA). The satellite represents a quantum leap in the state of the art for geostationary weather satellites by providing data from a suite of six new instruments. All instruments were developed expressly for this mission, and include two Earth-observing instruments (the Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM)), two solar-viewing instruments (Solar Ultraviolet Imager (SUVI) and Extreme ultraviolet and X-ray Irradiance Sensors (EXIS)) and two in situ instruments (Space Environment In-Situ Suite (SEISS) and a magnetometer pair). In addition to hosting the instruments, GOES-R also accommodates several communication packages designed to collect and relay data for weather forecasting and emergency management. Accommodating the six instruments and four communication payloads imposed challenging and competing constraints on the satellite, including requirements for extremely stable earth and solar pointing, high-speed and nearly error-free instrument data transmission, and a very quiet electromagnetic background. To meet mission needs, GOES-R employed several technological innovations, including low-thrust rocket engines that allow instrument observations to continue during maneuvers, and the first civilian use of Global Positioning System-based orbit determination in geostationary orbit. This paper will provide a brief overview of the GOES-R satellite and its instruments as well as the developmental challenges involved in accommodating the instruments and communications payloads.

SUVI↗

An Overview of the Design and Development of the GOES R-Series Space Segment

The first of the National Oceanic and Atmospheric Administration (NOAA) Geostationary Operational Environmental Satellite R-series (GOES-R) satellites was launched in November 2016. GOES-R has been developed by NOAA in partnership with the National Aeronautics and Space Administration (NASA). The satellite represents a quantum leap in the state of the art for geostationary weather satellites by providing data from a suite of six new instruments. All instruments were developed expressly for this mission, and include two Earth-observing instruments (the Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM)), two solar-viewing instruments (Solar Ultraviolet Imager (SUVI) and Extreme ultraviolet and X-ray Irradiance Sensors (EXIS)) and two in situ instruments (Space Environment In-Situ Suite (SEISS) and a magnetometer pair). In addition to hosting the instruments, GOES-R also accommodates several communication packages designed to collect and relay data for weather forecasting and emergency management. Accommodating the six instruments and four communication payloads imposed challenging and competing constraints on the satellite, including requirements for extremely stable earth and solar pointing, high-speed and nearly error-free instrument data transmission, and a very quiet electromagnetic background. To meet mission needs, GOES-R employed several technological innovations, including low-thrust rocket engines that allow instrument observations to continue during maneuvers, and the first civilian use of Global Positioning System-based orbit determination in geostationary orbit. This paper will provide a brief overview of the GOES-R satellite and its instruments as well as the developmental challenges involved in accommodating the instruments and communications payloads.

GOES-16↗

GOES-16 ABI Navigation Assessment

The US Geostationary Operational Environmental Satellite – R Series (GOES-R) was launched on November 19, 2016and was designated GOES-16 upon reaching geostationary orbit ten days later. After checkout and calibration, GOES-16 was relocated to its operational location of 75.2 degrees west and officially became GOES East on December 18, 2017. The Advanced Baseline Imager (ABI) is the primary instrument on the GOES-R series for imaging Earth's surface and atmosphere to significantly improve the detection and observation of severe environmental phenomena. A team supporting the GOES-R Flight Project at NASA's Goddard Space Flight Center developed algorithms and software for independent verification of ABI Image Navigation and Registration (INR), which became known as the INR Performance Assessment Tool Set (IPATS). In this paper, we will briefly describe IPATS on top concept level, and then introduce the Landsat chips, chip registration algorithms, and how IPATS measurements are filtered. We present GOES-16 navigation (NAV) errors from flight data from January 2017 to May 2018. The results show a) IPATS characterized INR variations throughout the post-launch test phase; and b) ABI INR has improved over time as post-launch tests were performed and corrections applied. Finally, we will describe how estimated NAV errors have been used to assess and understand satellite attitude anomalies and scale errors etc. This paper shows that IPATS is an effective tool for assessing and improving GOES-16 ABI INR and is also useful for INR long-term monitoring.

GOES-R↗

In-Flight Line-Of-Sight Pointing Performance for the GOES-16 and GOES-17 Spacecraft

The Geostationary Operational Environmental Satellite-R program (GOES-R) has launched two of the next generation geostationary weather satellites, both of which are now fully operational. GOES-16 launched in November 2016, and GOES-17 launched in March 2017. In this paper, we present the pointing and pointing stability results of the two spacecraft, with specific focus on aspects of the design related to mitigating jitter. The flight instrument suite includes 6 seismic accelerometers sampled at approximately 2 kilohertz, allowing in-flight verification of pointing stability and comparison back to simulation predictions. This paper compares the observed flight results with the simulation predictions for acceleration and shock response spectrum (SRS) for various operational scenarios and instrument observation modes. Passive isolation of both the reaction wheels and the payload deck have proved to be effective in reducing jitter responses. Active Vibration Damping (AVD) of flexible-body modes attenuates the low frequency motion of the vehicle appendages, improving the low-frequency pointing performance. Knowledge of the instrument scan mirror motion is fed forward to the reaction wheel control, reducing disturbances on the spacecraft bus. Attitude knowledge and rate data are provided to the primary Earth-observing instrument with an accuracy defined by the Integrated Rate Error (IRE) requirements. The data are used to adjust instrument scanning. As we show in this paper, the in-flight performance of the GN&C (Guidance, Navigation and Control) design provides the necessary capabilities to achieve the demanding GOES-R mission objectives while its robustness enabled the simultaneous operation of the Advanced Baseline Imager (ABI) prime and redundant cryocoolers (CCs) to resolve an in-flight cooling anomaly on GOES-17.

Line-of-Sight↗

GOES-16 and GOES-17 ABI INR Assessment

The first two satellites of the US Geostationary Operational Environmental Satellite R-Series (GOES-R) were launched on November 19, 2016 and March 1, 2018 respectively. GOES-16 officially became GOES East on December 18, 2017, and the designation of GOES-17 as GOES West occurred on February 12 2019. The Advanced Baseline Imager (ABI) is the primary instrument on GOES-16 and GOES-17 for imaging Earth’s surface and atmosphere to significantly improve the detection and observation of severe environmental phenomena. The Image Navigation and Registration (INR) Performance Assessment Tool Set (IPATS) was developed to assess INR performance of GOES-R series ABI images. In this paper, we first describe the assessment of IPATS algorithm accuracy. Next, we present the relationship between view zenith angle (VZA) and the quality of the IPATS measurements. Lastly, we present GOES-16 and GOES-17 navigation (NAV) assessments results from flight data spanning from the start of INR assessment to June 2019. The results show a) IPATS “stair step” measurement error is less or equal to 0.06 ABI pixel with IPATS baseline configuration; b) VZA is an effective filter to exclude outliers of the measurements; and c) ABI INR for both satellites has improved over time as post-launch tests (PLT) were performed and corrections applied. This paper also shows that the post-launch INR tuning of GOES-17 was much shorter than GOES-16.

GOES-17↗