Search NASA⌕ Search

SEARCH · Search NASA

Results for “Alignment plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Analysis of Mars 2020 Perseverance Entry, Descent, and Landing Attitude Initialization Performance

The Mars 2020 Perseverance rover successfully landed at Jezero Crater on February 18, 2021. To perform this feat, the entry, descent, and landing navigation filter must be initialized with an estimate of the spacecraft state, which includes attitude from the cruise attitude control subsystem. Accuracy of this initial attitude estimate has an impact on important metrics such as touchdown velocity. This paper presents a post-landing reconstruction of the attitude initialization error budget, showing that the requirement of 0.15 deg ($3\sigma$, per axis) was met. Each error source is described and analyzed, including flight telemetry where possible. Analysis of the error budget shows that it is driven by systematic sun sensor errors, star-scanner-to-sun-sensor alignment stability, and inertial-measurement-unit-to-sun-sensor alignment stability. Finally, a contingency plan to initialize the navigation filter in the event of a star scanner failure is presented. While this plan was not needed in flight, results indicate that the attitude initialization requirement could have still been met in this off-nominal scenario.

Lo, Kevin D.↗

Development of Flight Slit-Jaw Optics for Chromospheric Lyman-Alpha SpectroPolarimeter

In sounding rocket experiment CLASP, I have placed a slit a mirror-finished around the focal point of the telescope. The light reflected by the mirror surface surrounding the slit is then imaged in Slit-jaw optical system, to obtain the a-ray Lyman secondary image. This image, not only to use the real-time image in rocket flight rocket oriented direction selection, and also used as a scientific data showing the spatial structure of the Lyman alpha emission line intensity distribution and solar chromosphere around the observation area of the polarimetric spectroscope. Slit-jaw optical system is a two off-axis mirror unit part including a parabolic mirror and folding mirror, Lyman alpha transmission filter, the optical system magnification 1x consisting camera. The camera is supplied from the United States, and the other was carried out fabrication and testing in all the Japanese side. Slit-jaw optical system, it is difficult to access the structure, it is necessary to install the low place clearance. Therefore, influence the optical performance, the fine adjustment is necessary optical elements are collectively in the form of the mirror unit. On the other hand, due to the alignment of the solar sensor in the US launch site, must be removed once the Lyman alpha transmission filter holder including a filter has a different part from the mirror unit. In order to make the structure simple, stray light measures Aru to concentrate around Lyman alpha transmission filter. To overcome the difficulties of performing optical alignment in Lyman alpha wavelength absorbed by the atmosphere, it was planned 'following four steps in order to reduce standing time alignment me. 1. is measured in advance refractive index at Lyman alpha wavelength of Lyman alpha transmission filter (121.567nm), to prepare a visible light Firuwo having the same optical path length in the visible light (630nm).2. The mirror structure CLASP before mounting unit standing, dummy slit and camera standing prescribed position in leading frame is, to complete the internal alignment adjustment. 3. CLASP structure F mirror unit and by attaching the visible light filter, as will plague the focus is carried out in standing position adjustment visible flight products camera. 4. Replace the Lyman alpha transmission filter, it is confirmed by Lyman alpha wavelength (under vacuum) the requested optical performance have come. Currently, up to 3 of the steps completed, it was confirmed in the visible light optical performance that satisfies the required value sufficiently extended. Also, put in Slit-jaw optical system the sunlight through the telescope of CLASP, it is also confirmed that and that stray light rejection no vignetting is in the field of view meets request standing.

chromospheric↗

Development of Flight Slit-Jaw Optics for Chromospheric Lyman-Alpha SpectroPolarimeter

In sounding rocket experiment CLASP, I have placed a slit a mirror‐finished around the focal point of the telescope. The light reflected by the mirror surface surrounding the slit is then imaged in Slit‐jaw optical system, to obtain the alpha‐ray Lyman secondary image. This image, not only to use the real‐time image in rocket flight rocket oriented direction selection, and also used as a scientific data showing the spatial structure of the Lyman alpha emission line intensity distribution and solar chromosphere around the observation area of the polarimetric spectroscope. Slit‐jaw optical system is a two off‐axis mirror unit part including a parabolic mirror and folding mirror, Lyman alpha transmission filter, the optical system magnification 1x consisting camera. The camera is supplied from the United States, and the other was carried out fabrication and testing in all the Japanese side. Slit‐jaw optical system, it is difficult to access the structure, it is necessary to install the low place clearance. Therefore, influence the optical performance, the fine adjustment is necessary optical elements are collectively in the form of the mirror unit. On the other hand, due to the alignment of the solar sensor in the US launch site, must be removed once the Lyman alpha transmission filter holder including a filter has a different part from the mirror unit. In order to make the structure simple, stray light measures Aru to concentrate around Lyman alpha transmission filter. To overcome the difficulties of performing optical alignment in Lyman alpha wavelength absorbed by the atmosphere, it was planned following four steps in order to reduce standing time alignment me. 1: is measured in advance refractive index at Lyman alpha wavelength of Lyman alpha transmission filter (121.567nm), to prepare a visible light Firuwo having the same optical path length in the visible light (630nm). 2: The mirror structure CLASP before mounting unit standing, dummy slit and camera standing prescribed position in leading frame is, to complete the internal alignment adjustment. 3: CLASP structure F mirror unit and by attaching the visible light filter, as will plague the focus is carried out in standing position adjustment visible flight products camera. 4: Replace the Lyman alpha transmission filter, it is confirmed by Lyman alpha wavelength (under vacuum) the requested optical performance have come. Currently, up to 3 of the steps completed, it was confirmed in the visible light optical performance that satisfies the required value sufficiently extended. Also, put in Slit‐jaw optical system the sunlight through the telescope of CLASP, it is also confirmed that and that stray light rejection no vignetting is in the field of view meets request standing.

Kubo, Masahito↗

Coordinated Natural Gas and Electric Planning: Case Studies of Current Approaches and Practices

This paper examines how natural gas and electric utilities across eight U.S. states and two Canadian provinces are beginning to coordinate historically separate planning processes in response to growing system interdependencies, policy mandates, aging infrastructure, and changing customer energy choices. Electricity planning has long relied on robust integrated resource planning frameworks that weigh numerous objectives, risks, and costs. Natural gas planning, on the other hand, is typically less transparent and more narrowly focused on safety and system integrity. As economic, reliability, and policy drivers place new and shared demands on both systems, jurisdictions and utilities are experimenting with approaches such as coordinated forecasting, non pipeline alternatives, and combined planning pilots. A few have issued regulatory or statutory directives for greater data sharing and methodological alignment. Case studies from British Columbia, California, Colorado, Illinois, Massachusetts, Minnesota, New York, Québec, Rhode Island, and Washington illustrate a wide range of approaches to rethinking siloed planning. The paper identifies several common themes across the jurisdictions examined. It provides observations on the methods, processes, and organizational steps that may be needed in the future to address the challenges being faced by states and utilities. Lastly, it identifies some initial steps that states and utilities can consider if they would like to pursue more integrated, cost-effective, policy-aligned energy system planning.

03 NATURAL GAS↗

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

The Department of Energy and IDEA team up to document industry best practices

This article describes a collaboration between the U.S. Department of Energy and the International District Energy Association (IDEA) to document best practices in district energy systems. The initiative focuses on analyzing real-world performance data and highlighting effective strategies for improving efficiency, integrating renewable energy, and supporting decarbonization efforts. It highlights case studies from the University of California, Davis, and Princeton University to show how long-term master planning, phased project implementation, and strong financial analysis can drive successful transitions to more sustainable energy systems. U.C. Davis emphasizes incremental, results-driven planning and pilot projects, while Princeton focuses on aligning climate goals with financially viable infrastructure investments and life-cycle cost analysis. Overall, the article demonstrates that combining strategic planning, data-driven decision-making, and financial accountability is essential for advancing sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Software Quality Assurance Plan: Cardinal

The Cardinal Software Quality Assurance (SQA) Program aims to provide the controls and processes necessary to enable continuous, high-quality software development while meeting user and program sponsor requirements. This SQA Plan (SQAP) delineates the SQA Program framework for Cardinal by describing the Program activities, organization, and documentation, and by clearly defining the interconnection of all Program items. It should be noted that this SQAP is aligned with the current version of the Argonne Quality Assurance Program Plan, which was designed to align with DOE O 414.1D. This SQAP is also aligned with the revision 10 of the SQAP for MOOSE and MOOSE-based applications.

97 MATHEMATICS AND COMPUTING↗

An agentic artificially intelligent X-ray scientist

Executing experimental tasks in both normal research laboratories and large-scale scientific facilities often requires extensive human supervision and remains a key challenge on the path to fully autonomous, artificial intelligence (AI)-driven science. Here we demonstrate a large language model-driven agent that autonomously performs X-ray sample alignment on a synchrotron beamline by planning actions, executing instrumental commands, interpreting observations and iterating towards experimental goals. Based on existing large language models with structured tool-use via the model context protocol, our AI X-ray scientist was guided and tested using an in-house-built virtual experimental setup that mirrors a six-circle diffractometer at an operational synchrotron beamline. The agentic workflow developed in the virtual environment was directly deployed on a real beamline, where it correctly identified reference reflections and determined the orientation matrix, an essential first step in any type of single-crystal scattering experiment. Our AI X-ray scientist responded effectively to unexpected experimental conditions, demonstrating adaptive problem-solving and readiness for addressing practical experimental situations. Our study provides a step towards autonomous operation across diverse experimental environments at large-scale scattering facilities.

Chen, Zhantao (ORCID:0000000319543868)↗

Electric Vehicle Charging Demand in the Chicago Metropolitan Area through 2030

This report outlines the collaborative efforts between Argonne National Laboratory and Exelon in advancing the Agent-Based Transportation Energy Analysis Model (ATEAM). Aligning with ComEd’s beneficial electrification plan, this study developed eight scenarios to access the temporal and spatial distribution of charging load and demand stemming from the widespread adoption of battery electric vehicles (BEV) adoption, augmented public charging infrastructure deployment, and increased multi-unit dwelling (MUD) charging availability. Enhancements to the ATEAM model encompassed the simulation of multiple days of travel behavior, estimation of total public charging infrastructure needs, user interface refinements, and output tracking at both vehicle and charging station levels. The total electricity consumption for residential and public charging to support over 800,000 BEVs in Chicago in 2029 is projected at approximately 10.2 GWh. Enhanced MUD home charging accessibility (70%) amplifies the home charging load in the study area by 1.5% compared to the baseline scenario (10%). The widespread adoption of BEVs reduces peak charging loads, owing to their inclusion across households with diverse income levels, thus fostering a more dispersed charging activity pattern. However, widespread BEV adoption increases the peak home charging load in areas with lower median household incomes, reflecting a higher BEV concentration in these locales and, subsequently, heightened peak charging demands. In the Widespread BEV adoption scenario, fewer census tracts exhibit elevated peak loads for combined home and public charging, indicating a more even distribution of charging demand across the study area. Predominantly, peak loads for combined charging—both home and public— occur between 2 p.m. and 10 p.m. across all scenarios, encompassing the majority of census tracts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The in-flight calibration of the Hubble Space Telescope fine guidance sensors

The Hubble Space Telescope (HST) fine guidance sensors are unique in the precision and performance levels being attempted; spacecraft control and astrometric research at the near milliarcsecond level are the ultimate goals. The inflight calibration of the sensors is presented, describing both the algorithms being used as well as the results achieved to date. The calibration items of principal interest are optical distortion, sensor magnification, and relative alignments. Calibration accuracies at the 20 milliarcsecond level have been achieved for specific data sets for optical distortion parameters. Unexpected variations occurring from Dec. 1990 - May 1991 in the magnification and alignment parameters are currently under investigation. Plans are being developed for new data acquisitions and reductions that should substantially improve HST pointing performance.

Welter, G. L.↗

Optical testing

Optical testing is one of the most vital elements in the process of preparing an optical instrument for launch. Without well understood, well controlled, and well documented test procedures, current and future mission goals will be jeopardized. We should keep in mind that the reason we test is to provide an opportunity to catch errors, oversights, and problems on the ground, where solutions are possible and difficulties can be rectified. Consequently, it is necessary to create tractable test procedures that truly provide a measure of the performance of all optical elements and systems under conditions which are close to those expected in space. Where testing is not feasible, accurate experiments are required in order to perfect models that can exactly predict the optical performance. As we stretch the boundaries of technology to perform more complex space and planetary investigations, we must expand the technology required to test the optical components and systems which we send into space. As we expand the observational wavelength ranges, so must we expand our range of optical sources and detectors. As we increase resolution and sensitivity, our understanding of optical surfaces to accommodate more stringent figure and scatter requirements must expand. Only with research and development in these areas can we hope to achieve success in the ever increasing demands made on optical testing by the highly sophisticated missions anticipated over the next two decades. Technology assessment and development plan for surface figure, surface roughness, alignment, image quality, radiometric quantities, and stray light measurement are presented.

Wyant, James↗

Controlling Rapid Change Through Systems Engineering the Organization

A new approach to change management has been developed and applied at the Jet Propulsion Laboratory (JPL). It's main focus is on aligning the organization with the strategic plan; and understanding the internal organizational relationships that impact change, which ultimately determine an organizations ability to be transformed and renewed The new approach regards the strategic plan of a company as the standard by which progress and achievement are measured. Purposeful interventions should generate a company movement along a strategic course, and tracking that movement is essential for managing change. This paper presents an overview of DYNOMO, or the DYNamic Organizational MOdel which was developed to assist in the measurement and analysis of organizational state. The paper concludes with summaries of two applications.

Hihn, Jairus↗

Humanoids for lunar and planetary surface operations

This paper presents a vision of humanoid robots as human's key partners in future space exploration, in particular for construction, maintenance/repair and operation of lunar/planetary habitats, bases and settlements. It integrates this vision with the recent plans, for human and robotic exploration, aligning a set of milestones for operational capability of humanoids with the schedule for the next decades and development spirals in the Project Constellation. These milestones relate to a set of incremental challenges, for the solving of which new humanoid technologies are needed. A system of systems integrative approach that would lead to readiness of cooperating humanoid crews is sketched. Robot fostering, training/education techniques, and improved cognitive/sensory/motor development techniques are considered essential elements for achieving intelligent humanoids. A pilot project in this direction is outlined.

information fusion↗

Humanoids in Support of Lunar and Planetary Surface Operations

This paper presents a vision of humanoid robots as human's key partners in future space exploration, in particular for construction, maintenance/repair and operation of lunar/planetary habitats, bases and settlements. It integrates this vision with the recent plans for human and robotic exploration, aligning a set of milestones for operational capability of humanoids with the schedule for the next decades and development spirals in the Project Constellation. These milestones relate to a set of incremental challenges, for the solving of which new humanoid technologies are needed. A system of systems integrative approach that would lead to readiness of cooperating humanoid crews is sketched. Robot fostering, training/education techniques, and improved cognitive/sensory/motor development techniques are considered essential elements for achieving intelligent humanoids. A pilot project using small-scale Fujitsu HOAP-2 humanoid is outlined.

imitation↗

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

A Proposed Approach for Prioritizing Maintenance at NASA Centers

The National Aeronautics and Space Administration (NASA) manages a vast array of infrastructure assets across ten National Centers with a worth of at least 30 billion dollars. Eighty percent of this infrastructure is greater than 40 years old and is in degraded condition. Maintenance budgets are typically less than one percent of current replacement value (CRV), much less than the 2-4% recommended by the National Research Council. The maintenance backlog was 2.55 billion dollars in FY10 and growing. NASA s annual budgets have flattened and are at risk of being reduced, so the problem is becoming even more difficult. NASA Centers utilize various means to prioritize and accomplish maintenance within available budgets, though data is suspect and processes are variable. This paper offers a structured means to prioritize maintenance based on mission criticality and facility performance (ability of the facility to deliver on its purpose). Mission alignment is assessed using the current timeframe Mission Dependence Index and a measure of facility alignment with the 2011 NASA Strategic Plan for the long-term perspective. Facility performance is assessed by combining specific findings from a structured facility condition assessment and an assessment of actual functional output. These are then combined in a matrix to identify the facilities most critical to mission and able to deliver services. The purpose of this approach is to provide the best benefits for the available funding. Additionally, this rationale can also be applied to the prioritization of investment (recapitalization) projects so that the ultimate customers of this paper, the senior infrastructure managers at each NASA Center, are better able to strategically manage their capabilities.

Dunn, Steven C.↗

Technology Alignment and Portfolio Prioritization (TAPP)

Technology Alignment and Portfolio Prioritization (TAPP) is a method being developed by the Advanced Concepts Office, at NASA Marshall Space Flight Center. The TAPP method expands on current technology assessment methods by incorporating the technological structure underlying technology development, e.g., organizational structures and resources, institutional policy and strategy, and the factors that motivate technological change. This paper discusses the methods ACO is currently developing to better perform technology assessments while taking into consideration Strategic Alignment, Technology Forecasting, and Long Term Planning.

Funaro, Gregory V.↗